HomeMy WebLinkAbout725 Crossway Road - Approval LetterCITY OF BURLINGAfVIE
City Hall — 501 Primrose Road
Burlingame, California 94010-3997
April 6, 2012
Tim and Linda Reeth
725 Crossway Road
Burlingame, CA 94010
Re: 725 Crossway Road �
Dear Mr. and Mrs, Ree#h,
�C1T
1.� ' i
� �t�
s.. :
.
.4r4 r ''p
..o»�r«
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division
PH: (650) 558-7250
FAX: (650) 696-3790
Since there was no appeal to or suspension by the City Council, the March 26, 2012, Planning
Commission approval of your application for Design Review and Special Permit for declining height
envelope became effective April 5, 2012. This appfication was for a second story addition to an
existing single family dwelling with a detached garage at 725 Crossway Road, zoned R-1. .
The March 26, 2012 minutes of the Planning Corx�mission state yaur application was approved with
the following conditions: �
1.
�
that the project shall be built as shown on the plans submitted to the Planning Division date
stamped March 6, 2012, sheets 1 though 8 and Topographic Map;
that all new skylights shall be of a flat glass design;
3. that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amo�nt or type of hardscape materials shall be subject to Planning
Division or Planning Commission review (FYI or amendment to be determined by Planning
staff);
4. that any changes to the size or envelope of the basement, first or second floors, or garage,
which would include adding or enlarging a dormer(s), shall require an amendment to this
permit;
5. that the conditions of the Chief Building Official's January 13, 2012 and November 17, 2011
memos, the City Engineer's December 9, 2011 memo, the Parks Supervisor's January 17,
2012 and November 28, 2011 memos, the Fire Marshal's November 21, 2011 memo, and the
NPDES Coordinator's November 21, 2011 memo shall be met;
6. that any recycling containers, debris boxes or dumpsters for the construction project shall be
placed upon the private property, if feasible, as determined by the Community Development
Director;
i :: Register online to receive City of Burlingame e-mail updates at www.burlingame.org �:
April 6, 2012
725 Crossway Road
Page 2
7. that demolition or removal of the existing structures and any grading or earth moving on the
site shall not occur until a building permit has been issued and such site work shall be
required to comply with all the regulations of the Bay Area Air Quality Management District;
8. that prior to issuance of a build'mg permit for constructinn of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of approval
adopted by the Planning Commission, or City Council on appeal; which shall remain a part ofi
ail sets of approved plans throughaut the construction process. Compliance with all
conditions of approval is required; the conditions of approval shall no# be modified or changed
without thE anproval of the Planning Commission, or City Council on appeal;
9. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a sing(e
termination and installed on the portions of the roof not visit�le from the street! and that these
verrting details shall -he included and approved in the construction plans before a Building
perrriit is issued;
10. that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance whBch requires affected demolition, new construction and alteration projects to
submit a Waste Reductian plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
11. that the project shall meet all the requirements of the California Building and Uniform Fire
Codes, 2010 Edition, as amended by the City of Burlingame;
THE FOLLOWING CONDITtONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
12. that prior to scheduling the framing inspection the applicant shall provide a certification by the
project architect or residential designer, or another architect or residential design
professional, that demonstrates that the project falls at or below the maximum approved floor
area ratio for the property;
13. that prior to the framing inspection the project architect or residential designer, or another
architect or residential design professional, shall provide an architectural certification that the
architectural details shown in the approved design which should be evident ai framing, such
as window locations and bays, are built as shown on the approved plans; architectural
certification documenting framing compliance with approved design shall be submitted to the
Building Division before the final framing inspection shall be scheduled;
14. that prior to scheduling the roof deck inspection, a licensed sunreyor shall shoot the height of
the roof ridge and provide certification of that height to the Building Division; and
15. that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.
:: Register online to receive City of Burlingame e-mail updates at www.burlingame.org C:
April 6, 2012
725 Crossway Road
Page 3
All site improvements and construction work vvill require separate application to the Building
Department. This approval is valid for one year during which time a building permit must be issued.
