December 8, 2014
Planning Commission
Director's Report
Meeting Date: December 8, 2014
Erika Lewit, Senior Planner
FYI — REVIEW OF PROPOSED CHANGES TO A PREVIOUSLY APPROVED
DESIGN REVIEW PROJECT AT 1025 CABRILLO AVENUE, ZONED R-1.
Summary: An application for Design Review and a Conditional Use Permit for a new two-story
single-family dwelling and a detached garage with a half bathroom at 1025 Cabrillo Avenue,
zoned R-1, was approved by the Planning Commission at the most recent hearing on
November 24, 2014.
The conditions of approval for the project were amended by the Commission at the hearing to
require that changes to the staircase window and the landscaping be brought back as an FYI
item. These changes were requested by the neighbor to the left of the subject property and
included obscuring the stairwell window and replacing the proposed trees along the driveway
with hedges.
The applicant submitted revised plans date stamped December 3, 2014. The plans reflect that
the bottom portion of the stairwell window at the left elevation will be treated with a permanent
stain or obscure glaze and that proposed Grecian Laurel trees along the left property line have
been removed and replaced with a continuous Pittosporum hedge.
Attached is an email communication between the applicant and the neighbor to the left of the
subject property to show that the neighbor has reviewed and approved the two revisions.
Other than the changes detailed in the applicant's email and revised plans, there are no other
changes proposed to the design of the house. If the Commission feels there is a need for more
study, this item may be placed on an action calendar for a second review and/or public hearing
with direction to the applicant.
Erika Lewit
Senior Planner
Attachments:
Emails to explain the proposed revisions, dated November 25 and December 4, 2014 (3 emails)
Revised left side building elevation and landscape plan, date stamped December 3, 2014
�D/rtG-Lewit, Erika
From: Economy Plumbing <economysf@gmail.com>
Sent: Thursday, December 04, 2014 9:59 AM
To: CD/PLG-Lewit, Erika
Cc: James Chu; Michael Callan; Sylvester Carolan; dave.waite@Ihfs.com
Subject: Re: 1025 Cabrillo Ave
Good Morning All,
I apologize, I had e-mailed James last week directly instead of replying to all. Thank you, I appreciate all the
changes that have been made.
Best,
Dan
Economy Plumbing, CEO
Cell: (650) 302-1736
Office: (650) 756-5100
Fax: (650) 756-5151
P.O. Box 1487, Burlingame, CA 94011
On Thu, Dec 4, 2014 at 9:25 AM, CD/PLG-Lewit, Erika <elewit o,burlin a� me.org> wrote:
Hello James,
I have not yet seen a response from Mr. Griffin regarding the changes to the landscaping. An email with the
changes was sent to Mr. Griffin from Michael Callan one week ago.
James, please let me know the status of these revisions. I will need 8 half size copies of the proposed revisions
to place the FYI on the next available agenda (which is in January).
Mr. Griffin, if you can send an email to note that you have reviewed the landscaping revisions and approve of
the changes (as you did with the revised stairwell window treatment), that will be helpful information for the
Planning Commission.
Please let me know there are any other questions.
Erika
.,
From: James Chu [mailto:jamesCc�chudesign.com]
Sent: Tuesday, November Z5, 2014 10:31 AM
To: economysfCa�gmail.com
Cc: Michael Callan; Sylvester Carolan; dave.waiteCa�lhfs.com; CD/PLG-Lewit, Erika
Subject: 1025 Cabrillo Ave
Hi Mr. Griffin,
Attached you'll find the left elevation where the lower part of the staircase window will be "Obscured" as
agreed.
Mike Callan will send you the revised landscape plan today. Please let us know if you have any question, as we
would like to resubmit back to Planning for FYI approval.
Best,
James
James Chu
Email: James@chudesign.com
Website: www.chudesign.com
Chu Design Associates, �nc.
CUSTOM HOME DESIGN & ENGINEERING
55 West 43rd Avenue
San Mateo, CA 94403
Tel:(650�345-9286 x104
Fax:(650�345-9287
. r
�D/PLG-Lewit, Erika
From:
Sent:
To:
Cc:
Subject:
Attachments:
Michael Callan <mike@michaelcallan.com>
Tuesday, November 25, 2014 1:16 PM
James Chu
Dan Griffin; Sylvester Carolan; Dave Waite; CD/PLG-Lewit, Erika
Re: 1025 Cabrillo Ave- Revised Landscape Plan with hedge screening planting PDF
attached
pittosporum tenuifoium jpg; 1025 Cabrillo - Revised Landscape Plans with side
hedge.pdf
Mr. Griffin,
I wanted to follow up with a PDF copy of a revised landscape plan for 1025 Cabrillo where I have used a dense
pittosporum hedge along the driveway instead of taller evergreen trees.
This evergreen hedge is shown all the way down our shared property line for privacy screening which can get
up to 10'-12' tall.
Please review the attached revised landscape plan along with a picture of the proposed shrub/hedge.
I appreciate your time in reviewing the plan and photo and would be happy to answer any questions.
Regards,
Mike Callan
michaelcallan
landscape architect
63 Bovet Rd #314
San Mateo, CA 94402
ph: 650.372.9220
fax: 650.372.9219
mike@michaelcallan.com
www.michaelcallan.com
DISCLA/MER
By reading Ihis, you are in agreement irith the follotiving:
The de/rveiy of this/these electronic frle(s) does not constitute the delive�y of our professiona/ work prodvc[ In using rt, n:odifyrng it, or pu/ling information fi•om it, yoai are
responsible for confrrmaliott, accaracy and checkrng fhereof. Michae! Callan, Landscape Architect hereby disc(aims any and a11 responsibilrry from any resrdts obtained rn vse of
thrs data and does nof guarantee any accairacy of the informaiion. You agree to indemnify and hold harmless Michael Callan, Landscape Architect from any and all actrons
ar•ising from the use of these elecfronic f:/es. It is imperative that the Surveyor should obtain a fzdl set of conslrvction doc:�ments prior �o any construction staking.
On Tue, Nov 25, 2014 at 10:30 AM, James Chu <james(a�chudesi n.� com> wrote: