Loading...
HomeMy WebLinkAbout2508 Valdivia Way - Approval LetterCITY OF BURLINGAME City Hall — 501 Primrose Road Burlingame, California 94010-3997 November 7, 2012 Peter and Joanie Schlampp 2508 Valdivia Way Burlingame, CA 94010 Re: 2508 Valdivia Way Dear Mr. and Mrs. Schlampp, � tITY '``r : � i . ic�w --- COMMUNITY DEVELOPMENT DEPARTNlENT Planning Division PH: (650) 558-7250 FAX: (650) 696-3790 Since there was no appeal to or suspension by the City Councii, the October 22, 2012, Planning Commission approval of your application for Design Review and Hiliside Area Construction Per�rnit became effective November 1, 2012. This application was for a major ;enovation and first �loor addition to a single family dwelling with an attached garage (qualifies as substantial construction) at 2508 Valdivia Way, zoned R-1. The October 22, 2012 minutes of the Planning Commission state your application was approved with the following conditions: 1. that the project shall be built as shown on the plans submitted to the Planning Division date stamped October 10, 2012, sheets AO through A6„ SU1, L1.0, L2.0 and G; 2. that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYI or amendment to be determined by Planning staf�; 3. that any changes to the size or envelope of the first floor or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; 4. that the conditions of the Chief Building Offcial's September 14 and August 3, 2Q12 memos, the Parks Division's September 13 and August 10, 2012 memos, the Engineering Division's August 17, 2012 memo, the Fire Division's August 6, 2012 memo and the Stormwater Division's August 2, 2012 memo shall be met; 5. that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; 6. that dernolition or removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; :C Register online to receive City of Burlingame e-mail updates at www.burlingame.org �� November 7, 2012 25�8 Valdivia Way Page 2 7. that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; 8. that all air ducts, plurr�bing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 9. that the project shail comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 10. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2010 Edition, as amended by the City of Burlingame; THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 11. prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as sh�wn on the approved plans; architectural certification documenting framing compliance with approved design shali be submitted to the Building Division before the final framing inspection shall be scheduled; 12. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; and 13. that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. Ail site improvements and construction work will require separate application to the Building Department. This approval is valid for one year during which time a building permit must be issued. An extension of up to one year may be considered by the Planning Commission if application is made before the end of the first year. �� Register online to receive City of Burlingame e-mail updates at www.burlingame.org o: November 7, 2012 2508 Valdivia Way Page 3 The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section 1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within 90 days of the date of the decision unless a shorter time is required pursuant to state or Tederal law. Sincerely, William Meeker Community Development Director c. Natalie Hyland, designer Hyland Design Group 585 Quarry Road San Carlos, �A 94070 Chief Deputy Valuation, Assessor's Office (LOT 2 BLOCK 20 RESUB OF PTN BLOCKS 17 19 RAY PARK RSM 40/47 CITY OF BURLINGAME; APN: 025-171-020) Chief Building Official, Community Development Dept./Building Div. File .s Register onli�e to receive City of Burlingame e-mail updates at www.burlingame.org Ea Project Comments Date: September 13, 2012 -�o; 0 City Engineer (650) 558-7230 ii ChieT Building Official (650) 558-7260 0 City Arborist (650) 558-7254 From: Planning Staff � Recycling Speciaiist (650) 558-7273 0 Fire Marshal (650) 558-7600 0 NPDES Coordinator (650) 342-3727 Q City Attorney Subject: Request for Design Review and Hillside Area Construction Permit for a new single family dwelling (substantial construction) with an attached garage at 2508 Valdivia Way, zoned R-'[, APN: 025-171- 020 Staff Review: No further comments. All conditions of approval as stated on the review dated 8-3-2012 shall apply to this p ro� e ct. Reviewed Date:9-14-2012 _... , _. _.,_. . _ _. ,. _ t .. � Project �omments � - Date: � From: August 1, 2012 � Engineering Division (650) 558-7230 X Building Division (650) 558-7260 � Parks Division (650) 558-7334 � Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Planning Staff Subject: Request for Design Review and Hillside Area Construction Permit for a new single family dwelling (substantial construction) with an attached garage at 2508 Valdivia Way, zoned R-1, APN: 025-171-020 Staff Review: August 6, 2012 1) �n ihe plans specify that this project will comply with the 2010 California Building Code, 2010 California Residential Code (where applicable), 2010 California Mechanical Code, 2010 California Electrical Code, and 2010 California Plumbing Code, including all amendments as adopted in Ordinance 1856-2010. Note: If the Planning Commission has approved the project prior to 5:00 p.m. on December 31, 2010 then the building permit application for that project may use the provisions found in the 2007 California Building Codes including all amendments as adopted in /� Ordinance 1813. ,��/ On the plans provide a copy of the GreenPoints checklist for this project at full scale. �� Specify on the pla�s that this project will comply with the 2008 California Energy Efficiency 5tandards. Go to http //www.enerqV ca qovJtitle24/2008standardsl for publications and details. /`+� Place the foilowing information on the first page of ihe plans: C� "Construction Hours" Weekdays: 7:00 a.m. — 7:00 p.m. Saiurdays: 9:00 a.m. — 6:00 p.m. Sundays and Holidays: 10:00 a.m. — 6:00 p.m. ^ (See City of Burlingame Municipai Code, Section 13.04.100 for details.) /5} �On the first page of the plans specify the following: "Any hidden conditions that require work io C_./ be performed beyond the scope of the building permit issued for these plans may require further City approvals including review by the Planning Commission." The building owner, project designer, andlor contractor must submit a Revision to the City for any work nof graphically illustrated on the Job Copy of the plans prior to performing the work. 6) Anyone who is doing business in the City must have a current City of Burlingame business license. 7) Provide fully dimensioned plans. 8) Provide a fuily dimensioned sife plan which shows the true property boundaries, the location of all structures on the property, existing driveways, and on-site parking. 9) Provide existing and proposed elevations. 10) This project will be considered a Ne�v Building because, according to the City of Burlingame Municipal code, "when additions, alteraiions or repairs within any twelve-month period exceed iiity percent of the current replacement value of an existing building or structure, as determined by the building o�cial, such building or structure shall be made in its entirety to conform with the requirements Tor new buildings or structures." This building must comply with the 2010 California Building Code for new structures. BMC 18.07.020 Note: Any revisions to the plans approved by the Building Division must be submitted to, and approved by, fhe Building Division prior to the implemenfation of any work nof specifically shown on the plans. Signifcant delays can occur if changes made in the field, without City approval, necessitate further reviev✓ by City departments or the Planning Commission. Inspections cannot be scheduled and will not be performed for work that is not shown on the Approved pians. 11) Due to the extensive nafure of this construction project the CerEificate of Occupancy will be rescinded once construction begins. A new Certificate of Occupancy will be issued after the project has been finaled. No occupancy of the building is to occur until a new Certificate of Occupancy has been issued. 12) Provide a complete demolition plan that indicates the exisfing walis, walls to be demolished, new walls, and a legend. NOTE: A condition of this project approval is that the Demofition Permit will not be issued and, and no work can begin (including the removal of an building components), until a Building Permit has been issued for the project. The property owner is responsible for assuring that no work is authorized or performed. 13) When you submit your pians to the Building Division for plan review provide a completed Supplemen'tal Demolition Permit Application. NOTE: The Demolition Permit will not be issued until a Building Permit is issued for the project. 14) Show the distances from all exterior walls to property lines or to assumed property lines 15 Show the dimensions to adjacent structures. - 6) ooms that can be used for sleeping purposes must have at least one window or door thaf complles with the egress requirements. Specify the location and fhe net clear opening height and width of all required egress windows on the elevaf�on drawinqs. Note: The area labeled "Craft Room" is a room that can be used for sleeping purposes and, as such, must compiy with 1.�his requirement. �ridicate on the plans that a Grading Permit, if required, wili be obtained from the Department of �-' Public Works. 18) Provide guardrails at all landings. NOTE: All landings more than 30" in heigh't at any point are considered in calculating the allowable lot coverage. Consult the Planning Department for detaiis if your project entaiis landings more than 30" in height. 19) Provide handraiis at all stairs where there are four or more risers. 20) Provide lighting at all exterior landings. NOTE: A written response to the items noted here and plans that specifically address items 1, 2, 3, 4. 5, 16, and 17 must be re-submitted before this project can move forward for Planning Comr�ission action. '� �`1� Date:8-3-2012 Reviewed by: � l'�f �� r � Project Cort�ments Date: To: August 1, 2012 0 Engineering Division (650) 558-7230 � Building Div�sion (650) 558-726Q 0 Fire Division (650) 558-7600 0 Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 X Parks DNision {650) 558-7334 From Planning SfafF Subject: Request fior Design Review and Hillside Area Construction Permit for a new sing{e family dwelling (substantia! constructian) with an attached garage ai 25�8 Valdivia Way, zoned R-1, APN: 025-171-020 Staff Review: August 6, ZQ12 1. Landscape Plan and (irigation Pfan (ook ok. 2�. New Gity Street tree needs to be changed to Pyrus cafleryana `Red Spire" instead of `Aristocrat' 3. Removal of existing Magnofia tree will need a permit from Parks Division if circumf�rence is greater than 48 in measured 54 in from ground. �(,� 8 � �'�"�`` l.� `"'�`�.f.(� " /� � �/ / l%�� Reviewed by: B Disco Date: 8/1 Q/12 Project Comments Date: To: From: August 1, 2012 of Engineering Division (650) 558-7230 ❑ Fire Division (650) 558-7600 ❑ Building Division (650) 558-7260 ❑ Parks Division (650) 558-7334 Planning StafF ❑ Stormwater Division (650) 342-3727 ❑ City Attorney (650) 558-7204 Subject: Request for Design Review and Hillside Area Construction Permit for a new single family dwelling (substantial construction) with an attached garage at 2508 Valdivia Way, zoned R-1, APN: 025-171-020 Staff Review: August 6, 2012 1. Storm drainage shall be designed to drain towards the street frontage or to the City storm drain system. 2. The project shall, af its own cost, design and construct frontage public improvements including curb, gutter, sidewalk, driveway and other necessary appurtenant work. 3. Sewer backwater protection certification is required. Contact Public Works — Engineering Division at (650) 558-723Q for additional information. Reviewed by: V V Date: 8/'17(2012 Project Comments Date To: From August 1, 2012 � Engineering Division (650) 558-7230 0 Building Division (650) 558-7260 0 Parks Division (650) 558-7334 0 Fire Division (650) 558-7600 - � Stormwater Division (050) 342-3727 � City Attorney (650) 558-7204 Planning Staff Subject: Request for Design Review and Nillside Area Construction Permit for a new single family dwelling (substantial construction) with an attached garage at 2508 Valdivia Way, zoned R-1, APN: 025-171-020 Staff Review: August 6, 2012 Provide a residential fire sprinkler throughout the residence. 1. Provide a minimum 1 inch water meter. 2. Provide backflow prevention device/double check valve assembly — Schematic of water lateral line after meter shall be shown on Bui�ding Plans prior to approval indicating location of the device after the split between domestic and fire protection lines. 3. All sprinkler drainage shall be placed into landscaping areas. 4. Drawings submitted to Building Department for review and approval shall clearly indicate Fire Sprinklers shall be installed and shop drawings shafl be approved by the Fire Department prior to installation. Reviewed by: � � Date: � � � � Project Comments Date: To: From: August 1, 2012 � Engineering Division (650) 558-7230 � Building Division (650) 558-7260 � Parks Division (650) 558-7334 0 Fire Division (650) 558-7600 0 Stormwater Division (650) 342-3727 � City Aftorney (650) 558-7204 Planning Staff Subject: Request for Design Review and Hillside Area Construction Permit for a new single family dwelling (substantial construction) with an attached garage at 2508 Valdivia Way, zoned R-1, APN: 025-171-020 Siaff Review: August 6, 2012 Any construction project in the City, regardless of size, shall comply with the City NPDES permit to prevent stormwater pollution from construction activities. Project proponent shall ensure all contractors implement Best Management Practices (BMPs) during all phases of construction (including demolition). When submitting plans for a building permit include a list of construction stormwater pollution prevention BMPs as project notes and include them as a separate full size plan sheet, preferably 2' x 3' or larger. Project proponent may use the attached Construction Best Management Practices (BMPs) plan sheet to comply with this requirement. Electronic file is available for download at http://www.flowstobay.org/bs_construction.php (Scroli about half-way down the page and click on Construction BMR Plan Sheet). For assistance please contact Stephen D. at 650-342-3727 Reviewed bv: SD � � Date: 8/2/2012