Loading...
HomeMy WebLinkAbout122 Stanley Road - Staff ReportCITY OF BURLINGAME PLANNING COMMISSION — Approved Minutes November 12, 2013 3. 122 STANLEY ROAD, ZONED R-1—APPLICATION FOR DESIGN REVIEW FORA NEW, TWO-STORY SINGLE FAMILY DWELLING AND DETACHED GARAGE (DE NGUYEN, THE DESIGN GROUP, APPLICANT AND DESIGNER; MR. & MRS. COSTAGLIO, PROPERTY OWNER) STAFF CONTACT: ERICA STROH R.:. All Commissioners had wsitedA a propertyx �tiere er no ex -pa communig%6 mmissioner DeMartini indicated sihathe� 'not in attend'" . e ti I Y! 2' 2013 esign Review eting, but he had watched the video. R rence staff r ort d ed Nov ber 12, 013, with attachments. Associate Planner Strohmeier prese ed the report, 'viewed criteria a d staff om 2nts. Fifteen (15) conditions were suggested for consideration. ??,; Vice Chair Davis opened the public hearing. De N u e Jed s ted the a licanfr Decido go with a br �l,il houjdo'. Ilew h use is sdua d at the average setbao 20' 8 Was a to enlarge the hou onthe width an reate a fr t por^lat is bigger.Remo the 6 x 6 posts by` ttir6 a single post in the froSimpli the wood trim arou d t .-windows and doors. ■ Removed the deck at the Master Bedroom at the rear to elifv the look of the:vation. Commission questions/comments: I • Improvement from before, including the interior layout. • Is there a reason why the stone veneer is held off the ground? On the columns it does not go down to the deck level, and on the sides it is a few inches above the grade (Nguyen: It stops at the foundation.) It would look better if it went all the way down and overlapped. (Nguyen: It is for waterproofing. Eventually landscaping will cover the gap. The Building Code requires the gap to be 8 inches.) The sill plate needs to be a certain distance up, but not the stone veneer. • There are ways to detail the stone veneer without having the big gap. With hardscape paving at the bottom, can reduce the gap to 2 inches, or could take it all the way down and have a gap at a higher point with weep holes to allow the water to come out from behind the stone. With the gap it makes the stone look fake — does not look like the foundation of the house. Happy to see the porch, and likes the changes to the front elevation. • Doors to the den make it look like another front door. Maybe change it to a window so the front door will be the prominent entry point. Would then allow there to be furniture on the porch —otherwise the size of the porch and the door swing would make it hard to have room for a bench. (Nguyen: Previously the commission has liked the doors to open to the porch. Can change it to the window, but thinks people will be able figure out which door is the front door. There will be a custom wood front door that highlights the main entrance, and the pathway leads to the front door. Willing to change it to windows however.) The rear elevation looks a bit flat without the balcony. Maybe something to give it a little relief? Even a trellis over the French doors would help the elevation. (Nguyen: A trellis over the door would not be practical. Would look good but over time when growing vines, they will drip down over the doors. Not functional —wants to make sure everything is functional.) Do not have to grow things on a trellis — sometimes they are just for shade. • Maybe make a box window if there is enough square footage? (Nguyen: Could put a planter box under the three windows.) As shown the rear French doors are exposed to the weather. A trellis or awning would not only help with the massing, but would help protect the doors. • In previous meeting asked for clarification on size of brackets. Still looks vague on new plans. Clarify the construction hours — not an issue starting at 8:00 a.m.? (Nguyen: Not an issue.) City of Burlingame Design Review Address: 122 Stanley Road Item No. 3 Regular Action Meeting Date: November 12, 2013 Request: Application for Design Review for a new, two-story single family dwelling and detached garage. Applicant and Designer: De Nguyen, The Design Group Property Owner: Mr. & Mrs. Costaglio General Plan: Low Density Residential APN: 029-282-210 Lot Area: 5,750 SF Zoning: R-1 Environmental Review Status: The project is Categorically Exempt from review pursuant to the California Environmental Quality Act (CEQA), per Section 15303 (a), which states that construction of a limited number of new, small facilities or structures including one single family residence or a second dwelling unit in a residential zone is exempt from environmental review. In urbanized areas, up to three single-family residences maybe constructed or converted under this exemption. Project Description: The applicant is proposing to demolish the existing single story house with an attached garage and to build a new, two-story single family dwelling and detached garage. The proposed house and detached garage will have a total floor area of 3,317 SF (0.58 FAR) where 3,340 SF (0.58 FAR) is the maximum allowed (including covered porch and chimney exemptions). The proposed project is 23 SF below the maximum allowed FAR and is therefore within 1 % of the maximum allowed FAR. The project includes a new detached garage (427 SF) which will provide two code -compliant covered parking spaces for the proposed four -bedroom house. There is one uncovered parking space (9' x 20') provided in the driveway. All other Zoning Code requirements have been met. The applicant is requesting the following application: Design Review for a new, two-story single family dwelling and detached garage (CS 25.57.010 a, 1). 122 Stanley Road Lot Area: 5,750 SF Plans date stamped: November 1. 2013 PROPOSED ALLOWED/REQUIRED SETBACKS Front (1st fir): 20'-10" 20'-10" (block average) (2nd fir): 27'-4" (to bay) 20'-10" (block average) Side (left): 10'-0" (to 2nd story bay) 4'-0" (right): 5'-6" 4'-0" Rear (1st fir): 34'-7" 15'-0" (2nd flr): 34'-7" 20'-0" Lot Coverage: 2,103 SF 2,300 SF 36.6% 40% FAR: 3,317 SF 3,340 SF' 0.58 FAR 0.58 FAR # of bedrooms: 4 --- Parking: 2 covered 1 covered (20' x 20') (10' x 20') 1 uncovered 1 uncovered (9' x 20') (9' x 20') Height. 25-0" 30'-0" DH Envelope: complies CS 25.26.075 (0.32 x 5,750 SF) + 1,100 SF + 400 SF = 3,340 SF (0.58 FAR) Design Review 122 Stanley Road Staff Comments: See attached memos from the City Engineer, Chief Building Official, Parks Supervisor, Fire Marshal and Stormwater Coordinator. Design Review Study Meeting: At the Planning Commission Design Review Study meeting on July 22, 2013, the Commission had several questions and comments concerning the retention of the existing front wall, the detailing provided in the plans, the proposed six by six front porch columns and the inconsistency of the proportion of the window pattern. It voted to place the item on the Regular Action Calendar when the plans have been revised as directed (July 22, 2013, Planning Commission Minutes). The applicant submitted revised plans and a response letter on November 1, 2013, to address the Planning Commission's questions and comments. The revised plans include a complete demolition of the existing single storydwelling. Please refer to the copy of the July 22, 2013, Planning Commission minutes included in the staff report for the list of Planning Commission questions and comments. Design Review Criteria: The criteria for design review as established in Ordinance No. 1591 adopted by the Council on April 20, 1998 are outlined as follows: Compatibility of the architectural style with that of the existing