HomeMy WebLinkAbout1320 Skyview Drive - ResolutionRECORDING REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL TO.
COMMUNITY DEVELOPMENT DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94010
2010-101124
08:37am 09107110 R1 Fee: NO FEE
Count of pages 12
Recorded in Official Records
County of San Mateo
Warren Slocum
Assessor -County Clerk -Recorder
1
Resolution No. 99-2007
1320 SKYVIEW DRIVE —APN 027-201-260
TITLE OF DOCUMENT
hereby certify this to be a full, true and correct copy of the
document it purports to be, the original of which is on file in my
nffire
Date:
RESOLUTION APPROVING CATEGORICAL EXEMPTION AND DESIGN REVIEW
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a categorical exemption has been proposed and application has been made for
design review for a first and second story addition to a single family dwelling at 1320 Skyview
Drive, zoned R-1, Samuel and Elaine Wong, property owners, APN: 027-201-260;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on
October 22, 2007, at which time it reviewed and considered the staff report and all other written
materials and testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
On the basis of the Initial Study and the documents submitted and reviewed, and
comments received and addressed by this commission, it is hereby found that there is
no substantial evidence that the project set forth above will have a significant effect on
the environment, and categorical exemption, per CEQA Article 19, Section: 15301 Class
1(e)(1) - additions to existing structures provided the addition will not result in an
increase of more than 50% of the floor area of the structures before the addition, is
hereby approved.
2. Said design review is approved, subject to the conditions set forth in Exhibit "A" attached
hereto. Findings for such design review are as set forth in the minutes and recording of
said meeting.
3. It is further directed that a certified copy of this resolution be recorded in the official
records of the County of San Mateo.
I, • T`eArYDV1013 Secretary of the Planning Commission of the City of Burlingame,
do hereby certify that the foregoing resolution was introduced and adopted at a regular meeting
of the Planning Commission held on the 22nd day of October. 2007 by the following vote:
1320 SKYVIEW DRIVE - RESO 99-2007
AYES: Auran, Brownrigg, Cauchi, Osterling,
Terrones, Vistica
NOES: NONE
ABSENT: Deal
ABSTAIN: NONE
Se retary
EXHIBIT "A"
Conditions of approval for categorical exemption and design review.
1320 Skyview Drive
Effective November 1, 2007
1) that the project shall be built as shown on the plans submitted to the Planning Department date
stamped October 12, 2007, sheets A1.1 through A1.3, A2.1 through A2.2, and A3.1 through
A3.3, and that any changes to building materials, exterior finishes, footprint or floor area of the
building shall require an amendment to this permit;
2) that a tree protection plan shall be prepared, to be reviewed and approved by the City Arborist,
to ensure the preservation of all trees on the property during the construction process, the tree
protection measures shall be installed before a building permit is issued;
3) that the conditions of the Chief Building Official's, Fire Marshal's, and NPDES Coordinator's
May 14, 2007 memos, and the City Engineer's May 17, 2007 memo shall be met;
4) that demolition or removal of the existing structures and any grading or earth moving on the site
shall not occur until a building permit has been issued and such site work shall be required to
comply with all the regulations of the Bay Area Air Quality Management District;
5) that any changes to the size or envelope of the basement, first or second floors, or garage,
which would include adding or enlarging a dormer(s), moving or changing windows and
architectural features or changing the roof height or pitch, shall be subject to Planning
Commission review;
6) that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that these
venting details shall be included and approved in the construction plans before a Building permit
is issued;
7) that the project shall comply with the Construction and Demolition Debris Recycling Ordinance
which requires affected demolition, new construction and alteration projects to submit a Waste
Reduction plan and meet recycling requirements; any partial or full demolition of a structure,
interior or exterior, shall require a demolition permit;
8) that the project shall meet all the requirements of the California Building and Uniform Fire
Codes, 2001 Edition, as amended by the City of Burlingame;
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS
PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
9) that prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural certification
that the architectural details shown in the approved design which should be evident at framing,
such as window locations and bays, are built as shown on the approved plans; architectural
certification documenting framing compliance with approved design shall be submitted to the
Building Division before the final framing inspection shall be scheduled;
10) that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of
the roof ridge and provide certification of that height to the Building Department; and
-2-
EXHIBIT "A"
Conditions of approval for categorical exemption and design review.
