Resolution No. 019-2004
2838 ADELINE DRIVE; APN: 027-091-080
TITLE OF DOCUMENT
I hereby certify this to be a full, true
and correct copy of the document it purports
to be, the original of which is on file in my office.
Date: 03/19/2004
"aw�A%A'v—
MVgakt MonrA City Planner
CGT.
RECEIVED
APR 8 2004
CITY OF BURLINGAME
PLANNING DEPT.
RESOLUTION 019-2004
RESOLUTION APPROVING MITIGATED NEGATIVE DECLARATION, DEISGN REVIEW
AND SPECIAL PERMIT
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a mitigated negative declaration has been proposed and application has been made for
design review and special permit to construct a new two and a half story single family dwelling with an
attached garage at 2838 Adeline Drive, zoned R-1, Michael W. and Donna A. Gaul, property owners, APN:
027-091-080;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on March
8, 2004, at which time it reviewed and considered the staff report and all other written materials and testimony
presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
1. On the basis of the Initial Study and the documents submitted and reviewed, and comments
received and addressed by this commission, it is hereby found that there is no substantial evidence that the
project set forth above will have a significant effect on the environment, and mitigated negative declaration,
per Mitigated Negative Declaration No. ND-532-P, is hereby approved.
2. Said mitigated negative declaration, design review and special permit are approved, subject to
the conditions set forth in Exhibit "A" attached hereto. Findings for such mitigated negative declaration,
design review and special permit are set forth in the minutes and recording of said meeting.
It is further directed that a certified copy of this resolution be recorded in the official records of
the County of San Mateo.
w�
AIRMAN
I, —17 ✓Y1 A-kVa1'\ , Secretary of the Planning Commission of the City of Burlingame,
do hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the
Planning Commission held on the 8th day of March, 2004. by the following vote:
AYES: COMMISSIONERS:
Auran, Bojues, Brownrigg, Keighran, Osterling, Vistica
NOES: COMMISSIONERS:
NONE
ABSENT: COMMISSIONERS:
Keele SECRETARY
ABSTAIN: COMMISSIONERS:
NONE
EXHIBIT "A"
Conditions of approval for mitigated negative declaration, design review and special permit.
2838 Adeline Drive
effective March 18, 2004
1. that the project shall be built as shown on the plans submitted to the Planning Department
date stamped April 29, 2003, Sheets 1 thru 8, site plan, floor plans, roof plan, and building
elevations, and Sheet L1.0 and L2.0 landscape plan and erosion control plan;
2. that the applicant shall adhere to the construction phasing schedule listed in the applicants
"Calendar of Operations" , however not necessarily the dates, which may shift for various
reasons;
3. that the applicant shall install a walkway in front of the property to a standard acceptable to
Public Works Department;
4. that any changes to the size or envelope of the basement, first or second floors, which would
include adding or enlarging a dormer(s), moving or changing windows and architectural
features or changing the roof height or pitch, shall be subject to design review;
5. that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects to
submit a Waste Reduction Plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
6. that the conditions of the Fire Marshal's April 24 and 30, 2003 memos, City Engineer's April
16, 2003 and May 8, 2003 memos, and City Arborist's April 11, 2003 memo shall be met;
7. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of
the roof ridge and provide certification of that height;
8. that prior to scheduling the framing inspection, the project architect, engineer or other
licensed professional shall provide architectural certification that the architectural details
such as window locations and bays are built as shown on the approved plans; if there is no
licensed professional involved in the project, the property owner or contractor shall provide
the certification under penalty of perjury;
9. that prior to final inspection, Planning Department staff will inspect and note compliance of
the architectural details (trim materials, window type, etc.) to verify that the project has been
built according to the approved Planning and Building plans;
10. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that these
venting details shall be included and approved in the construction plans before a Building
permit is issued;
Conditions of approval for mitigated negative declaration, design review and special permit.