character of the neighborhood; 2. Respect for the parking and garage patterns in the neighborhood; 3. Architectural style and mass and bulk of structure; 4. Interface of the proposed structure with the structures on adjacent properties; and 5. Landscaping and its proportion to mass and bulk of structural components. Planning Commission Action: The Planning Commission should conduct a public hearing on the application, and consider public testimony and the analysis contained within the staff report. Action should include specific findings supporting the Planning Commission's decision, and should be affirmed by resolution of the Planning Commission. The reasons for any action should be stated clearly for the record. At the public hearing the following conditions should be considered: that the project shall be built as shown on the plans submitted to the Planning Division date stamped November 1, 2013, sheets T1 through GN, Landscape Site Plan, Landscape Plan and Boundary and Topographic Survey; 2. that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYI or amendment to be determined by Planning staff); 3. that any changes to the size or envelope of the first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; 4. that the conditions of the City Engineer's April 26, 2013 memo, the Chief Building Official's June 21, 2013 and April 18, 2013, memos, the Parks Supervisor's June 17, 2013 and April 25, 2013 memos, the Fire Marshal's April 30, 2013 memo, and the Stormwater Coordinator's June 28, 2013 and April 18, 2013 memos shall be met; 5. that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; 6. that demolition for removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the 2 Design Review 122 Stanley Road regulations of the Bay Area Air Quality Management District; 7. that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; 8. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 9. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 10. that during demolition of the existing residence, site preparation and construction of the new residence, the applicant shall use all applicable "best management practices" as identified in Burlingame's Storm Water Ordinance, to prevent erosion and off -site sedimentation of storm water runoff; 11. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2010 Edition, as amended by the City of Burlingame; THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 12. that prior to scheduling the framing inspection the applicant shall provide a certification by the project architect or residential designer, or another architect or residential design professional, that demonstrates that the project falls at or below the maximum approved floor area ratio for the property; 13. that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; 14. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; and 15. that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. Erica Strohmeier Associate Planner c. De Nguyen, The Design Group, 205 E. Third Avenue #300, San Mateo, CA 94401, designer. 3 Design Review 122 Stanley Road Attachments: Applicant's response to Commission's comments, date stamped November 1, 2013 July 22, 2013 Planning Commission Design Review Study Minutes Application to the Planning Commission Letter from neighbors with specific requests, date stamped July 9, 2013 Photographs of streetscape, date stamped April 15, 2013 Staff Comments Planning Commission Resolution (Proposed) Notice of Public Hearing — Mailed November 1, 2013 Aerial Photo 4 TDG-The Design Group 205 East 3rd Avenue, San Mateo, CA 94401 Tel: (650) 483-9454; Fax (650) 357-6995 October 23, 2013 Re: New Residence @ 122 Stanley Rd. Dear ADRB members and Planning Staff: We have made the following revisionsTresponses to items at the meeting for the above reference project per July 22, 2013. Architectural: 1. Tear down the existing structural and build the new residence. So all structures to be new. 2. The new house meet the average Setback at 20'-10" 3. Revised the new roof 4. Revised to simplify the windows trim 5. 6X6 columns are now change to single taped wood columns 6. New layout for upper and lower and no more deck at the master bedroom. 7. All the windows at the house and garage to be wood with aluminum cladding. 8. All direct vent to be vent all the way up. 9. Added floor drain notes at the garage 10. Revised Storm water checklist. This concludes the response to items mentioned at the preliminary ADRB meeting. We are happy to answer any final questions or comments in an effort to satisfy the requirements of your review. Regards, VED De Nguyen P�ov Cr7Y OF BURLINGAME CDD-PLANNING DPI. EXCERPT —July 22, 2013 Planning Commission Minutes 122 Stanley Road (Agenda Item 3) 3. 122 STANLEY ROAD, ZONED R-1 — APPLICATION FOR DESIGN REVIEW FOR A NEW, TWO-STORY SINGLE FAMILY DWELLING AND DETACHED GARAGE (DE NGUYEN, THE DESIGN GROUP, APPLICANT AND DESIGNER; MR. & MRS. COSTAGLIO, PROPERTY OWNER) STAFF CONTACT: ERICA STROHMEIER No ex parte communications were reported and all Commissioners had visited the property. Reference staff report dated July 22, 2013, with attachments. Community Development Director Meeker briefly presented the project description. Questions of staff: None. Vice -Chair Davis opened the public comment period. De Nguyen represented the applicant: Are attempting to redefine the home as Craftsman -style. Are keeping the existing one-story wall at the front that is at a substandard setback in order to provide a greater setback at the rear. The two story element will be pushed back on the lot to provide less mass on the structure. Commission comments: • Expressed concern regarding the retention of the existing front wall; what will happen if the wall ends up being removed during construction? (Meeker — noted that if the wall is removed, then the project must be returned to the Planning Commission for reconsideration. A notation has been provided on the plans to this effect; a similar condition would be included in proposed conditions of approval.) ■ Remembers a similar situation elsewhere in the City; should the project have returned to the Commission? (Meeker — yes, though if staff wasn't made aware of the situation if could be missed.) • Doesn't look like the existing wall will last long — he was able to push his pen through the wall when visiting the site. (Nguyen — will reinforce the existing wall and footings if needed during the construction so that it can remain as it is.) • The existing wall will be stripped down to studs during the construction — it could be rotted and require removal. Why is the setback being measured to the existing bay window? (Hurin — the setback is measured to the existing wall that is proposed to remain.) Why is a two car garage being provided? Seems like it is eating into the yard area. (Nguyen — client requested it.) • The applicant needs to understand that there will likely be a condition of approval to require the project to be revisited if the existing wall is removed. It would likely be easier to begin with a clean slate. (Meeker — if the wall is removed, then the applicant would need to request a variance. It is unclear whether or not findings for a variance for a new wall could be met, so the project may need to be revised to comply with the setback.) • Asked if a bay window that doesn't extend to the ground would still be counted in the setback? (Hurin — yes.) Noted that the roof structure over the bay window is to be revised