HomeMy WebLinkAbout117 Costa Rica Avenue - Staff Report�'�l�"�
BURLINGAME
k. .
DATE:
TO:
FROM:
��- � ''_'
CITY OF BURLINGAME
Communify Development Department
MEMORANDUM
August 21, 2012
Planning Commission
Erica Strohmeier, Associate Planner
Director's Report
Meeting Date: August 27, 2012
SUBJECT: FYI — REQUESTED CHANGES TO A PREVIOUSLY APPROVED DESIGN
REVIEW PROJECT AT 117 COSTA RICA AVENUE, ZONED R-1.
Summary: An application for Negative Declaration, Design Review and Special Permit for a
basement for a new, two-story single family dwelling and detached garage at 117 Costa Rica
Avenue was approved by the Pianning Commission on May 10, 2010 2011 (May 10, 2010,
Planning Commission Meeting Minutes attached). A building permit was issued on June 30,
2011 and the house is currently under construction.
In a letter dated August 7, 2012, the property owners are requesting an FYI to change out the
approved Ipe siding along a portion of the south elevation to stucco siding to match the rest of
the house.
The property owners submitted a letter and originally approved and proposed south elevation
drawings, date stamped August 7, 2012, to explain the proposed change to the previously
approved design review project. Other than the proposed revision listed above and detailed in
the property owners' letter, there are no other changes proposed to the design of the house.
Planning staff would note that because of the minor revision to siding material along the south
elevation, it was determined that the project could be reviewed by the Commission as an FYI
item. If the Commission feels there is a need for more study, this item may be placed on an
action calendar for a second review and/or public hearing with direction to the applicant.
Erica Strohmeier, Associate Planner
c. Gary and Jolanda Breazeale, 117 Costa Rica Ave, Burlingame, CA 94010, property owners.
ATTACHMENTS:
Explanation letter from property owners, date stamped August 7, 2012
May 10, 2010, Planning Commission Regular Action Minutes
Originally approved and proposed South Elevations, date stamped August 7, 2012
August 7, 2012
Planning Commission
Burlingame Planning Department
501 Primrose Road
Burlingame, CA 94010
RE: 117 Costa Rica Avenue
Dear Plauning Commission,
We would like to inform you of a change in exterior material. We have decided
to change a small portion of exterior siding at our house on 117 Costa Rica in
Burlingame. The change is to the small area of approved Ipe siding on the
exterior dining room wall. We would like this area to be the same colored
stucco that is on the rest of the house. We feel that the stucco is more in
keeping with the predominant Spanish style of the house and the private
courtyard garden that this azea creates. As you had noted previously, the Ipe
siding is not traditional in a Spanish design and we see how not using it would
actually improve the exterior presentation of our home. We have enclosed an
elevation of the approved and proposed elevations. Thank you for your
consideration on this matter.
Sincerely,
; �,c�-d�-
� ��
�.
Gary and Jolanda Breazeale
����� � ��
AUG - 7 2012
CITY OF BURLINGAME
CDD-PLANNING QI\/.
CITY OF BURLINGAME PLANNING COMMISSION — Approved Minutes May 10, 2010
4. 117 COSTA RICA AVENUE, ZONED R-1 — APPLICATION FOR NEGATIVE DECLARATION, DESIGN
REVIEW AND SPECIAL PERMIT FOR A BASEMENT WITH A CEILING HEIGHT GREATER THAN 6'-0",
FORA NEW, TWO-STORY SINGLE FAMILY DWELLING AND DETACHED GARAGE (FLORIAN SPEIER,
APPLICANT AND DESIGNER; JOLANDA AND GARY BREAZEALE, PROPERTY OWNERS) STAFF
CONTACT: ERICA STROHMEIER
Reference staff report dated May 10, 2010, with attachments. Community Development Director Meeker
presented the report, reviewed criteria and staff comments. Fourteen (14) conditions were suggested for
consideration.
Chair Terrones opened the public hearing.
Florian Speier, 880 Harrison Street, San Francisco; represented the applicant.
■ Detailed the changes to the project plans.
