CITY OF BURLINGAME
City Hall — 501 Primrose Road
Burlingame, California 94010-3997
August 19, 2022
Tim Raduenz
Form + One
4843 Silver Springs Drive
Park City, UT 84098
Re: 2229 Adeline Drive
Dear Mr. Raduenz,
•�.
BURLINGAME
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division
PH: (650) 558-7250
FAX: (650) 696-3790
Since there was no appeal to or suspension by the City Council, the August 8, 2022, Planning Commission
approval of your application for Design Review and Special Permit for Declining Height Envelope became
effective August 18, 2022. This application was for a finro and a half story addition to an existing single-unit
dwelling at 2229 Adeline Drive, zoned R-1.
The August 8, 2022 minutes of the Planning Commission state your application was approved with the following
conditions:
that the project shall be built as shown on the plans submitted to the Planning Division date stamped
July 26, 2022, sheets T1.0, A1.0 through G2.0;
2. that any changes to building materials, exterior finishes, windows, architectural features, roof height or
pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning
Commission review (FYI or amendment to be determined by Planning staf�;
3.
4.
that any changes to the size or envelope of the basement, first or second floors, or garage, which
would include adding or enlarging a dormer(s), shall require an amendment to this permit;
that any recycling containers, debris boxes or dumpsters for the construction project shall be placed
upon the private property, if feasible, as determined by the Community Development Director;
5. that demolition for removal of the existing structures and any grading or earth moving on the site shall
not occur until a building permit has been issued and such site work shall be required to comply with all
the regulations of the Bay Area Air Quality Management District;
6. that prior to issuance of a building permit for construction of the project, the project construction plans
shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning
Commission, or City Council on appeal; which shall remain a part of all sets of approved plans
throughout the construction process. Compliance with all conditions of approval is required; the
conditions of approval shall not be modified or changed without the approval of the Planning
Commission, or City Council on appeal;
7. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination
and installed on the portions of the roof not visible from the street; and that�these venting details shall
be included and approved in the construction plans before a Building permit is issued;
eg Register online to receive City of Burlingame e-mail updates at www.burlingame.org ��
DocuSign Envelope ID: COA92086-DFCF-4IBD-A4F3-4763DF285F98
August 19, 2022
2229 Adeline Drive
Page 2
8. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which
requires affected demolition, new construction and alteration projects to submit a Waste Reduction
plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior,
shall require a demolition permit;
9. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, in
effect at time of building permit submittal, as amended by the City of Burlingame;
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS
PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
10. that prior to scheduling the framing inspection the project architect or residential designer, or another
architect or residential design professional, shall provide an architectural certification that the
architectural details shown in the approved design which should be evident at framing, such as window
locations and bays, are built as shown on the approved plans; architectural certification documenting
framing compliance with approved design shall be submitted to the Building Division before the final
framing inspection shall be scheduled;
11. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof
ridge and provide certification of that height to the Building Division; and
12. that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural
details (trim materials, window type, etc.) to verify that the project has been built according to the
approved Planning and Building plans.
All site improvements and construction work will require a separate application to the Building Division. This
approval is valid for two years during which time a building permit must be issued (building permit must
be issued by April 7, 2024). One extension of up to one year may be considered by the Community Development
Director if a written application and filing fee is submitted to the Planning Division at least 30 days prior to the
expiration date of the initial Planning approval.
The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section 1094.6.
If you wish to challenge the decision in a court of competent jurisdiction, you must do so within 90 days of the date
of the decision unless a shorter time is required pursuant to state or federal law.
Sincerely,
�t ui�. Ga�v'�.i�n.t,V'
Kevin Gardiner, AICP
Community Development Director
c. Cameron and Shannon Foster, property owners
2229 Adeline Drive
Burlingame, CA 94010
Chief Deputy Valuation, Assessor's Office
(Lot 15 Block 4 Burlingahome Sub Rsm 9/49 50; APN: 027-161-160)
File