HomeMy WebLinkAbout260 Crescent Avenue - Resolution.
. , .
�
RECORDING REQUESTED BY:
Planning Deparhnent
City of Burlingame
WHEN RECORDED MAIL TO:
PLANNING DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE
BURLINGAME, CA 94010
Resolution No. 069-2003
263 Crescent Ave. ; APN: 028-287-010
TITLE OF DOCUMENT
' 2003-263602
I 12:56pm 09/1 S/03 R1 Fee: 0.00
Count of pages 18
I Recorded in Official Records
County of San Mateo
Warr�n Slocum
j Assessar-�ounty Clerk-Recorder �
'�II��I ��I���� II����� ll'�il '�,�' II!�I'��I'I I��II �i��i ����' II��I �'����' �II�'I JI
* Z 0�J 3 0 2 6 3 6 0 2 A R*
RECEIVED
�r,T 1 0 2003
C1 PLANNBNG DEPT�E
I hereby certify this to be a full, true
and correct copy of the document it purports
to be, the original of which is on file in my office.
Date: 8/11/03
Ma gar t Monroe, City Planner
��
RESOLUTION APPROVING CATEGORICAL EXEMPTION
AND DESIGN REVIEW
RESOLUTION 069-2003
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a categorical exemption has been proposed and application has been made for desiQn
review for a new, two-story dwellin� with detached ��e at 263 Crescent Avenue zoned R-1. Chetcuti &
Associates. Inc., property owner, APN: 028-287-010;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on Julv
28, 2003, at which time it reviewed and considered the sta.ff report and all other written materials and
testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Pianning Commission that:
1. On the basis of the Initial Study and the documents submitted and reviewed, and comments
received and addressed by this commission, it is hereby found that there is no substantial evidence that the
project set forth above will have a significant effect on the environment, and categorical exemption, per
CEQA Article 19, Section 15303, Class 3, construction and location of limited numbers of new, small
facilities or structures including (a) single-famiiy residences not in conjunction with the building of two or
more such units is hereby approved.
2. Said design review is approved, subject to the conditions set forth in Exhibit "A" attached
hereto. Findings for such design review are as set forth in the minutes and recording of said meeting.
3. It is further directed that a certified copy of this resolution be recorded in the official records of
the County of San Mateo.
C
TIM AURAN f
I, , Secretary of the Planning Commission of the City of Burlingame, do
hereby certify.that the foregoing resolution was introduced and adopted at a regular meeting of the Planning
Commission held on the 28th day of Julv , 2003 , by the following vote:
AYES: COMMISSIONERS:
NOES: COIVIlVIISSIONERS:
ABSENT: COMIVIISSIONERS:
Auran; Bojues; Kerighran; Vistica: Osterling
�C��i`iJ
Keele, Brownrigg
ABSTAIN: COMMISSIONERS NONE
�
SECRETARY
EXHIBIT "A"
Conditions of approval for categorical exemption and design review
263 Crescent Avenue
effective August 7, 2003
1. that the project shall be built as shown on the plans submitted to the Planning Department date
stamped July 18, 2003, sheets 1 through 6, and Sheet L, and that any changes to building materials,
exterior finishes, footprint or floor area of the building shall require an amendment to this pernut with
the following revisions: that the shutter on the window on the second floor on the left side elevation
shall be eliminated and the window shown with two shutters on the left side first floor elevation shall
have one shutter as shown on the window above and that the garage shall be moved forward so that
there is 12 feet between the rear property line and the rear of the garage and 20 feet between the front
property line and the front of the garage so that there is one uncovered parking space created on the
lot; that 50-75°10 of the outside of the proposed wall along property line shall be covered by plants
and shrubs and vines as approved by the City Arborist to provide the required coverage, that the
concrete patio shall be pulled back from the structure on two sides to create planting areas in the
ground which shall be planted with suitable plants and, that all landscaping and planted areas shall be
provided with automatic irrigation;
2. that any changes to the size or envelope of the basement, first or second floors, or garage, which
would include adding or enlaxging a dormer(s), moving or changing windows and architectural
features or changing the roof height or pitch, shall be subject to Planning Commission review;
3. that prior to scheduling the foundation inspection a licensed surveyor shall locate the property corners