from a flat roof to a gabled roof. EXCERPT —July 22, 2013 Planning Commission Minutes 122 Stanley Road (Agenda Item 3) Page A.1 — shows hip roof on site plan, but it is a gable on the elevation. • In general, the massing is being handled well. ■ May wish to spend more time on the detailing, particularly around the windows. • Feels like there is not a consistent proportion with the window pattern. Expressed concern regarding the six by six column elements on the front porch — could be spaced too closely and may be difficult to maintain — a more substantial column may be better. Look at details that are more typical of the Craftsman style. • Noted that there are some awkward interior elements — should consult an interior designer, as there could be some floor plan changes that may change the massing of the structure. • Clarify the dimensions of the design elements on the exterior — thickness as well as width. • Referenced other examples of material massing that could be helpful. • A.2 — the master bedroom window will look down onto a roof — look at detailing in this area. • On page A.5 it appears that the roof adjacent to the balcony on the rear is not proportioned correctly. • Window notation — specify that will be wood windows with aluminum cladding will be used on both the home and garage — be consistent. • Noted the direct vent fireplace — would like to see the vent for the fireplace run all the way up rather than out the side of the house. • Regarding storm water runoff notation — planning to save rainwater? (Nguyen — will consider.) • Noted that the floor drains in the garage cannot be drained to the sanitary sewer. • Noted other possible errors in the storm water checklist. • Noted concerns expressed by neighbors. (Nguyen — has met with neighbors and they are ok with plans now.) Public comments: Dennis Wong, 121 Channing Road; spoke: The second floor deck appears to be looking directly into his rear yard — will impact his privacy. The plans show the Plum tree being retained — is this correct? (Nguyen — correct. Meeker — suggested that applicant meet with Wong to address his concerns.) Additional Commission comments: Main concern is with front wall. There were no other comments from the floor and the public hearing was closed. Commissioner Gaul made a motion to place the item on the Regular Calendar when complete. This motion was seconded by Commissioner Yie. Discussion of motion: None. EXCERPT — July 22, 2013 Planning Commission Minutes 122 Stanley Road (Agenda Item 3) Vice -Chair Davis called for a vote on the motion to place this item on the Regular Action Calendar when plans have been revised as directed. The motion passed on a voice vote 4-0-3-0 (Commissioners DeMartini, Sargent and Terrones absent). The Planning Commission's action is advisory and not appealable. This item concluded at 8.20 p.m. e COMMUNITY DEVELOPMENT DEPARTMENT • 501 PRIMROSE ROAD • BURLINGAME, CA 94010 p: 650.558.7250 • f: 650.696.3790 • www.burlingame.org APPLICATION TO THE PLANNING COMMISSION Type of application: 10Design Review ❑ Variance ❑ Parcel #: 82 — 210 ❑ Conditional Use Permit ❑ Special Permit ❑ Other: PROJECT ADDRESS: I Z2 S I PAN j /ZIP APPLICANT project contact person ❑ Payor of DSR deposit/handling fee ❑ OK to send electronic copies of documents ❑ Name: 1 D G— 1 I Dr-SI C--t-J 0 T2LJU1' Address: 7-all; E . 7 tfi4f) 1AWIF # 300 City/State/Zip: Sol'k j M /t Inc) ; CA v / Phone: (CS-0 Fax: PROPERTY OWNER project contact person Payer of DSR deposit/handling fee ❑ OK to send electronic copies of documents ❑ Name: Mt.. s' Mt,,. CAS i ACC L10 Address: z;O l C� F /MF2E/Z Gi City/State/Zip: HI LC&olZou(4�y , C7} Phone: 1978 Fax: E-mail: DE' CO, TO4 A(2� . CoM E-mail: ARCHITECT/DESIGNER project contact personPl Payer of DSR deposit/handling fee ❑ OK to send electronic copies of documents ❑ Name: T Q 'T H-F -FEi ati G7f2oUF_7V'� Address: City/State/Zip: _ '—�= AS. AbOVC Phone: Fax: E-mail: * Burlingame Business License #: ZP)3 sj 5 PROJECT DESCRIPTION: �is4jo2 2�f�tUPtZ 4 �FC�Ni� CTyrzS iii�nl�o/� AFFADAVIT/SIGNATURE: I here y certify under p "of p jury that the information given herein is true and correct to the best of my knowledge and belief. Applicant's signature: Date: 4 /j 2' 12D I am aware of the proposed application and hereby author) bove applicant to submit this application to the Planning Commission. � 2 Property owner's signature: '`ry`y r ' l d 4;i v Date:_ y Date submitted: 4' (5' 1 * Verification that the project architect/designer has a valid Burlingame business license will be required by the Finance Department at the time application fees are paid. s:IHANoouTSWCAPP/Icotlon.doc llwjad leha S ds ulllemcj Ilwed al ulS ads MON N ullslx3 d Malna�j u lsa4 2JS4 a olanu3;y 10H ululloaa 3Ha Twiad asfl leuolimuoo dflo weal uoileinajggy :AoN ola()j i7J � y�naJoGS��_`H �� �aaawwb� 05 :Aq pied ea; 6uilpuey/4isodep asa Va p - V W (�.O; � b/` U �.t .Jl /' t� �, l9 �vl I v�� �I'.1 1 b n n(L�S p .^c» � 1 \ l � ` l 1 1 Ma „vard .,y, �� fa, uoL�V �,�adv :uoijduosaa }oafoad .Q Aiup asn mess aao jol aaeds siul June 3, 2013 City of Burlingame Planning Commission 501 Primrose Road Burlingame, CA 94010 Re: 122 Stanley Road Dear Planning Commissioners, .JUL - ? 2013 CITY OF BURLINGAME CDD-PLANNING DIY. Thank you for taking the time to read this letter. We recently learned that a new house will be constructed at 122 Stanley Road. We are pleased with the proposed improvements and welcome our new neighbors to the block. We do expect some disruption during construction. However, there are several families with young children on this block. Therefore, we sincerely request that the contractor implement the following mitigations during construction and ask that they be included as conditions of approval for the project: ■ Start construction no earlier than 8 a.m. on weekdays; and ■ Install construction fencing with a screen or fabric along the perimeter of the property to contain dust and debris and also keep children from entering the construction site. Below you will find signatures of several neighbors within the vicinity of the proposed project who request that the above be implemented during construction. 1,5 +}+' ,«-r IAf_ ;p, r ✓R."a�. - 'tea .✓ .I1 p■]{ I r.- • f•1, w • wT— X, 77 I. J. Date: To: From: Project Comments April 15, 2013 X Engineering Division (650) 558-7230 0 Building Division (650) 558-7260 0 Parks Division (650) 558-7334 Planning Staff 0 Fire Division (650) 558-7600 0 Stormwater Division (650) 342-3727 0 City Attorney (650) 558-7204 Subject: Request for Design Review for a first and second story addition (major renovation) and new detached garage at 122 Stanley Road, zoned R-1, APN: 029-282-210 Staff Review: April 22, 2013 1. Storm drainage shall be designed to drain towards the street frontage or to the City storm drain system. 