Loading...
HomeMy WebLinkAbout2208 Adeline Drive - Approval LetterCITY OF BURLINGAME City Hall — 501 Primrose Road Burlingame, California 94010-3997 July 23, 2013 Dale Meyer Dale Meyer Associates 100 EI Camino Real, Suite 201 Burlingame, CA 94010 Re: 2208 Adeline Drive Dear Mr. Meyer, � C17Y �� � �J � �� •.". COMMUNITY DEVELOPMENT DEPARTMENT Pianning Division PH: (650) 558-7250 FAX: (650) 696-3790 Since there was no appeal to or suspension by the City Council, the July 8, 2013, Planning Commission approval of your application for Variance for Lot Coverage became effective July 18, 2013. This application was for a first and second story addition to an existing single family dwelling at 2208 Adeline Drive, zoned R-1. The July 8, 2013 minutes of the Planning Commission state your application was approved with the following conditions: 1. that the project shall be built as shown on the plans submitted to the Planning Division date stamped June 26, 2013, sheets P1 through P6, and that any changes to the footprint or floor area of the building shall require an amendment to this permit; - _ _ _ _ _ _ _ . . _ 2. that the conditions of the Building Division's June 4 and April 12, 2013 memos, the Engineering Division's April 22, 2013 memo, the Fire Division's April 15, 2013 memo, the Parks Division's April 12, 2013 memo and the Stormwater Coordinator's April 18, 2013 memo shall be met; 3. that if the structure is. demolished or the envelope changed at a later date the lot coverage variance, as well as any other exceptions to the code granted here, will become void; 4. that demolition or removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 5. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; and �: Register online to receive City of Burlingame e-mail updates at www.burlingame.org :: July 23, 2013 2208 Adeline Drive Page 2 6. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2010 Edition, as amended by the City of Burlingame. All site improvements and construction work will require separate application to the Building Department. This approval is valid for one year during which time a building permit must be issued. An extension of up to one year may be considered by the Planning Commission if application is made before the end of the first year. The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section 1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within 90 days of the date of the decision unless a shorter time is required pursuant to state or federal law. Sincerely, ;�-�I� � . ,; ;:� � - �: �Iliam Meeker Community Development Director c. John and Robin Watson, property owners 2208 Adeline Drive Burlingame, CA 94010 Chief Deputy Valuation, Assessor's Office (LOT 20 BLOCK 2 BURLINGHOME SUB RSM 9/49 50; APN: 027-142-150) _ File _ _ - :: Register online to receive City of Burlingame e-mail updates at www.burlingame.org �: � 0 Date: Project Comments June 3, 2013 To: � Engineering Division (650) 558-7230 X Building Division (650) 558-7260 0 Parks Division � (650) 558-7334 From: Planning Staff � Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Subject: Request for variances for lot coverage and side setback for a first and second story addition to an existing single family dwelling at 2208 Adeline Drive, zoned R-1, APN: 027-142-150 Staff Review: No further comments. All conditions of approval as stated in the review dated 4-12-2013 will apply to this project. Reviewe : 6-4-2013 �� Project Comments Date: To: From: April 11, 2013 � Engineering Division (650) 558-7230 X Building Division (650) 558-7260 � Parks Division (650) 558-7334 � Fire Division (650) 558-7600 0 Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Ptanning Staff Subject: Request for variances for lot coverage and side setback for a first and second tory addition to an existing single family dwelling�at 2208 Adeline Drive, zoned R-1, APN: 027-142-150 Staff Review: April 15, 2013 �On the plans specify that this project will comply with the 2010 Califomia Building Code, 2010 California Residential Code (where applicable), 2010 California Mechanical Code, 2010 California Electrical Code, and 2010 California Plumbing Code, including all amendments as adopted in Ordinance 1856-2010. Note: If the Planning Commission� has approved the project prior to 5:00 p.m. on December 31, 2010 then the building permit application for that project may use the provisions found in the 2007 California Building Codes including all amendments as adppted in Ordinance 1813. �On the plans provide a copy of the GreenPoints checklist for this project at full scale. /� Specify on the plans that this project will comply with the 2008 California Energy __.. Efficiency Standards. --Go to htfp:"/lwww.enerqv.ca:qov/title24/2008standards - orpublications an " etai s: �j Place the following information on the first page of the plans: "Construction Hours" , Weekdays: 7:00 a.m. — 7:00 p.m. � Saturdays: 9:00 a.m. — 6:00 p.m. � Sundays and Holidays: 10:00 a.m. — 6:00 p.m. (See City of Burlingame Municipal Code, Section 13.04.100 for details.) �n the first page of the plans specify the following: "Any hidden conditions that require work to be performed beyond the scope of the building permit issued for these plans may require further City approvals including review by the Planning Commission." The building owner, project designer, and/or contractor must submit a Revision to the City for any work not graphically illustrated on the Job Copy of the plans prior to performing the work. 6) Anyone who is doing business in the City must have a current City of Burlingame business license. 7) Provide fully dimensioned plans. 8) Provide a fully dimensioned site plan which shows the true property boundaries, the location of all structures on the property, existing driveways, and on-site parking. 9) Provide existing and proposed elevations. 10) This project will be considered a New Building because, according to the City of Burlingame Municipal code, "when additions, alterations or repairs within any twelve- month period exceed fifty percent of the current replacement value of an existing building or structure, as determined by the building official, such building or structure shall be made in its entirety to conform with the requirements for new buildings or structures.° This building must comply with the 2010 California Building Code for new structures. BMC 18.07.020 Note: Any revisions to the plans approved by the Building Division must be submitted to, and approved by, the Building Division prior to the implementation of any work nof specifically shown on the plans. Significant delays can occur if changes made in the field, without City approval, necessitate further review by City departments or the Planning Commission. Inspections cannot be scheduled and will not be pertormed for work that is not shown on the Approved plans. 11) Due to the extensive nature of this construction project the Certificate of Occupancy will be rescinded once construction begins. A new Certificate of Occupancywill be issued after the project has been finaled. No occupancy of the building is to occur until a new Certificate of Occupancy has been issued. 12) Provide a complete demolition plan that indicates the existing walls, walls to be demolished, new walls, and a legend. NOTE: A condition of this project approval is that the Demolition Permit will not be issued and, and no work can begin (including the removal of a� building components), until a Building Permit has been issued for the project. The property owner is responsible for assuring that no work is authorized or pertormed. 13) Show the distances from all exterior walls to property lines or to assumed property lines �On the plans specify that the roof eaves will not project within two feet of the property line. . ndicate on the plans that exterior bearing walls less than five feet from the property line �� �ill be built of one-hour fire-rated construction. (2010 CBC, Table 602) �J�`ooms that can be used for sleeping purposes must have at least one window or door that complies with the egress requirements. Specify the locafion and the net c/ear opening height and widfh of all required egress windows on the elevafion - - -- --- -- awm_4s.----- - — -- --- - 17 dicate on the plans that a Grading Permit, if required, will be obtained from the Department of Public Works. 18) Provide guardrails at all landings. NOTE: All landings more than 30" in height at any point are considered in calculating the allowable lot coverage. Consult the Planning � Department for details if your project entails landings more than 30° in height. 19) Provide handrails at all stairs where there are four or more risers. ,�20 Provide lighting at all exterior. landings. he fireplace chimney must terminate at least two feet higher than any portion of the building within ten feet. 2010 CBC §2113.9 NOTE: A written response to the items noted here and plans that specifically address items 1, 2, 3, 4, 5, 14, 15, 16, 17, and 21 must be re-submitted before this project can move forward for Planning Corr�ssion action. Reviewed,b�f./ ��; �f� r�f/'�� Date: 4-12-2013 Project Comments � Date: To: From: April 11, 2013 � Engineering Division (650) 558-7230 � Building Division (650) 558-7260 � Parks Division (650) 558-7334 0 Fire Division � (650) 558-7600 �.Stormwater Division (650) 342-3727 0 City Attorney (650) 558-7204 Planning Staff Subject: Request for variances for lot coverage and side setback for a first and second story addition to an existing single family dwelling at 2208 Adeline Drive, zoned R-1, APN: 027-142-150 Staff Review: April 15, 2013 1) Any construction project in the City, regardless of size, shall comply with the City's NPDES (stormwater) permit to prevent stormwater pollution from construction � activities. Project proponent shall ensure all contractors irnplement appropriate and effective BMPs during all phases of construction, including demolition. When submitting plans for a building permit include a list of construction BMPs as project notes on a separate full size plan sheet, preferably 2' x 3' or larger. Project proponent may use the attached Construction BMPs plan sheet to comply with this requirement. Electronic file is available for download at: http•//www.flowstobay.orq/documents/business/construction/Countvwide Proqram B MP Plan Sheet Jun2012.pdf 2) Best Management Practices (BMPs) requirements apply on any projects using architectural copper. To learn what these requirements are, see attached flyer "Requirements for Architectural Copper." Electronic file is available for download at: http://www.flowstobay.orq/documents/municipalities/nd/Materials/2012%20Materials/ Architectural copper BMPs FINAL.pdf For assistance please contact Stephen D. at 650-342-3727 Reviewed by: SD � Date: 4/18/2013 Project Comments Date: To: From: April 11, 2013 X Engineering Division (650) 558-7230 � Building Division (650) 558-7260 � Parks Division (650) 558-7334 � Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 0 City Attorney (650) 558-7204 Planning Staff Subject: Request for variances for lot coverage and side setback for a first and second tory addition to an existing single family dwelling at 2208 Adeline Drive, zoned R-1, APN: 027-142-150 Staff Review: April 15, 2013 1. Storm drainage shall be designed to drain towards the street frontage or to the City storm drain system. 2. The project shall, at its own cost, design and construct frontage public improvements including curb, gutter, sidewalk,.driveway and other necessary appurtenant work. - 3. Sewer backwater-protection certification is required.._ContactP_ublic Works — Engineering Division at (650) 558-7230 for additional-information. Reviewed by: V V Date: 4/22/2013 Project Comments Date: To: From: April 11, 2013 0 Engineering Divisian (650) 558-7230 � Building Division (650) 558-7260 � Parks Division (650) 558-7334 8 Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Planning Staff Subject: Request for variances for lot coverage and side setback for a first � �and second tory addition to an existing single family dwelling at 2208 Adeline Drive, zoned R-1, APN: 027-142-150 Staff Review: April 15, 2013 While the project appears to not require sprinklers based upon proposed addition and remodel, the project is close. Be advised where more than one (1) addition and/or alteration for which building permits are required are made within a finro (2) year period and said alterations are made to the premises of the same