Loading...
HomeMy WebLinkAbout12 Vista Lane - Approval LetterCITY OF BURLINGAME BUR LII .GAME City Hall Primrose Road Burlingame,, Californiali 94010-3997 July 28, 2015 Jacob Furlong Dreiling Terrones Architecture Inc. 1103 Juanita Avenue Burlingame, CA 94010 Re: 12 Vista Lane Dear Mr. Furlong, COMMUNITY DEVELOPMENT DEPARTMENT Planning Division PH: (650) 558-7250 FAX: (650) 696-3790 Since there was no appeal to or suspension by the City Council, the May 11, 2015, Planning Commission approval of your application for Design Review, Hillside Area Construction Permit and Special Permits for declining height envelope and attached garage became effective May 21, 2015. This application was for a new, two-story single family dwelling and attached garage at 12 Vista Lane, zoned R-1. The May 11, 2015, minutes of the Planning Commission state your application was approved with the following conditions: 1. that the project shall be built as shown on the plans submitted to the Planning Division date stamped April 29, 2015, sheets A0.0 through A5.2, L1.1, L1.2, AR1.0, AR2.0 and G1.0; 2. that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYI or amendment to be determined by Planning staff); 3. that any changes to the size or envelope of the first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; 4. that a certified arborist shall be on site during any grading or digging activities that take place within the designated tree protection zones, including the digging of the pier holes for the pier and grade beam foundation and digging for removal or installation of any utilities; 5. that the property owner shall be responsible for implementing and maintaining all tree protection measures and trimming instructions as defined in the arborist report prepared by Kielty Arborist Services, dated January 29, 2015. All tree protection measures shall be taken prior to beginning any tree removal activities, grading or construction on the site; 6. that a licensed arborist, hired by the applicant, shall inspect the construction site once a week or more frequently if necessary and certify in writing to the City Arborist and Planning Division that all tree protection measures are in place and requirements are being met; 7. that a licensed arborist shall provide a post -construction maintenance program to the property N Register online to receive City of Burlingame e-mail updates at www.burlingame.org July 28, 2015 12 Vista Lane Page 2 owners with instructions on how to maintain the Coast Live Oak tree and identify warning signs of poor tree health; the property owners shall be responsible for the maintenance of the tree for 3 years after construction is finalled by the City; 8. that all clearing limits, easements, setbacks, sensitive or critical areas, buffer zones trees, and drainage courses are clearly delineated with field markers or fencing installed under the supervision of a licensed arborist and inspected by the City Arborist; and that adjacent properties and undisturbed areas shall be protected from construction impacts with vegetative buffer strips, sediment barriers or filters, dikes or mulching as designed by and installed with the supervision of a licensed arborist to standards approved by the City Arborist 9. that the conditions of the Building Division's July 7, 2014 and May 9, 2014 memos, the Parks Division's February 26, 2015, February 3, 2015, July 8, 2014 and May 12, 2014 memos, the Engineering Division's June 19, 2014 memo, the Fire Division's May 12, 2014 memo and the Stormwater Division's May 15, 2014 memo shall be met; 10. that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; 11. that demolition for removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 12. that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; 13. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 14. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 15. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2013 Edition, as amended by the City of Burlingame; THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 16. that prior to scheduling the framing inspection the applicant shall provide a certification by the project architect or residential designer, or another architect or residential design professional, that N Register online to receive City of Burlingame e-mail updates at www.burlingame.org of July 28, 2015 12 Vista Lane Page 3 demonstrates that the project falls at or below the maximum approved floor area ratio for the property; 17. that prior to scheduling the foundation inspection, a licensed surveyor shall locate the property corners, set the building footprint and certify the first floor elevation of the new structure(s) based on the elevation at the top of the form boards per the approved plans; this survey shall be accepted by the City Engineer; 18. that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; 19. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; and 20. that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. All site improvements and construction work will require separate application to the Building Department. This approval is valid for one year during which time a building permit must be issued. An extension of up to one year may be considered by the Planning Commission if application is made before the end of the first year. The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section 1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within 90 days of the date of the decision unless a shorter time is required pursuant to state or federal law. Sincerely, William Meeker Community Development Director C. Jianguang Zhang, property owner 8 Vista Lane Burlingame, CA 94010 Chief Deputy Valuation, Assessor's Office (113.49 FT X 110.18 FT F&R MEAS LYING BETWEEN LOTS 11 & 12 13BLOCK 4 BURLINGAME HILLS 2; APN: 027-093-320) File :: Register online to receive City of Burlingame e-mail updates at www.burlingame.org :: Project Comments Date: Revised Plans Submitted July 3, 2014 To: 0 Engineering Division (650) 558-7230 X Building Division (650) 558-7260 0 Parks Division (650) 558-7334 From: Planning Staff 0 Fire Division (650) 558-7600 0 Stormwater Division (650) 342-3727 0 City Attorney (650) 558-7204 Subject: Request for Design Review, Hillside Area Construction Permit and Special Permits for declining height envelope and attached garage for a new, two-story single family dwelling and attached garage at 12 Vista Lane, zoned R-1, APN: 027-093-320 Staff Review: NIA No further comments. All conditions of approval as stated in the review dated 5-9-2014 will apply to this project. Reviewed by 7 7_0n1n