HomeMy WebLinkAbout821 Cowan Road - Resolution< �
RECORDING REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL TO:
PLANNING DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94n 1 a
---- --_ --- --
_ _ - - _ ___.
�
2005-046446
08:43am 03/24/05 R1 Fee: NO FEE
Count af pages 13
' Recorded in Official Records ,
, Gounty of 5an Mateo
Warr�n Slocum
� Assessor-County Clerk-Recorder
' �� � � � �� � �� �� � :' �� �` ��:'� 1'CI I" : I i'� l�i I I ��I II' I I III
x � �`J � �� 0 4 6 4 4 b A R*
RESOLUTION NO. 021-2005
821 COWAN ROAD: APN: 024-401-560
TITLE OF DOCUMENT
13�•
.
��
APR 1 � 2005
CITY OF BURUNGqME
PLANNING DEP7;
I hereby certify this to be a full, true
and correct copy of the document it purports
to be, the original of which is on file in my office.
Date: 03/15/2005
�
Margaiet nroe, Ci Planner
RESOLUTION 021-2005
RESOLUTION APPROVING NIIT�GATED NEGATIVE DECLARATION,
CONDITIONAL USE PERMITS, PARHING AND SIDE SETBACK VARIANCES
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a mitigated negative-d�claration has been proposed and application has been made
for conditional use t�ermits to exceed the Specif c Area Plan land use densitv and to vary from
the desig�guidelines for Bayfront Develo mp ent, parking variance for aisle width and side
setback variance for a first floor remodel and second floor addition to an existin�
office/warehouse buildin� at 821 Cowan Road zoned O-M Konstantinos Dokos P O Box 125
Millbrae, CA, 94030, propertv owner, APN: 024-401-560;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on
February 28, 2005, at which time it reviewed and considered the staff report and all other written
materials and testimony presented at said hearing;
NOW; THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
1.• On the basis of the Initial Study and the documents submitted and reviewed, and
comments received and addressed by this commission; it is hereby found that there is no
substantial evidence that the project set forth above will have a significant effect on the
environment, and mitigated negative declaration, per Mitigated Negative Declaration No.
ND-536P, is hereby approved.
2. Said mitigated negative declaration, conditional use pertnits, parking and side setback
variances are approved, subject to the conditions set forth in Exhibit "A" attached hereto.
Findings for such mitigated negative declaration, conditional use permits, parking and
side setback variances are as set forth in the minutes and recording of said meeting.
3. It is fiirther directed that a certified copy of this resolution be recorded in the official
records of the County of San Mateo.
� s e
Ch uman
I, IM�GH,rka� A eo�•1+�0.k� l , Secretary of the Planning Commission of the City of
Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a
regular meeting of the Planning Commission held on the 28th day of Februarv, 2005, by the
following vote:
AYES: COMMISSIONERS: Auran, Bojues, Brownrigg, Keighran, Osterling
NOES: COMMISSIONERS: Vistica s
ABSENT: COMMISSIONERS: NONE ���
Secreta
ABSTAIN: COMMISSIONERS: NONE
EXHIBIT "A"
Conditions of approval for mitigated negative declaration, conditional use permits, parking and
side setback variances.
821 Cowan Road
Effective March 10, 2005
1. that the project shall be built as shown on the plans submitted to the Planning Deparhnent
date stamped February 4, 2005, sheets T.1, L.1, T.2, A.1 through A.7 and Plat of Survey;
2. that a seating area, to be architectural compatible with the building, shall be designed at
the front entrance to the building;
3. that vines, to grow along the front wall of the building, shall be planted and maintained
by the property owner;
4. that the windows and window trim shall be installed as shown on the detail, date stamped
February 4, 2005;
5. that the parking variance shall only apply to this building and shall become void if the
building is ever expanded, demolished or destroyed by catastrophe or natural disaster or
for intentional replacement;
6. that the conditions of the City Engineer's and Fire Marshal's June 1, 2004, memos, the
Chief Building Official's February 9, 2005, and June 4, 2004, memos, the Recycling
Specialist's June 2, 2004, memo and the NPDES Coordinator's January 31, 2005, memo
shall be mei;
7. that payment of a Bayfront Development fee to the City of Burlingame for traffic impacts
in the Inner Bayshore and Shoreline areas shall be required to mitigate cumulative
impacts of this and other proj ects on area circulation, one-half of the fee is due at the time
of planning application and one-half due before the final framing inspection;
8. that one-way directional signage shall be installed and painted throughout the parking
area to clearly define the vehicular direction for employees and visitors to the site; prior
to issuance of a building permit, the applicant/property owner shall work with the City's
traffic engineer to determine the required signage and markings on the pavement to
clearly identify the on-site vehicular direction;
9. that the driveway aisles in front of the roll-up doors at the rear of the building and in the
parking area shall be rnaintained clear and trucks shall not be stored or parked in the
driveway aisles;
10. that the paved area adjacent to parking space #15 shall be painted "No Parking" to
provide a clear, unobstructed back-up area for the disabled-accessible parking spaces;
EXHIBIT "A"
Conditions of approval for mitigated negative declaration, conditional use permits, parking and
side setback variances.