An extension of up to one year may be considered by the Planning Commission if application is
made before the end of the first year.
The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure
Section 1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must
do so within 90 days of the date of the decision unless a shorter time is required pursuant to state or
federal 1aw.
Sincerely,
William Meeker
Community Development Director
c. Waldemar Stachniuk, designer
500 Airport Blvd. #100
Burlingame, CA 94010
Chief Deputy Valuation, Assessor's Office
(LOT 20 BLOCK 11 BURLINGAME TERRACE NO 2 RSM 7/38; APN: 029-045-080)
Chief Building Official, Community Development Dept./Building Div.
File
:: Register online to receive City of Burlingame e-mail updates at www.burlingame.org oa
1
e
Project Comments
Date:
November 17, 2011
To: af City Engineer
(650) 558-7230
❑ Chief Building Official
(650) 558-7260
❑ City Arborist
(650) 558-7254
From:
Subjec#:
Staff Review:
Planning Staff
� f2ecycling Specialist
{650) �58-7271
❑ Fire �arshal
(650) 55&760D
❑ NPDES Coorditiatcf
(650) 342-3727
❑ City �ttorney
Request for Design Review for a secortd stoy addition at
725 Crossway Road, zaned R-1, APN: 029-045-08D
November 21, 2011
1. Storm drainage shall be designed to drain towards the street frontage or to the
City storm drain system.
2. Replace all displaced/damaged sidewalk, driveway, curb and gutter.
3. Sewer backwater protection certification is required. Contact Public Works —
Engineering Division at (650) 558-7230 for additional information.
Reviewed by: V V
Date: 12/09/2011
0
Date:
To:
Revised Plans Submitted January 11, 2011
❑ City Engineer
�650) 558-�230
❑ Recycling Specialist
(650) 558-727�
❑ Fire Marshal
(650) 55&-7600
❑ NPDES Coordinator
(650) 342-3727
❑ City Attorney
X Chief Building Offici-al
(650) 558-7260
❑ Parks Supervisor
(650) 558-7334
From:
PTanning Staff
Subject: Request for Deisgn Review and Special Perm�t for declining height
envelo�e for a first and second story addition to an -existing single
family dwelling at 725 Crossway Road, zoned R-1, APN: 029-045-
080
Staff Review: N/A
On the first page of the plans under "Project Data" remove references to the
2006 IBC, 2005 NEC, 2006 UPC and 2006 UMC as these are outdated
references and do not apply to this project.
Item #9 has been removed as a condition of this project.
All o�her conditions of approval as stated in the review dated 11-17-2011 will
apply to this project. .
f� `' � t F
Reviewed-by:--"�� i _ Date: 1-13-2012
��. �` r
V
Date:
To:
From: '
Subject:
Sta#f Review:
1)
2)
3)
4)
5)
6)
7)
8)
9)
November 17, 2011
❑ City Engineer
(650i 558-7230
X Chief Building Official
(650) 558-7260
❑ C;#y Arborist
(650) 558-7254
❑ Recycling Specralist
(650) 558-7279
❑ Fire Marshal
(650) 558-7600
❑ NPDES- Coordinator
(650) 342-3727
❑ City Attorney
Planning Staff
Request for Design Review for a secor�d story addition at
725 Crossway R.oad, zoned R-1, APN: 029-045-080
November 21, 2011
On the plans specify that this project will comply with the 2010 Califomia Building Code, 2010
California Residential Code (where applicable), 2010 Califomia Mechanical Code, 2010 Califomia
Electrical Code, and 2010 Cafifomia Plumbing Code, including all amendments as adopted in
Ordinance 1856-2010. Note: If the Planning Commission has approved the project prior to 5:00
p.m. on December 31, 2010 then the building permit application for that project may use the
provisions found in the 2007 California Building Codes including all amendments as adopted in
Ordinance 1813.
On the plans provide a copy of the GreenPoints checklist for this project at full scale.
Specify on the plans that this project will comply with the 2008 Califomia Energy Efficiency
Standards.
Go to hitp://www.enerqv.ca.qov/titfe24/2008standards/ for publications and details.
