Loading...
HomeMy WebLinkAbout1320 Skyview Drive - Approval LetterCITY OF BURLINGAME fir' BURLI NG0.ME City Hall — 501 Primrose Road Burlingame, California 94010-3997 April 10, 2008 Peter Lam, Architect 848 Folsom Street #102 San Francisco, CA 94107 Re: 1320 Skyview Drive Dear Mr. Lam, COMMUNITY DEVELOPMENT DEPARTMENT Planning Division PH: (650) 558-7250 FAX: (650)696-3790 Since there was no appeal to or suspension by the City Council, the March 24, 2008, Planning Commission approval of your application for Design Review Amendment became effective April 4, 2008. This application was to add a skylight to an approved first and second story addition at 1320 Skyview Drive, zoned R-1. The application to change the roof material was not approved. The March 24, 2008 minutes of the Planning Commission state your application was approved with the following conditions: 1) that the project shall be built as shown on the plans submitted to the Planning Department date stamped October 12, 2007, sheets A1.1 through A1.3, and AV through A3.3, and March 5, 2008, sheets A2.1 and A2.2, and that any changes to building materials, exterior finishes, footprint or floor area of the building shall require an amendment to this permit; 2) that a tree protection plan shall be prepared, to be reviewed and approved by the City Arborist, to ensure the preservation of all trees on the property during the construction process, the tree protection measures shall be installed before a building permit is issued; 3) that the conditions of the Chief Building Official's, Fire Marshal's, and NPDES Coordinator's May 14, 2007 memos, and the City Engineer's May 17, 2007 memo shall be met; 4) that demolition or removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 5) that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dormer(s), moving or changing windows and architectural features or changing the roof height or pitch, shall be subject to Planning Commission review; 6) that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 7) that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to :: Register online to receive City of Burlingame e-mail updates at www.burlingame.org C: April 10, 2008 1320 Skyview Drive Page 2 submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 8) that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2001 Edition, as amended by the City of Burlingame; THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 9) that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; 10) that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Department; and 11) that prior to final inspection, Planning Department staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. All site improvements and construction work will require separate application to the Building Department. This approval is valid for one year during which time a building permit must be issued. One extension of up to one year may be considered by the Planning Commission if application is made before the end of the first year. The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section 1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within 90 days of the date of the decision unless a shorter time is required pursuant to state or federal law. ' Sincerely, William Meeker {� Community Development Director c. Chief Deputy Valuation, Assessor's Office (LOT 1 BLOCK 3 SKYVIEW TERRACE RSM 44125 CITY OF BURLINGAME; APN: 027-201-260) Chief Building Official, Community Development Dept./Building Div. Samuel and Elaine Wong 1320 Skyview Drive Burlingame, CA 94010 File Calm Register online to receive City of Burlingame e-mail updates at www.burlingame.org Calm Project Comments Date: May 11, 2007 To: ❑ City Engineer ❑ Recycling Specialist (650) 558-7230 (650) 558-7271 X Chief Building Official ❑ Fire Marshal (650) 558-7260 (650) 558-7600 ❑ City Arborist ❑ NPDES Coordinator (650) 558-7254 (650) 342-3727 ❑ City Attorney From: Planning Staff Subject: Request for design review for first and second story addition to existing single family dwelling at 1320 Skyview Drive, zoned R-1, APN: 027-201-260 Staff Review: May 14, 2007 1) All construction must comply with the 2001 California Building Codes (CBC), the Burlingame Municipal and Zoning Codes, and all other State and Federal requirements. 2) Provide fully dimensioned plans. 3) Provide existing and proposed elevations. 4) Provide a complete demolition plan that indicates the existing walls, walls to be demolished, new walls, and a legend. NOTE: The Demolition Permit will not be issued until a Building Permit Is issued for the project. 5) Due to the extensive nature of this construction project the Certificate of Occupancy will be rescinded once construction begins. A new Certificate of Occupancy will be Issued after the project has been finaled. No occupancy of the building is to occur until a new Certificate of Occupancy has been issued. 6) Comply with the new, 2005 Califomia Energy Efficiency Standards for low-rise residential buildings. Go to hftp://www.energy.ca.gov/title24 for publications and details. *7) Rooms that can be used for sleeping purposes must have at least one window or door that complies with the egress requirements. 8) Provide guardrails at all landings. NOTE: All landings more than 30" in height at any point are considered in calculating the allowable floor area. Consult the Planning Department for details if your project entails landings more than 30" in height. 