821 Cowan Road �
Effective March 10, 2005
page 2
1 l. that the 53 on-site parking spaces shall be used only for the customers and employees of
the businesses at this site and shall not be leased or rented for storage of automobiles
either by businesses on this site or by other businesses for off-site parking;
12. that the landscaping noted on sheet L.1 shall be installed according to plan and shall be
irrigated with an automatic irrigation system; landscaping that does not survive on the
site shall be immediately replaced with an equivalent species;
13. that the property
Conservat�on Plan
application;
owner shall provide a complete Irrigation Water Management
together with landscape and irrigation plans at time of permit
14. that the office/warehouse building shall be built so that the interior noise level in all areas
used as office does not exceed 45 dBa;
15. that all construction shall abide by the construction hours established in the City of
Burlingame Municipal Code, and shall occur only between the hours of 7:00 a.m. and
7:00 p.m. on weekdays, 9:00 a.m. and 6:00 p.m. on Saturdays, and 10:00 a.m. and 6:00
p.m. on Sundays and holidays;
16.
17.
18.
19.
that on-site illumination shall be shielded and directed only on to the site in compliance
with the City's exterior illumination ordinance;
that all parking areas should be lit for safety at night, such lighting should comply with
the requirements of the City's exterior illumination ordinance;
that the remodel/addition shall not be built with a reflective exterior finish;
that the project shall obtain necessary permits to meet the standards of the required
pernutting agencies including: Bay Area Air Quality Management District;
20. that the proj ect design shall conform to all seismic related requirements of the latest
edition of the California Building Code as amended by the City of Burlingame in effect at
the time a building permit is issued and any additional seismic requirements established
by the State Architect's office;
21. that all construction shall be required to be done in accordance with the California
Building Code requirements, 2001 edition, as amended by the City of Burlingame, and in
addition to the limitations of hours of construction imposed by the City of Burlingame
Municipal Code (CS 18.08.035);
EXHIBIT "A"
Conditions of approval for mitigated negative declaration, conditional use permits, parking and
side setback variances.
821 Cowan Road
Effective March 10, 2005
page 3
22. that all new utility connections to serve the site and which are affected by the
developmPnt shall be installed to meet current code standards and diameter; existing
sewer laterals shall be checked and replaced if necessary;
23. that water and sewer lines shall be constructed from flexible material with flexible
connections with the degree of flexibility established by the City Engineer and with his
approval and inspection;
24. that in the event that there is subsidence as the result of an earthquake, the site shall be
repaired as approved by the City Engineer;
25. that all site and roof drainage shall be directed to the street frontage;
26. that low flow plumbing fixtures shall be installed and City water conservation
requirements shall be met at all times, including special additional emergency
requirements;
27. that the grading plan shall be prepared by a licensed Civil Engineer and approved by the
City Engineer. All applicable requirements of the NPDES permit for the site shall be
adhered to in the design and during construction;
28. that if con�truction is done during the wet season (October 15 through April 15), that
prior to October 15 the developer shall implement a winterization program to minimize
the potential for erosion and polluted runoff by inspecting, maintaining and cleaning all
soil erosion and sediment control prior to, during, and immediately after each storm
even; stabilizing disturbed soils throughout temporary or permanent seeding, mulching
matting, or tarping; rocking unpaved vehicle access to limit dispersion of mud onto
public right-of-way; covering/tarping � stored construction materials, fuels and other
chemicals;
29. that all applicable San Mateo County Stormwater Pollution Prevention Program Best
Management Practices shall be adhered to in the design and during construction,
including stabilizing areas denuded due to construction prior to the wet season; erosion
shall be controlled during and after construction to protect San Francisco Bay waters;
EXHIBIT "A"
Conditions of approval for mitigated negative declaration, conditional use permits, parking and
side setback variances.