2. The project shall, at its own cost, design and construct frontage public improvements including curb, gutter, sidewalk, driveway and other necessary appurtenant work. 3. Sewer backwater protection certification is required. Contact Public Works — Engineering Division at (650) 558-7230 for additional information. Reviewed by: V V Date: 4/26/2013 Date To: From Project Comments Revised Plans Submitted June 17, 2013 0 Engineering Division (650) 558-7230 X Building Division (650) 558-7260 0 Parks Division (650) 558-7334 Planning Staff 0 Fire Division (650) 558-7600 0 Stormwater Division (650) 342-3727 0 City Attorney (650) 558-7204 Subject: Request for Design Review for a first and second story addition (major renovation) to an existing single family dwelling and a new detached garage at 122 Stanley Road, zoned R-1, APN: 029-282- 210 Staff Review: N/A No further comments. All conditions of approval as stated in the review dated 4-18-2013 will apply to this project. Reviewed Project Comments Date: April 15, 2013 To: 0 Engineering Division (650) 558-7230 X Building Division (650) 558-7260 0 Parks Division (650) 558-7334 From: Planning Staff 0 Fire Division (650) 558-7600 0 Stormwater Division (650) 342-3727 0 City Attorney (650) 558-7204 Subject: Request for Design Review for a first and second story addition (major renovation) and new detached garage at 122 Stanley Road, zoned R-1, APN: 029-282-210 Staff Review: April 22, 2013 1) On the plans specify that this project will comply with the 2010 California Building Code, 2010 California Residential Code (where applicable), 2010 California Mechanical Code, 2010 California Electrical Code, and 2010 California Plumbing Code, including all amendments as adopted in Ordinance 1856-2010. Note: If the Planning Commission has approved the project prior to 5:00 p.m. on December 31, 2010 then the building permit application for that project may use the provisions found in the 2007 California Building Codes including all amendments as adopted in Ordinance 1813. On the plans provide a copy of the GreenPoints checklist for this project at full scale. (�V Specify on the plans that this project will comply with the 2008 California Energy Efficiency Standards. Go to htto://www.enerov.ca.gov/title24/2008standards/ for publications and details. 4) Place the following information on the first page of the plans: "Construction Hours" Weekdays: 7:00 a.m. — 7:00 p.m. Saturdays: 9:00 a.m. — 6:00 p.m. Sundays and Holidays: 10:00 a.m. — 6:00 p.m. (See City of Burlingame Municipal Code, Section 13.04.100 for details.) On the first page of the plans specify the following: "Any hidden conditions that require work to be performed beyond the scope of the building permit issued for these plans may require further City approvals including review by the Planning Commission." The building owner, project designer, and/or contractor must submit a Revision to the City for any work not graphically illustrated on the Job Copy of the plans prior to performing the work. 6) Anyone who is doing business in the City must have a current City of Burlingame business license. 7) Provide fully dimensioned plans. 8) Provide a fully dimensioned site plan which shows the true property boundaries, the location of all structures on the property, existing driveways, and on -site parking. 9) Provide existing and proposed elevations. 10) This project will be considered a New Building because, according to the City of Burlingame Municipal code, "when additions, alterations or repairs within any twelve-month period exceed fifty percent of the current replacement value of an existing building or structure, as determined by the building official, such building or structure shall be made in its entirety to conform with the requirements for new buildings or structures." This building must comply with the 2010 California Building Code for new structures. BMC 18.07.020 Note: Any revisions to the plans approved by the Building Division must be submitted to, and approved by, the Building Division prior to the implementation of any work not specifically shown on the plans. Significant delays can occur if changes made in the field, without City approval, necessitate further review by City departments or the Planning Commission. Inspections cannot be scheduled and will not be performed for work that is not shown on the Approved plans. 11) Due to the extensive nature of this construction project the Certificate of Occupancy will be rescinded once construction begins. A new Certificate of Occupancy will be issued after the project has been finaled. No occupancy of the building is to occur until a new Certificate of Occupancy has been issued. 12) Provide a complete demolition plan that indicates the existing walls, walls to be demolished, new walls, and a legend. NOTE: A condition of this project approval is that the Demolition Permit will not be issued and, and no work can begin (including the removal of any building components), until a Building Permit has been issued for the project. The property owner is responsible for assuring that no work is authorized or performed. 13) When you submit your plans to the Building Division for plan review provide a completed Supplemental Demolition Permit Application. NOTE: The Demolition Permit will not be issued until a Building Permit is issued for the project. 14) Show the distances from all exterior walls to property lines or to assumed property lines 15) Show the dimensions to adjacent structures. 16) Obtain a survey of the property lines for any structure within one foot of the property line. (PW E tter dated 8-17-88) ndicate on the plans that exterior bearing walls at the garage that are less than five feet from the property line will be built of one -hour fire -rated construction. (2010 CBC, Table 602) Rooms that can be used for sleeping purposes must have at least one window or door that complies with the egress requirements. Specify the location and the net clear opening height and width of all required egress windows on the elevation drawings. J�TQIndicate on the plans that a Grading Permit, if required, will be obtained from the Department of Public Works. 20) Provide guardrails at all landings. NOTE: All landings more than 30" in height at any point are considered in calculating the allowable lot coverage. Consult the Planning Department for details if your project entails landings more than 30" in height. 21) Provide handrails at all stairs where there are four or more risers. 22 rovide lighting at all exterior landings. 5,1the fireplace chimney must terminate at least two feet higher than any portion of the building within ten feet. 2010 CBC §2113.9 NOTE: A written response to the items noted here and plans that specifically address items 2, 3, 5, 17, 18, 19, and 23 must be re -sub 'tt ed before this project can move forward for Planning Commission action. Reviewed by:, Date: To: From: Project Comments Revised Plans Submitted June 17, 2013 0 Engineering Division (650) 5W7230 0 Building Division (650) 558-7260 0 Parks Division (650) 558-7334 Planning Staff 0 Fire Division (650) 558-7600 0 Stormwater Division (650) 342-3727 0 City Attorney (650) 556-7204 Subject: Request for Design Review for a first and second story addition (major renovation) to an existing single family dwelling and a new detached garage at 122 Stanley Road, zoned R-1, APN: 029-282- 210 Staff Review: N/A 1. Landscape plan is required to meet'Water Conservation in Landscape Regulations" (attached). Irrigation Plan required for Building permit. Audit due for Final. Project Comments Date: April 15, 2013 To: 0 Engineering Division (650) 558-7230 0 Building Division (650) 558-7260 X Parks Division (650) 558-7334 From: Planning Staff 0 Fire Division (650) 558-7600 0 Stormwater Division (650) 342-3727 0 City Attorney (650) 558-7204 Subject: Request for Design Review for a first and second story addition (major renovation) and new detached garage at 122 Stanley Road, zoned R-1, APN: 029-282-210 Staff Review: April 22, 2013 1. No existing tree over 48 inches in circumference at 54 inches from base of tree may be removed without a Protected Tree Permit from the Parks Division (558-7330). 