and set the building envelope;
4. that prior to underfloor frame inspection the surveyor shall certify the first floor elevation and the
second floor plate height of the new structure and the various surveys shall be accepted by the City
Engineer;
5. that prior to scheduling the roof deck inspection, a licensed surveyor shall establish the height of
the roof ridge and provide certification of that height;
6. that prior to scheduling the framing inspection, the project architect, engineer or other licensed
professional shall provide architectural certification that the architectural details such as window
locations and bays are built as shown on the approved plans; if there is no licensed professional
involved in the project, the property owner or contractor shall provide the certification under
penalty of perjury;
7. that prior to final inspection, Planning Department staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans;
8. that all air ducts, plumbing vents, and flues shall be combined, where possibie, to a single
termination and installed on the portions of the roof not visible from the street; and that these
venting details shali be included and approved in the construction plans before a Building permit is
issued;
page 3 , �
Conditions of approval for categorical exemption and design reyiew
263 Crescent Avenue
effective August 7, 2003
9. that the conditions of the City Engineer's, the Fire Marshal's memo, and the the Chief Building
Inspector's 1VIay 12, 2003 memos, and the Recycling Specialist's May 14, 2003 memo shall be met;
10. that the applicant shall comply with Ordinance 1503, the City of Burlingame Storm Water
Management and Discharge Control Ordinance;
11. that during demolition of the existing residence, site preparation and construction of the new
residence, the applicant shall use all applicable "best management practices" as identified in
Burlingame's Storm Water Ordinance, to prevent erosion and off-site sedimenta#ion of storm water
runoff;
12. that the project is subject to the state-mandated water conservation program, and a complete
Irrigation Water Management Plan must be submitted with landscape and irrigation plans at time
of permit application;
13. that demolition of the existing structures and any grading or earth moving on the site shall be
required to comply with all the regulations of the Bay Area Air Quality Management District; anci
14. that any improvements for the use shall meet all California Building and Fire Codes, 2001 Edition
as amended by the City of Burlingame.
3
ROUTING FORM
DATE: May 12, 2003
TO: � City Engineer
� Cluef Building Official
Fire Marshal
Recycling Specialist
_Sr. Landscape Inspector
City Aftorney
_ FROM: Plauuung Staff
SUBJECT: Request for design review for .a new two-story single family dwelling at 263 Crescent .
Avenue, zoned R 1, APN: 028-287-010 .
Y � ' �
�
., P1J�LIC WORKS DEPARTMENT ENGIlVEERING DIVISION
� : rLArnvnvG x�v�w coNnv�rrrs �►�-�
ProjectName:-��t.�� .ns�te�
. , f�"`�,. _, ,
- Project Address:_� �Ik+�
The following requirements appiy ta the project
1 � A property. boundary survey sha11 be preforrned by a licensed land
surveyor. The survey shall show all property lines, property corners,
easements, topograp�ical fea.tures and utilities. (Required prior to the
. building permit iss�ance.)
2 �t _ The site and mof drainage sha11 be shown on plans and should be made to
drain towards the Frontage Street. (Required prior to the building permit
issuance.)
3. The applicant shall submit project grading and drainage plans for
. approval prior to the issuance of a Building permit.
4 The pioject site is in a flood zone, the project sha11 comply with the City's
flood zone requirements.
5 � A sanitary sewer lateral i�t is required for the project in accordance with
the City's standards: (Required prior to the building petmit issuance.)
6. The project plans �ha11 show the required Bayfront Bike/Pedestrian trail
and necessary public access improvements as required by San Francisco
Bay Conservation and Development Commission.
7, Sanitary sewer analysis is required for the project. The sewer analysis
shall identify the project's nnpact to the City's sewer system and any
sewer pump stations and identify mitigation measures.� ;
$ Submit traffic trip generation analysis for the project,
�. 9. -� Submit a traffic� impact study for the project. The traffic study shouid
identify the project generated impacts and recommend mitigation
� measures to be adopted. by the project to be approved by the City
. Engineer.