1320 Skyview Drive
Effective November 1, 2007
11) that prior to final inspection, Planning Department staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.
-3-
Project Comments
Date: May 11, 2007
To: ❑ City Engineer
(650) 558-7230
X Chief Building Official
(650) 558-7260
❑ City Arborist
(650) 558-7254
From: Planning Staff
❑ Recycling Specialist
(650) 558-7271
❑ Fire Marshal
(650) 558-7600
❑ NPDES Coordinator
(650) 342-3727
❑ City Attorney
Subject: Request for design review for first and second story addition to
existing single family dwelling at 1320 Skyview Drive, zoned R-1,
APN: 027-201-260
Staff Review: May 14, 2007
1) All construction must comply with the 2001 California Building Codes (CBC), the Burlingame
Municipal and Zoning Codes, and all other State and Federal requirements.
2) Provide fully dimensioned plans.
3) Provide existing and proposed elevations.
4) Provide a complete demolition plan that indicates the existing walls, walls to be demolished,
new walls, and a legend. NOTE: The Demolition Permit will not be issued until a Building
Permit is issued for the project.
5) Due to the extensive nature of this construction project the Certificate of Occupancy
will be rescinded once construction begins. A new Certificate of Occupancy will be
issued after the project has been finaled. No occupancy of the building is to occur until
a new Certificate of Occupancy has been issued.
6) Comply with the new, 2005 California Energy Efficiency Standards for low-rise residential
buildings. Go to http7//www.ener_qv.ca.gov/title24 for publications and details.
Rooms that can be used for sleeping purposes must have at least one window or door that
complies with the egress requirements.
8) Provide guardrails at all landings. NOTE: All landings more than 30" in height at any point are
considered in calculating the allowable floor area. Consult the Planning Department for details
if your project entails landings more than 30" in height.
9) Provide handrails at all stairs where there are four or more risers.
10) Provide lighting at all exterior landings.
11) The fireplace chimney must terminate at least two feet above any roof surface within ten feet.
12) NOTE: Plans that specifically address item #7 must be re -submitted before this project
can move forward for Planning Commission action.
Revi y: —•� Date: ����p
Project Comments
Date: May 11, 2007
To: 0 City Engineer
(650) 558-7230
U Chief Building Official
(650) 558-7260
0 City Arborist
(650) 558-7254
From: Planning Staff
Subject: Request for design
existing single family
APN: 027-201-260
Staff Review: May 14, 2007
0 Recycling Specialist
(650) 558-7271
Fire Marshal
(650) 558-7600
0 NPDES Coordinator
(650) 342-3727
U City Attorney
review for first and second story addition to
dwelling at 1320 Skyview Drive, zoned R-1,
*Provide a residential fire sprinkler throughout the residence.
1. Provide a minimum 1 inch water meter.
2. Provide backflow prevention device/double check valve assembly —
Schematic of water lateral line after meter shall be shown on Building
Plans prior to approval indicating location of the device after the split
between domestic and fire protection lines.
3. Drawings submitted to Building Department for review and approval shall
clearly indicate Fire Sprinklers shall be installed and shop drawings
shall be approved by the Fire Department prior to installation.
Ensure the fire flow from the closest fire hydrant is capable of delivering a minimum
of 1000 gallons per minute. You may disregard this requirement for single family
dwellings equipped with a minimum NFPA 13D compliant fire sprinkler system
throughout.
0
MAY t. <, 'M07
Reviewed by:
CITY o-
Date: PLANNING DEPT.
Project Comments
Date: May 11, 2007
To: City Engineer
(650) 558-7230
00, Chief Building Official
(650) 558-7260
10- City Arborist
(650) 558-7254
From: Planning Staff
100, Recycling Specialist
(650) 558-7271
101,
Fire Marshal
6509 558-7600
NPDES Coordinator
0 342-3727
City Attorney
Subject: Request for design review for first and second story addition to
existing single family dwelling at 1320 Skyview Drive, zoned R-1,
APN: 027-201-260
Staff Review: May 14, 2007
1) Any construction project in the City, regardless of size, shall comply with the City
NPDES permit requirement to prevent stormwater pollution including but not
limited to ensuring that all contractors implement construction Best Management
Practices (BMPs) and erosion and sediment control measures during ALL phases
of the construction project (including demolition). Include appropriate stormwater
BMPs as Project Notes. These BMPs include but are not limited to the following:
• Store, handle, and dispose of construction materials and wastes properly
to prevent contact and contamination of stormwater;
• Control and prevent the discharge of all potential pollutants, including
pavement cutting wastes, paints, concrete, petroleum products, chemicals,
wash water or sediments, and non-stormwater discharges to storm drains
and watercourses;
• Use sediment controls or filtration to remove sediment when dewatering
site and obtain all necessary permits;
• Avoid cleaning, fueling, or maintaining vehicles on -site except in a
designated area where wash water is contained and treated;
• Protect adjacent properties and undisturbed areas from construction
impacts using vegetative buffer strips, sediment barriers or filters, dikes,
mulching, or other measures as appropriate;
• Perform clearing and earth moving activities only during dry weather;
• Limit and time application of pesticides and fertilizers to prevent polluted
runoff;
• Limit construction access routes and stabilize designated access points;
• Avoid tracking dirt or other materials off -site; clean off -site paved areas
and sidewalks using dry sweeping method;
• The Contractor shall train and provide instruction to all employees and
subcontractors regarding the construction BMPs.
1 of 2
Project Comments Con't-1320 Skyview Dr., 1st and 2"d story
addition to existing single family dwelling.
2) The public right of way/easement shall not be used as a construction staging
and/or storage area and shall be free of construction debris at all times. The
easement shall be protected from any site runoff.
3) Implement Erosion and Sedimentation Controls (if necessary):
a. Install and maintain all temporary erosion and sediment controls
continuously until permanent erosion control have been established;
b. Address method(s) for diverting on -site runoff around exposed areas and
diverting off -site runoff around the site;
c. Address methods for preventing erosion and trapping sediment on -site.
4) Provide notes, specifications, or attachments describing the following:
a. Construction, operation and maintenance of erosion and sediment control
measures, including inspection frequency;
b. Methods and schedule for grading, excavation, filling, clearing of
vegetation, and storage and disposal of excavated or cleared material.
Brochures and literatures on stormwater pollution prevention and BMPs are available for
your review at the Planning and Building departments. Distribute to all project
proponents.
For additional assistance, contact Eva J. at 650/342-3727.
Reviewed by: FJ Date: 06/14/07
2 of 2
Project Comments
Date: May 11, 2007
To: City Engineer
(650) 558-7230
❑ Chief Building Official
(650) 558-7260
❑ City Arborist
(650) 558-7254
From: Planning Staff
❑ Recycling Specialist
(650) 558-7271
O Fire Marshal
(650) 558-7600
❑ NPDES Coordinator
(650) 342-3727
❑ City Attorney
Subject: Request for design review for first and second story addition to
existing single family dwelling at 1320 Skyview Drive, zoned R-1,
APN: 027-201-260
Staff Review: May 14, 2007
The following items are noted as requirements. Please review and indicate your method of compliance for
each item:
1 property boundary survey,
2 stormwater drainage plan,
4 sewer lateral test and sewer backwater.protection certificate
12 replace damaged sidewalk, curb, gutters, and other necessary appurtenant work, etc.,
18 NPDES permit requirements,
19, 20, 21 driveway information,
Other concerns to be addressed at time of building permit application:
a debris box
b encroachment permit
c conform to Plan Commission and City Council actions
d pedestrian protection
MAY 1 7 2007
ciri CF BU?UNaGI- IIJia
PLANNING GEPT.