Place the following information on the first page of the plans:
"Construction Hours"
Weekdays: 7:00 a.m. — 7:00 p.m.
Saturdays: 9:00 a.m. — 6:00 p.m.
Sundays and Holidays: 10:00 a.m. — 6:00 p.m.
(See City of Burlingame Municipal Code, Section 13.04.100 for details.)
On the first page of the plans specify the following: "Any hidden conditions that reguire work to
be performed beyond the scope of the building permit issued for these p(ans may require further
City approvals including review by the Planning Commission." The building owner, project
designer, and/or contractor must submit a Revision to the City for any work not graphically
illustrated in these plans prior to performing this work.
Anyone who is doing business in the City must have a current City of Burlingame business
license.
Provide fully dimensioned plans.
Provide existing and proposed elevations.
This project will be considered a New Building because, according to the City of Burlingame
Municipal code, "when additions, alterations or repairs within any twelve-month period exceed
fifty percent of the current replacement value of an existing building or structure, as determined
by the building official, such building or structure shall be made in its entirety to conform with the
requirements for-�ew buildings or structures." This building must comply with the 2010 California
Building Code for new structures. BMC 18.07.020
Note: Any revisions to the plans approved by the Building Division must be submitted to, and
approved by, the Buiiding Division prior fo the implementation of any work not specifically shown
on the plans. Significant delays can occur if changes made in the field, without City approval,
necessitate further review by City departments or the PlanniRg Commission. Inspections cannot
be scheduled and will not be performed for work that is not shown on the Approved plans.
1D) Provide a complete demolition plan that indicates #he existing walls, walls to be demolished, new
�;ralls, and a legend. NOTE: Tl�e Demolition Permit will not be issued and, and no wark can
begin, untit a Build'mg Permit has been issued for the project.
11) When you submit your plans to the Building �ivisi�n for plan review provide a completed
Supplerr�ental Demo6tion Permit Application. NOTE: The Demolition Permit will not be issued
until a B-uilding Permit is issued for the project.
?-2) Rooms that can be used for sleeping purposes must have at least one window or door that
complies with the egress requirements. Specify the size and location of all required egress
windo�+s on the elevation drawings.
13) Define the Use for the room that is immediately adjaeent to ths Family Room and specify the size
and locaiion-of-all-required-egress-windows for this room on the elevation drawings.
14) Provide guardrails at all landings. NOTE: Afl fandings more than 30" in height at any point are
considered in calculating the allowal�le lot coverage. Consu6t the Planning Departr�ent for de#ails
if your project entails landings mofe than 30" in height.
15) Provide handrails at all stairs where there are four or more risers.
16) Provide lighting at all exterior landings.
17) The fireplace chimney must terminate at least two feet higi�er than any portion of the building
within ten feet. 2010 CBC §2113.9
NOTE: A written response to the items noied here and plans that specifically address items 1,
2, 3, 4, 5, 12, and 13 must be re-submitted before this project can move forward for Planning
Commission action.._,._�_.,� ______.�—T_
Date: 11-17-2011
Project Comments
�ate:
Revised Plans Submitted Ja�uary 11, 2011
To: � �ity Engineer
(650} 558-7230
fl Chief Buifdi:�g Official
�s5o� �ss-�Zso
�C Parks Supenrisor
(65Qj 558-7334
Fro�t: Pianning Staff
� Recycling Speciafist
(650) 558-7279
� Fire Marshal
�sso� ssa-7soo
� NPDES Coordinator
(65�) 342-3727
� City Attorney
Subject: Request for Deisgn Review and �peciai P�ermit for deciming height
envelope for a first and second story addition to a� e�dsting- single
family dweiling at 725 Crossway Road, zoned R-1, APN: 029-045-
080
Staff Review: NfA
e
� Project Comments
Date:
November 17, 2D11
To: 0 City Engineer
(650) 558-7230
� Chief Building Official
(650) 558-7260
X City Arbarist
(650) �5�-7254
From:
Subject:
Planning Staff
� Recycling Specialist
(6�0) 558-7271
� Fire M�rshal
(650) 558-7600
0 NPDE� Coordinator
(650) 342-3727
� City Attomey
Request for C3esign Review for a second story acidition at
725 Crossway Road, zoned R-�, APN: 029-045-080
Staff Fteview: November 21, 2011
trees.