" . 10. The project shall file a parcel map with the Public Works Engineering
� Division. The parcel map shall show a11 existing property lines, easements,
. � monumenfs, and new property and lot lines proposed by the map.
Page 1 of 3
U,lprivate deveiopment�PLANNING REVTEW COMMENTS.doc
:j . . �.
,. PIIBLIC WORKS DEPARTME� ENGINEERING DIVISION
11. A latest prelimirrary title report of the subject pazcei of land shall be
submitted to the Public Works Engineering Division with the parcel map
for reviews.
12, Map closurel.lot closure calculations shall be submitted with the parcel
map. �
13 � The gmject s�all suhmit a condominium map to the Engineering Divisions
in accordance with the requirements of the Subdivision Map Act.
14 � The. pmject shali, at iYs own cost, design and construct frontage public
improvements including curb, guiter, sidewalk and other necessary
; appurtenaat work.
15 � The projec# shall, at ii� own cost, design and conshvct irontage sireetscape
unprovements including sidewalk, curb, gutters, pazking meters and poles,
trees, and streetlights ui accordance wittt streetscape master plan.
16 By the preliminary review of plans, it appears that the project may cause
adverse impacts .during construction to vehicular traffc, pedestrian traffc
and public on street parking. The project sha11 identify these impacts and
provide mitigation measure acceptable to the City.
17 The project shall submit hydrologic calculations from a registered civil
engineer for the proposed creek enclosure. The hydraulic calculations
must show that the proposed creek enclosure doesn't cause any adverse
' impact to both upstream and downstream properties. T'he hydrologic
calculations shall accompany a site map showing the area of the 100-yeaz
flood and existing improvements with proposed impravements.
18 _�l. Any work witliin the drainage area; creek, or creek banks requires a State
�:� ; Department of Fish and Game Pemut �nd Army Corps of Engineers
Pemuts: �
19 ,�_ No constntction debris shall be allowed into the creek.
20 �� The project shall comply with the Gity's NPDES permit requireme�t to
� prevenf storm water.pollufion.
21 �_ The project does not show the dimensions of existing drivewa.ys, re-
submit plans with .driveway �dimensions. Also clarify if #he project is
proposing to widen the driveway. Any widening of the driveway is subject
�to City Engineer's approval.
22 The . plans do not indicate the slope of the driveway, re-submit plans
- showing the.driveway profile with elevations
� Page 2 of 3
iT:lprivate developmentlPLANNING KEVIEW COI�IIv�NTS.doc
} . .
� b ♦
.. '� PITBLIC WORKS DEPARTIVIENT ENGINEERING DIVISION
23 �— The back of the drivewa.y/sidevyallc approach shall be at least 12" above
�he flow Iine of the frontage curb in the stxeet to prevent overIlow of storm
water from the street into private property.
24. For the talceout serviee, a garbage reeeptacle shall be placed in front. The
� sidewalk fronting the store shat� be kept clean 20' fro�n each . side of the
ProPertY•
25. For commercial projects a designated gazbage bin space and cleaning area.
shall be located inside th� building. A drain connecting the gazbage azea to
the Sanitary Sewer System is required.
.� -,
- � Page 3 of 3
U:lprivate developmentll'LANNING REV�W COI�'IlvtENTS.doc
ROUTING FORM
nA�: May 12, 2003
TO: City Engineer
Chief Building Official
. �Fire Marshal
Recqcling Specialist
Sr. Landscape Inspector
City Attorney
, FROM: Planning Staff
SUBJECT: Request for design review for a new two-story si�gle family dwelling at 263 Crescent .
Avenue, zoned R 1, APN: 028-287-010 .
ROUTING FORM
DATE: May 12, 2003
T0: _City Engineer
- �Cluef Building Offiieial
Fire Marshal
RecYcling Specialist
� _Sr. Landscape Tnspector
City Attorney
, FROM: Planning Staff
----�
SUBJECT: Request for design review for a new two-story single family dwelling aC 263 Crescent
Avenue, zoned R 1, API�i: 028-287-010 .
DATE:
ROUTING FORM
SUBJECT: Request for design review for a new twastory single family dweliing at 263 Crescent .
Avenue, zoned R 1, APN: 028-287-010 . �
STAFF REVIEW: Mondav, Mav 12, 2003
TO: City Engineer
Ghief Buitding Officiai
Fire Marshal
�Recycling Specialist
_Sr. Landscape Inspector
City Attotney
, FROMi Planning Staff
May 12, 2003
� ���� �'��y�� � G�i��--�
1 ��—
� � � I�l�� a� � � "
� ���
�� ��� � � �
�s,� �
��� .���� ��
�� �� � ��
. . �, ��� `� �--�,
�� ���
� . �
�,,� { �%l/�, , �r� . �
'� �
�
-�.� r��� .
��
�� ��
..
�- .�._ ��� 1 � � �, �� -f� ��s1 �-- 1 s
�
Reviewed B : �� ��/�-- � �'�'�v / " Date of Commen : � � � � �
Y ts
ROUTING FORM
nA�: Ma.y 12, 2003
TO: �/ City Engiueer
_Chief Building Official
Fire Mars6al
Recycling Specialist
_Sr. Landscape Inspector
_City Aftorney
. FROM: Planning Staff
SUBJECT: Request for design review for .a new two-story singte family dwelling at 26� Crescent
Avenue, zoned R-1, APN: 02$-28?-010 .
�
�: � PUBLIC WORKS DEPARTMENi ENGINEERING DIVISIO�T
rLArnvnvG x�vrEw co�rrrs �� �-�( .
� Project Name: ���
, �"�,�--r'��'`�3
- Project Address:_�. �e�'�
The following requirements apply to the project
� 1"� �[_ A properly boundary survey shall be preformed by a licensed land
surveyor. The survey shall show all P�1��3' ��, P�PertY corners,
, _ � easements, topagraptucal feaiures and utilities. (Re+quired prior to the
. buiiding pernut iss�ance.) .
2 _ t� The site and roof drainage shall be shown on plans and shouid be made to
. drain towards the Fmntage Street. (Required prior to the building permit
- issuance.)
3. The applicant sha11 submit project grading and drainage plans for
_ approval.prior to the issuance of a Building permi�
4 � The project site is in a flood zone, the project sha11 comply with the City's
� flood zone requirements.
5�� A sanitary sewer laterall�t is required for the project in accordance with
the City's standards. (Required prior to the building pernut issuance.)
6. The project plans shall show the required Bayfront Bike/Pedestrian trail
and necessary public access improvements as required by San Francisco
Bay Conservation and I�evelopment Commission.
7. Sanitary sewer analysis is required for the project. The sewer analysis
shall identify the project's impact to the Cily's sewer system and any
sewer pump stations and identify mitigation measures.� :
8 � Submit traffic trip .generation analysis for the proj ect,
9. - Submit a traffic impact study for the project. The traffic study should
� identify the project generated impacts and recommend mitigation
� measures to be adopted by the project to be approved by the City
Engineer_
10. The projeet sha11 file a parcel �nap with the Public Works Engineering
Divistoa The parcel map shall show a11 existing property lines, easements,
. � monumen#s, and new property and lot iines proposed by the map.
Page 1 of 3
U:lpriva�te developmeut�PLANNING REVIEW COD�A+IENTS.doc
;. , ..
.� PUBLIC WORKS DEPARTMEi�'T ENGINEERING DIVISiON
1l. A latest preliminary title report of the subject parcel of land shall be
submitted to the Public Works Engineering Division with the parcel map
for reviews.
12, Map closurellot closure calculatians shall be submitted with the pazcel
map.
13 The gmject shali submit a condominium map to the Engineering Divisions
in accordance with the requiremenfis of the Subdivision Map Act.
� 14 � The. project shall, at its own cost, design and conshuct frontage pubtic
improvements including curb, gutter, sidewalk and other n�essary
i appurtenant work.
15 The project sha11, at�its own cost, desiga and construct frontage streetsc�pe
improvements including sidewalk, curb, gutters, parking meters and poles,
trees, and sireetlights in accordance with streetscape master plan.
16 By the prelim.inary review of plans, it appears that the project may cause
ad.verse impaets .during constr�ction ta vehiculaz traffic, pedestrian traffc
and public on street parkiag. The project shall identify tliese impacts and
provide mitigation measure acceptable to the City.
17 The project shall submit hydrologic calculations from a registered civil
. engineer for the proposed creek enclosure. The hydraulic calculations
must show that the proposed creek enclosure dcesn't cause any adverse
impact to both upstream and downstream properties. The hydroiogic
� calculations shall accompany a site map showing the area of the 100-year
flood and existing improvements with proposed 'unprovements.
18 _�l. Any work within the drainage area; creek, or creek banks requires a Sta.te
�= ; Department of Fish and Game Permit and Arm.y Corps of Engineers
Permits:
19 �� No construction debris shali be allowed into the creek.
20 X The project shall comply with the City's NPDES pemut requirement to
T
� - _ prevenf storm water pollution.
21 �_ The project does not show the dimensions of existing driveways, re-
submit plans with .drivewayti dimensions. Also clarify if the project is
proposing to widen the drivewa.y. Any widening of the driveway is subject
�to City Engineer's approval.
22 The: plans do not indicate the slope of the driveway, re-submit plans �
showing the.drivewa.y profile with elevations
� Page 2 of 3
I7:�private development�PLANNING KEVIEW COMI�RENTS.doc
T • . '
i d •
�� '' PUB�.IC WORKS DEPARTMENT ENGINEERiNG DIVISION
23 �— The back of_the drivewaylsidewalk approach shall be at least 12" above
the flow line of the frontage curb in. the slre�t.to prevent over�low of storni
� water from the sireet into private property.
24. For the takearut serviee, a garbage reeeptacle shall be placed iri front The
R sidewalk fronting the store shall be kept c�ean 20' from each - side of the
ProPertY• -
. 25. For commercia� pro�ects a designa�ed gatbage bin space and cleaning area
_. shall be located ins�ide the building. A drain connecting tlie garbage area to
_ the Sanifary Sewer System is required.�
_ _ _ . .. .
.��-�
- � Page 3 of 3
U:>private developmentlPLANNI1�iG REVIEW COI�i�IlVIEN'TS.doc
ROUTiNG FORM
DA�'E: = -i1�ta.y 12, 2003
TO: City Engineer
Chief Building Official
�Fire Marshal
Recycling Specialist
� Sr. Landscape Inspector
�ity Attorney
_ . FROMi . Planning Staff
SUBJECT: Request for design review for a new two-story si�gie famiiy dwellui� at 263 Crescent .
Avenue, zoned R 1, APN: 028-287-010 .
. �
ROUTING FORM
DA�: May 12, 2003
TO: City Engineer
�Cluef Building Offiieial
Fire Matshal
Recycling Specialist
� Sr. Landscape Inspector
City Attorney
, FROM: Plaruung Sr.aff
_._---�\
SUBJECT: Request for -design review for a new two-story single family dwelinig at 263 Crescent
Avenue, zoned R 1, APN: �28-287-010 . �
e
r
� s
ROUTIl�1� FORM
DATE: 1VIay 12, 2003
TO: _City Engineer
- Chief Building Of�cial
Fire Marshal
�Recycling Specialist
� Sr. Lan.dscape �nspector
_City Attorney
, FRaMi Planning Staff
SUBJECT: Request for desig� review for a new two-story single family dweiling at 263 Crescent .
Avenue, zoned R 1, APN: 028-287-0�0 .
STAFF REVIEW: Monday. Mav 12, 2003
j� ��t- ���n� � �/��-�
� �l� ��
���
� --�� -�'�2 �C a,� -�
a s � ¢— �-
��it.� . ���� ��3
��
�� � ��
_ . .� G���� ��-�i-�.,, �;�-� v�
�� ��� �
� . �
�' I P�j/�J � �(l�1. •
� �
� re.- G��� I ����� �f�- ���1 �- l S
�- �
�
:�� ��� . .
�u,�
Reviewed B : �� � �'�v / " Date of Comments: � j � � �
Y