The City of Burlingame
CIT'Y HALL 501 PRIMROSE ROAD TEL: (650) 558-7250
PLANNING DEPARTMENT BURLINGAME, CALIFORNIA 94010-3997 FAX: (650) 696-3790
June 3, 2005
Frankie L. Gonzalez and Irene Azzollini
1109 Balboa Avenue
Burlingame, CA 94010
Dear Mr. Gonzalez and Ms. Azzollini,
Since there was no appeal to or suspension by the City Council, the May 23, 2005 Planning Commission
approval of your application for design review became effective June 2, 2005. This application was to allow a
first and second story addition at 1109 Balboa Avenue, zoned R-l.
The May 23, 2005 minutes of the Planning Commission state your application was approved with the following
conditions:
that the project shall be built as shown on the plans submitted to the Planning Deparhnent date
stamped May 5, 2005, sheets 1 through 8, site plan, floor plan, building elevations and landscape plan
on the site plan and that any changes to building materials, exterior finishes, footprint or floor area of
the building shall require an amendment;
2. that any increase to the habitable basement floor area and any changes to the size or envelope of the
first or second floors, which would include expanding the footprint or floor area of the structure,
replacing or relocating a window (s), adding a dormer (s) or changing the roof height or pitch, shall be
subject to design review;
3. that the conditions of the Recycling Specialist, Fire Marshal, Chief Building Official, NPDES
Coordinator and City Engineer's memos dated February 15, 2005 shall be met;
4. that prior to scheduling the framing inspection, the project architect, engineer or other licensed
professional shall provide architectural certification that the architectural details such as window
locations and bays are built as shown on the approved plans; if there is no licensed professional
involved in the project, the property owner or contractor shall provide the certification under penalty
of perjury. Certifications shall be submitted to the Building Department;
5. that prior to final inspection, Planning Department staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans;
Iuhe 3, 2005
1109 Balboa Avenue
Page 2
6. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that these venting
details shall be included and approved in the construction plans before a Building permit is issued;
7. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof
ridge and provide certification of that height to the Building Department;
that during construction the applicant shall use all applicable "best management practices" as
identified in Burlingame's Storm Water Ordinance, to prevent erosion and off-site sedimentation of
storm water runoff; and
9. that the project shall meet all the requirements of the California Building and Fire Codes, 2001
edition, as amended by the City of Burlingame.
Reimbursement of the design review deposit has been processed and will be mailed to you under separate cover.
All site improvements and construction work will require separate application to the Building Department. This
approval is valid for one year during which time a building permit must be issued. One extension of up to one
year may be considered by the Planning Commission if application is made before the end of the first year.
The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section
1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within 90 days
of the date of the decision unless a shorter time is required pursuant to state or federal law.
Sincerely yours,
(�� �._
Margaret Monroe
City Planner
c. JD & Associates
1228 Paloma Avenue
Burlingame, CA 94010
Chief Deputy Valuation, Assessor's Office
(LOT 12 BLOCK 24 EASTON ADD BURLIGNAME NO 2 RSM A/72; APN# 026-162-110)
�
Date:
Project Comments
02/15/200�
To: � City Engineer
� Chief Building Official
� � City Arborist
� City Attorney
From:
Subject:
Planning Staff
X Recycling Specialist
� Fire Marshal
� NPDES Coordinator
Request for design review for a first and second story addition at
1109 Balboa Avenue, zoned R-1, APN: 026-162-110
Staff Review: 02/15/2005
Applicant shall submit for approval a Waste Reduction Plan and recycling deposit for
this and all covered projects prior to construction or permitting.
Reviewed by:
Date: �/ 7.� Oj
,
Date:
� To:
From:
Subject:
Staff Review:
Project Comments
02/15/2005 .
t�(( City Engineer
❑ Chief Building Official
❑ City Arborist
O City Attorney
Planning Staff
O Recycling Specialist
❑ Fire Marshal
❑ NPDES Coordinator
Request for design review for a first and second story addition at
1109 Balboa Avenue, zoned R-1, APN: 026-162-110
02/15/2005
1. Storm drainage shall be designed to drain towards the street frontage.
Drainage piping as shown on plans is acceptable.
2. Replace all displaced/damaged sidewalk, driveway, curb and gutter.
3. Sewer backwater protection certification is required. Contact Public Works —
Engineering Division at (650) 558-7230 for additional information.
�..
� Reviewed by: V V
Date: 2/22/2005
,
D�te:
, To:
From:
Subject:
Staff Review:
Project Comments
02/15/2005
a City Engineer ❑ Recycling Specialist .
❑ Chief Building Official �f Fire Marshal
❑ City Arborist ❑ NPDES Coordinator
❑ City Attomey �
Planning Staff
Request for design review for a first and second story addition at
1109 Balboa Avenue, zoned R-1, APN: 026-162-110 �
02/15/2005
Provide a residential fire sprinkler throughout the residence.
1. Provide a minimum 1 inch water meter.
2. Provide double backflow prevention.
a
�
Reviewed by: :>�`�
Date: ��� �,���
Project Comments
Date:
To:
From:
Subject:
Staff Review:
02/15/2005
� City Engineer
X Chief Building Official
� City Arborist
O Ciry Attomey
❑ Recycling Specialist
❑ Fire Marshal
❑ NPDES Coordinator
Planning Staff
Request for design review for a first and second story addition at
1109 Balboa Avenue, zoned R-1, APN: 026�-16Z-110
02/15/2005
1) All construction must comply with the 2001 California Building Codes (CBC),
the Burlingame Municipal and Zoning Codes, and all other State and Federal
requirements.
2) Provide fully dimensioned plans.
3) According to the City of Burlingame Municipal code "when additions,
alterations or repairs within any twelve-month period exceed fifty percent of
the current replacement value of an existing building or structure, as
determined by the building official, such building or structure shall be made in
its entirety to conform with the requirements for new buildings or structures."
Therefore, this building must comply with the 2001 Califomia Building Code
for new structures.
4) Obtain a survey of the property lines for any structure within one foot of the
property line.
5) Roof eaves must not project within two feet of the property line.
6) Exterior bearing walls less than three feet from the property line must be
constructed of one-ho�r fire-rated construction. �
•7) Rooms that can be used for sleeping purposes must have at least one window
or door that complies with the egress requirements. �
8) Provide guardrails at all landings.
9) Provide handrails at all stairs where there are more than two risers.
10)Provide lighting at all exterior landings.
11)The fireplace chimney must terminate at least two feet above any roof surface
within ten feet.
� -��� ate: c�,��j /�'
Project Comments
Date:
To:
From:
Subject:
Staff Review:
02/15/2005
� City Engineer
� Chief Building OfFcial
� City Arborist
� City Attomey
� Recycling Specialist
� Fire Marshal
✓ NPDES Coordinator
Planning Staff
Request for design review for a first and second story addition at
1109 Balboa Avenue, zoned R-1, APN: 026-162-110
02/15/2005
Any construction project in the City, regardless of size, shall comply with the City
NPDES permit requirement to prevenf stormwater pollution including but not limited
to ensuring that all contractors implement construction Best Management Practices
(BMPs) and erosion and sediment control measures during ALL phases of the
construction project (including demolition).
The easement located behind the site shall not be used as a construction staging
and/or storage area and shall be free of construction debris at all times.
Additional stormwater requirements may be issued as conditions of approval for this
project. �
Brochures and literatures on stormwater pollution prevention and BMPs are available
for your review at the Planning and Building departments. Distribute to all project
proponents.
For additional assistance, contact Eva J. at 650/342-3727.
Reviewed by: ��. Date: o�I b�oS"