1. Site plan needs to include all major trees and shrubs including City street
2. No tree may be removed withaut permit from Parks Division (558-7330)
3. ��linimum of 3 landscape trEe (existing or new) are required for final.
Reviewed by: B Disco
Date: 11/28/11
Project Comments
Date:
To:
Fr_om:
Subject:
Staff Review:
November 17, 2011
0 City Engineer
(650) 558-7230
� Chief Building Official
(650) 558-7260
0 City Arborist
(650� 558-7254
� Recycling Speciafist
(650J 55�-7271
�- Fire Marshal
� 650j 558-7600
O NPDES Coordnator
(650) 342-3727
� City Attorney
Planning Sfaff
Request far Design Review for a second story addition at
725 Crossway Road, zoned R-1, APN: Q29-D45-080
November 21, 2011
Provide a residential fire sprinkler throughout the residence.
1. Provide a minimum 1 inch water meter.
2. Provide backflow prevention device/double check valve assembly —
Schematic of water lateral line after meter shall be shown on Building
Plans prior to approval indicating location of the device after the split
between domestic and fire protection lines.
3. Drawings submitted to Building Department for review and approval shall
clearfy indicate Fire Sprinklers shalt be instatted and shop drawings
shall be approved by the Fire Department prior to installation.
Reviewed by: � �� �i Date: ,Z � ;Y� r.`/
Project Comments
Date: November � 7, 2011
To: � City Engineer � Rec.ycling Specialist
(650) 558-7230 (650) 558-7271
� Chief Building Official � Fire Marshal
(650) 558-?260 (650) 558-7600
� City Arborist � NPDES Coordinator
(650) 558-7254 , (650) 342-3727
� City Attorney
From: Planning Staff
Subject: Request for Design Review f�r a second story addifion at
725 Crossway RQad, zoned R-1, APN: 029-045-080
Staff Review: Nove�nber 2'�, 2Q1'!
Any construction project in the City, regardless of size, shall comply with the City
NPDES permit to prevent stormwater pollution from construction activities. Project
proponent shall ensure all contractors implement Best Management Practices
(BMPs) during all phases of construction (including demolition).
When submitting plans for a building permit include a list of construction stormwater
pollution prevention BMPs as project notes and include them as a separate full size
plan sheet, preferably 2' x 3' or larger. Project proponent may use the attached
Construction Best Management Practices (BMPs) plan sheet to comply with this
requirement. Electronic file is available for download at
http://www.flowstobay.org/bs_construction. php
(Scrol! about half-way down the page and click on Constructian BMP Plan
Sheet).
For assistance please contact Eva J. at 650-342-3727.
�
Reviewed by: � Date: 11-21-2011
�:ft�=;��
SAN Mn7E0 C!7UN7YVJIDC
Water Pollution
Prevention Program
Clean Watec Healthy (:mnrnunity.
Construction Best Management Practices (BMPs)
DOWNLOAD e-file at http://www.flowstobay.org/bs_constructiqn.php
Construction projects are required to innplement the stormwater best management practices (BMP) on this page,
as they apply to your project. Please note: the wet season begins on October 1 and continues through Apri130.
Materials & Waste NIanagement
Non-Hnxxrdua� Malcrfale
❑ fle'm und cover elockpiles oC eona d�rt or olher con�WotVon meledul
w�iih laryc when min is Corecnel or iinot acll�•ely being umd e�ilhln
l4 dnps.
❑ Usc (bul don't o�•eruse) rcclalmed wnht Pordu�l oontral,
Hazardom MaMrlaly
❑ Cehd nll hazorduns malcrinb ond heratJou� woelot (wch o�
pcsliciJes, painls, tl�inne�s, aolvcnla, 1�e1, oil, nnd w�tllreer.e) In
accordonce witl� ciq�, county, sinte end federnl regulntlona.