2838 Adeline Drive
Page 2
11. That there shall be no pile driving as part of this project;
12. That the house foundation be a drilled pier and grade beam design, penetrating into the
underlying sandstone bedrock material a minimum of 8 feet, with an expected overall depth
of 18 feet with a minimum of a 16" diameter;
13. That the piers shall be designed to resist a lateral active pressure of 50 pounds per cubic foot
acting on the top five feet of the pier;
14. That all clearing and earth moving activities shall only occur during dry weather only, April
15 through November 1, as per the San Francisco Regional Water Quality Control Board and
that all NPDES and STOPPP requirements shall be met on the site at all times during
construction;
15. That at the commencement of construction, the retaining walls shall be erected prior to the
removal of the trees on -site and prior to the grading of the driveway;
16. That no demolition or grading shall occur until the City Arborist has reviewed and approved
all required arborist reports; and during excavation and slope cutting temporary shoring shall
be required to prevent movement of exposed materials. All shoring shall be analyzed by
licensed engineer, and shall be approved by the City Engineer prior to any construction;
17. That the retaining walls shall be designed to resist lateral earth pressure and additional lateral
pressures to the levels required by a license soils engineer and approved by the City; caused
by surcharge loads applied at the ground surface behind the walls;
18. That all imported fill materials on the site shall be non -expansive materials with a Plasticity
Index of 12 or less;
19. That all retaining walls shall have a sub -drain system consisting of a four inch diameter
perforated pipe bedded in drain rock wrapped with filter fabric to a height of two-thirds the
height of the wall;
20. That all retaining walls shall be backfilled and compacted to at least 90 percent relative
compaction;
21. That all retaining walls shall be waterproofed;
22. That the project shall be required to meet all the requirements, including seismic standards,
of the California Building and Fire Codes, 2001 Edition, as amended by the City of
Burlingame, for structural stability; an the construction plans and design shall be approved by
the Building Department and all necessary permits issued before any grading, tree removal or
construction occurs on the site;
Conditions of approval for mitigated negative declaration, design review and special permit.
2838 Adeline Drive
Page 3
23. That the applicant shall connect with the existing 3 inch screwed steel water line on Adeline
Drive for the domestic water supply for the new single family dwelling, in accordance with
the City of Burlingame Public Works standards;
24. That the applicant shall use the swimming pool on -site for the water supply for the residential
fire sprinkler system, with a suction pump that will powered from the main electrical service,
and will also be connected to the back up generator, all system details shall be reviewed and
approved to be in accordance with standards acceptable to the City of Burlingame's Fire
Marshal prior to issuance of a building permit;
25. That the applicant shall submit an erosion and sedimentation control plan describing BMPs
(Best Management Practices) to be used to prevent soil, dirt and debris from entering the
storm drain system; the plan shall include a site plan showing the property lines, existing and
proposed topography and slope; areas to be disturbed, locations of cut/fill and soil
storage/disposal areas; areas with existing vegetation to be protected; existing and proposed
drainage patterns and structures; watercourse or sensitive areas on -site or immediately
downstream of a project; and designated construction access routes, Staging areas and
washout areas; this plan must be approved by the City Engineer, Public Works Department
prior to any grading or construction work on the site;
26. That the erosion and sedimentation control plans should include notes, specifications, and/or
attachments describing the construction operation and maintenance of erosion and sediment
control measures, including inspection frequency; methods and schedule for grading,
excavation, filling clearing of vegetative cover and mulch, including methods and schedules
for planting and fertilization; and provisions for temporary and permanent irrigation;
27. That off -site runoff shall be diverted around the construction site and all on -site runoff shall
be diverted around exposed construction areas;
28. That methods and procedures such as sediment basins or traps, earthen dikes or berms, silt
fences, straw bale dikes, check dams storm drain inlet protection soil blanket or mats, and
covers for soil stock piles to stabilize denuded areas shall be installed to maintain temporary
erosion controls and sediment control continuously until permanent erosion controls have
been established;
29. That all construction materials and waste, including solid wastes, paints, concrete, petroleum
products, chemicals, wash water or sediment, shall be stored, handled and disposed of
properly to prevent the discharge of all potential pollutants into stormwater;
30. That no vehicles or equipment shall be cleaned, fueled or maintained on -site, except in
designed areas which runoff is contained and treated;
Conditions of approval for mitigated negative declaration, design review and special permit.
