Loading...
HomeMy WebLinkAbout1102 Balboa Avenue - Approval Letter� PUBLIC WORKS DEPARTMENT (650) 558-7230 l 'l rf', ,_ - . `�- r� J; The Ciiy of Burlingame CITY HALL - 501 PRIMROSE ROAD BURLINGAME, CALIFORNIA 94010-3997 June 27, 2007 Yang Min Yang 1104 Balboa Avenue Burlingame, CA 94010-4931 Re: Change of Address - 1104 Balboa Avenue APN 026-161-160 Dear Mr. Yang: CORPORATION YARD (650) 558-7670 This letter confirms the change of address that you requested to your existing house from 1104 Balboa Avenue to 1102 Balboa Avenue. . Please post the new address number on the front of the house near the entrance so that it can be visible from the street. Also, the new numbers must be illuminated. We have given notice to the parties listed below. Please advise other interested parties of this change. Sincerely, CITY OF BURLINGAME Syed Murtuza, P.E. Asst. Director of Public Works sy Edwin Chung Engineering Technician c: Pacific Gas & Electric, Pac�c Bell, Burlingame Post Office, Plaiuiing Department, Building Department, Fire Department, Street & Sewer Department, Police Department, Water Office, Water Departrnent, Park Department, Assessor's Office [] CHANGE ADDRESS ON FLOODPLAIN DATABASE ON LOCAL AREA NET [] REPRINT FLOODPLAIN DATABASE & GNE BUII.DING DEPT. CHANGED DATABASE [] CHANGE ADDRESS ON WATER, SEWER & STORM MAPS IN MAP ROOM (RED) [) GIS DATA BASE (JIlVI KELL� ,� CITV � �� � � / � ��� v a'I � 411� �M1l� ��� q �4now�rc The City of Burlingame CITY HALL 501 PRIMROSE ROAD TEL: (650) 558-7250 PLANNING DEPARTMENT BURLINGAME, CALIFORNIA 94010-3997 FAX: (650) 696-3790 November 6, 2007 James Chu Chu Design and Engineering, Inc. 55 W. 43`d Avenue San Mateo, CA 94403 Dear Mr. Chu, Since there was no appeal to or suspension by the City Council, the October 22, 2007, Planning Commission approval of your application for design review became effective November 1, 2007. This application was to allow for a new two-story house with two-car detached garage at 1104 Balboa Avenue, zoned R-1. The October 22, 2007, minutes of the Planning Commission state your application was approved with the following conditions: that the project shall be built as shown on the plans submitted to the Planning Department date stamped October 11, 2007, sheets A.1 through A.6 and L1.0, and that any changes to building materials, exterior finishes, footprint or floor area of the building shall require an amendment to this permit; 2. that the conditions of the Chief Building Official's June 22 and September 24, 2007 memos, the City Engineer's June 25, 2007 memo, the Fire Marshal's June 26, 2007 memo, and the NPDES Coordinator's June 26, 2007 memo shall be met; 3. that demolition for removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 4. that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dormer(s), moving or changing windows and architectural features or changing the roof height or pitch, shall be subject to Planning Commission review; 5. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 6. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; November 6, 2007 1104 Balboa Avenue Page —2- 7. that during demolition of the existing residence, site preparation and construction of the new residence, the applicant shall use all applicable "best management practices" as identified in Burlingame's Storm Water Ordinance, to prevent erosion and off-site sedimentation of storm water runoff; 8. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2001 Edition, as amended by the City of Burlingame; THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 9. that prior to scheduling the foundation inspection, a licensed surveyor shall locate the property corners, set the building footprint and certify the first floor elevation of the new structure(s) based on the elevation at the top of the form boards per the approved plans; this survey shall be accepted by the City Engineer; 10. that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; 11. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Department; and 12. that prior to final inspection, Planning Department staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. All site improvements and construction work will require separate application to the Building Department. This approval is valid for one year during which time a building permit must be issued. One extension of up to one year may be considered by the Planning Commission if application is made before the end of the first year. The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section 1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within 90 days of the date of the decision unless a shorter time is required pursuant to state or federal law. Sincerely yours, (�.1GG����'c%'/ William Meeker Community Development Director c. James Chu, designer 55 W. 43`d Avenue San Mateo, CA 94403 Chief Deputy Valuation, Assessor's Office (LOT 16 BLOCK 19 EASTON ADD BURLINGAME NO 2 RSM A/72) File v 0 Project Comments Date: June 21, 2007 To: �( City Engineer (650) 558-7230 ❑ Chief Building Official (650) 558-7260 ❑ City Arborist (650) 558-7254 From: Subject: Staff Review: Planning Staff ❑ Recycling Specialist (650) 558-7271 ❑ Fire Marshal (650) 558-7600 d NPDES Coordinator (650) 342-3727 ❑ City Attorney Request for design review for new two-story single family dwelling at 1104 Balboa Avenue, zoned R-1, APN: 026-161-160 June 25, 2007 1. See attached. 2. Sewer backwater protection certification is required. Contact Public Works — Engineering Division at (650) 558-7230 for additional information. Date: 6/25/2007 Reviewed by: V V •, . , . PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION PLANNING REVIEW COMII�NTS � �`' � �0'� Project Namee •� 52.��s iea,�qv��� -ProjectAddress: U,s� ��`19 ��� The following requirements apply to the project 1 � A property boundary survey shall be preformed by a licensed land . surveyor. The survey shall show all property lines, property corners, easements, topograplucal features and utilities. (Required prior to the building permit issuance.) ��;t�v��/ �� ���r-�� cs� '� ,/ t�i,C�� 1.�� s�,t�f:�l ���7e—. 2 1� The site and roof drainage shall be shown on plans and should be made to drai.n towards the Frontage Street. (Required prior to the building permit issuance.) 3. The applicant shall submit project grading and drainage plans for approval prior to the issuance of a Building permit. 4 The project site is in a flood zone, the project shall comply with the City's flood zone requirements. 5 1� �� tary sewer lateral �t is required for the project in accordance with th� City's standazds. ) 6. The project plans shall show the required Bay&ont Bike/Pedestrian trail and necessary public access improvements as required by San Francisco Bay Conservation and I�evelopment Commission. 7. Sanitary sewer analysis is required for the project. The sewer analysis shall identify the project's impact to the City's sewer system and any sewer pump stations and identify mitigation measures. , 8 Submit tra�ffic trip generation analysis for the project. 9. Submit a traffic impact study for the projec� The traffic study should identify the project generated impacts and recommend mitigation measures to be adopted by the project to be approved by the City Engineer. 10. The project shall file a parcel map with the Public Works Engineering Division. The parcel map shall show all existing property lines, easements, monuments, and new properry and lot lines proposed by the map. Page 1 of 3 U:\private development�PLANNING REVIEW CONIMENTS.doc � , .. PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION 11. A latest preliminary title report of the subject parcel of land shall be submitted to the Public Works Engineering Division with the parcel map for reviews. 12. Map closure/lot closure calculations sha11 be submitted with the parcel map. 13 The project shall submit a condominium map to the Engineering Divisions in accordance with the requirements of the Subdivision Map Act. 14 �_ The project shall, at its own cost, design and construct frontage public improvements including curb, gutter, sidewalk and other necessary , appurtenant work. 15 The project sha11, at its own cost, design and construct fronfage streetscape improvements including sidewalk, curb, gutters, pazking meters and poles, trees, and streetlights in accordance with streetscape master plan. 16 By the preliminary review of plans, it appears that the project may cause adverse impacts during construction to vehiculaz traffic, pedestrian traffic and public on street pazking. The project shall identify these impacts and provide mitigation measure acceptable to the City. 17 The project shall submit hydrologic calculations from a registered civil engi.neer for the proposed creek enclosure. The hydraulic calculations � must show that the proposed creek enclosure doesn't cause any adverse impact to both upstream and downstream properties. The hydrologic calculations shall accompany a site map showing the area of the 100-year flood and existing improvements with proposed improvements. 