Loading...
HomeMy WebLinkAbout2508 Valdivia Way - Resolution�� f RECORDING REQUESTED BY: Planning Department City of Burlingame WHEN RECORDED MAIL T0: COMMUNITY DEVELOPMENT DEPARTMENT CITY OF BURLINGAME 501 PRIMROSE ROAD BURLINGAME, CA 94010 2012-185990 �:0� �m 12'11i72 R1 Fae: NQ ��� Counf cf pages 1? Fcer,orded i�i �ffirial Fiecords County of San Mat�r_. P�lark Church As e�c�r r'�t nt l�Id � �� ��I' ��I�'3�I !'P �Ill�ri Re�� ,�J, r,'� �� � �,I � ,, , � ��� ��i��.l��,�� ;�r� � I 5 5 4 u 2�� Resolution No. 52-2012 2508 VALDIVIA WAY — APN 025-171-020 TITLE OF DOCUMENT �� I hereby certify this to be a full, true and correct copy of the document it purports to be, the original of which is on file in my office. Date: November 2, 2012 ���,F i �/ Willi�am Meeker, Community Development Director RESOLUTION APPROVING CATEGORICAL EXEMPTION , DESIGN REVIEW AND HILLSIDE CONTRUCTION PERMIT RESOLVED, by the Planning Commission of the City of Burlingame that: WHEREAS, a categorical exemption has been proposed and application has been made for Desiqn Review and Hillside Area Construction Permit for a major renovation and first floor addition to a sinqle family dwellinq with an attached paraqe (qualifies as substantial construction) at 2508 Valdivia Wav, zoned R-1, Peter and Joanie Schlampp, property owners, APN: 025-171-020; WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on October 22, 2012, at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing; NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that: On the basis of the Initial Study and the documents submitted and reviewed, and comments received and addressed by this commission, it is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and categorical exemption, per CEQA Article 19, Section 15303 (a), which states that construction of a limited number of new, small facilities or structures including one single family residence or a second dwelling unit in a residential zone is exempt from environmental review. In urbanized areas, up to three single-family residences maybe constructed or converted under this exemption, is hereby approved. 2. Said Design Review and Hillside Area Construction Permit approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such Design Review and Hillside Area Construction Permit are set forth in the staff report, minutes, and recording of said meeting. 3. It is further directed that a certified copy of this resolutio be recorded in the offici records of the County of San Mateo. ' Chairman I, �. J�'V%'�7 ?/Y►� , Secretary of the Planning Commission of the City of Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the Planning Commission held on the 22"d dav of October. 2012 by the following vote: 2504 HILLSIDE DRIVE - RESO 52-2012 AYES: Auran. Gaul, Sargent. Terrones. Yie NOES: None ABSENT: Cauchi RECUSE: None Secretary EXHIBIT "A" Conditions of approval for Construction Permit. 2508 Valdivia Way Effective November 1, 2012 Page 1 Categorical Exemption, Design Review and Hillside Area that the project shall be built as shown on the plans submitted to the Planning Division date stamped October 10, 2012, sheets AO through A6„ SU1, L1.0, L2.0 and G; 2. that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYI or amendment to be determined by Planning staf�; 3. that any changes to the size or envelope of the first floor or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; 4. that the conditions of the Chief Building Official's September 14 and August 3, 2012 memos, the Parks Division's September 13 and August 10, 2012 memos, the Engineering Division's August 17, 2012 memo, the Fire Division's August 6, 2012 memo and the Stormwater Division's August 2, 2012 memo shall be met; 5. that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; 6. that demolition or removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 7. that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Pianning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; 8. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 9. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 10. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2010 Edition, as amended by the City of Burlingame; EXHIBIT "A" Conditions of approval for Construction Permit. 2508 Valdivia Way EfFective November 1, 2012 Categorical Exemption, Design Review and Hillside Area THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 11. prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the finai framing inspection shall be scheduled; 12. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; and 13. that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. Project Comments Date: To: From: September 13, 2012 0 City Engineer (650) 558-7230 X Chief Building Official (650) 558-7260 � City Arborist (650) 558-7254 0 Recycling Specialist (650) 558-7273 � Fire Marshal (650) 558-7600 0 NPDES Coordinator (650) 342-3727 � City Attorney Planning Staff Subject: Request for Design Review and Hillside Area Construction Permit for a new single family dwelling (substantial construction) with an attached garage at 2508 Valdivia Way, zoned R-1, APN: 025-171- 020 Staff Review: No further comments. All conditions of approval as stated on the review dated 8-3-2012 shall apply to this project. Reviewed Date:9-14-2012 - Project Comments Date: To: From August 1, 2012 � Engineering Division (650) 558-7230 X Building Division (650) 558-7260 � Parks Division (650) 558-7334 � Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Planning Staff Subject: Request for Design Review and Hillside Area Construction Permit for a new single family dwelling (substantial construction) with an attached garage at 2508 Valdivia Way, zoned R-1, APN: 025-171-020 Staff Review: August 6, 2012 � On the plans specify that this project will comply with the 2010 California Building Code, 2010 � California Residential Code (where applicable), 2010 California Mechanical Code, 2010 California Electrical Code, and 2010 California Plumbing Code, including all amendments as adopted in Ordinance 1856-2010. Note: If the Planning Commission has approved the project prior to 5:00 p.m. on December 31, 2010 then the building permit application for that project may use the provisions found in the 2007 California Building Codes including all amendments as adopted in � Ordinance 1813. �2 � On the plans provide a copy of the GreenPoints checklist for this project at full scale. ' Specify on the plans that this project will comply with the 2008 Califomia Energy Efficiency Standards. Go to http //www enerqV ca qov/title24/2008standards! for publications and details. ,4�, P6ace the following information on the first page of the plans: C_./ "Construction Hours" Weekdays: 7:00 a.m. — 7:00 p.m. Saturdays: 9:00 a.m. — 6:00 p.m. Sundays and Holidays: 10:00 a.m. — 6:00 p.m. (See City of Burlingame Municipal Code, Section 13.04.100 for details.) 5)�On the first page of the plans specify the following: "Any hidden conditions that require work to �be performed beyond the scope of the building permit issued for these plans may require further City approvals including review by the Planning Commission." The building owner, project designer, and/or contractor must submit a Revision to the City for any work not graphically illustrated on the Job Copy of the plans prior to performing the work. 6) Anyone who is doing business in the City must have a current City of Burlingame business license. 7) Provide fully dimensioned plans. 8) Provide a fully dimensioned site plan which shows the true property boundaries, the location of all strvctures on the property, existing driveways, and on-site parking. 9) Provide existing and proposed elevations. 10) This project will be considered a New Building because, according to the City ef Buriingame Municipal code, "when additions, alterations or repairs within any twelve-month period exceed fifty percent of the current replacement value of an existing building or structure, as determined by the building official, such building or structure shall be made in its entirety to conform with the requirements for new buildings or structures." This building must comply with ;he 2010 California Building Code for new structures. BMC 18.07.020 Note: Any revisions to the plans approved by the Building Division must be submitted to, and approved by, the Building Division prior to the implementation of any work not specifically shown on the plans. Significant delays can occur if changes made in the field, without City approval, necessitate further review by City departments or the Planning Commission. Inspections cannot be scheduled and will not be perFormed for work that is not shown on the Approved plans. 11) Due to the extensive nature of this construction project the Certificate of Occupancy will be rescinded once construction begins. A new Certificate of Occupancy will be issued after the project has been finaled. No occupancy of the building is to occur until a new Certificate of Occupancy has been issued. 12) Provide a comp!ete demolition plan that indicates the existing walls, walls to be demolished, new walls, and a legend. NOTE: A condition of this project approval is that the Demolition Permit will not be issued and, and no work can begin (including the removal of a� building components), until a Building Permit has been issued for the project. The property owner is responsible for assuring that no �vork is authorized or performed. 13) When you submit your plansto the Building Division for plan review provide a completed Supplemental Demolition Permit Application. NOTE: The Demolition Permit will not be issued until a Building Permit is issued for the project. 14) Show the distances from all exterior walis to property lines or to assumed property lines 15 Show the dimensions to adjacent structures. 6) ooms that can be used for sleeping purposes must have at least one window or door that complies with the egress requirements. Specify the location and the net c/ear opening height and width of all required egress windows on the elevation drawinqs. Note: The area labeled "Craft Room" is a room that can be used for sleeping purposes and, as such, must comply with �tt�is requirement. 1� J�idicate on the plans that a Grading Permit, if required, will be obtained from the Department of �-'�Public Works. 18) Provide guardrails at all landings. NOTE: All landings more than 30" in height at any point are considered in calculating the allowable lot coverage. Consult the Planning Department for details if your project entails landings more than 30" in height. 19) Provide handraiis at all stairs where there are four or more risers. 20) Provide lighting at all exterior landings. NOTE: A written response to the items noted here and plans that specifically address items 1, 2, 3, 4. 5, 16, and 17 must be re-submitted before this project can move forward for Planning Commissior action. �---- Reviewed by: —'�--�""� �^~ ' ` Date: 8-3-2012 J/ �; U Project Comments Date: To: August 1, 2012 � Engineering Division (650) 558-7230 � Building Division (650) 558-7260 � Fire Division (650) 558-7600 0 Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 X Pa� ks Division (650) 558-7334 From: Planning Staff Subject: Request for Design Review and Hillside Area Construction Permit for a new single family dwelling (substantial constructian) with an attached garage at 2508 Valdivia Way, zoned R-1, APN: 025-171-020 Staff Review: August 6, 2012 1. Landscape Plan and Irrigation Plan look ok. 2O. New City Street tree needs to be changed to Pyrus calleryana `Red Spire" instead of `Aristocrat' 3. Removal of existing Magnofia tree will need a permit from Parks Division if circumference is greater than 48 in measured 54 in from ground. �._. �� �„�, ��� � �f/i,��� l� 0 Reviewed by: B Disco Date: 8/10/12 Project Comments Date: To: August 1, 2012 d Engineering Division (650) 558-7230 ❑ Fire Division (650) 558-7600 ❑ Building Division (650) 558-7260 ❑ Parks Division (650) 558-7334 From ❑ Stormwater Division (650) 342-3727 ❑ City Attorney (650) 558-7204 Planning Staff Subject: Request for Design Review and Hillside Area Construction Permit for a new single family dwelling (substantial construction) with an attached garage at 2508 Valdivia Way, zoned R-1, APN: 025-171-020 Staff Review: August 6, 2012 1. Storm drainage shall be designed to drain towards the street frontage or to the City storm drain system. 2. The project shall, at its own cost, design and construct frontage public improvements including curb, gutter, sidewalk, driveway and other necessary appurtenant work. 3. Sewer backwater protection certification is required. Contact Public Works — Engineering Division at (650) 558-7230 for additional information. Reviewed by: V V Date: 8/17/2012 Project Comments Date: To: From August 1, 2012 � Engineering Division (650) 558-7230 � Building Division (650) 558-7260 � Parks Division (650) 558-7334 0 Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Planning Staff Subject: Request for Design Review and Hillside Area Construction Permit for a new single family dwelling (substantial construction) with an attached garage at 2508 Valdivia Way, zoned R-1, APN: 025-171-020 Staff Review: August 6, 2012 Provide a residential fire sprinkler throughout the residence. 1. Provide a minimum 1 inch water meter. 2. Provide backflow prevention device/double check valve assembly — Schematic of water lateral line after meter shall be shown on Building Plans prior to approval indicating location of the device after the split between domestic and fire protection lines. 3. All sprinkler drainage shall be placed into landscaping areas. 4. Drawings submitted to Building Department for review and approval shall clearly indicate Fire Sprinklers shall be installed and shop drawings shall be approved by the Fire Department prior to installation. Reviewed by: �� � � � Date: � � � � Project Comments Date: To: From: August 1, 2012 0 Engineering Division (650) 558-7230 0 Building Division (650) 558-7260 � Parks Division (650) 558-7334 � Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Planning Staff Subject: Request for Design Review and Hillside Area Construction Permit for a new single family dwelling (substantial construction) with an attached garage at 2508 Valdivia Way, zoned R-1, APN: 025-171-020 Staff Review: August 6, 2012 Any construction project in the City, regardless of size, shall comply with the City NPDES permit to prevent stormwater pollution from construction activities. Project proponent shall ensure all contractors implement Best Management Practices (BMPs) during all phases of construction (including demolition). When submitting plans for a building permit include a list of construction stormwater pollution prevention BMPs as project notes and include them as a separate full size plan sheet, preferably 2' x 3' or larger. Project proponent may use the attached Construction Best Management Practices (BMPs) plan sheet to comply with this requirement. Electronic file is available for download at http://www.flowstobay.org/bs_construction.php (Scroll about half-way down the page and click on Construction BMP Plan Sheetj. For assistance please contact Stephen D. at 650-342-3727 Reviewed bv: SD i � Date: 8/2/2012