11 2. Three (3) new or existing landscape trees will be required for final. New trees !� must be 24" box size or larger. P. Protect City Street Tree during all phases of construction. Reviewed by: B Disco Date: 4/25/13 Date: To: From: Project Comments April 15, 2013 0 Engineering Division (650) 558-7230 0 Building Division (650) 558-7260 0 Parks Division (650) 558-7334 Planning Staff ® Fire Division (650) 558-7600 0 Stormwater Division (650) 342-3727 0 City Attorney (650) 558-7204 Subject: Request for Design Review for a first and second story addition (major renovation) and new detached garage at 122 Stanley Road, zoned R-1, APN: 029-282-210 Staff Review: April 22, 2013 Provide a residential fire sprinkler throughout the residence. 1. Provide a minimum 1 inch water meter. 2. Provide backflow prevention device/double check valve assembly — Schematic of water lateral line after meter shall be shown on Building Plans prior to approval indicating location of the device after the split between domestic and fire protection lines. 3. All sprinkler drainage shall be placed into landscaping areas. 4. Drawings submitted to Building Department for review and approval shall clearly indicate Fire Sprinklers shall be installed and shop drawings shall be approved by the Fire Department prior to installation. Reviewed by:� Date: '�I 6_ f 3 Date: To: From Project Comments Revised Plans Submitted June 17, 2013 0 Engineering Division (650) 558-7230 0 Building Division (650) 558-7260 0 Parks Division (650) 558-7334 Planning Staff 0 Fire Division (650) 558-7600 X Stormwater Division (650) 342-3727 0 City Attorney (650) 558-7204 Subject: Request for Design Review for a first and second story addition (major renovation) to an existing single family dwelling and a new detached garage at 122 Stanley Road, zoned R-1, APN: 029-282- 210 Staff Review: N/A 1) The Stormwater Requirements Checklist has been filled out and returned. It indicates that the project does not trigger the new stormwater requirements. 2) Comments included in earlier review should be incorporated during building permit issuance. For assistance please contact Stephen D. at 650-342-3727 Reviewed by: SD Date: 6/28/13 Project Comments Date: April 15, 2013 To: 0 Engineering Division 0 Fire Division (650) 558-7230 (650) 558-7600 0 Building Division X Stormwater Division (650) 558-7260 (650) 342-3727 0 Parks Division 0 City Attorney (650) 558-7334 (650) 558-7204 From: Planning Staff Subject: Request for Design Review for a first and second story addition (major renovation) and new detached garage at 122 Stanley Road, zoned R-1, APN: 029-282-210 Staff Review: April 22, 2013 1 Stormwater requirements are required to be implemented at stand-alone single amily home projects that create and/or replace 2,500 sq.ft. or more of impervious surface. These requirements are in addition to any City requirements. To determine if this project is subject to those requirements complete and return the attached "Stormwater Checklist for Small Projects." For additional information about these requirements please refer to the attached flyer "New Stormwater Control Requirements Effective 12/1112" and by visiting the San Mateo County Stormwater Pollution Prevention Program (SMCWPPP) website at: hftp://flowstobay.org/bs_new—development.php#flyers 2) Any construction project in the City, regardless of size, shall comply with the City's NPDES (stormwater) permit to prevent stormwater pollution from construction activities. Project proponent shall ensure all contractors implement appropriate and effective BMPs during all phases of construction, including demolition. When submitting plans for a building permit include a list of construction BMPs as project notes on a separate full size plan sheet, preferably 2' x 3' or larger. Project proponent may use the attached Construction BMPs plan sheet to comply with this requirement. Electronic file is available for download at: http://www.flowstobay. org/documents/business/construction/Cou ntywide_Prog ram_B MP_Plan_Sheet_J un2012.pdf 3) Best Management Practices (BMPs) requirements apply on any projects using architectural copper. To learn what these requirements are, see attached flyer "Requirements for Architectural Copper." Electronic file is available for download at: http://www.flowstobay. org/docu ments/m u n icipalities/nd/Materia Is/2012%20 Materials/ Arch itectural_copper_BMPs_FI NAL. pdf For assistance please contact Stephen D. at 650-342-3727 Reviewed by: SD 5b Date: 4/18/2013 SAN MATEO COUNTYWIDE `YaterPolltnbn Prevention Ptogmm Stormwater Checklist for Small Projects Municipal Regional Stormwater Permit (MRP) Order No. R2-2009-0074 ; Order No. R2-2011-0083 NPDES No. CAS612008 RECEIVED City of Burlingame - Office of NOV _ 1 2013 Environmental Compliance 1103 Airport Blvd CIT`f OF BURLINGAME Office: (650) 342.3727 COD -PLANNING DIY. Fax: (650) 342.3712 Complete this Pofm for individual single family home projects of any size, otherprojects that create andror replace less than 10,000 square feet of impervious surface, and projects in the following categories that create and/or replace less than 5,000 square feet of impervious surface: restaurants, retail gasoline outlets, auto service facilities', and parking lots (stand-alone or part of another use). A. Project Information A.1 Project Name: 111 STANJI`'1 SD A.2 Project Address: A.3 Project APN: rs 2 9 - 2 /P� 2 - 9 Cp B. Select Appropriate Site Design Measures —/ B.1 Does the project create and/or replace 2,500 square feet or more of Impervious surfacez? ❑ Yes t{eT No D If yes, and the project will receive final discretionary approval on or after December 1, 2012, the project must include one of Site Design Measures a through f3 Fact sheets regarding site design measures a through f may be downloaded at httpJ/www.flawstobay.org/bs new developmentphp#ftyers.. D If no, or the project will receive final discretionary approval before December 1, 2012, the project is encouraged to implement site design measures , which may be required at municipality discretion. Consult with municipal staff about requirements for yourproject. B.2 Is the site design measure included in the project plane? Yes No Plan Sheet No. ❑ a. Direct roof runoff into cisterns or rain barrels and use rainwater for irrigation or other non -potable use. - ❑ b. Direct roof runoff onto vegetated areas. [{� ❑ c. Direct runoff from sidewalks, walkways, and/or patios onto vegetated areas. ❑ d. Direct runoff from driveways and/or uncovered parking lots onto vegetated areas. [J� ❑ e. Construct sidewalks, walkways, and/or patios with permeable surfaces. ❑ f. Construct bike lanes, driveways, and/or uncovered parking lots with permeable surfaces. a../ LvJ ❑ g. Minimize land disturbance and impervious surface (especially parking lots). ❑ h. Maximize permeability by clustering development and preserving open space. ❑ I. Use micro -detention, including distributed landscape -based detention. ❑ J. Protect sensitive areas, including wetland and riparian areas, and minimize changes to the natural topography. ❑ d k. Self -treating area (see Section 4.2 of the C.3 Technical Guidance) ❑ 00/ I. Self -retaining area (see Section 4.3 of the C.3 Technical Guidance) ❑ m. Plant or preserve interceptor trees (Section 4.1, C.3 Technical Guidance) t See Standard Industrial Classification (SIC) codes here z Complete the C.3/CS Development Review Checklist if the project is not an Individual single family home, and D creates and/or replaces 10,000 square feet or more of impervious surface; or if R is a restaurant, retail gasoline outlet, auto service facility, or parking lot project that creates and/or replaces 5,000 square feet or more of Impervious surface. 