18 Any work within the drainage area, creek, or creek banks requires a State Department of Fish and Game Permit and Army Corps of Engineers Perr�its. � 19 No construction debris shall be allowed into the creek. 20 � The project shall comply with the City's NPDES permit requirement to prevent storm water pollution. 21 The project does not show the dimensions of existing driveways, re- submit plans with driveway dimensions. Also clarify if the project is proposing to widen the driveway. Any widening of the driveway is subject to City Engineer's approval. 22 The plans do not indicate the slope of the driveway, re-submit plans showing the driveway profile with elevations Page 2 of 3 U:\private development�PLANNING REVIEW COMMENTS.doc .� , + .' PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION 23 The back of the driveway/sidewalk approach shall be at least 12" above the flow line of the frontage curb in the street to prevent overIlow of storm water from the street into private property. 24. For the takeout service, a gazbage receptacle shall be placed in front. The � sidewalk fronting the store shall be kept clean 20' from each side of the property. 25. For, commercial projects a designated gazbage bin space and cleaning azea shall be located inside the building. A drain connecti.ng the gazbage area to the Sanitary Sewer System is required. Page 3 of 3 U:\private development�PLANNING REVIEW COM1vv�NTS.doc Project Comments Date: To: From: Subject: Staff Review: June 21, 2007 a City Engineer (650) 558-7230 X Chief Building Official (650) 558-7260 ❑ City Arborist (650) 558-7254 ❑ Recycling Specialist (650) 558-7271 ❑ Fire Marshal (650) 558-7600 ❑ NPDES Coordinator (650) 342-3727 ❑ City Attorney Planning Staff Request for design review for new two-story single family dwelling at 1104 Balboa Avenue, zoned R-1, APN: 026-161-160 June 25, 2007 1) All construction must comply with the 2001 California Building Codes (CBC), the Burlingame Municipal and Zoning Codes, and all other State and Federal requirements. 2) Provide fully dimensioned plans. 3) When you submit your plans to the Building Division for plan review provide a completed Supplemental Demolition Permit Application. NOTE: The Demolition Permit will not be issued until a Building Permit is issued for the project. 4) Comply with the new, 2005 California Energy Efficiency Standards for low-rise residential buildings. Go to http•//www.enerqv.ca.qov/title24 for publications and details. 5) Obtain a survey of the property lines for any structure within one foot of the property line. 6) Roof eaves must not project within two feet of the property line. 7) Exterior bearing walls less than three feet from the property line must be constructed of one- hour fire-rated construction and no openings are allowed. �8) Rooms that can be used for sleeping purposes must have at least one window or door that complies with the egress requirements. 9) Provide guardrails at all landings. NOTE: All landings more than 30" in height at any point are considered in calculating the allowable floor area. Consult the Planning Department for details if your project entails landings more than 30" in height. 10) Provide handrails at all stairs where there are four or more risers. 11) Provide lighting at all exterior landings. 12) The chimney for a solid fuel burning fireplace must terminate at least two feet above any roof surface within ten feet. 13) NOTE: Plans tHat specifically address item 8 must be re-submitted before this project can move forward for Planning Commission action. Reviewed b��� � � � Date: � /°� L / � i��- �-`� �L �Jx `��� � � � Y � Date: To: Project Commenfs June 21, 2007 ❑ City Engineer ❑ Recycling Specialist (650) 558-7230 (650) 558-7279 ❑ Chief Building Official D Fire Marshai (650) 558-7260 (650) 558-7600 []� City Arborist ❑ NPDES Coordinator (650) 558-7254 {650).342-3727 ❑ City Attorney From: Planning Staff Subject: Request for design review for new two-story single family dwelling at 1104 Balboa Avenue, zoned R-1, APN: 026-161-960 Staff Review: June 25, 2007 -- -- - �CL- ---��SE�?�J� ��ri'tl1��`�Y� - , _ _ .._.___ �_. _ .