occupant. In such circumstances, the sum of these additions and/or alterations construction costs during this two (2) year period shall be aggregated for the purpose of calculating the replacement cost value formula. Final determination will be made and the plan review phase of the project. It is very important that you understand the threshold indicated by BMC §17.04.030. Designer, contractor, and owner should communicate specifically the extent of demolition and remodel. Keeping in mind any change orders and addendums which increase the total amount of square footage added or remodeled after plan review would be applied to the sprinkler ordinance. Reviewed by: ;��/ Date: /,s-�� f� L Date: To: From: Subject: Staff Review: Project Comments April 11, 2013 � Engineering Division (650) 558-7230 0 Building Division (650) 558-7260 X Parks Division (650) 558-7334 Planning StafF � Fire D_ivision (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Request for variances for lot coverage and side setback for a first and second tory addition to an existing single fami4y dwetling at 2208 Adeline Drive, zoned R-1, APN: 027-142-150 April 15, 2013 ' 1. No Comments- landscaping is not changing. Correct number of trees existing on site. � Reviewed by: B Disco Date: 4/12/13 � SAN MATEO COUNiYWIOE Water Pollution Prevention Program Clean Water. Healthy Lomm�nity. Construction B;est Nlaterials & V1'aste blanagement Noo-Amanlauf Materlali � O Bem� nnd eova slaApiies of mnd, dirt or o�M1cr consmwtion meteriol n•iih urq w�lan rain i� foraail m if nol xlivcly bcing uud uithin 14 dara. O Uac (bm don'1 ovenoe) ¢clnimed n•altt for dusl conhol. Huardom Molertai� ❑ label ali hnnrdous mnmriel� and hn.ardou� wnsici (mcA a� pearicide�, puime, U�innen. �ohxms, fuel, oil, ond nmifrzers) in xcmdonce vilh city, counry, slole and kdernl ropulationn. � Slom hazardous moMrialt end watles in ���ater IigM conlainen, storc in eppropri�le cecm�dary conlainnwnt, and corer Jmm at Ihe uid of eacn work day a dming H�d weelhcr or n�lron nin if forecari � Foilo.f n�enufaclnrcr i eppliwlion inslmclion� for hvardou� materiole ond be ureflil nol to ua morc Ihnn neces�w. Do na nppic chcmicals omdoon �vhen rein ie fortcee� wiihin 241wim. O Mange fa npproprialt disposnl of oll hazp�dow waslm. Wmlt Mnnagemenl O Covv wes�e diaposol conlainen sttmcl�• irilh terys nt �he end of treq• �vorl dey nnd d�iriny.ve� p•ceiiwr. ❑ Checl- waste dispofoPconminen freqacnd,v for �mks �nd Io meke sure ihey ert not orerGlled. Ne�u M1ose do�m n dnmprer on Ihe consttuction ai�a ❑ Clean or rcplace pona6le loilcis, and iiupecl0�em Gequen�ly fa leala end epiilf. ❑ Disposc o(oll �veslq and deMi� propcdy, Raycle ma�erial� end �raslef Ihal un be rccrcled (sucB m�sphall. concrcle. eggeg�te bnse molcrinl; n•ood. SyP bonrd, Pipe, cm.) O Dispose olliquid rniduq Gom poinls,lhinncrt wlrenla, `lue�, end cleening Iluie4 nf hnznrdws �vasle. Conctructlon Enirance.� anU Perimeler O Esloblieh ond meinuin effective pedmeler conirob end eubilize eli wnstruction entmnce� nnd e�its Io fulficitnlly control erosion pnd udimenl dixhargea Gom tim �nd vockin` off eile. ❑ S�veep or �acwm anT shsel IrncWn` immedialely ond secme udin�ent soume �o prcvent funher vxking. Nevv hox do��n �imms lo cican np Incling. Equipment Managemcnt & � Spill Control � � ..�.. .�F ' i _ i � . f� Construction projects are required to implement the stormwater best management practices (BMP) on this page, as they apply to your project, all year long. i hlnintenanccandPuking I ❑ Designele m uea, fined ni1L oppropriete BMP�, fa �•ehicle and equipmcnt pad:in` md slaaga I ❑ Perfo`m mqjor meinteunu, rcpnirjoM, nnd �rohicb end eqnipmmt w�sshing oReite. ❑ If mfuelin' or �rchicle meintenenee mmt be done onsiiq afork in e b�mmcd nu enar hom slomi dniro end o�xr � drip pen big mougA lo collcet Auids. Rec��cle or dispose of Buida o� hivnrdwi neete. O If ve6icle or equi�nenl cleaning m�al be doik onsih, cleen wi0i aeter only in � bem�ed arce ilial '�vill �wt albn rinae �veter to mn inw guncrs. �hecl; etorm a,dna. a ��u�� a.c«.. i ❑ Do nol cican .chick w equipment onsiw us�ng waps, sohxnl3, degrtaser; etenm eknnuig tquipmen4 �t0. Sp�li Prtccndon