■ Agreed to placing the debris box on the property during the construction process.
Commission comments:
■ Why the single, bubbled skylight? (Speier — this type of skylight is required due to the slope of the
roof; but could build it up on one side to meet the requirements for installation.)
■ Why is a portion of the roof flat? (Speier — needs to fit that portion of the roof under the main roof;
necessitates the design.)
■ Could a solar tube be used in place of the skylight? (Speier — doesn't provide as much light.)
■ Likes the garden wall along the driveway; shows commitment not to use the area for parking.
■ Likes the column design at the entry.
■ Be certain that the double cantilever on the garage can work from an engineering standpoint.
■ With respect to the dining room wall; the windows in the dining room wall look a lot like apartment
windows; is there an alternate design that may work better, even a series of three casement
windows? (Speier — looked at several alternatives; selected this approach, using a high-quality
window with thicker trim than that shown on the plans.)
■ Asked for a description of "Spanish-textured" stucco. (Speier — not completely flat, or completely
smoothed.)
■ Pleased to see that some of the window area has been removed from the master bedroom; will
need to be certain proper materials are used to reduce the potential for sun damage.
■ Was the potential for shading adequately calculated relative to the overhangs? (Speier— has been
designed so that the home will not require air conditioning.)
• Noted that the drainage may require tying into the City storm drain. (Speier— has reviewed with the
Geotech; feels this will not be necessary.)
Public comments:
Pat Giorni, 1445 Balboa Avenue; spoke:
Requested that the debris box be placed upon the private property during the construction process.
There were no further comments and the public hearing was closed.
Commissioner Yie moved to approve the application, by resolution, with the following amended conditions:
that the project shall be built as shown on the plans submitted to the Planning Division date stamped
10
CITY OF BURLINGAME PLANN/NG COMMISSION — Approved Minutes May 10, 2010
April 22, 2010, sheets A-001 through A-302;
2. that any recycling containers, debris boxes or dumpsters for the construction project shall be placed
upon the private property, if feasible;
3. that the "bubble" type skylight at the rear of the house shall be replaced with a flat profile skylight
design;
4. that any changes to building materials, exterior finishes, windows, architectural features, roof height
or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning
Commission review (FYI or amendment to be determined by Planning staffl;
5. that any changes to the size or envelope of the basement, first or second floors, or garage, which
would include adding or enlarging a dormer(s), shall require an amendment to this permit;
6. that the conditions of the Chief Building Official's February 18, 2010 and November 30, 2009
memos, the City Engineer's November 30, 2009 and May 21, 2009 memos, the Fire Marshal's
November 30, 2009 memo, the City ArborisYs December 19 and May 6, 2009 memos, and the
NPDES Coordinator's November 30, 2009 memo shall be met;
7. that demolition for removal of the existing structures and any grading or earth moving on the site
shall not occur until a building permit has been issued and such site work shall be required to
comply with all the regulations of the Bay Area Air Quality Management District;
8. that prior to issuance of a building permit for construction of the project, the project construction
plans shall be modified to include a cover sheet listing all conditions of approval adopted by the
Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved
plans throughout the construction process. Compliance with all conditions of approval is required;
the conditions of approval shall not be modified or changed without the approval of the Planning
Commission, or City Council on appeal;
9. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that these venting
details shall be included and approved in the construction plans before a Building permit is issued;
10. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which
requires affected demolition, new construction and alteration projects to submit a Waste Reduction
plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior,
shall require a demolition permit;
11. that during demolition of the existing residence, site preparation and construction of the new
residence, the applicant shall use all applicable "best management practices" as identified in
Burlingame's Storm Water Ordinance, to prevent erosion and off-site sedimentation of storm water
runoff;
12. that the project shall meet all the requirements of the California Building and Uniform Fire Codes,
2007 Edition, as amended by the City of Burlingame;
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION
13. that prior to scheduling the foundation inspection, a licensed surveyor shall locate the property
11
CITY OF BURLINGAME PLANN/NG COMMISSION — Approved M�nutes May 10, 2010
corners, set the building footprint and certify the first floor elevation of the new structure(s) based on
the elevation at the top of the form boards per the approved plans; this survey shall be accepted by
the City Engineer;
14. that prior to scheduling the framing inspection the project architect or residential designer, or another
architect or residential design professional, shall provide an architectural certification that the
architectural details shown in the approved design which should be evident at framing, such as
window locations and bays, are built as shown on the approved plans; architectural certification
documenting framing compliance with approved design shall be submitted to the Building Division
before the final framing inspection shall be scheduled;
15. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the
roof ridge and provide certification of that height to the Building Division; and
16. that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.
