HomeMy WebLinkAbout1301 Skyview Drive - Approval LetterCITY OF BURLINGAME
City Hall — 501 Primrose Road
Burlingame, California 94010-3997
November 12, 2015
Candice Williams
1301 Skyview Drive
Burlingame, CA 94010
Re: 1301 Skyview Drive
Dear Ms. Williams,
� CiTV
'�r . � 1
_�°`'\ ���
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division
PH:(650)558-7250
FAX: (650) 6963790
Since there was no appeal to or suspension by the City Council, the October 26, 2015 Planning Commission
approval of your application for Design Review and Special Permit became effective November 5, 2015. This
application was for a first floor addition to an existing single family dwelling and to enlarge and existing
attached garage at 1301 Skyview Drive, zoned R-1.
The October 26, 2015, minutes of the Planning Commission state your application was approved with the
following conditions:
2.
that the project shall be built as shown on the plans submitted to the Planning Division date
stamped September 25, 2015, sheets A1 through A8;
that all new windows and exterior doors, with the exception of the front entry door which is to be
solid wood, shall be wood with aluminum cladding; the new garage door shall be wood and shall
match the design of the existing garage door to remain;
3. that any changes to building materials, exterior finishes, windows, architectural features, roof height
or pitch, and amount or type of hardscape materials shall be subject to Planning Division or
Planning Commission review (FYI or amendment to be determined by Planning staf�;
4. that any changes to the size or envelope of first or second floors, or garage, which would include
adding or enlarging a dormer(s), shall require an amendment to this permit;
5. that the conditions of the Building Division's September 25, 2015 and September 4, 2015 memos,
the Parks Division's September 10, 2015 memo, the Engineering Division's September 28, 2015
and September 2, 2015 memos, the Fire Division's September 10, 2015 memo and the Stormwater
Division's September 3, 2015 memo shall be met;
6. that any recycling containers, debris boxes or dumpsters for the construction project shall be placed
upon the private property, if feasible, as determined by the Community Development Director;
7. that demolition or removal of the existing structures and any grading or earth moving on the site
shall not occur until a building permit has been issued and such site work shall be required to
comply with all the regulations of the Bay Area Air Quality Management District;
8. that prior to issuance of a building permit for construction of the project, the project construction
plans shall be modified to include a cover sheet listing all conditions of approval adopted by the
Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved
plans throughout the construction process. Compliance with all conditions of approval is required;
:: Register online to receive City of Burlingame e-mail updates at www.burlingame.org ::
November 12, 2015
1301 Skyview Drive
Page 2
the conditions of approval shall not be modified or changed without the approval of the Pianning
Commission, or City Council on appeal;
that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that these
venting details shall be included and approved in the construction pians before a Building permit is
issued;
10. that the project shall compiy with the Construction and Demolition Debris Recycling Ordinance
which requires affected demolition, new construction and alteration projects to submit a Waste
Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior
or exterior, shall require a demolition permit;
11. that the project shall meet all the requirements of the California Building and Uniform Fire Codes,
2013 Edition, as amended by the City of Burlingame;
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS
PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
12. that prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural cer6fication that
the architectural details shown in the approved design which should be evident at framing, such as
window locations and bays, are built as shown on the approved plans; architectural certification
documenting framing compliance with approved design shall be submitted to the Building Division
before the final framing inspection shall be scheduled; and
13. that prior to finai inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.
All site improvements and construction work will require separate application to the Building Department.
This approval is valid for one year during which time a building permit must be issued. An extension of up to
one year may be considered by the Planning Commission if application is made before the end of the first
year.
The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section
1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within 90
days of the date of the decision unless a shorter time is required pursuant to state or federal law.
Sincerely,
�
William Meeker
Community Development Director
c. Gregorin Engineering & Design
Chief Deputy Valuation, Assessor's Office
(LOT 5& SWLY 1/2 OF ADJ RESERVE LOT BLK 1 SKYVIEW TERRACE RSM 44/25; APN: 027-051-
050)
File