3 See MRP Provision C.3.1. 4 See MRP Provision C.3.a.1.(8). Approved December4, 2012 Stormwater Checklist for Small Projects C. Select appropriate source controls (Encouraged for all projects; maybe required at municipal discretion. Consult municipal staff.$) Are these features In Features that require source - Source control measures Is source control measure Included project? control (Refer to Local Source Control List for detailed requirements) in project plans? measures Yes No Plan Yes No Sheet No. 9 ❑ Storm Drain • Mark on -site inlets with the words "No Dumping! Flows to Bay" or equivalent. ❑ 091 ❑ Floor Drains • Plumb interior floor drains to sanitary sewer [or prohibit]. ❑ Parking garage • Plumb interior parking garage floor drains to sanitary sewers El El Landscaping • Retain existing vegetation as practicable. ❑ • Select diverse species appropriate to the site. Include plants that are pest - and/or disease -resistant, drought -tolerant, and/or attract beneficial insects. 1P11Equipment • Minimize use of. pesticides and quick -release fertilizers. • Use efficient irrigation system; design to minimize runoff. ooVSpa/Fountain • Provide connection to the sanitary sewer to facilitate draining s ElElFood Service Provide sink or other area for equipment cleaning, which is: ❑ El • Connected to a grease interceptor prior to sanitary sewer discharge. (non- • Large enough for the largest mat or piece of equipment to be cleaned. - residential) • Indoors or in an outdoor roofed area designed to prevent stormwater run-on and run-off, and signed to require equipment washing in this area. ❑ Refuse Areas • Provide a roofed and enclosed area for dumpsters, recycling containers, etc., ❑ ❑ _ designed to prevent stormwater run-on and runoff. • Connect any drains in or beneath dumpsters, compactors and tallow bin areas serving food service facilities to the sanitary sewer. El Outdoor Process • Perform process activities either indoors or in roofed outdoor area, designed ❑ ❑ Activities 7 to revert stormwater run-on and runoff, and to drain to the sanita sewers ❑ Outdoor + Cover the area or design to avoid pollutant contact with stormwater runoff. ❑ ❑ Equipment/ Locate area only on paved and contained areas. Materials Roof storage areas that will contain non -hazardous liquids, drain to sanitary will Storage sewers and contain b or similar. ❑ Vehicle/ Roofed, pave and berm wash area to prevent stormwater run-on and runoff, ❑ ❑ Equipment plumb to the sanitary sewers, and sign as a designated wash area. Cleaning Commercial car wash facilities shall discharge to the sanitary sewers ❑ Vehicle/ Designate repair/maintenance area indoors, or an outdoors area designed to ❑ ❑ Equipment prevent stormwater run-on and runoff and provide secondary containment. Do Repair and not install drains in the secondary containment areas. Maintenance • No floor drains unless pretreated prior to discharge to the sanitary sewer. s • Conned containers or sinks used for parts cleaning to the sanitary sewer. s ❑ Fuel • Fueling areas shall have impermeable surface that is a) minimally graded to ❑ ❑ Dispensing prevent ponding and b) separated from the rest of the site by a grade break. Areas • Canopy shall extend at least 10 ft in each direction from each pump and drain away from fueling area. ❑ Loading Docks • Cover and/or grade to minimize run-on to and runoff from the loading area. ❑ ❑ • Position downspouts to direct stormwater away from the loading area. • Drain water from loading dock areas to the sanitary sewers • Install door skirts between the trailers and the building. ET ❑ Fire Sprinklers • Design for discharge of fine —sprinkler test water to landscape or sanitary sewers ❑ Rr ❑ Miscellaneous • Drain condensate of air conditioning units to landscaping. Large air ❑ ❑ Drain or Wash conditioning units may connect to the sanitary sewers Water • Roof drains shall drain to unpaved area where practicable. • Drain boiler drain lines, roof top equipment, all washwater to sanitary sewers. - ❑ Architectural • Drain rinse water to landscaping, discharge to sanitary sewers, or collect and ❑ ❑ Copper . dispose propedy offsite. See flyer "Requirements for Architectural Copper." 5 See MRP Provision C.3.0(7). 2 Approved December4, 2012 Stormwater Checklist for Small Projects D. Implement construction Best Management Practices (BMPs) (Required thrall projects.) DA Is the site a "High Priority Site"? (Municipal staff will make this determination; if the answer is yes, � Yes ❑ No the project will be referred to construction site inspection staff for monthly stormwater inspections during the wet season, October f through April 30.) • 'High Priority Sites" are sites that require a grading permit, are adjacent to a creek, or are otherwise high priority for stormwater protection during construction per MRP Provision C.6.e.1(2). D.2 All projects require appropriate stormwater BMPs during construction, indicate which BMPs are included in the project, below. Yes No Best Management Practice BMP ❑ Attach the San Mateo Countywide Water Pollution Prevention Program's construction BMP plan sheet to project plans and require contractor to implement the applicable BMPs on the plan sheet. ❑ Temporary erosion controls to stabilize all denuded areas unlit permanent erosion controls are established. [vf ❑ Delineate with field markers clearing limits, easements, setbacks, sensitive or critical areas, buffer zones, trees and drainage courses. ❑ Provide notes, specifications, or attachments describing the following: • Construction, operation and maintenance of erosion and sediment controls, include Inspection frequency; • Methods and schedule for grading, excavation, filling, clearing of vegetation, and storage and disposal of excavated or cleared material; • Specifications for vegetative cover 6 mulch, include methods and schedules for planting and fertilization; • Provisions for temporary and/or permanent irrigation. ❑ Perform clearing and earth moving activities only during dry weather. ❑ Use sediment controls or filtration to remove sediment when dewaterinh and obtain all necessary Denita. ig ❑ Protect all storm drain inlets in vicinity of site using sediment controls such as berms, fiber rolls, or filters. ❑ Trap sediment on -site, using BMPs such as sediment basins or traps, earthen dikes or banns, silt fences, check dams, soil blankets or mats, covers for soil stock piles, etc. _ Rf ❑ Divert on -site runoff around exposed areas; divert off -site runoff around the site (e.g., swales and dikes). ❑ Protect adjacent properties and undisturbed areas from construction Impacts using vegetative buffer strips, ❑ No cleaning, fueling, or maintaining vehicles on -site, except in a designated area where washwater is ❑ Store, handle, and dispose of construction materials/wastes property to prevent contact with stormwater. ❑ Contractor shall train and provide instruction to all employees/subcontractors re: construction BMPs. ❑ Control and prevent the discharge of all potential pollutants, including pavement cutting wastes, paints, concrete, petroleum products, chemicals, washwater or sediments, rinse water from architectural copper, and non-stormwater discharges to storm drains and watercourses. Name of applicant completing the Date: Iy/zs/ 13 E. Comments (for municipal staff use only): F. NOTES (for municipal staff use only): Section A Notes: Section B Notes: 6 Any connection to the sanitary sewer system Is subject to sanitary district approval. Businesses that may have outdoor process activities/aquipment include machine shops, auto repair, industries with pretreatment facilities. 