Loading...
HomeMy WebLinkAbout1801 Adrian Road 2 of 2 - Approval LetterCITY OF BURLINGAME City Hall — 501 Primrose Road Burlingame, California 940103997 December 20, 2019 Bryan Miranda Public Storage, Inc. 701 Westem Avenue Glendale, CA 97201 Re: 1801 Adrian Road Dear Bryan, 1i�-r v ,e.. �f _'��wu j; COMMUNITY DEVELOPMENT DEPARTMENT Planning Division PH: (650) 558-7250 FAX: (650) 6963790 Mailing date 04.1320 Since there was no appeal to or suspension by the City Council, the December 9, 2019, Planning Commission approval of your application for Commercial Design Review, Conditional Use Permits, and Parking Variance became effective December 19, 2019. This application was for a two-story addition to an existing one-story commercial building for a personal storage use at 1801 Adrian Road, zoned RRMU. The December 9, 2019, minutes of the Planning Commission state your application was approved with the following conditions: 1. that the project shall be built as shown on the plans submitted to the Planning Division date stamped August 29, 2019, sheets 1-12; 2. that the conditions of the Engineering Division's August 29, 2019 memo shall be met during the building permit submittal phase. 3. that the project shall comply with Code Section 25.39.040 (C)(7) by providing street frontage improvements along the Adrian Road frontage length of the lot, a minimum 6'-0" wide public walk zone and a minimum 5'-0" wide amenity/planter zone with tree wells that are at least 5'-0" by 5'-0", to be verified by staff at time of building permit review. 4. that prior to issuance of a building permit for the project, the project applicant shall pay the first half of the North Burlingame Development and Public Facilities Impact Fees, made payable to the City of Burlingame and submitted to the Planning Division; 5. that prior to scheduling the framing inspection, the project applicant shall pay the second half of the North Burlingame Development and Public Facilities Impact Fees, made payable to the City of Burlingame and submitted to the Planning Division; B. that any changes to the size or envelope of the building, which would include changing or adding exterior walls or parapet walls, shall require an amendment to this permit; 7. that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYI or amendment to be determined by Planning staf�; 8. that demolition or removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; :C Register online to receive City of Burlingame e-mail updates at www.burlingame.org �� December 20, 2019 1801 Adrian Road Page 2 9. that prior to issuance of a building permit for construction of the project, the project construcfion plans shall be modfied to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the condiGons of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; 10. that the project shall comply with the Construction and Demolitlon Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 11. that the applirant shall comply with Ordinance 1503, the City of Burlingame Stortn Water Management and Discharge Control Ordinance; 12. that the project shall meet all the requirements of the Cal'rfomia Building and Uniform Fire Codes, in affect at time of building permit submittal, as amended by the City of Burlingame. THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 13. that prior to scheduling the framing inspection, the project architect, engineer ar other licensed professional shall provide architectural certification that the architectural details such as window locations and bays are built as shown on the approved plans; if there is no licensed professional involved in the project, the property owner or contractor shall provide the certifica6on under penalty of perjury. Certifications shall be submitted to the Building Department; and 14. that prior to final inspecHon, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. All site improvements and construction work will require separate application to the Building Department This approval is valid for one year duNng which time a building pertnit must be issued. An extension of up to one year may be considered by the Planning Commission if application is made before the end of the first year. The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section 1094.6. If you wish to challenge the decision in a court of competent jurisdiction, yau must do so within 90 days of the date of the decision unless a shorter time is required pursuant to state or federal law. Sincerely, `� r, �'�� "�v Kevin Gardiner Community Development Director c. Public Storege, Inc., property owner, 701 Western Avenue, Glendale, CA 91201 Chief Depuly Valuation, Assessor's Office (5.84 ACS MOL PTN OF LOTS 4 5 6 7 8 BLOCK 6 MILLSDALE INDUSTRIAL PARK UNIT NO 3 RSM 41/45 46 CITY OF BURLINGAME; APN: 025-169-050) File CC Register online to receive City of Burlingame e-mail updates at www.burlingame.org :: Projecf Comments - Planning Applicetion Project Address: 1801 Adrlan Rd, zoned North Rollins Rosd Mixed Use District (RRMU►, APN: 02b-169-060 Description: Request for Environmenfal Review, Condttional Use Pertnits for use and Noor area ratlo for a remodel and additlon W an existlng commercial bulldfnp, which includes adding a second floor wRhin the exlstlnp building. From: Martin Quan Public Works Engineering Please addreas the following commeMa at this tlme; provide a written rosponae and revised plana with your resubmitfal: 3. :�� ..e..a,..,..,,- -'--..__ ..,� ' ' ' . Plannlnp application approval will be contingent on closing out the sewer lateral test for 1 T61 Adrian Court 4• � � ' '. The proposed baain is on top of the sanitary sewer and manhole. Please relocate so that it is outside thia area. 7. PNor to approval of this planning application, complete the sewer lateral test for 1761 Adrlan Court and submit ths test reaults to Engineering to close out the neighboring project The following comments do not need to be addressed now, but you should be aware oi them as they /will need to be addressed at tlme of building pertnit submlttal. �. Based on the scope of work, this is a"Type III" project that requires a Stormwater Construction Pollution Prevention Permit. This pertnit is required prior to issuance of a Building Permit. An inkial field inspection is required prior to the start of any construction (on private property or in the public right-of-way). 2. Any work in the City right-of-way, such as placement of debris bin in street, work in sidewalk area, public easements, and utiliiy easements, is required to obtain an Encroachment Pertnk prior to starting work. Porta potty's are not allowed to be placed in the City right-of-way. s. Construction hours in the City Public right-of-way are limited to weekdays and non-City Holidays between 8:00 a.m. and 5:00 p.m. for all activities (including hauling). a. Replace damaged and displaced curb, gutter and/or sidewalk fronting site. s. All water lines wnnections to city water mains for services orfire line protection are to be installed per cily standard procedures and material specifiptions. Contact the city Water department for connection fees. If required, all fire services and services 2" and over will be installed by builder. All underground fire service connections shall be submitted as separate Underground Fire Service pertnit for review and approval. s. Sewer Backwater Protection Certification is required for the installation of any new sewer fixture per Ordinance No. 1710. The Sewer Backwater Protection Certificate is required prior to the issuance of Building Permit. �. Insert the 'Best Management Practices', updated June 2014, construction sheet into the plana set. A copy can be found at or e. Please submit an erosion control plan. This plan shall include, but not limited to, delineation of area of work, show primary and secondary erosion control measures, protection of creek or atorm drein inlets, perimeter controls, protections for construction aocess points, and sediment control measures. s. A survey by a licensed surveyor or engineer is required. The survey shall show how the property Iines were detertnined and that the property comers were set with surveyors license numbers on dureble monuments. This survey shall be attached to the construction plans. All comers need to be maintained or reinstalled before the building final. All property comers shall be maintained during construction or reestablished at the end ai the project. Reviawed By: Martin Quan Date: 8/29H9 650-55&7245