2838 Adeline Drive
Page 4
31. That dust control should be implemented where required during grading, which includes
spraying cut areas where there is significant particulate matter created by soil disturbance;
32. That within 24 hours after cutting down the Eucalyptus trees on the site, the stumps shall be
ground;
33. That the site shall be terraced, either permanently or temporarily, immediately after the
removal of the trees on this site and no later than 4 weeks, after cutting the trees to prevent
erosion and soil instability on the slope;
34. That the root zones of Oak trees to remain on -site shall be covered with 4 inches of mulch,
and then covered with a layer of plywood to reduce soil compaction around the tree;
35. That the trunks of the Oak trees shall be wrapped with wooden planks with highly visible
orange netting wrapped around the planks to attached them to the trunk, no nails or screws
shall be used for attachment;
36. That low limbs, identified and marked by a licensed arborist, that will be in the way of
construction traffic shall be trimmed as directed by a licensed arborist prior to construction to
avoid having them ripped off by construction vehicles;
37. That all clearing limits, easements, setbacks, sensitive or critical areas, buffer zones trees,
and drainage courses are clearly delineated with field markers or fencing installed under the
supervision of a licensed arborist and inspected by the City Arborist; and that adjacent
properties and undisturbed areas shall be protected from construction impacts with vegetative
buffer strips, sediment barriers or filters, dikes or mulching as designed by and installed with
the supervision of a licensed arborist to standards approved by the City Arborist;
38. That all of tree protection measures shall be taken prior to beginning any tree removal
activities, grading or construction on the site;
39. That a licensed arborist, hired by the applicant, shall inspect the construction site once a
week or more frequently if necessary and certify in writing to the City Arborist and Planning
Department that all tree protection measures are in place and requirements are being met;
40. That in accordance with the City's Reforestation Ordinance a reforestation program for this
site shall include planting the following 24" box size trees: 3 Japanese Maples, 5 Southern
Magnolias,13 Coast Live Oaks, 7 Swampmyrtles, 6 Western Redbuds, 6 Strawberry Trees,
1 Jacaranda, 4 Pittosporum Undulatum and 16 Tree Ferns at the locations shown on the
approved landscape plan prior to scheduling the final inspection;
Conditions of approval for mitigated negative declaration, design review and special permit.
2838 Adeline Drive
Page 5
41. That a licensed arborist shall provide a post -construction maintenance program to the
property owners with instructions on how to maintain them and identify warning signs of
poor tree health; the property owners shall be responsible for the maintenance of the trees for
3 years after construction is finalled by the City and shall bear the penalty fee should the trees
not survive the 3-year period; the trees shall be inspected for compliance twice a year by the
City Arborist during the 3-year period;
42. That drilling of piers shall be limited to Monday through Saturday 8:00 a.m. to 4:00 p.m.,
with no drilling on Sundays or Holidays. All other construction shall be done in accordance
with the California Building Code requirements as amended by the City of Burlingame, and
limits to hours of construction imposed by the City of Burlingame Municipal Code, 7:00 a.m.
and 7:00 p.m. on weekdays, 9:00 a.m. and 6:00 p.m. on Saturdays and 10:00 a.m. to 6:00
p.m. on Sundays and holidays;
43. That the applicant is shall construct a minimum paved turnout of 20' wide by 40' deep at the
top of the driveway to provide parking for a fire truck on -site;
44. That the applicant shall construct a staircase to code standards from the turnout at the top of
the driveway to the lower driveway to allow direct pedestrian access to the structure for
emergency response personnel;
45. That the staircase from the turnout at the driveway entrance to the lower driveway shall be
lighted from dusk to dawn daily for safe passage;
46. That the contractor shall submit the "Recycling and Waste Reduction" form to the building
department to be approved by the Chief Building Official that demonstrates how that 60
percent of the total waste tonnage generated from project construction shall be diverted from
the waste stream and the property owner shall be responsible for the implementation of this
plan;
47. All runoff created during construction and future discharge from the site will be required to
meet National Pollution Discharge Elimination System (NPDES) standards;
48. That this project shall comply with Ordinance No. 1477, Exterior Illumination Ordinance;
49. That the applicant shall provided landscaping on the site as shown on the plans approved by
the Planning Commission. All shall be drip irrigated and installed prior to scheduling the
final building inspection;
50. That the project shall obtain Planning Commission design review approval before any tree
removal, grading or construction takes place on the site;
Conditions of approval for mitigated negative declaration, design review and special permit.
