HomeMy WebLinkAbout137 Costa Rica Avenue - Approval Letter� �s
DocuSign Envelope ID: EB1F24CE-F8A9-4A5D-AA72-DF8CE3848828
CITY OF BURLINGAME
City Hall — 501 Primrose Road
Burlingame, California 94010-3997
� CITY
.cr . 1
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division
PH: (650) 558-7250
FAX:(650)696-3790
September 4, 2020
Architecture Allure
Adam Bittle
51 Somerset Street
San Francisco, CA 94134
Re: 137 Costa Rica Avenue
Dear Mr. Bittle,
Mailing Date: 10.01.20
�ince there was no appeal to or suspension by the City Council, the August 24, 2020, Planning
Commission approval of your application for Design Review became effective September 3, 2020.
This application was for Design Review for a remodel and two-story addition to the rear of an existing
two- story single family dweliing at 137 Costa Rica Avenue, zoned R-1.
i� he August 24, 2020, minutes of the Planning Commission state your application was approved with
the following conditions:
that the project shall be built as shown on the plans submitted to the Planning Division date
stamped July 7, 2020, sheets A1- A11;
2. that the existing nonconforming wall and foundation, located within the right side setback at
3'-6" where 4'-0" is required per code and measuring 48'-1" in length, shall not be removed
during construction; if any wall studs or foundation, or both, along the existing
nonconforming length are removed during construction, either an application for a Side
Setback Variance will be required to replace the wali at the same location or an application
for a Design Review Amendment will be required showing compliance with current setback
requirements;
3. that the existing nonconforming wall and foundation, located within the front setback at 22'-
4" where 24'-10" is the biock average and required per code and measuring 35'-11" in
length, shall not be removed during construction; if any wall studs or foundation, or both,
along the existing nonconforming length are removed during construction, either an
application for a Front Setback Variance will be required to replace the wall at the same
location or an application for a Design Review Amendment will be required showing
compliance with current setback requirements;
4. that the floor plans and structural plans will include the following note for the existing
nonconforming walls and foundation along the right side and the front: "Existing
nonconforming wall and foundation to remain. No modifications to studs or foundation shall
occur";
�� Register online to receive City of Burlingame e-mail updates at www.burlingame.org ��
� �
DocuSign Envelope ID: E81 F24CE-F8A9-4A5D-AA72-DF8CE384B828
September 4, 2020
137 Costa Rica Avenue
Page 2
5. that any changes to building materials, exterior finishes, windows, architectural features,
roof height or pitch, and amount or type of hardscape materials shall be subject to Planning
Division or Planning Commission review (FYI or amendment to be determined by Planning
staf�;
6. that any changes to the size or envelope of the first or second floors, or garage which would
include adding or enlarging a dormer (s), shall require an amendment to this permit;
7. that any recycling containers, debris boxes or dumpsters for the construction project shall
be placed upon the private property, if feasible, as determined by the Community
Development Director; that demolition or removal of the existing structures and any grading
or earth moving on the site shall not occur until a building permit has been issued and such
site work shall be required to comply with all the regulations of the Bay Area Air Quality
Management District;
8. that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of
approval adopted by the Planning Commission, or City Council on appeal; which shall
remain a part of all sets of approved plans throughout the construction process. Compiiance
with all conditions of approval is required; the conditions of approval shall not be modified or
changed without the approval of the Planning Commission, or City Council on appeal;
9. that all air ducts, plumbing vents, and flies shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and thaf
these venting details shall be included and approved in the construction plans before a
Building permit is issued;
10. that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects to
submit a Waste Reduction plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
11. that the project shall meet all the requirements of the California Building and Uniform Fire
Codes, in effect at time of building permit submittal, as amended by the City of Burlingame;
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
12. prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural
certification that the architectural certification that the architectural details shown in the
approved design which should be evident at framing, such as window locations and bays,
are built as shown on the approved plans; architecturai certification documenting framing
compliance with approved design shall be submitted to the Building Division before the final
framing inspection shall be scheduled;
Register online to receive City of Burlingame e-mail updates at www.burlingame.org '�
� ti
DocuSign Envelope ID: EB1 F24CE-F8A9-4A5D-AA72-DF8CE384B828
September 4, 2020
137 Costa Rica Avenue
Page 3
13. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height
of the roof ridge and provide certification of that height to the Building Division; and
14. that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been
build according to the approved Planning and Building plans.
All site improvements and construction work will require separate application to the Building Department.
This approval is valid for one year during which time a building permit must be issued. An extension of
up to one year may be considered by the Planning Commission if application is made before the end of
the first year.
The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section
1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within
90 days of the date of the decision unless a shorter time is required pursuant to state or federal law
Sincerely,
CDocuSignetl 6y:
��/,. ���,:.�.ir
2806423C2E8849F...
Kevin Gardiner, AtCP
Community Development Director
c. Tehan and Subodh Gupta, property owners
137 Costa Rica Avenue
Burlingame, CA 94010
Chief Deputy Valuation, Assessor's Office
Lot 5 Block 8 Burlingame Park No 2 Rsm B/17; APN 028-316-040
File
C: Register online to receive City of Burlingame e-mail updates at www.burlingame.org ':y