end Con[ml I, O Keep epill cicenup malerisl� (nge, abeor6cnu, cte.) e�yileble at tl¢ conslrucfim silc al all Hnxs�. O Inspcc� �c6iclu and equipmcnt f qucnUy flr end mpoir leali p`vmptlf. Use ddp pnns ro cemb leak� until rtpoin are made. O Cleon up apill� or Ieala immedin�ely ond disposa of cleem�p materiel� propeclp, ❑ Do �ro11wu do.vn aurfacu �rhae Ouids h�ve epilled. Use drp cleennp mcll�ods (ebwrbcnl mo�erialf. wt lille, anNof ngf} ' ❑ S�vicep np epillcd dn melerieB immcslimeltl Do not try to wmh �hem nw�ap wiW wattr. or buq Ihem. O Clenn up apille on dirt arcna by digging i�p ond properly diepoeing ofwntaminated aoiL I O Reporl signifiunt spills immediaroh. Yw ua rcq��irtd bp Im lo rcpart oli aig�ificanl releau: oCAaiudo�u malcriel; including oil. To report e epill: 1) Disl 911 m 7�onr locel emergency �eaponae number, 2) Cell tlw Garemorl O[Gce oCEmergencl• Servicet Wnmin` Cemeq (8(r% 832-830 (2i Loun). i, Management Practices (BMPs) �arthwork & Paving/Asphalt Work Contnminated Soiis � C � ...���" ! ��� . � `d 1� , ..,"�.�.»�.�`.+�"""«ra„�{,� � � . .,a � � �/ 1/ - � � A/�a a � E�oslon Contml � Sc6ednit gnding �nd e<carnHon o�orl: Cor dry' �atalher only. O Sabii(ee sll denuded areae, insiall md meintain Icmponq• ttofion controla (such m�rmion wntrol fa6rie w booded fiber mnui�) unN vegemtion Ie mtablislKd O Seed or plenl �egetntion for aysion . controi on alopes or �diece comtruction is nat immediaRly plenned Sedimenl COnlrol O Pmtecl storm dnin inleq Qu4m, ditc6q, and dninage cwna n•i�h opp�opriole BMP�, mch u grorel bege, fiber m(Is, bemu. elc. O P�evenl sedimenl from migroting offaile by in�elline nnd mainteining eediment comrolf, such es Gbet m1is, sill kncet or sediment besins. O Keep atcar��cd wil on Uw siw where it �rill nd wllecl in�o We �treel O TrensRr esuvelad mnteriai� to dump trocki on �he si�e, nW in tl�e etrceL O Contnmine�ed Soib ❑ If enT of Ihe fol�o��ing oondilion� em obearved, leat 1'a eomnminetlon a�d comacl �io Rcgionnl Wamr Queliry Control Boerd: ■ Umm�ul wil rnndilionf, dixoiwation, a� odor. ■ AbendoiKd imdcrgmund bnka. ■ Abendoncd wcll� ■ Bwied bmmb, debr'v, or trazh O A�vid pnving ond xnl cooting in w�tl mteJ¢y ora�hen roin ia fofecest before fresM1 peremenl �vill he�e lime �o tti¢. O Cover nom� dnin inlcu a� mm�holea whco applying sul rneL nck cwt, stu�� wl tog sen4 etc. O Colleuendrtxycleoroppropriatelp dispox oCezcesr abrmi.e pa�xl or �and. Do NOT meep ot �vns6 it imo gutters. ❑ Da nol me welv lo wesh down hesh osphel[ concmle pnvement Seecutt(n� & Aephdt/ConcrtMe Rcmovd ❑ Completel� em�er or borticede srom� dreininleDwhcnsawtatling. Usefiller febriq catd� bezin inicl filias, or gn.xl bags m lup alum out o( Ow aofm drain syatem. O Shovel, aboewb, w �aowm uwtut dmry and dispou of elI waste o aoon ea yw arc finid�cd in oirc loca�ion w e� �he end of each work dn?• (whichn�er If soonvl). O If san•cro slum• mters � cerch lnsia clean it up immcdialcly. Concrete, Grout & blortar Application ❑ Sroie wnaetq grout nnd mortu under w�v, on peileb and eway from dnLuge arca. Theu marcriols musl naror rcach • �lorm dnin. O Wesh ait concmlc cquipmenUuuckf oRsiro or In � conloined areo, so Ihem i� m dircherge inro Iiw mided,ving wil of alio SurtW Ildin� �Rif, �,CI COI1CrtM harden and diapou of as garbage. � Collect ihe �vosh n�e�cr Gvm nashing esposed eggrcgnte wncrcte u�d mmo��e il for npp�opriele disposol ofCsile. Dewatering :t.-, f t,� � Y ,yi4�._� '� � �ui;;r� �� . . �' l[� O ERecii�nh• monege all ninon, oll runoff n•ilhin Uw �iw, nnd ell mnoRlhol dizhargc� ham t6e sitc, Divert runon H�eicr fmm olTiiic m��ey Rom all dislurbcd nrem a otl�erni�e ensure wmplin�e. ❑ When den�e�crinQ, no�ify and obUin npprova� han Ihe loul municipotiry• befort diech�rging ���etn lo � atrecl guuer or stonn d'nin. Filtralion or di�ersion throug6 � baain, �, a scdimenl trnp mar Ix ¢qoircd O In areef o(kno�n con�amineiion, tcsun� i� rtqui�ed prior io rcnm or diacl�aqte of gm�mdwola. Cons�dt ailh tl�c Engincer lo delem�ine whe0�er tee�iny is requirtd and hmr lo intcrprM rtsulu. Conlamina�ed gronnd�vela mm1 bc Uee�ed or henlcA oQKi�e fw propu d'uposui. Storm drain polluters may be liable for fines of up �to $10,000 per Painting & Paint Removal 1�,.