9) Provide handrails at all stairs where there are four or more risers. 10) Provide lighting at all exterior landings. 11) The fireplace chimney must terminate at least two feet above any roof surface within ten feet. 12) NOTE: Plans that specifically address item #7 must be re -submitted before this project can move forward for Planning Commission action. Revi y: �� Date: Project Comments Date: May 11, 2007 To: 0 City Engineer (650) 558-7230 0 Chief Building Official (650) 558-7260 0 City Arborist (650) 558-7254 From: Planning Staff Subject: Request for design existing single family APN: 027-201-260 Staff Review: May 14, 2007 0 Recycling Specialist (650) 558-7271 Fire Marshal (650) 558-7600 0 NPDES Coordinator (650) 342-3727 0 City Attorney review for first and second story addition to dwelling at 1320 Skyview Drive, zoned R-1, *Provide a residential fire sprinkler throughout the residence. 1. Provide a minimum 1 inch water meter. 2. Provide backflow prevention device/double check valve assembly — Schematic of water lateral line after meter shall be shown on Building Plans prior to approval indicating location of the device after the split between domestic and fire protection lines. 3. Drawings submitted to Building Department for review and approval shall clearly indicate Fire Sprinklers shall be installed and shop drawings shall be approved by the Fire Department prior to installation. Ensure the fire flow from the closest fire hydrant is capable of delivering a minimum of 1000 gallons per minute. You may disregard this requirement for single family dwellings equipped with a minimum NFPA 13D compliant fire sprinkler system throughout. MAY 1 G %NV Reviewed by: CITY G; 5'_:a;A a.z.ivic Date: PLANNING DEPT. Project Comments Date: May 11, 2007 To: City Engineer (650) 558-7230 10, Chief Building Official (650) 558-7260 City Arborist (650) 558-7254 From: Planning Staff Subject: Request for design. existing single family APN: 027-201-260 Staff Review: May 14, 2007 00, Recycling Specialist (650) 556-7271 00, Fire Marshal 6509 558-7600 NPDES Coordinator 0 342-3727 City Attorney review for first and second storyaddition to dwelling at 1320 Skyview Drive, zoned R-1, 1) Any construction project in the City, regardless of size, shall comply with the City NPDES permit requirement to prevent stormwater pollution including but not limited to ensuring that all contractors implement construction Best Management Practices (BMPs) and erosion and sediment control measures during ALL phases of the construction project (including demolition). Include appropriate stormwater BMPs as Project Notes. These BMPs include but are not limited to the following: • Store, handle, and dispose of construction materials and wastes properly to prevent contact and contamination of stormwater; • Control and prevent the discharge of all potential pollutants, including pavement cutting wastes, paints, concrete, petroleum products, chemicals, wash water or sediments, and non-stormwater discharges to storm drains and watercourses; • Use sediment controls or filtration to remove sediment when dewatering site and obtain all necessary permits; • Avoid cleaning, fueling, or maintaining vehicles on -site except in a designated area where wash water is contained and treated; • Protect adjacent properties and undisturbed areas from construction impacts using vegetative buffer strips, sediment barriers or filters, dikes, mulching, or other measures as appropriate; • Perform clearing and earth moving activities only during dry weather; • Limit and time application of pesticides and fertilizers to prevent polluted runoff; • Limit construction access routes and stabilize designated access points; • Avoid tracking dirt or other materials off -site; clean off -site paved areas and sidewalks using dry sweeping method; • The Contractor shall train and provide instruction to all employees and subcontractors regarding the construction BMPs. 1 of 2 Project Comments Con't —1320 Skyview Dr., 1st and 2"d story addition to existing single family dwelling. 2) The public right of way/easement shall not be used as a construction staging and/or storage area and shall be free of construction debris at all times. The easement shall be protected from any site runoff. 3) Implement Erosion and Sedimentation Controls (if necessary): a. Install and maintain all temporary erosion and sediment controls continuously until permanent erosion control have been established; b. Address method(s) for diverting on -site runoff around exposed areas and diverting off -site runoff around the site; c. Address methods for preventing erosion and trapping sediment on -site. 4) Provide notes, specifications, or attachments describing the following: a. Construction, operation and maintenance of erosion and sediment control measures, including inspection frequency; b. Methods and schedule for grading, excavation, filling, clearing of vegetation, and storage and disposal of excavated or cleared material. Brochures and literatures on stormwater pollution prevention and BMPs are available for your review at the Planning and Building departments. Distribute to all project proponents. For additional assistance, contact Eva J. at 650/342-3727. Reviewed by:� Date: 05/14/07 2of2 Project Comments Date: May 11, 2007 To: City Engineer (650) 558-7230 ❑ Chief Building Official (650) 558-7260 ❑ City Arborist (650) 558-7254 From: Planning Staff ❑ Recycling Specialist (650) 558-7271 0 Fire Marshal (650) 558-7600 ❑ NPDES Coordinator (650) 342-3727 ❑ City Attorney Subject: Request for design review for first and second story addition to existing single family dwelling at 1320 Skyview Drive, zoned R-1, APN: 027-201-260 Staff Review: May 14, 2007 The following items are noted as requirements. Please review and indicate your method of compliance for each item: 1 property boundary survey, 2 stormwater drainage plan, 4 sewer lateral test and sewer backwater.protection certificate 12 replace damaged sidewalk, curb, gutters, and other necessary appurtenant work, etc., 18 NPDES permit requirements, 19, 20, 21 driveway information, Other concerns to be addressed at time of building permit application: a debris box b encroachment permit c conform to Plan Commission and City Council actions d pedestrian protection R.r rrn.