Loading...
HomeMy WebLinkAbout2740 Summit Dr - Technical StudyDon Hillebrandt Associates Geotechnical Consultants 604 Mission St. Suite 901 • San Francisco, CA 94105 • Phone (415) 543-5943 April 7, 1981 Project 944-1 Mr. Cliff Semmler 2740 Summit Drive Burlingame, CA 94010 RE: Geotechnical Investigation Semmler Property on Summit Drive Burlingame, California Dear Mr. Semmler: In accordance with your request, we have performed a geotechnical investigation for your property on Summit Drive in Burlingame, California. The accompanying report presents the results of our field, laboratory and office studies. The geologic, seismic, soil and foundation conditions are discussed and appropriate conclusions and recommendations are presented. Our geotechnical investigation indicates that the proposed residence on Parcel B can be safely constructed at the site and will not adversely affect any of the adjacent properties to the north and northwest of your property. In order to safely construct the proposed residence on Parcel B, it will be necessary to (1) remove existing fill in the area of the proposed residence, (2) carefully control surface and subsurface water, and (3) support the proposed residence on a drilled pier and grade beam foun- dation system. We refer you to the text of the report for a detailed discussion of our findings and recommendations. If you have any questions concerning our findings and recommenda- tions, please call us. Very truly yours, DON HILLEBRANDT ASSOCIATES James C. Prendergast C.E. 16338 Donald H. Hillebrandt C.E. 16338 DHH:es Copies: Addressee (8) George Harris Kelly, Civil Engineer (1)