2838 Adeline Drive
Page 6
51. That should any cultural resources be discovered during construction, all work shall be halted
until they are fully investigated by a professional accepted as qualified by the City Planner
and the recommendations of the expert have been executed to the satisfaction of the City;
52. That if the applicant finds it necessary to access the subject property from the Sisters of
Mercy trail, the applicant shall be responsible for repairing any damage to the trail; and
53. that the chain link fence to be installed on the site shall be a dark green clad fence.
VA
ROUTING FORM
2nd review
DATE: April 29, 2003
TO: _City Engineer
Chief Building Official
VFire Marshal
Recycling Specialist
_City Arborist
_City Attorney
FROM: Planning Staff
SUBJECT: Request for design review, environmental review and special permit for an attached garage
for an new single family dwelling at 2838 Adeline Drive, zoned R-1:
APN: 027-091-080.
STAFF REVIEW: Monday, May 5, 2003
Reviewed By: Tate of Comments: 3oc�Z
ROUTING FORM
DATE: April 2, 2003
TO: _City Engineer
Chief Building Official
]ZFire Marshal
Recycling Specialist
Sr. Landscape Inspector
_City Attorney
FROM: Planning Staff
SUBJECT: Request for design review, environmental review and special permit for an attached garage
for a new single family dwelling at 2838 Adeline Drive, zoned R-1, APN: 027-091-080.
51 Ark ELb V 1h W : Monday, April '/, LOOS
e—
Reviewed By:-� /�'���.� Date of Comments:
ROUTING FORM
2nd reVieW
DATE: April 29, 2003
TO: City Engineer
Chief Building Official
Fire Marshal
_Recycling Specialist
_City Arborist
City Attorney
FROM: Planning Staff
SUBJECT: Request for design review, environmental review and special permit for an attached garage
for an new single family dwelling at 2838 Adeline Drive, zoned R-1:
APN: 027-091-080.
STAFF REVIEW: Monday, May 5, 2003
0 ! c L H %v0 70 ee!//�✓ 2�✓i!i o •�G.9-r
i�Geo.•.z5wc?'77�D�J ipeeoaa..r4 7'
iewed By: ihd &/ZZ a Date of Comments:
J
ROUTING FORM
DATE: April 2, 2003
TO: 1! City Engineer
Chief Building Official
Fire Marshal
Recycling Specialist
Sr. Landscape Inspector
City Attorney
FROM: Planning Staff
SUBJECT: Request for design review, environmental review and special permit for an attached garage
for a new single family dwelling at 2838 Adeline Drive, zoned R-1, APN: 027.091-080.
STAtIf MVIEW: Monday, April 7, L003
@ &,*M f�" VW. <V9 -51q-6 xfk0a -1. w4whoL9
Vy qlk,�
C
® ( ice " 4tAA 3 LA 4 � jXfaW94;
Reviewed By: Vy , Date of Comments: I
PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
PLANNING REVIEW COMMENTS WigV yi�
Project Name: t�Z
Project Address:
The following requirements apply to the project
1.__ A property. boundary survey shall be preformed by a licensed land
surveyor. The survey shall show all property lines, property corners,
easements, topographical features and utilities. (Required prior to the
building permit issuance.)
2_ The site and roof drainage shall be shown on plans and should be made to
drain towards the Frontage Street. (Required prior to the building permit
/ issuance.)
3. Y The applicant shall submit project grading and drainage plans for
approval prior to the issuance of a Building permit.
4 The project site is in a flood zone, the project shall comply with the City's
flood zone requirements.
5 A ssani'tary sewer lateral- UK is required for the project in accordance with
the City's standards. (Required prior to the building permit issuance.)