3 Approved December 4, 2012 SAw-kAT Ea COUNTYWIDE ion. 7Pr.; f g pram Clean Water. Ndaahy Community. T Construction projects are requiredto i-Wlarctent the stortnw.ater best management practices (BMP) on this page, as tttey•app}y to youf project;,all yearlong. Materials & waste Management Nun-Narmwous blartrina O BCrmand<o•tralOclprlcs of and tlifl[r UlFtrcM[WClrm rmlcrkl 144krpsnm'Rn min is rnrtcmt Prifnol mlirch bcins mW'xiein 1[Jvyt. O UU, fbul JoliI mower r Iaimedwmm to, Jon wwvl. IiavaLlua NoteAmr -0 Lebel'-14bmWo W amvruls aw hamnlom xaer tsath or pvikWe:.pmnv, Ihimm�. rah UoW. rrsl. oik and wife-¢l la veU`U`U pdW'tin'. mrmq'. skk em1 r[J'rel rtjWntms Q SINeIm!araarpankr "a Bed nylti in yv¢r Ug111 eonNopr[. [brt IU'dpplppame s-m'amn' eoru inm(nt eW wm> Wem L IM1c-W Of mGvmmll: dny during Ntl Ne xlun NMrwnakn min ri forccmt "-O FaO" rlrtrvepplkallan Wlrmalbrs forhecWom . mFk�WR�a b-racf[l ubno umnbr[ Ines a -snap. p-ew vpph'oaldwrs ....'P rek is fatten xiWin3U Moo, ❑ Armrot apPrUPdm[ tlispaml-fall Munkm matlat. 'Wab Mampemret O C.rt[nmu du,aUll wnmiw,, _,,h. with outs m the mJ or - nary xmrt dmew dadngnv nmllrcr yO Ch' %wo duWml co.winm rUm Umly For o,U on, W mokv art IhcS dr[ ad[•crf tcd Nctr M1om Jvnn a Jump-W m rFc cwuuwdw alk. '!Q Ckm ar mplxt pprmme ledma ena inapell Ihcm frtmrrnth for kebvd rphh.. . O D'upnc Pfall nvI-wJ Jchrb pmWdm. Rmxk makriplr PW umoriolc cm bOV b.o laWnm mpke. [on trek. vggrtsak bmc nrakrk4 xmod 09 bwW. piPc..k.l v❑ Dixoto orliq.U.dun nom punu. eiamn, aP,m, glm, aw dmniny WIN v 1—dom xvk {CumtrunWn lmrnntts nnJ Pcrimcrn ""main Emr::...IRmlr'e.IUdee¢rconWu and smbibtt all wvwnion ngvent-and trio to auftriwlry mnwl nmioa ono rnfi. tlimlmne. tbnranae.aw m.d R,U. Q SwveP m mmuum.ny rlrnl Imetlns immcaiald,.W mare mtlimtal rUnmePrnenl I'urlFcr ImcAlnp,NanFuu tlwrn nrta to elan rm Irne41a. Equipment Management &- Splll Control Matto amtood Punkin, ❑ Bo'yose-rmartgfinoa.Nilh epprgPdak BMPLfor - ahickmdquipmw,Pi i'W'rryh, ❑ P-Rmme jamain. ampakjn U,.UU'lucI, and [9mpmwtmtynsaRxik. ❑ ar<ruel"u8or .earal neioWmwemmeone woilL wr4wo Wmw oma w.x�Bom stela tlmiW uN alp a Aipp+ b --Nah 1. [pibW. o[r dd Recyck xdupme ra[iasmlmmJPour... ❑ V redieb m rwrpmmnlmaug un ". Uemm [Ir-vr Rilb'T'Qdy W v1-Wed ale WelmBml dnUu. r nakrlemPIllb 8rrt-2 rlrtcu, slam data,-ormrgxenmum ❑ Do ml tled•enmkm ognip. came urWemupL mimmb &a.. s..:mine WOlpnmoo, .W. SPRIPlmtmiunand Comml ❑ KmP Sptl tkmPpmmcrfah'(mv A".¢.p.l .•ubblem WecpmWeumaik m oU unr- Q'Iaspect;wkW oW.abmw afegvvll)' for w rcpvv k+ia Pool ux drip parW Uuh U,o eetirmwk, mcmmk. O Ck .,Pah.olrmin imnmdolahmddIUP..f ❑ X)U.1 h. doou ourrmo Ua ro Bleb hnc'UJ Vmdry [kanUP..lbws(abmW-m.a rick. ulm. onarormaay O Smup trys WeIeT ouuUieb wmedhkll. no ml Yf to mmsbth,UmmT.0 x1tt o1 loo, Ihwt O Ckm vp mllh wtlin env by JiMing op and P PWdy d'upod, or ... Wmw D. O lto"I,i"itant epilb immrdinWly. You ar .mquanj bf W.b rtWneu elg(d8cmf Wkmsu olh®udbm --Wank uulvltesoii Th mwrtn milE Ilnid911 ur%I=r-r mmagemyltcpomrmumlol, tlnUo to n.n.,18 1M-Offix PfBm24 cjlqhotr Sen is-WeMnB Crn¢r, Itlpl NR.]551)133 M1ounl. Storm drain Earthwork& Paving/AsphaltWork Contagiinated Soils HmaYe9talml Q&Uw wmingead.1 letting in ns, Q seLnauk Smdfve and epamavon xnll fur colt.. m ubanmk'v lemon WFUU, dV nwnmaMv. - free pmemkm, out WU dmg m doe. Q Slabala all dtrui Aa^_, malallffi nuaAdkl0pirdrj'evemot 0Covaabrmd-UrWhUandmaMel- hula noo Gbv aiUUUPpfSina PUUw Ll —Ldr, Bust rti cc UUK"rb.opo'boiaewboluu Seoagwlt sneralmgbr onomvd 6 $pWixpleei lcaeudm krerniw 'mowl ood O Cvtolawv nuk ornWmprutcb tlimme Ulem3iabvym lt!md or row, collnnklknh Wmrml-dwarpoUneea. ❑DDou roN...mm<.. meaomn eolm-e. Sedimml Cunkvl O PWMrmm.eWv Nktr, smWn.Nv51m and Qmiengemmi![-Nilb vpPlpplvk b�ms.rY pynel bass tbu mllL O Pnmw mdimpnr fmmmialmivgvadk to Wkllfo,6[vtl mtivhuiyadimenl [mbuly mth ul Rbn m114 sill lmmL w meimanlm,�,. O Kpyncemmr mil Po ale em n'hoo it wawlwL4m iPW We [veer ❑ MU ce-k mvu a to El. C.Utu og lhesik, ml in lLe tllxL ❑ ComvmWvd 8o16 Q Ifaiw Ptec fPlWmringwwialmserc ob0ied lust Wrtov�imdpnevd welvpt to Reyoml nbur OIm4q. GNml9mrd: •Vnlmmlmlltgwhl.ro.Aircolondoe. orodm. •AbewPlpd mdmemuvd W &P • AOoas o ad rots atBumd bvritly &bm, or 1I . -pmllwxuawm�mmL Sawmwn[ & wsp hnbfrooirell Remornl O Compl-loto nor bnioule alorm dmih bJctrxffi mwwll¢s. Uq fJkr fvbriawWh moon ivklnLrmmymtl bop W lmep xleiry'vurorWe nom drvk Slm'eT abomh. wmenwu snrcul amI �W tlbplm ofgll name m moU arcoochr nPm kwemmm ae ew ofw8 mm.k dq' (Nakn-n is movvl). Q V mpcbl shmT man d mkn busin clan atop immedu¢h'. be liable for fines of up to $ Concrete, Grout& Mortar ma ortpvll[naMsnny from Rita', m. Them marmn man m•er rurJl o atom drain. Well. eLdc.a te11ipmmrplmc$ oRpbo' vmmeiaM arw to tl¢n: b oo dixIne W o the UaUUrI, ng it i1a m ono -di., emn. lei mwnlc maw duNm.,fro. egc. ❑ UIPUUUlhe UwM1 mokr rmm rd'or lbWSW PrwtU mew rrtle eM tuner- it r nYVrPptkk uk W ml nrttik. Dewatering . r� f OFn limb lnmem dlivnon all lmrvnMlun Ih[ w s and dl n ran W I --`Ur es 1 - silo room dhse mkrfrnmemaemhyrmmallwocc. tl w1as tf ePUmUse-anusani awmc. Q W bus aewu. �ho mlil W oblvin pprmhl rmm tie IPa1 mvniciNliry bok. Waughdaud6vmryrydi rusWtmorlr mbtlvimcmmCu p er manumduin FIlrtmonordioman mybmqm O Warusu Pillow-commimtion,,,"r b ltqulnd prior totwee or W. Enui'ca. tmrru. er, Con lam, WewilUda ro b.l 0 n xamlkl Ul,. c h ,niuUN mA now dImerynt ttulb.COnbmllbkd po llo 61er mlln be,oaIW or Iraukd onalu kr poper mepmal. Painting & Paint Removal ka y I Palm ngcl- O Nmur-Iran blush-.1 nom point one rl-o mlo -an-n, pa,, mvmr Jmm.-sun—xvun. �Ibn..l.rl -d wmis, IUU.m bmsFcs IO We c[knr ponrbk Rim[ IO We mule srnn amk Ira. hel.IinW ym-1.10. GPmW 1.1 wmenokr ---anus mWodp. Non to Nim ❑ For wan. mu rot bm[Mtm W<-kn1 Ncnbk aw Ilea-nilb N—r mJ-.l mz e m mrwnWeer Fru,r Una Wrw m-- M l'—U turn?a 1-0-aM unumble Winnn/mlrmuas Lumrtnmr.1vlc Puinl mmvl O Cam•"cvl peal n61pint, tdu-aod rArPvmd dun from maim Pemuer wmuwnm mna lwtl Pr Inbunum on bt ai-PPsm -r m nmam,n mm,m. ❑ P-im cbiw PM dust from nmlJuzvdmn dnCtlnPA.9-dswdblUI,o rbe su Pl Up or mlrttlN io pWlk dmp .WhsaddaPncd.resami. Landscape Materials ON O CvnuW nocklited boom -pins makrah bl .bons than -,,, WIP, u'nrn Wry ort rot-tiloly Win, uUoL O Slmk npdibk low.,X motor, un Palkb. C-m rpbm Jam mm-awls ram Iner not anirtly being I l or .PpIIW ' me O DUCOmlmc vpplicnuun or. cmalb e ImdbPPe malcnnl 1%%in t dust M., n r 1—min n-nlndurtno..I nwWrr. SAN HATE I EOOhIMIDE Water4lution Prevention Program Requirements for Architectural Copper Own W.W. Hums C.., hy. Protect water quality during installation, cleaning, treating, and washing! Copper from Buildings May Harm Aquatic Life Copper can harm aquatic life in San Francisco Bay. Water that comes into contact with architectural copper may contribute to impacts, especially during installation, cleaning, treating, or washing. Patination solutions that are used to obtain the desired shade of green or brown typically contain acids. After treatment, when the copper is rinsed