❑ 5[am huz+rdous mnlc�inlc md rvualee In wulcr Ilghl rnnlainan, elota
��� oPPmD��te secondory conlalnmonl, end covor thom ot Iha end of
cvcry rvork day or during �vel woatlmr nr �vhcn raln M forcca+l.
❑ Fallow monn(acinrer i opplicolion In�Wctions for howduue
moterials m�d be cuefid nol lo nse more Ihm necaanry. Do nol
npply chcmicnls unldoorr when tnin b Iorcrn�t wllhfn 24 houn.
❑ Armnge Por opproprialc diepoanl oCnll hmardou� rvaetce.
Wmte Manngemenl
❑ Cmcr �vcs�c disposal cnnteincu eacumly wllh �nrp� el qw and oC
e��cry irork dny end during wai wonthcr.
❑ ChecA wuste Jispoanl conluinnn fmquanlly fur lenk� und Io mnke
sure ihry nre not ocerfiiled. Never hose dowu n Aumprlei on tlie
conslruclion sile
O Cicun or rcplocc pvtlablc toi�eU, nnd Inapecl lhcm (roquenlly 1'or
Icnks and spills.
❑ Uispose af nll �vrslca nnd debrlt properly, Recycic mnledob nnJ
x•osles thnl cun be rccycled (enah nx nephnlL wncrelo, eyyroguln batc
malcrials. wood. Srp 6oud, pipc, elo.)
❑ Disposc o( IiquiA rcsidue� f�om pnbfU, diionan. mlvonu. glua�, nnd
cicaning Iiuide as hnxncdous wn�lc.
Corotractlon Enlrunrce and Pcrhnc�er
❑ EsmM1lish and moinlnin elPocliva perlmclar oanVoln nnd eluUflim nll
canstruciim� cntrancas nnd exfla In nuNdcnlly cnnvo� cronlnn anJ
scdimcnl dischargce tiom ciln nnJ Vncking all' dte.
U Srveep or vacunm unp slrccl lraaAing fmmedlnlely md teaure
sedimeul sou¢e lu pmvcnt furlbor Irnoklnp. Nc�'ar ho�n down tlrcele
ta cicnn up Iracking.
�quipment Manegement &
Spill Control
� .e�...�
4 ,,.
prt.;; (1 14
I I 1
.�,.. r � �..°g'
Melntcnantt and ParWnR
O Dceignnle en nreq Illlcd whh nppmpriatc AMPe, for
vehlclo nnd cqnlpmom pntking end aloregc,
O. PoA'orm mqjor mointanunca, repeirjobn, and vchicla
aid equipmenl weehing od'dlm
L7 IFrofueling or �Khicle mninknonce must be done
onsile, work in n benned nrco mvay hmn eiurm itrafns
nnd over o ddp pon blg enough to oollect Auid�.
Recycle or dlepole of Oidd� m hnvardon� n•mlc.
O V vahicle or oqulpmenl cicaning m�ml bc done ond�a,
denn wilh wolor unly In n betmed nteo Wol �vlll not
nllow rinfe rvnter lo run Inlo gullere, otreele, elo1m
rUoina, or endnce rvnlere.
f] Du nol clem vehiale or eqoipmenl aniile iufng �oope,
�ohronls, dagrearcn, �lenm cleaning eq�dpmenl, etc.
Splll Prcvenllon aml Conlrol
0 Kcep eplll aleenup mewdnl� (mg�. ab�orbcai�. cic.)
nvaileblo m �ho comWctlon �Ilo e� ell timc�.
❑ Inupeol veh(clea nnd equlpmaN fmqnantly for ond
repuir lenk� promplly. Uie d�ip pm� lo cnlch leokr
unlil repnin nre muAe.
❑ Clenn up apllle or laoka linmadfa�cly and diopou of
cicenup malcdntr propady.
❑ Uo not hoie down �udoce� rvhore Iluid� hova �pllleA.