6. The project plans shall show the required Bayfront Bike/Pedestrian trail
and necessary public access improvements as required by San Francisco
Bay Conservation and Development Commission.
7. Sanitary sewer analysis is required for the project. The sewer analysis
,shall identify the project's impact to the City's sewer system and any
sewer pump stations and identify mitigation .-!t-ysures.
8 Submit traffic trip generation analysis for the project.
9. Submit a traffic impact study for the project. The traffic study should
identify the project generated impacts and recommend mitigation
measures to be adopted by the project to be approved by the City
Engineer.
10. The project shall file a parcel map with the Public Works Engineering
Division. The parcel map shall show all existing property lines, easements,
monuments, and new property and lot lines proposed by the map.
Pagel of 3
UAprivate developmenAPLANNING REVIEW COMMENTS.doc
PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
11. A latest preliminary title report of the subject parcel of land shall be
submitted to the Public Works Engineering Division with the parcel map
for reviews.
12. Map closure/lot closure calculations shall be submitted with the parcel
map.
13 The project shall submit a condominium map to the Engineering Divisions
in accordance with the requirements of the Subdivision Map Act.
14 _it/ The project shall, at its own cost, design and construct frontage public
improvements including curb, gutter, sidewalk and other necessary
appurtenant work.
15 The project shall, at its own cost, design and construct frontage streetscape
improvements including sidewalk, curb, gutters, parking meters and poles,
trees, and streetlights in accordance with streetscape master plan.
16 By the preliminary review of plans, it appears that the project may cause
adverse impacts during construction to vehicular traffic, pedestrian traffic
and public on street parking. The project shall identify these impacts and
provide mitigation measure acceptable to the City.
17 The project shall submit hydrologic calculations from a registered civil
engineer for the proposed creek enclosure. The hydraulic calculations
must show that the proposed creek enclosure doesn't cause any adverse
impact to both upstream and downstream properties. The hydrologic
calculations shall accompany a site map showing the area of the 100-year
flood and existing improvements with proposed improvements.
18 Any work within the drainage area, creek, or creek banks requires a State
Department of Fish and Game Permit and Army Corps of Engineers �= i
Permits.
19 No construction debris shall be allowed into the creek.
20 The project shall comply with the City's NPDES permit requirement to
prevent storm water pollution.
21 The project does not show the dimensions of existing driveways, re-
submit plans with driveway dimensions. Also clarify if the project is
proposing to widen the driveway. Any widening of the driveway is subject
to City Engineer's approval.
22 _ V The plans do not indicate the slope of the driveway, re -submit plans
showing the driveway profile with elevations, P u
�2,U
UAprivate developmentTLANNING REVIEW COMVIENTS.doc
PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
23 The back of the driveway/sidewalk approach shall be at least 12" above
the flow line of the frontage curb in the street to prevent overflow of storm
water from the street into private property.
24. For the takeout service, a garbage receptacle shall be placed in front. The
sidewalk fronting the store shall be kept clean 20' from each side of the
property.
25. For commercial projects a designated garbage bin space and cleaning area
shall be located inside the building. A drain connecting the garbage area to
the Sanitary Sewer System is required.
Page 3 of 3
U:\private development\PLANNING REVIEW COMMENTS.doc
ROUTING O.
DATE: April 2, 2003
TO: _City Engineer
Chief Building Official
Fire Marshal
Recycling Specialist
7Sr. Landscape Inspector
_City Attorney
FROM: Planning Staff
SUBJECT: Request for design review, environmental review and special permit for an attached garage
for a new single family dwelling at 2838 Adeline Drive, zoned R-1, APN: 027-091-080.
STAFF REVIEW: Mondav, April 7, 2003
/ r
/ ��Ozv-
Ic'. Sp, i ,-2 6 -701 E ---- S �jb 12 e5 �r.d-c .�-r� Gv i,
F-e - C a—, r--- � /Z S cam- -Z Zf5t�-0 2 fit-
2�51Z:i'—cS cj5.y�.�
Reviewed By: _--''/ ' D
Y -- ate of Comments: