October 26, 2020
Gleason & Gleason Design Partners
77 Huntleigh Road
Piedmont, CA 94611
Re: 100 Costa Rica Avenue, Burlingame
Dear Applicant,
Mailing Date: 11.12.20
Since there was no appeal to or suspension by the City Council, the October 13, 2020, Planning
Commission approval of your application for Design Review and Conditional Use Permits became
effective October 23, 2020. This application was for a first and second story addition to an existing single
family dwelling and Conditional Use Permits for a new detached garage at 100 Costa Rica Avenue,
zoned R-1.
The October 13, 2020, minutes of the Planning Commission state your application was approved with
the following conditions:
that the project shall be built as shown on the plans submitted to the Planning Division date
stamped September 21, 2020, sheets A1.0 through A.5.1 and L1;
2. that prior to issuance of a bui►ding permit, the applicant shall submit an FYI noting on the
plans that the project will include simulated true divided lite windows; the FYI shall also
include a sample or photographs of the proposed concrete tile roofing material and an
address of a house in Burlingame where the proposed concrete tile roofing has been
installed;
3. that any changes to building materials, exterior finishes, windows, architectural features,
roof height or pitch, and amount or type of hardscape materials shall be subject to Planning
Division or Planning Commission review (FYI or amendment to be determined by Planning
staff); �
4. that any changes to the size or envelope of the first or second floors, or garage which would
include adding or enlarging a dormer (s), shall require an amendment to this permit;
5. that any recycling containers, debris boxes or dumpsters for the construction project shall
be placed upon the private property, if feasible, as determined by the Community
Development Director; that demolition or removal of the existing structures and any grading
or earth moving on the site shall not occur until a building permit has been issued and such
site work shall be required to comply with all the regulations of the Bay Area Air Quality
Management District;
�� Register online to receive City of Burlingame e-mail updates at www.burlingame.org :'_.
DocuSign Envelope ID: BD976C83-E8D7-48D5-BD68-FOFD94F24810
October 26, 2020
100 Costa Rica Avenue
Page 2
�-� w
6. that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of
approval adopted by the Planning Commission, or City Council on appeal; which shall
remain a part of all sets of approved plans throughout the construction process. Compliance
with all conditions of approval is required; the conditions of approval shall not be modified or
changed without the approval of the Planning Commission, or City Council on appeal;
7. that all air ducts, plumbing vents, and fiies shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that
these venting details shall be included and approved in the construction plans before a
Building permit is issued;
8. that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects to
submit a Waste Reduction plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
9. that demolition for removal of the existing structures and any grading or earth moving on the
site shall not occur until a building permit has been issued and such site work shall be
required to comply with all the regulations of the Bay Area Air Quality Management District;
10. that the project shall meet all the requirements of the California Buitding and Uniform Fire
Codes, in effect at time of building permit submittal, as amended by the City of Burlingame;
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
10. that prior to scheduling the framing inspection the applicant shall provide a certification by
the project architect or residential designer, or another architect or residential design
professional, that demonstrates that the project falls at or below the maximum approved
floor area ratio for the property;
11. that prior to scheduling the foundation inspection, a licensed surveyor shall locate the
property corners, set the building footprint and certify the first floor elevation of the new
structure(s) based on the elevation at the top of the form boards per the approved plans;
this survey shall be accepted by the City Engineer;
12. prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural
certification that the architectural certification that the architectural details shown in the
approved design which should be evident at framing, such as window locations and bays,
are built as shown on the approved plans; architectural certification documenting framing
compliance with approved design shall be submitted to the Building Division before the final
framing inspection shall be scheduled;
13. that prior to schedu�ing the roof deck inspection, a licensed surveyor shall shoot the height
of the roof ridge and provide certification of that height to the Building Division; and
I�`� Register online to receive City of Burlingame e-mail updates at www.burlingame.org ���
DocuSign Envelope ID: BD976C83-ESD7-4BD5-BD6&FOFD94F24810
� Oc+obe� 26, 2020
100 Costa Rica Avenue
Page 3
14. that prior to final inspection, Pfanning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been
build according to the approved Planning and Building plans.
All site improvements and construction work will require separate application to the Building Department.
This a}�proval is valid for one year during which time a building permit must be issued. An
extensson of up to one year may be considered by the Planning Commission if application is made
before the end of the first year.
The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section
1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within
90 days of the date of the decision unless a shorter time is required pursuant to state or federal law.
SincerVly,
CDocu�gned by:
��. ���.�
28D6423C2E8849F...
Kevin Gardiner, AICP
Community Development Director
c. Kristine Furrer, property owner
100 Costa Rica Avenue, Burlingame
Chief Deputy Valuation, Assessor's Office
(LOT 19 BLOCK 7 BURLINGAME PARK NO 2 RSM B/17; APN: 028-293-190)