Um Jry elaonup metliodi (nbeorbenl mnieriulr, cni
litter, nnd/or roge).
f:l Srveop up rpllleA Jry malerinle hnmedintaly, Du nol
try� lo �rneh tl�mn mvny wllh �vamr, or bup� Ihem.
❑ Clonn up Ipille on din moae by JiQying up end
pmperly Jbpodny of conlominnlcd �oIL
G Repoil rigidlfconl eD��b �mmeJlulaly. You ore rcquircJ
by Imv �u rcputl nll dynl6cnnl reierod� uf hnwdom
mn�adnb. Inclndlna oll. 7b raporl n q>ill: q Dfnl 911
o� poiu Ivcnl mnerganop roepomo numbar, 2) Cnll iho
dovorno�'i 0111oe of Rinergonoy Sorvlcoi Wnrnh�g
Ccutcr, (N00) N!2•7550 (2A hourR),
�arthwork &
Contaminated
5oils
� , -.��.:;�x{
.� . �
' �[�
.. .•—_..oc::,-- . .. .
3w::1.-ui;l7fu�:.� '�.�'-_ .;. -_�.`„m'"��
..,"R,-..�-r-....
Eroelon Conirol
❑ ScheQulo groding ond excovatfon work I'or
dry wcolher only.
❑ Slebiliu nll denuded ereas, imlull nnd
meinlnin lempomq� ero�ion oonlrol� (mch
a� eroiion oonuo166�ic or bunded Ober
mo�ix) nnifl vegetnlion Io e�lnbllihed.
O Socd or plent �•egelnUon [or eronlon
conlml on elapcf or wAcrc cont Wction Is
nnl immcdiololy pinnned.
SeJlmcm Cuntfvl
❑ P�olecl elotm drein inlmq gWmre, dlrohc�,
nnd drelnngc couaa wllh opptop�irtc
BMN�, �uch n gre�Tl bng�, fiber mll�,
befmi, alc.
U ProveN eadiment kom mlgrNing otl'dte
by in��alling and melmelning aedimenl
eonhole, eueh as 8bor mlle, eSt kncoe, or
sedimcnl Ua�lm.
O Keap excovnted �oil on tlw dlc �vhem i�
rvlll nn� cnllem INo IAo etrcct.
C1 Tmnehr excnvnled me�edola lu Jump
Irnck� on Ihe die, no� hi tlie �Ireel.
❑ (:enleminalod Soil� ,
❑ 11'nny of IMe Iollo�vinp oondlilone nre
ob�urvnd, lo�l for conlmninnllan nnd
conmai �he Regiunol Wmer Quulliy
Cunlrol Boo�J:
■ Unuenel �oll conAillone, dl�colorellon.
or odor,
■ Abondoned underyroundtank�.
■ AbnnJoned wcllt
■ Duded Uovcle, debde, nr Irnnh.
Paving/Asphalt Work
�., I
U Avoid peving nnd aeel coaling In �vel
u�enq+er, o� when raln I� foroens� bcfore
heeh pevemenl �vill have Ilmc �o curc.
O Cover atorm drnin inlete end monhotee
when npplying ¢ol aoe6 uck wei, cturty
�eol, fag eeul, plc.
U Collecl nnd rccycle or npproprimely
di�pote of exceit ubmfive grnvel or eanA.
Do NOT ewecp or we�h fl b�lo gullcrs.
❑ Dn not uee rvalcr la woeh down hosh
uepNolt wncroio povomcnl.
Snx�culling & A�phall/Cnncrelc Rcmurul
❑ Complelely cove� or 6nrticnde �lofm
dmin inlel� when inw cuuin�{. Uae lilier
fnbric, celch be�in inlel 611cn, or gmvcl
bugr lu krep alurry oul uf Ihe alurm drnin
ryalem.
❑ 3haval, aUoeorb, or vnanum amv�cut
elnrry and dleposo oFell �veslc m roon
m you mc flnlehcd In onn locallon nr a�
the and af oech �vork dny (whichever le
tonned).
U If �ervcW dunp entere o enleM bnifn, cleen
h up Inm�edimely.