Reviewed by: Date:
PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
PLANNING REVIEW COMMENTS
Project Name:-K�.rf-
Project Address:
The following requirements apply to the project
1 e A property boundary survey shall be preformed by a licensed land
surveyor. The survey shall show all property lines, property comers,
easements, topographical features and utilities. (Required prior to the
building permit issuance.)
2 �_ The site and roof drainage shall be shown on plans and should be made to
drain towards the Frontage Street. (Required prior to the building permit
issuance.)
3 The project site is in a flood zone, the project shall comply with the City's
flood zone requirements.
4 X A sanitary sewer lateral test is required for the project in accordance with
the City's standards. (Required prior to the building permit issuance.)
5 A sanitary sewer analysis is required for the project. The sewer analysis
shall identify the project's impact to the City's sewer system and any
sewer pump stations and identify mitigation measures.
6 Submit traffic trip generation analysis for the project.
7 Submit a traffic impact study for the project. The traffic study should
identify the project generated impacts and recommend mitigation
measures to be adopted by the project to be approved by the City
Engineer.
8 The project shall file a parcel map with the Public Works Engineering
Division. The parcel map shall show all existing property lines, easements,
monuments, and new property and lot lines proposed by the map.
9 A latest preliminary title report of the subject parcel of land shall be
submitted to the Public Works Engineering Division with the parcel map
for reviews.
10 Map closure/lot closure calculations shall be submitted with the parcel
map.
11 The project shall submit a condominium map to the Engineering Divisions
in accordance with the requirements of the Subdivision Map Act.
Pagel of 3
C:\Documents and Settings\dbell\My Documents\PLANNING REVIEW COMMENTS.doc
PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
12 X The project shall, at its own cost, design and construct frontage public
improvements including curb, gutter, sidewalk and other necessary
appurtenant work.
13 The project shall, at its own cost, design and construct frontage streetscape
improvements including sidewalk, curb, gutters, parking meters and poles,
trees, and streetlights in accordance with streetscape master plan.
14 By the preliminary review of plans, it appears that the project may cause
adverse impacts during construction to vehicular traffic, pedestrian traffic
and public on street parking. The project shall identify these impacts and
provide mitigation measure acceptable to the City.
15 The project shall submit hydrologic calculations from a registered civil
engineer for the proposed creek enclosure. The hydraulic calculations
must show that the proposed creek enclosure doesn't cause any adverse
impact to both upstream and downstream properties. The hydrologic
calculations shall accompany a site map showing the area of the 100 year
flood and existing improvements with proposed improvements.
16 Any work within the drainage area, creek, or creek banks requires a State
Department of Fish and Game Permit and Army Corps of Engineers
Permits.
17 No construction debris shall be allowed into the creek.
18 X_ The project shall comply with the City's NPDES permit requirement to
prevent storm water pollution.
19 _ The project does not show the dimensions of existing driveways, re-
submit plans with driveway dimensions. Also clarify if the project is
proposing to widen the driveway. Any widening of the driveway is subject
to City Engineer's approval.
20 X The plans do not indicate the slope of the driveway, re -submit plans
showing the driveway profile with elevations
21 The back of the driveway/sidewalk approach shall be at least 12" above
the flow line of the frontage curb in the street to prevent overflow of storm
water from the street into private property.
22 For the takeout service, a garbage receptacle shall be placed in front. The
sidewalk fronting the store shall be kept clean 20' from each side of the
property.
Page 2 of 3
C:\Documents and Settings\dbeffiMy Documents\PLANNING REVIEW COMMENTS.doc
PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
23 For commercial projects a designated garbage bin space and cleaning area
shall be located inside the building. A drain connecting the garbage area to
the Sanitary Sewer System is required.
Page 3 of 3
CADocuments and Settings\dbell\My Documents\PLANNING REVIEW COM IENTS.doc