��!' f Y �. �.., \�16vF la 1AM 17 2007 crrrcFa;U,RUN; PL`vN' NG. DEFT. Reviewed by: Date: ��/® 7 PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION PLANNING REVIEW COMMENTS The following requirements apply to the project /td-� r� Project Name: E><'-rf l3 Z o S� v«..✓�,: Project Address: 4¢PV 0,97- A property boundary survey shall be preformed by a licensed land surveyor. The survey shall show all property lines, property corners, easements, topographical features and utilities. (Required prior to the building permit issuance.) 2 The site and roof drainage shall be shown on plans and should be made to drain towards the Frontage Street. (Required prior to the building permit issuance.) The project site is in a flood zone, the project shall comply with the City's flood zone requirements. A sanitary sewer lateral test is required for the project in accordance with the City's statidards. (Required prior to the building permit issuance.) A sanitary sewer analysis is required for the project. The sewer analysis shall identify the project's impact to the City's sewer system and any sewer pump stations and identify mitigation measures. 6 Submit traffic trip generation analysis for the project. 7 Submit a traffic impact study for the project. The traffic study should identify the project generated impacts and recommend mitigation measures to be adopted by the project to be approved by the City Engineer. The project shall file a parcel map with the Public Works Engineering Division. The parcel map shall show all existing property lines, easements, monuments, and new property and lot lines proposed by the map. A latest preliminary title report of the subject parcel of land shall be submitted to the Public Works Engineering Division with the parcel map for reviews. 10 Map closure/lot closure calculations shall be submitted with the parcel map. 11 The project shall submit a condominium map to the Engineering Divisions in accordance with the requirements of the Subdivision Map Act. Pagel of 3 CADocuments and Settings\dbell\My DocumentsTLANNING REVIEW COMMENTS.doc PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION 12 X The project shall, at its own cost, design and construct frontage public improvements including curb, gutter, sidewalk and other necessary appurtenant work. 13 The project shall, at its own cost, design and construct frontage streetscape improvements including sidewalk, curb, gutters, parking meters and poles, trees, and streetlights in accordance with streetscape master plan. 14 By the preliminary review of plans, it appears that the project may cause adverse impacts during construction to vehicular traffic, pedestrian traffic and public on street parking. The project shall identify these impacts and provide mitigation measure acceptable to the City. 15 The project shall submit hydrologic calculations from a registered civil engineer for the proposed creek enclosure. The hydraulic calculations must show that the proposed creek enclosure doesn't cause any adverse impact to both upstream and downstream properties. The hydrologic calculations shall accompany a site map showing the area of the 100 year flood and existing improvements with proposed improvements. 16 Any work within the drainage area, creek, or creek banks requires a State Department of Fish and Game Permit and Army Corps of Engineers Permits. 17 No construction debris shall be allowed into the creek. 18 �_ The project shall comply with the City's NPDES permit requirement to prevent storm water pollution. 19 _ The project does not show the dimensions of existing driveways, re- submit plans with driveway dimensions. Also clarify if the project is proposing to widen the driveway. Any widening of the driveway is subject to City Engineer's approval. 20 X The plans do not indicate the slope of the driveway, re -submit plans showing the driveway profile with elevations 21 _� The back of the driveway/sidewalk approach shall be at least 12" above the flow line of the frontage curb in the street to prevent overflow of storm water from the street into private property. 22 For the takeout service, a garbage receptacle shall be placed in front. The sidewalk fronting the store shall be kept clean 20' from each side of the property. Page 2 of 3 C:\Documents and Settings\dbell\My DocumentsTLANNING REVIEW COMMENTS.doc PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION 23 For commercial projects a designated garbage bin space and cleaning area shall be located inside the building. A drain connecting the garbage area to the Sanitary Sewer System is required. Page 3 of 3 C:\Documents and SettingAdbellMy Documents\PLANNING REVIEW COMMENTS.doc