Loading...
HomeMy WebLinkAbout100 Costa Rica Avenue - Approval LetterDocuSlgn Envelope ID: BD976C83-ESD7-4BD5-BD68-FOFD94F'24810 ,y ,� R CITY OF BURLINGAME City Hall — 501 Primrose Road Burlingame, California 94010-3997 CITY ,�r � e4 COMMUNITY DEVELOPMENT DEPARTMENT Planning Division PH:(650)558-7250 FAX:(650)696-3790 October 26, 2020 Gleason & Gleason Design Partners 77 Huntleigh Road Piedmont, CA 94611 Re: 100 Costa Rica Avenue, Burlingame Dear Applicant, Mailing Date: 11.12.20 Since there was no appeal to or suspension by the City Council, the October 13, 2020, Planning Commission approval of your application for Design Review and Conditional Use Permits became effective October 23, 2020. This application was for a first and second story addition to an existing single family dwelling and Conditional Use Permits for a new detached garage at 100 Costa Rica Avenue, zoned R-1. The October 13, 2020, minutes of the Planning Commission state your application was approved with the following conditions: that the project shall be built as shown on the plans submitted to the Planning Division date stamped September 21, 2020, sheets A1.0 through A.5.1 and L1; 2. that prior to issuance of a bui►ding permit, the applicant shall submit an FYI noting on the plans that the project will include simulated true divided lite windows; the FYI shall also include a sample or photographs of the proposed concrete tile roofing material and an address of a house in Burlingame where the proposed concrete tile roofing has been installed; 3. that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYI or amendment to be determined by Planning staff); � 4. that any changes to the size or envelope of the first or second floors, or garage which would include adding or enlarging a dormer (s), shall require an amendment to this permit; 5. that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; that demolition or removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; �� Register online to receive City of Burlingame e-mail updates at www.burlingame.org :'_. DocuSign Envelope ID: BD976C83-E8D7-48D5-BD68-FOFD94F24810 October 26, 2020 100 Costa Rica Avenue Page 2 �-� w 6. that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; 7. that all air ducts, plumbing vents, and fiies shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 8. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 9. that demolition for removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 10. that the project shall meet all the requirements of the California Buitding and Uniform Fire Codes, in effect at time of building permit submittal, as amended by the City of Burlingame; THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 10. that prior to scheduling the framing inspection the applicant shall provide a certification by the project architect or residential designer, or another architect or residential design professional, that demonstrates that the project falls at or below the maximum approved floor area ratio for the property; 11. that prior to scheduling the foundation inspection, a licensed surveyor shall locate the property corners, set the building footprint and certify the first floor elevation of the new structure(s) based on the elevation at the top of the form boards per the approved plans; this survey shall be accepted by the City Engineer; 12. prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; 13. that prior to schedu�ing the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; and I�`� Register online to receive City of Burlingame e-mail updates at www.burlingame.org ��� DocuSign Envelope ID: BD976C83-ESD7-4BD5-BD6&FOFD94F24810 � Oc+obe� 26, 2020 100 Costa Rica Avenue Page 3 14. that prior to final inspection, Pfanning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been build according to the approved Planning and Building plans. All site improvements and construction work will require separate application to the Building Department. This a}�proval is valid for one year during which time a building permit must be issued. An extensson of up to one year may be considered by the Planning Commission if application is made before the end of the first year. The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section 1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within 90 days of the date of the decision unless a shorter time is required pursuant to state or federal law. SincerVly, CDocu�gned by: ��. ���.� 28D6423C2E8849F... Kevin Gardiner, AICP Community Development Director c. Kristine Furrer, property owner 100 Costa Rica Avenue, Burlingame Chief Deputy Valuation, Assessor's Office (LOT 19 BLOCK 7 BURLINGAME PARK NO 2 RSM B/17; APN: 028-293-190) �File �� Register online to receive City of Burlingame e-mail updates at www.burlingame.org ��