� _ Date: ��� �l�o� Z Project Comments Date: June 26, 2007 To: � City Engineer � Recycling Specialist (650) 558-7230 (650) 558-7271 � Chief Building Official x Fire Marshal (650) 558-7260 (650) 558-7600 � City Arborist � NPDES Coordinator (650) 558-7254 (650) 342-3727 � City Attorney From: Planning Staff Subject: Request for design review for new two-story single family dwelling at 1104 Balboa Avenue, zoned R-1, APN: 026-161-160 Staff Review: June 25, 2007 Provide a resideniial fire sprinkler throughout the residence. 1. Provide a minimum 1 inch water meter. 2. Provide backflow prevention device/double check valve assembly — Schematic of water lateral line after meter shall be shown on Building Plans prior to approval indicating location of the device after the split between domestic and fire protection lines. 3. Drawings submitted to Building Department for review and approval shall clearly indicate Fire Sp�inklers shall be installed and shop drawings shall be approved by the Fire Department prior to installation. R���"������ J�cJ � � 2007 ���-�( pF 6URLWGAME PW�(�ING DEPT. Reviewed by: Date: Project Comments Date: To: � City Attorney From: Subject: Staff RP_VIP_W: June 21, 2007 � City Engineer (650) 558-7230 � Chief Building Official (650) 558-7260 � City Arborist (650) 558-7254 � Recycling Specialist (650) 558-7271 � Fire Marshal (650) 558-7600 � NPDES Coordinator (650) 342-3727 Planning Staff Request for design review for new finro-story single family dwelling at 1104 Balboa Avenue, zoned R-1, APN: 026-161-160 June 25, 2007 1) Any construction project in the City, regardless of size, shall comply with the City NPDES permit requirement to prevent stormwater pollution including but not limited to ensuring that all contractors implement construction Best Management Practices (BMPs) and erosion and sediment control measures during ALL phases of the construction project (including demolition). Include appropriate stormwater BMPs as Project Notes. These BMPs include but are not limited to the following: • Store, handle, and dispose of construction materials and wastes properly to prevent contact and contamination of stormwater; . Control and prevent the discharge of all potential pollutants, including pavement cutting wastes, paints, concrete, petroleum products, chemicals, wash water or sediments, and non-stormwater discharges to storm drains and watercourses; . Use sediment controls or filtration to remove sediment when dewaterirg site and obtain all necessary permits; • Avoid cleaning, fueling, or maintaining vehicles on-site except in a designated area where wash water is contained and treated; • Protect adjacent properties and undisturbed areas from construction impacts using vegetative buffer strips, sediment barriers or filters, dikes, mulching, or other measures as appropriate; • PerForm clearing and earth moving activities only during dry weather; . Limit and time application of pesticides and fertilizers to prevent polluted runoff; • Limit construction access routes and stabilize designated access points; • Avoid tracking dirt or other materials off-site; clean off-site paved areas and sidewalks using dry sweeping method; • The Contractor shall train and provide instruction to all employees and subcontractors regarding the construction BMPs. 1 of 2 Project Comments — Con't-1104 Balboa Ave., New, 2-story Single Family Dweliing. 2) The public right of way/easement shall not be used as a construction staging and/or storage area and shall be free of construction debris at all times. 3) Implement Erosion and Sedimentation Controls: a. Install and maintain all temporary erosion and sediment controls continuously until permanent erosion control have been established; b. Address method(s) for diverting on-site runoff around exposed areas and diverting off-site runoff arount the site; c. Address methods for preventing erosion and trapping sediment on-site. 4) Provide notes, specifications, or attachments describing the following: a. Construction, operation and maintenance of erosion and sediment control measures, including inspection frequency; b. Methods and schedule for grading, excavation, filling, clearing of vegetation, and storage and disposal of excavated or cleared materi�l. Brochures and literatures on stormwater pollution prevention and BMPs are available for your review at the Planning and Building departments. Distribute to all project proponents. For additional assistance, contact Eva J. at 650/342-3727. Reviewed by: �� Date: 06/26/07