to remove these acids, the rinse water is a source of pollutants. Municipalities prohibit discharges to the storm drain of water used in the installation, cleaning, treating and washing of architectural copper. Use Best Management Practices (BMPs) The following Best Management Practices (BMPs) must be implemented to prevent prohibited discharges to storm drains. gutter and drainpipe. During Installation • If possible, purchase copper materials that have been pre-patinated at the factory. • If patination is done on -site, implement one or more of the following BMPs: o Discharge the rinse water to landscaping. Ensure that the rinse water does not flow to the street or storm drain. Block off storm drain inlet if needed. o Collect rinse water in a tank and pump to the sanitary sewer. Contact your local sanitary sewer agency before discharging to the sanitary sewer. o Collect the rinse water in a tank and haul off -site for proper disposal. Consider coating the copper materials with an impervious coating that prevents further corrosion and runoff. This will also maintain the desired color for a longer time, requiring less maintenance. prohibited discharge. The water must be pumped and disposed of properly. During Maintenance Implement the following BMPs during routine maintenance activities, such as power washing the roof, re-patination or re -application of impervious coating: • Block storm drain inlets as needed to prevent runoff from entering storm drains. • Discharge the wash water to landscaping or to the sanitary sewer (with permission from the local sanitary sewer agency). If this is not an option, haul the wash water off -site for proper disposal. Protect the Bay/Ocean and yourself! If you are responsible for a discharge to the storm drain of non- stormwater generated by installing, cleaning, treating or washing copper architectural features, you are in violation of the municipal stormwater ordinance and may be subject to a fine. Contact Information The San Mateo Countywide Water Pollution Prevention Program lists municipal stormwater contacts at www.flowstobay.org (click on 'Business", then "New Development', then 'local permitting agency"). FINAL February 29, 2012 RESOLUTION APPROVING CATEGORICAL EXEMPTION AND DESIGN REVIEW RESOLVED, by the Planning Commission of the City of Burlingame that WHEREAS, a categorical exemption has been proposed and application has been made for Design Review for a new, two-story single family dwelling and detached garage at 122 Stanley Road, zoned R-1, 50 Kammerer Ct, Hillsborough, CA 94010, Property owners, APN: 029-282- 210 WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on November 12, 2013, at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing; NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that On the basis of the Initial Study and the documents submitted and reviewed, and comments received and addressed by this commission, it is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and categorical exemption, per CEQA Article 19, 15303 (a), which states that construction of a limited number of new, small facilities or structures including one single family residence or a second dwelling unit in a residential zone is exempt from environmental review. In urbanized areas, up to three single-family residences maybe constructed or converted under this exemption. 2. Said Design Review is approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such Design Review are set forth in the staff report, minutes, and recording of said meeting. 3. It is further directed that a certified copy of this resolution be recorded in the official records of the County of San Mateo. Chairman I, , Secretary of the Planning Commission of the City of Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the Planning Commission held on the 12'" day of November. 2013 by the following vote: Secretary EXHIBIT "A" Conditions of approval for Categorical Exemption and Design Review. 122 Stanley Road Effective November 22, 2013 1. that the project shall be built as shown on the plans submitted to the Planning Division date stamped November 1, 2013, sheets T1 through GN, Landscape Site Plan, Landscape Plan and Boundary and Topographic Survey; 2. that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYI or amendment to be determined by Planning staff); 3. that any changes to the size or envelope of the first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; 4. that the conditions of the City Engineer's April 26, 2013 memo, the Chief Building Official's June 21, 2013 and April 18, 2013, memos, the Parks Supervisor's June 17, 2013 and April 25, 2013 memos, the Fire Marshal's April 30, 2013 memo, and the Stormwater Coordinator's June 28, 2013 and April 18, 2013 memos shall be met; 5. that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; 6. that demolition for removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 7. that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; 8. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 9. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 10. that during demolition of the existing residence, site preparation and construction of the new residence, the applicant shall use all applicable "best management practices" as identified in Burlingame's Storm Water Ordinance, to prevent erosion and off -site sedimentation of storm water runoff; EXHIBIT "A" Conditions of approval for Categorical Exemption and Design Review. 122 Stanley Road Effective November 22, 2013 11. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2010 Edition, as amended by the City of Burlingame; THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 12. that prior to scheduling the framing inspection the applicant shall provide a certification by the project architect or residential designer, or another architect or residential design professional, that demonstrates that the project falls at or below the maximum approved floor area ratio for the property; 13. that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; 14. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; and 15. that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. CITY OF BURLINGAME a COMMUNITY DEVELOPMENT DEPARTMENT 501 PRIMROSE ROAD BURLINGAME, CA94010 PH: (650) 558-7250 • FAX: (650) 696-3790 www.burlingame.org Site: 122 STANLEY ROAD The City of Burlingame Planning Commission announces the following public hearing on WESDAY, NOVEMBER 12, 2013 at 7:00 P.M. in the City Hall Council Chambers, 501 Primrose Road, Burlingame, (A: Application for Design Review for a new, two-story single family dwelling and detached garage at 122 STANLEY ROAD zoned R-l. APN 029-282-210 Mailed: November 1, 2013 (Please refer to other side) PUBLIC HEARING NOTICE City of Burlingame A copy of the application and plans for this project may be reviewed prior to the meeting at the Community Development Department at 501 Primrose Road, Burlingame, California. If you challenge the subject application(s) in court, you may be limited to raising only those issues you or someone else raised at the public hearing, described in the notice or in written correspondence delivered to the city at or prior to the public hearing. Property owners who receive this notice are responsible for informing their tenants about this notice. For additional information, please call (650) 558-7250. Thank you. William Meeker Community Development Director PUBLIC HEARING NOTICE (Please refer to other side)