821 Cowan Road
Effective March 10, 2005
page 4
30. that the applicant shall submit an erosion and sedimentation control plan describing
BMPs (Best Management Practices) to be used to prevent soil, dirt and debris from
entering the storm drain system; the plan shall include a site plan showing the property
lines, existing and proposed topography and slope; areas to be disturbed, locations of
cut/fill and soil storage/disposal areas; areas with existing vegetation to be protected;
existing and proposed drainage patterns and structures; watercourse or sensitive areas on-
site or immediately downstream of a project; and designated construction access routes,
staging areas and washout areas;
31. that the erosion and sedimentation control plans should include notes, specifications,
and/or attachments describing the construction operation and maintenance of erosion and
sediment control measures, including inspection frequency; methods and schedule for
grading, excavation, filling clearing of vegetative cover and mulch, including methods
and schedu�es for planting and fertilization; and provisions for temporary and permanent
irrigation;
32. that all runoff created during construction and future discharge from the site shall be
required to meet the applicable San Mateo County Stormwater Pollution Prevention
Program Best Management Practices for surface water runoff and Storm Drain
maintenance;
33. that all runoff in the parking lot, including runoff from the landscaped areas, shall be
filtered to remove oil and grease prior to discharge by a method approved by the City
Engineer and such facilities shall be installed and maintained by the property owner,
failure to maintain such filters and facilities in working conditions shall cause this
conditional use permit to be called up for review, all costs for the annual or more frequent
inspection and enforcement of this condition shall be paid for by this project's property
owner;
34. that the phrase "No Dumping-Drains To Bay" shall be labeled on new storm drain inlets
by stenciling, branding, plaguing or casting;
35. that grading shall be done so that impacts from erosion and runoff into the storm drain
will be minimal;
36. that each storm water inlet on the site shall be equipped with a sand/oil separator; all
sand/oil separators shall be inspected and serviced on a regular basis, and immediately
following periods of heavy rainfall, to ascertain the conditions of the chambers;
maintenance records shall be kept on-site and maintenance shall be as directed by the
City; �
EXHIBIT "A"
Conditions of approval for mitigated negative declaration, conditional use permits, parking and
side setback variances.
821 Cowan Road
Effective March 10, 2005
page 5
37. that drainage from paved surfaces, including parking lots, driveways and roofs shall be
routed to storm water inlets equipped with sand/oil-separators and/or fossil filters, then
the water shall be discharged into the storm drain system; the property owners shall be
responsible for inspecting and cleaning (vacuuming out) sandloil separators and changing
fossil filters on a regular basis as well as immediately prior to, and once during, the rainy
season (Oc��ber 15 — April 1) and as directed by the City;
38. that off-site runoff shall be diverted around the construction site and all on-site runoff
shall be diverted around exposed construction areas;
39. that trash enclosures and dumpster areas shall be covered and protected from roof and
surface drainage and that if water cannot be diverted from these areas, a self-contained
drainage system shall be provided that discharges to an interceptor;
40. that no vehicles or equipment shall be washed, cleaned, fueled or maintained on-site;
41. that methods and procedures such as sediment basins or traps, earthen dikes or berms, silt
fences, straw bale dikes, check dams storm drain inlet protection soil blanket or mats,
and covers for soil stock piles to stabilize denuded areas shall be installed during
construction to maintain temporary erosion controls and sediment control continuously
until permanent erosion controls have been established;
42. that the site shall be sprayed with water to control dust during grading and construction.
Construction equipment emissions shall be in compliance with the standards of the Bay
Area Air (�uality Management District;
43. that a construction fence, including a impermeable fabric/material, shall be required
around the site during construction to keep all construction debris on site;
44. that if any trenching is proposed on the site, the applicant shall contact the San Mateo
County Health Department; if any contaminated soil is encountered, the applicant shall
follow County protocol for its disposal; and
45. that if any prehistoric or historic archeological relics are discovered during grading and
construction, all work shall be halted until the finding can be fully investigated and
proper protection measures, as determined by qualified experts, can be implemented.
.,,:.���,..�.�. _ ..w . �t � _ : .. . .:. .��
Project Comments
Date:
To:
05l2512004
� City Engineer
❑ Chief Building Official
❑ 'Fire Marshal
❑ Recycling Specialist
❑ City Arborist
❑ City Attorney
From:
Planning Staff
Subject: Request for conditional use permit for an addition to an existing
� office/warehouse building at 821 Cowan ' Road, zoned M-1,
APN:024-409 -560
Staff Review: 06/01 /2004
�7 � %/_':a.._a�,.= '1> .�it ' �i�'L•. ..�..♦ ir I �: rH_.:�:rs (;�i - _ _
`���"t1�o�.
� � � i / f, 11 iI.L-:. i. C �
� i .
i i
G� � �, s - �[�.. a:.:a/, Lr
%.id ,!_ �� /�.it Ii::�/
i w..::�l. � iui.l .I\!�. _ � .•/ �s �1 �
[�'•� G.L.�.�. ...�. �.�L �n i:� s� ,i
ia% L• i�. �L � ,.�i . � . i r.r_ ..��i %l�, : n�a... 't.c.. � �
s� f'.[i. .i Y.i.l�
Reviewed by: V�
%��-/3.
Date: ��, j_�
y��
',� �L.� �- �
�
0
�
Date:
�o:
From:
Subject:
Staff Review:
�>,�-,� . .:�:�, .
Project Comments
05/25/2004
❑ City Engineer
❑ Chief Building Official
�i Fire Marshal
I� Recycling Specialist
❑ City Arborist
� City Attorney
Planning Staff
Request for conditional use permit for an addition to an existing
office/warehouse building at 821 Cowan Road, zoned M-1,
APN:024-401-560
06/01 /2004
�� ����- L.����..1 ����...�.� �- c�.1���.���'
��� � co �...s-�� ��-�-�-�- ��- "S a�/
��` � � �-
Reviewed by: �� �
Date: �, :�_ � ��
,..�a��.� , x�;;"... ......;^�� .re-�,.;•arnr>.w•:r�„,y,�s,�.r.: ,-�z-^ ..�.,a«r. ..�.-.,:.;,a.�sTM..a
- Project Commen#s
Date: 05/25/2004
To: ❑ City Engineer
❑ Chief Building Official
❑ Fire Marshal
�Recycling Specialist
❑ City Arborist
❑ City Attorney
From: Planning Staff
Subject: Request for conditional use permit for an addition to an existing
� office/warehouse building at 821 Cowan Road, zoned M-1,
APN:024-401-560
Staff Review: 06/01 /2004
�
�
,
�
wy.
----_
Date:
0
Date:
To:
From:
Subject:
Staff Review:
Project Comments
February 9, 2005 �
❑ City Engineer � ❑ Recycling Specialist
�VChief Building Official ❑ Fire Marshal
i'
❑ City Arborist ❑ NPDES Coordinator
❑ City Attorney
Planning Staff
Request for remodel and addition to an exis#ing office/warehouse
building at 821 Cowan Road, zoned O-M, APN: 024-401-560
�
�� p�,h,,s �w J� C�,,n,��.� c�� o� a�( c,G c, .
�/ l Qo J x�rrJ i �GC�.f'�� G C ���=.r/ff-�- ��
✓�,� � ,1G af'�� �p.s.f — �SGoP�� %�/��
/
i�.�'��" o� �K��L- ,�-►,�s � c��� u,� c� j
Cf�k�4-P-���, ,��.
I
Revi
0
� � /���-�-----
`YWY:YA. ...
Project Comments
Date:
�
From:
05/25/2004
❑ City Engineer
�''Chief Building Official
❑ Fire Marshal
❑ Recycling Specialist
❑ City Arborist
❑ City Attorney
Planning Staff
Subject: Request for conditional use permit for an addition to an existing
� office/warehouse building at 821 Cowan Road, zoned M-1,
APN:024-401-560
Staff Review: 06/01/2004
�, i. �- - � �'- -r ....� �
��� -
���1� !��'� �'� %�z�r +-c.� sy1�� c.C-� ,
�__ _��.G�t�afl.�t GX /•�,i�h#' I S 1 l9��.C_�i' �ia�� L''''7 Z/
� � � '� � �; i � /I t11/L
I
���
! t�l � �G� f,J�v� �iav� zY�GB-.r .- �as� ��a �vS � v ��
��d� '{�rs�riha� ,� r�i�B�'9 �i.u��aivY� �-l���r��l�
� T ' �d'X�lo d' CP'D�b'''J.
��� :! . _ I�, 9 : �. .� . � .
K/�ay�r C�t�' 2c�'�ss1 � � 4
Revi wed by:
��� _....
Date:
�'�9��a1
. �
e ' ' �
Date:
To:
From:
�
�
�
�
Project Comments
City Engineer � Recycling Specialist
Chief Building Official � Fire Marshal
City Arborist
City Attorney
Planning Staff
✓ NPDES Coordinator
Subject: Request for Mitigated negative declaration, conditional use permits,
. side setback and parking variances for a first floor remodel and
second floor addition to an existing office/warehouse building at 821
Cowan Road, zoned O-M, APN: 024-407-560
Staff Review:
Any construction project in the City, regardless of size, shall comply with the City
NPDES permit requirement to prevent stormwater pollution including but not limited
to ensuring that all contractors implement construction Best Management Practices
(BMPs) and erosion and sediment control measures during ALL phases of the
construction project (including demolition).
Additional stormwater requirements may be issued as conditions of approval for this
project. See attached.
Brochures and literatures on stormwater pollution prevention and BMPs are available
for your review at the Planning and Building departments. Distribute to all project
proponents.
For additional assistance, contact Eva J. at 650/342-3727.
Reviewed by: ��. -�� Date: p� � 3 �(aS