�:�„ � _.�- `� j� 'y ; I �•� ``+ ^ , w . 1 Prinlin� cleanup O Nm�er clean bmslw� or rinse painl fAnloinen into � 511Cc1, guttcr, slofm dmin,orsurfacen�alcrz � O For n�etcr-bucd paints, paini oul brushcs lo Jie eslcnl possiblc. Rinsc Io �hc saniury• srn�er once ��ou hne gained pem�ission from �he locol nros�ewntcr Imnlment nuthority. Nttcr pour peinl dmrn e drou�. ❑ Fw oil-Mmd painu. Winl rnn brushc� io Ihe toenl poseible end cleon n�i1h ILinner or sohxnt in � proper routeinet Filkr uid rcnsc Ihinncrt nnd zohrn�s. Disposc ol' 2tidue and umuable Ihinnedwkcnls os ha�ardous wesle. Pui�t �emurd ❑ Clrcmicnl pnint stripping residuc ond chiq ond d�isl Gom marine painls nr ainls conlai ' � P mi g Icad w Iribulylun must bc disposcd of u hazardous n'estc. ❑ Peint cM1ip� nnd dnri fmm non-ha ardau dry stripping nnd tnnd blosling mnr be nrept up or wilected in plas�ie drop clodis md dispo�cd of u unsh. Landscape lllaterials f �°M� f ����^t� -ti -: O Conttin stockpiled landscaping ma�erials M s�orin{ Wem u�tt lurps n�6cn lhq� em nd aclivcl7 bcin� �ued. O SmcY e�odiblc landxn�x mnlerial on pnllcu. Co�xr rn slom Ihesc malcrinla w�hen Iiwy arc nW acfirely 6eing uscd or nppli<d ❑ Diuonlinue nppliution of �ny podible lundscape melcriel x�i0�in 2 de��a Mforc n fomcasl rein e�xm or dnring n�cl �uArer. . � . iRN MASEO CDUNTYWlOF � Wa�er Poilution Prevention Program 6tae Watxr. He�hhy [ommuMiy. Requirements for Architectural Copper Protect water quality during installation, cleaning, treating, and washing! Copper from Buildings May Harm Aquatic Life Copper can harm aquatic life in San Francisco Bay. Water that comes into contact with architectural copper may contribute to impacts, especially during installation, cleaning, treating, or washing. Patination solutions that are used to obtain the desired shade of green or brown typically contain acids. After treatment, when the copper is rinsed to remove these acids, the rinse water is a source of pollutants. Municipalities prohibit discharges to the storm drain of water used in the installation, cleaning, treating and washing�of architectural copper. Use Best Management Practices (BMPs) The following Best Management Practices (BMPs) must be implemented #o prevent prohibited discharges to storm drains. During Installafion � � If possible, purchase copper materials that have been pre-patinated at the factory. • If patination is done on-site, implement one or more of the following BMPs: o Discharge the rinse water to landscaping. Ensure that the rinse water does not flow to the street or storm drain. Block off storm drain inlet if needed. o Collect rinse water in a tank and pump to the sanitary sewer. Contact your local� sanitary sewer agency before discharging to the sanitary sewer. o Collect the rinse water in a tank and haul off-site for proper disposal. � Consider coating the copper materials with an impervious coating that prevents further corrosion and runoff. This will Storm drain inlet is blocked to prevent - also-maintain-the-desired-color-for-a-longer-time;-requiring—pfO�'!bifeddischarge._T_he watermustbe _ less maintenance. pumped and disposed of properiy. During Maintenance � Implement the following BMPs during routine maintenance activities, such as power washing the roof, re-patination or re-application of impervious coating: • Block storm drain inlets as needed to prevent runoff from entering storm drains. Discharge the wash water to landscaping or to the sanitary sewer (with permission from the local sanitary sewer agency). If this is not an option, haul the wash water ofF-site for proper disposal. Protect the Bay/Ocean and yourself! If you are responsible for a discharge to the storm drain of non- stormwater generated by installing, cleaning, treating or washing copper architectural features, you are in violation of the municipal stormwater ordinance and may be subject to a fine. Contact Information The San Mateo Countywide Water Pollution Prevention Program lists municipal stormwater contacts at www.flowstobay.orp (click on "Business", then "New Development", then "local permitting agency"). FINAL February 29, 2012 gutfer and drainpipe.