The motion was seconded by Commissioner Vistica.
Discussion of motion:
Clarified that adoption of the Negative Declaration was included in the motion.
Chair Terrones called for a voice vote on the motion to approve. The motion passed 7-0-0. Appeal
procedures were advised. This item concluded at 8:16 p.m.
12
, r
�'��
� � �� � ��
F E /W-�v-�- C nuwuioowrnnnes,ww. B A %� II� T�� �a�� I
�-�y RESi �F rlouSE SHU11E0.5,ExPOSEDM�5T5,5EAtn5, y �'-r� II
� � ���44L0 TO I�IRi � RAFfEPSAND]OISTSTJeE�ARN � fl; Tr/ � -
�� S�AINE� WOoo uoN � [.'� � (II � 1.P I � i�'.. Y�I� .
_ . _ . _ _ _ _ _ _ . __ - . _ _ ._ .. _ _. . _ _. . ._. - _ _ _ . ._ . _ _ _. . - - - - - _ - _ - _ -.I.- SfUCCO - � - _ __ - - _ __ _ - _ '_ _ - -'- _ - -VELV%tlRPIl�SM1 C _ RCC�S _ - . _ - .-_-. _ - F�
_ Y� S lOP�0..WINDOWS/V/SC � ���������-.ST I
4EI U%SNYtIGH( ON CLSTOM CURO 1\CEPt FftENCH p0(M� ' �' :�.t y�,Y � �
+16�'4• ry+,; F , 1`f ; � "
� rovvEa currEa �` rixEo cvz�n� vnne�s i w000 u F � f��-E x� - � f 5 UPPEft ROOF RIOGE
E%d"NSTC �UODRAFfE0.iAi� G1A5591OCK� CHIMNEY, � &OOW SPWT �
mvvea cav �i 1 �� vnr+oow ��.ni, s m� h� ao �� d . �
� �= �� � 3 Ij "� - �:�:''_�. �: � � .23. 6.,
y ^ �u,�-
_ . - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - oowNsao reanuo� - - - -- - \ � . � - _ - �'q '�t�"'�' _C �� -- - - - - - - -- 4 RooF RiocE ZEITGEIST DESIGN
� . . . y -c-_ C C -- 104
_ _ _ �_ _. . _ ._ .. - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ __ _ _ - - _ _ _ I . _ - ���� _ � -oxn cuso.iw�Frearn��s O e
-�_ - c�� � Z �
� _,-� ; � Ga�eld Av
. _ �f
0 � " ��. ' j� � � j ��� ( �
- - -- - - -- - - � � � _�I _II �- � - _ _ . e 80027i11e C
�\ ... _ . _ .. _ , . �I1 � _ _ __ .� a_._ ��{. - _ _ - _ - _ _ _ _ ._ _ � _ - � LOFT FLOOR
/�
� � � -..-� - -- 000m-ramarvw�noows WWWZGARCCOM
s�nwsn rezruae s�ucco � �. ��� � � � �- i J� ` I y �i y� wnouenr �aon vwrtea 510 38'I 1567
��-w000 LOUvaF oWas • � v CJ OM /� �y � � eoxes Iw covoea adsNEr
i S�OrvEFaG,�F � FIf115HOHqlIfqCAOES _r . .. ,. I r� IC I
� � -NNtitEl �ILE R00% CO:OR pt1NN E�V/nRpS � �, � ` � - I ,� �
/ � sounQueee�ae , ri � . - :, � . . , ��"� � (;^ CONSULTANTS
i��. � � � 4_�.�'`---F � � - TRELLIS,6Xfi"POnB6%8"BEAM'- � � . . . . � f. _ _ ^ —" _ W.J _ �. .
z-E}.} c � � ( �� . � Surveyor- B+H Surveying
� . ~ � �i- - . - - _ __ _ . _ _ 3%6" TR[LLIS PNTEHS— - _ - _. - . . �•�� �• • - _ _ " .. _ _ _
�� � J
t , - �--�� � - � �_ - - - . . � � - - - - _ _ _ _ +�U'-6" Structural Engineer - S7RUCTECH Group
` . - ' � '� J. � � 22 nFLOOR
_ u � �o � o �.,, �
n
{C � _`t _ �`I.I � � �. ' . � - �- LandscapeArchitecl-SmallBrowqBud.
- � � , STONE PLIMN �YPlt- — - {{
� � � ty ~ � � �1 \' �� � - �Y- _-_ - I � �- -cse��rusronatnwmis GeotechnicalEngineer-Romig
_ 6
_ -- ��T- -� � '� ��`�'� � i i �` � � Engineers Inc.
� � __ I �� _ . . � � . e r � � � . � F � �, (fi50) 591-5224 report date B119/2010
i '� I�
f �r=- ' i I
� _ � Ft��t. =. � -` � �, �o . - - -
y_
Y� � I .t � .. f •�I . _ - _. _ ._. .. _ . I ��[.� _ _. .- - . . ' � c �n �..c. 61ROU41TIPO�1NAll1�l(
- _' - _.
I - . -� . - � . . - - . - l�� _ - .- _ ' - _ - - - - -. - _ _ _ _ - ai' 6
� � � - I . ��. .: I�-- � ��?-� r�a : _ .. ,__- . ' ' - ' _ _ _ ' _ __ _ _ _. '_ _ . _ _
. � �° �° i
I �
_
__."_'. __ -_. �,_..�___�.�__� .._�1-r _ - _._ ... __. �' - � � .�-�t'.� -"_•.'LF-" ��i�� � � . 17s�FLOOR
. . _ . _. _.- -__ ._ � __'. _- - : � .. � ap.
- _. ---_ -_ '
-�I%EDGtA[INGVANEL OGEPABIEGIAZIfIGFM1EL � �pEPABLE5Hl1T1ER5,TYF '�GROUND
18a24ACCE55pppR � I �
�-PROVID[MINI�WELI I 1HISYlAII'fOBEi1f0URFI0.EMTEDCONSiRUCfiON �
/WVROV[RUNAINAGE �-p(�ry[H�INTOWdTE0.(EA'IUftf REFERT�iABLEPEIOWFOROFENINGSCOMPIIANCE `
� S~ \ rr
J �' . �`'cr`
2B SOUTH ELEVATION P���O�G� VERIFlCATIONOFCOMPLIANCEWITHTABLE7048 C j�
� � .,<r,-. i � - � „ - - - � � — APPLIES TO EA575ECTION OF SOUTH WALL
��-'� �� � � NREaOFVJALL 4„OPENINGl�LLOWE� ALLOWEDAREn AHEAOFOPEN�NC;S COA1�LiE:F'!��einf3LE/u�t.N )
12550FT 25.00',531.2550FT 2)SOFT VES gl'eaZedle I\�SldenCe
- . . - _ . . _ _ 1 l7 CoSIu RICa Av'e
Budingame, CA 94010
� �o � qoTe � � APN:0�831G0>0
C wwcaw FaanFs,lun, B A
SHUnERS, EMPOSEO GO;TS, 9EAMS,
SfuCCO . �RTICALIVE5IDINE _ �/wnll.. � -n�EXwFlll%7Mf .r � pQ{OW�S�/WSCREfNS i i �
S i E
I _ .� VEW%SKTLIGH{ONNSTOMCUAB `� � (NQ DOORS _ � *26 4"
. . � � - ' - . ... ��:'t:Li`.IOnw00UNa�it-Hl,�iS GIl�SSI1LOCK CHImrvF! "- �� -. - - � - - R SvoUr ILU TALI L Ets � Ul E ��`, •. �UPPERROOFRI�G .�C�.171(�.1.111(��J 'Y I'CdLl:1�C
I COP LA4URE } � E �� �
COPVERCAP I \ .1 � : � +�... I �� . r
. . _ _ . _. _ . _ _ ._ _ _. _ . _ " . _ _ _._ - - - - - - . _ _ _'. 1 � �I � i �23 6
i � � ��� �3 'rF E�ti xt � _�`�_ �- aRooFRioce �
�ovici�urrzanrro � . -.�� � r�� a r � j 7 . 3 �� � �� �r'� .'r' � - --
Lo"'"s'o°, ; 3_ 3 F E � � _ ra�srio- eur_�r�a�+�nx�
i 4� �I � 3° i� � a � t� -oxe-cu�ro warex miu �� ��
1 � � lH � �i� � �,�� i�� � � � 1 � . ;� � `.� � � _ . ?I `ll iZ s���nr zr,v�scer-�.
.'si.r` < - �t r � r �s � r .��
r
t
- �.
- _ . _ _ _ _. . .. .. . . . .. . _. . . _ _ _ - _ _ _ _ _ _ __ . - _._ _ - �t I 1� :11Z -.' _ _. � x_ . . _ .:i.0 -_ �18 6 _'
:.ti � _.nj
^' _
svn i'> . �� �� � 11T . � j . I..I. , I,I . I I <� j t`\ . _ -I1_ .. .-.Vr _ _ V i. '_ _ - .. 3LOFT-FLOOR __
r �i cN uxe snicro . l,; v�� n -tt y �- .. woou i a u ows
,f:l,vi InCn;il -�YOUOLOUVNEUWR; � � 1 1 i �vftW( I0.0 Dll�ME0.
� � ry sr o nu cnoes �� � � � � �� �� eoxes n�� mvvea ons.�r MARK DATE DfiSCRIPTION
.
--EARRE'. TII[ A00{ COLCN OIINN EDWAP�S � J. f_ [L I I ./� � � I
� tlOUiiWE IIEIGf
1 � t � f.; �� € - [ 1 t E��I C� r 5ve'apsr 5xe e[ne+ , � . (;� O � ' II PLANSPREPAREDdVFIORIANSf[IER
[ � Y
x f � F� I c � � - � : 3 � � £�� � �xe-,aew>rU,t�eas-� - �;� �,., ,w.� � - � - orz�iTceisroEsicNi_�c
G { k'LE 7 j_ r �� { �J _. _. - __ _ _ - _ - __ _ _ _ _ _ -- _ _ -_ 't0.�..
E i I i�;'� 3 v � : E � ; E � � �`�� � ��� � � U _ - ���� _ �2�dF�ooa..
� c��rr��`{c �i�S'�� r, rrr ra ��C<'�`c�� — ---- -' � _�_ - � � -, �� -- - - —_ - -- _ �
� `X . _'� t �-�s � ->.-y �—� i s.orve vurvm wni I � / �' , � � � _ ,.e _ _ � m,.n
� a � � . � �� 1 '� r _ � _ _ .., .inu
�t�Li F` 4 Y t� � - I - � �p�. � � �-•U 7`� 1 � i �� � -
1 .� I� ��- �_ . -._ � '" �i� �� �� SHEFT TITIE
� � � � � 0 ,'�� ��
,I _ _ i —---- --- --
- � � � �� � r ' � � �°� " — -- .,��,�� ��,�,.��, SOUTH ELEVATIONS
�� � i� � ,� -� �' � .,, � �� .r_e.
I ,
' - - - - - - - - - - - -
�i=-'�1���i1 '.:�`' ,` t`��-_- 1- '- �--_ - - ----- -------- ' ---- --� ------ ----- - --
. .. . . . * isl FLOOR
.L.�- _ _:�, : , _
-- �r - _ _- -- � , :�-� --- I�� _— _ � - — _ - - -- � - -- r- .-�cRouNu - I
�-FlXEOGlA21 G IEl � 0[RABIEGlA21 G ANEL _pp��pLESHIIT�ERS,ttG
.
1
.
� IBv24ACCES5p00R \ ��NIIlG0.00MNOOVWINI�WW'pllSTNNE� ARK00.0WN,TTG
- E MWI WELL TNIS WAIL TO BE 1 HOUa FIRE MTE� CONSIRUCiION I
/wPR`OGE0.�MINaGt 1-pn�ry��iNPITON.�AtFRFEAnJRF 0.ktER1U"fAbLEOfION�FOROCC111fIGSCOMPI.WNCE
I
I -.- -,---., T FOR CONSTRUCTION
�n� 2B SOUTH ELEVA710N �hI)'I-��?OyFoS�� VERIFICATIONOFCOMPLIANCEWITHTABtE704.9
� -- �— APPLIEu TO G.A _�C710N OF SOIITH Wq� L �
L�-�F � �� AftEAbF4^AL ,�:14�LNiG'AILUWCG :.LLUJ/E�AP.� ^.oC�.nG��pFNINCS GOMi�LIE5uEk�hdLE�ti�IA A 203
� � 1255�FT "1.'�.00Y�312550FT 7Z50(T YES
SHEET 13 Of 42
r BURL,�� COMMUNITY DEVELOPMENT DEPARTMENT
� PLANNING FEES RECEIPT
Subject Address: I f� ���� ��� �� 1 l� �'
Received for application to the Planning Division for:
ACCT.101-36630 (#63)
X
�_ ._..-, , _,-
;..:, c�.��i.Z
Application to the Planning Commission -�Y�
Residential 8� Commercial Design Review Handling Fee
Title 25 Zoning Code (postage add $3.00)
Title 22- Sign Code
General Plan (postage add $6.00)
Specific Plan (for postage add $4.00)
Zoning Map
Photocopies ($0.25 x )
Environmental Handling Fee (35% of Contract)
Tape copies ($16.55 per tape)
Other
ACCT. 101-22525 (#67)
Residential & Commercial Design Review Consultant Deposit
ACCT.101-36640 (#57)
Engineering Fee
ACCT.101-36342 (#58)
Parks City Arborist Review
ACCT.101-36620 (#64)
Second Unit Amnesty Building Inspection Deposit
ACCT. 101-22590 (#83)
_ ' .. --�_i r+___..la....a C..�
m ��
� � �
� � ��
�
�1� - ��_
. f.�y �.I�1 } � l 1, Y;
� � i�; �, ri'
J �„i Itl �; � � ;
� CC � � r '��j
1
���n �
G .,,� 7: <,
� ~
1�1 �' �
U LY�
4,i
r•�
4 }�
�'F�: � �
�K:
6F � y�
�"��F' r;
_. � :
��
u�
lyl
��,1
��''a
+ft
�
�
f�
r�
!--
y
+F
6�_
[�t
� }{
���
� yi
� �
�f ..�
� L.b�
�J' �i
� � �
� ;v
�i .::c .
'+'''� �f�' ..
L`' S.ii '"_:• 5i.
� � �_�J �f� .
,_. :I.. "
�_ �_'�-,,c��41�
i: �-
w'A� I i F i`
ui zc:' 4 .
ykA �
'�i 4 � r
�IT:'r' �'�
�
{:;' ._: t4;i `. --
��;
� �' � J �
� � Y`
� `� �.�' `�
rF
�%0 , �
�
�
$
$
$
$
$
$
$
$
$
459.00
31.00
10.00
77.00
31.00
5.00
$
816.00
$
$ 168.00
$ 408.00
$
�
�
�
Public Facilities Impact F-ees (see reverse s�ue� $
�--� , /�_
,�_-�_ ., � ��= -� � -��
TOTAL FEES PAID: $ 2�� �
., _�--�,, l- �-
�_�- � � ,-�
�__ �_ _
Effective 07.2012 S:WANDOUTSIFee Schedule Receipt and Forms1201-2FFEES RECE/PT 07.2012.doc J
�ate: D� � U�- I � Z
���,� :A�•� �� �