Concrcte, Grout & Mortar
Application
❑ Slom concmle, gmut nnd motmr under
covet, on pnllela nnd nwny hom drninnge
orees. Theca mnleriele musl never rtoch n
e�urm droin.
O tVesh oul ooncrela equipmenV�mcks
otTelle or In e eoNnincd eren, so tlwro
is no dinchergo Inlo Nc undcrlping �oll
nr nnlo �urtounding arcss. Lel cnncrcic
hmden md dicpoec qf ea gorbagc.
❑ Collecl lhu ived� wotcr hom �vnthing
e:tpbied nggreyole cunctele ond �emove 11
Cor approprinle dlfpo�al vlfsil�.
Dcwatering
1� „'
�:.- U..��
� ����
� . t
�' .ti r�.l . 't,.
.1 1M, � ,( ��
� ""✓ �.. �,.�e F^� ..•-�✓'
❑ QReolively mennye all Kun-on, all
�unoR�vil�in Ihe alle, nnd nll mnolT Ihe1
dircharge� from iha d�a. Ulvert mnon
ivolerlrom o�tlle o�vny fmm olldislnrbed
nren� or olhenvim emwe complioncc.
O When darvelcring, noUfy end obtain
approvel hom tlm locnl mnnidpnlity
befara dlwherqing woior lo a nuca� guuer
ai dorm drein. Flllrntlm� or divcrslon
Ihrough e bn�In, lonk, nf eedimcnl trap
iney be requlmd.
p In mcne of knuwn canleminalion, lesling
is requlroJ priur lo �cuce or Jischarge of
givundwntec Conmll rvIW Ihc Cngineer lo
dalarmhm whollmr latlng b reqnircd nnd
hmr la lolerprcl rcml�e Comnndna�ed
groimdH�n�cr muei be vemc�l or 6nuled
o1l=ella for proper dieposol.
Si:orm drain polluters may be liable for fines of u.p to $10,�00 per day!
Paintipg & Paint Removal
. a, �.,
z
� � �, �' ,
;,i� ; � �.I..
,��`-�� �
� ~, � .�a 'e-".>,
Pelnling cicanup
❑ Nevar clenn bmshes or �inac peinl
conlninera inro e strceL gultcr, sinrm
d`ein, or audacc �ve�ers.
❑ Far wnitt-baaed ynin¢, paint ont 6nrshes
lo Ihe ezt<nl poasible. Rinse lo Ihe
snnilnq� sen•er once yw ha�n gained
permission Gom We locnl a•nslmraler
trcptmm�l aulhodh�. Ncvcr pour puint
dmvu a dmfu.
O For oll-bneed points, puint oul bmehes ta
Ihe ezlen[ poesible nnd clem wiN Ihinner
ot eolvenl in n proper conminec Filler nnd
rmne Ihinners �md solvcnb. llispose af
reaidue uod unusoble t6innttlaolvenls oc
hnrardoue w•asle.
Pxlnl rcmoval �
❑ Chemieal pnint stripping residue und
ehipS m�d dusl from mnrine pnints or
pninls eonlaining lend or Iribulyhin musl
be divpuaed oCua hezardaua �msle.
O Point chips ond dustlrom nan-hmardons
dry aldpping nnd sand 61ac[ing mny be
ex•cpl up or collechd in plaslic drop
clol6c nnd diapoxd of as trash.
I.andscape Materials
�ta..'�� �•`s,••
�i.�'��4-v�w„� ��
F; � r :•• '�i>:Z:\ `,`��
< ��:��:_ ' �
s,'til",�",
'•�� ��r:�,�..
l �:} ..
❑ Conlnin flockpiled landscaping moterfels
by� sloring Ihcm under ierys when ILey nrc
nol oclivel�• being med.
❑ Slnok crodiblc landscopc mntcrial an
pn11cU. Covcr ar elom Ihcsc mnlcdnls
�vhon Ihcy erc nol acih2ly bcing used or
npplled.
❑ �isconlinuo opplicalion of uny erodiblc
InnJecnpe mnleriel �vi�in 2 dnys before o
foacnit rnin ecem m divin6 n•e1 weelher.
• � . .