HomeMy WebLinkAbout616 Vernon Way - ResolutionRESOLUTION APPROVING CATEGORICAL EXEMPTION AND DESIGN REVIEW
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a Categorical Exemption has been prepared and application has been made for Desiqn
Review for first and second story additions at 616 Vernon Wav, Zoned R-1 Joshua and Hilary
Henshaw, propertv owners APN: 029-182-140;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on Julv 27,
2015, at which time it reviewed and considered the staff report and all other written materials and
testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
On the basis of the Initial Study and the documents submitted and reviewed, and comments
received and addressed by this Commission, it is hereby found that there is no substantial evidence
that the project set forth above will have a significant effect on the environment, and categorical
exemption, per CEQA Section 15301 (e)(1) of the CEQA Guidelines, which states that additions
to existing structures are exempt from environmental review, provided the addition will not result
in an increase of more than 50% of the floor area of the structures before the addition is exempt
from environmental review, is hereby approved.
2. Said Design Review is approved subject to the conditions set forth in Exhibit "A" attached
hereto. Findings for such Design Review are set forth in the staff report, minutes, and recording
of said meeting.
3. It is fuother directed that a certified copy of this resolution be recorded in the official records of
the County of San Mateo.
Chairman
I, , Secretary of the Planning Commission of the City of Burlingame, do
hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the
Planning Co�mmission held on the 27th dav of Julv 2015 by the following vote:
Secretary
EXHIBIT "A"
Conditions of Approval for Categorical Exemption and Design Review
6��6Vernon Way
Effective August 6, 2015
Page 1
1. that the project shall be built as shown on the plans submitted to the Planning Division
date stamped July 6, 2015, sheets A1 through A7, GBM and Boundary Survey;
2. that any changes to building materials, exterior finishes, windows, architectural features,
roof heigh± or pitch, and amount or type of hardscape materials shall be subject to
Planning Division or Planning Commission review (FYI or amendment to be determined
by Planning staf�;
3. that any changes to the size or envelope of the basement, first or second floors, or
garage, which would include adding or enlarging a dormer(s), shall require an
amendment to this permit;
4. that the conditions of the Engineering Divisions March 31, 2015 memo, the Building
Division's March 18, 2015 memo, the Parks Division's March 23 and June 1, 2015
memos, the Fire Division's March 25, 2015 memo, and the Stormwater Division's March
24, 2015 memo shall be met;
5. that any recycling containers, debris boxes or dumpsters for the construction project
shall be placed upon the private property, if feasible, as determined by the Community
Development Director;
6. that demolition or removal of the existing structures and any grading or earth moving on
the site shall not occur until a building permit has been issued and such site work shall
be required to comply with all the regulations of the Bay Area Air Quality Management
District;
7. that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of
approval adopted by the Planning Commission, or City Council on appeal; which shall
remain a part of all sets of approved plans throughout the construction process.
Compliance with all conditions of approval is required; the conditions of approval shall
not be modified or changed without the approval of the Planning Commission, or City
Council on appeal;
8. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a
single termination and installed on the portions of the roof not visible from the street; and
that these venting details shall be included and approved in the construction plans
before a Building permit is issued;
9. that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects
to submit a Waste Reduction plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
10. that the project shall meet all the requirements of the California Building and Uniform
Fire Codes, 2013 Edition, as amended by the City of Burlingame;
EXHIBIT "A"
Conditions of Approval for Categorical Exemption and Design Review
616 Verrron Way
Effective August 6, 2015
Page 2
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING
INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH
CONDITION:
11. that prior to scheduling the framing inspection the project architect or residential
designer, or another architect or residential design professional, shall provide an
architectural certification that the architectural details shown in the approved design
wN�ich should be evident at framing, such as window locations and bays, are built as
shown on the approved plans; architectural certification documenting framing
compliance with approved design shall be submitted to the Building Division before the
final framing inspection shall be scheduled;
12. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the
height of the roof ridge and provide certification of that height to the Building Division;
and
13. that prior to final inspection, Planning Division staff will inspect and note compliance of
th� architectural details (trim materials, window type, etc.) to verify that the project has
been built according to the approved Planning and Building plans.