Loading...
HomeMy WebLinkAbout832 Edgehill Drive - Resolution�r � ` RECORDING REQUESTED BY: Planning Department City of Burlingame WHEN RECORDED MAIL T0: COMMUNITY DEVELOPMENT DEPARTMENT CITY OF BURLINGAME 501 PRIMROSE ROAD BURLINGAME, CA 94010 2013.151532 11:05 am 1Q;30/13 R1 Fee: NO FEE Count of Payss 7s Recorded in Official Recorc�s COURiyGfu�ll MBfep � Assessor-Co�k Church n nty Clerk-4 ���lil!���I��/III�III±I�9'I�'I�If i �'! I� ecnrderil' * R� o� ��! �lillilii��ll I �(��� 0 1 7,� O�I��I�D�illi II�I 2 � Z 3 * Resolution No. 62-2013 832 EDGEHILL DRIVE APN 029-022-110 TITLE OF DOCUMENT I hereby certify this to be a full, true and correct copy of the document it purports to be, the original of which is on file in my office. Date October 28, 2013 ; �,- .- da �t't-.�: a � ����' .x.:.{ ' . ; r, �:'�... � �?. ,;�,z , c . �'� a :. �q�;�� � ; .;','_.. '._ 5 i tl ..- .y,:. �� _ d �; � r ��i at4..0.�0.�G RESOLUTION APPROVING CATEGORICAL EXEMPTION, DESIGN REVIEW, VARIANCES AND SPECIAL PERMIT RESOLVED, by the Planning Commission of the City of Burlingame that: WHEREAS, a categorical exemption has been proposed and application has been made for Desian Review, Side and Rear Setback Variances and Special Permit for a first floor addition (considered two-stonr at the rear of the house) and a new attached qaraqe at 832 Edqehill Drive, zoned C-R, Marc Maniscalco, 2818 Las Piedras Drive, Burlinqame, CA, 94010, property owner, APN: 029-022-110; WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on October 15, 2013, at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing; NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that: On the basis of the Initial Study and the documents submitted and reviewed, and comments received and addressed by this commission, it is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and categorical exemption, per CEQA Article 19, Section 15301 (e)(1) of the CEQA Guidelines, which states that additions to existing structures are exempt from environmental review, provided the addition will not result in an increase of more than 50% of the floor area of the structures before the addition, is hereby approved. 2. Said Design Review, conditions set forth in Variances and Special said meeting. Variances and Special Permit are approved subject to the Exhibit "A" attached hereto. Findings for such Design Review, Permit are set forth in the staff report, minutes, and recording of 3. It is further directed that a certified copy of this resolution be recorded in the official records of the County of San Mateo. Chairman I, ��Y��'\ ���l,�yf� ����",`��Secretary of the Planning Commission of the City of Burlingame, do hereby certify t at the foregoing resolution was introduced and adopted at a regular meeting of the Planning Commission held on the 15`h dav of October, 2013 by the following vote: 832 EDGEHILL DRIVE - RESO 62-2013 AYES: Bandrapalli, DeMartini, Gaul, Terrones, Yie NOES: Davis ABSENT: Sargent RECUSED: None , ' � I f '��``�b� , � ��� � � Secretary EXHIBIT "A" Conditions of approval for Permit. 832 Edgehill Drive Effective October 25, 2013 Categorical Exemption, Design Review, Variances and Special that the project shall be built as shown on the plans submitted to the Planning Division date stamped October 2, 2013, sheets A1 through A6, BMP and GB1; 2. that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYI or amendment to be determined by Planning staf�; 3. that any changes to the size or envelope of the first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; 4. that the conditions of the Chief Building Official's August 23 and July 12, 2013 memos, the City Engineer's August 15, 2013 memo, the Fire Marshal's July 24, 2013 memo, the City Arborist's September 4, August 26 and July 18, 2013 memos, and the Stormwater Coordinator's July 17, 2013 memo shall be met; 5. that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; 6. that demolition or removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 7. that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; 8. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 9. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 10. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2010 Edition, as amended by the City of Burlingame; Conditions of approval for Permit. 832 Edgehill Drive Effective October 25, 2013 Page 2 EXHIBIT "A" Categorical Exemption, Design Review, Variances and Special THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 11. prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; and 12. that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. Project Comments Date: August 22, 2013 To: � Engineering Division (650) 558-7230 X Building Division (650) 558-7260 0 Parks Division (650) 558-7334 From: Planning Staff 0 Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Subject: Request for Design Review, Special Permit for attached garage, Side and Rear Setback Variances for a second story addition to an existing single family dwelling and new detached garage at 832 Edgehill Drive, zoned C-R, APN: 029-022-110 Staff Review: No further comments. All conditions of approval as stated in the review dated 7-12-2013 will apply to this project. Reviewed 8-23-2013 Date: To: From: Project Comments � Engineering Division � Fire Division (650) 558-7230 (650) 558-7600 X Building Division (650) 558-7260 0 Parks Division (650) 558-7334 0 Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Planning Staff Subject: Request for Design Review, Special Permit for attached garage, Side Setback Variance for a second story addition and new attached garage to an existing single-family dwelling at 832 Edgehill Drive, zoned C-R, APN: 029-022-110 Staff Review: 1) On the plans specify that this project will comply with the 2010 California Building Code, 2010 California Residential Code (where applicable), 2010 California Mechanical Code, 2010 California Electrical Code, and 2010 California Plumbing Code, including all amendments as adopted in Ordinance 1856-2010. Note: If the Planning Commission has not approved the project prior to 5:00 p.m. on December 31, 2013 then this project must comply with the 2013 California Building Codes. 2) On the plans provide a copy of the GreenPoints checklist for this project at full scale. 3) Specify on the plans that this project will comply with the 2008 California Energy Efficiency Standards. Go to http�//www.energv.ca.gov/title24/2008standards/ for publications and details. ��Place the following information on the first page of the plans: "Construction Hours" Weekdays: 7:00 a.m. — 7:00 p.m. Saturdays: 9:00 a.m. — 6:00 p.m. Sundays and Holidays: 10:00 a.m. — 6:00 p.m. (See City of Burlingame Municipal Code, Section 13.04.100 for details.) ��On the first page of the plans specify the following: "Any hidden conditions that require work to be performed beyond the scope of the building permit issued for these plans may require further City approvals including review by the Planning Commission." The building owner, project designer, and/or contractor must submit a Revision to the City for any work not graphically illustrated on the Job Copy of the plans prior to performing the work. 6) Anyone who is doing business in the City must have a current City of Burlingame business license. 7) Provide fully dimensioned plans. 8) Provide a fully dimensioned site plan which shows the true property boundaries, the location of all structures on the property, existing driveways, and on-site parking. 9) Provide existing and proposed elevations. 10)Provide a complete demolition plan that indicates the existing walls, walls to be demolished, new walls, and a legend. NOTE: A condition of this project approval is that the Demolition Permit will not be issued and, and no work can begin (including the removal of a� building components), until a Building Permit has been issued for the project. The property owner is responsible for assuring that no work is authorized or performed. 11)Show the distances from all exterior walls to property lines or to assumed property lines 12)Show the dimensions to adjacent structures. 13)Obtain a survey of the property lines for any structure within one foot of the �roperty line. (PWE letter dated 8-17-88) 4 dicate on the plans that exterior bearing walls less than five feet from the property line will be built of one-hour fire-rated construction. (2010 CBC, Table 602) �Rooms that can be used for sleeping purposes must have at least one window or door that complies with the egress requirements. Specify the location and the net c/ear opening height and width of all required egress windows on the elevation drawin s. 16 dicate on the plans that a Grading Permit, if required, will be obtained from the Department of Public Works. 17)Provide guardrails at all landings. NOTE: All landings more than 30" in height at any point are considered in calculating the allowable lot coverage. Consult the Planning Department for details if your project entails landings more than 30" in height. 18)Provide handrails at all stairs where there are four or more risers. 19)Provide lighting at all exterior landings. NOTE: A written response to the items noted here and plans that specifically address items 4, 5, 14, 15, and 16 must be re-submitted before this project can move forward for Planning om ission action. -- - _ -.._ �.. Date: 7-12-2013 �'oe C , CBO 650- 8-7270 Project Comments Date: To: X Engineering Division (650) 558-7230 � Building Division (650) 558-7260 0 Parks Division (650) 558-7334 � Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 From Planning Staff Subject: Request for Design Review, Special Permit for attached garage, Side Setback Variance for a second story addition and new attached garage to an existing single-family dwelling at 832 Edgehill Drive, zoned C-R, APN: 029-022-110 Staff Review: 1. The proposed garage appears to be constructed within one foot of property line which requires a property boundary survey by a licensed land surveyor/engineer. 2. Storm drainage shall be designed to drain towards the street frontage or to the City storm drain system. 3. Replace all displaced/damaged sidewalk, driveway, curb and gutter. 4. Sewer backwater protection certification is required. Contact Public Works — Engineering Division at (650) 558-7230 for additional information. Reviewed by: V V Date: 8/15/2013 Project Comments Date: To: � Engineering Division (650) 558-7230 � Building Division (650) 558-7260 � Parks Division (650) 558-7334 ❑x Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 From: Planning Staff Subject: Request for Design Review, Special Permit for attached garage, Side Setback Variance for a second story addition and new attached garage to an existing single-family dwelling at 832 Edgehill Drive, zoned C-R, APN: 029-022-110 Staff Review: No comments at this time. Reviewed by: �� Date: ��Z � `13 Project Comments Date: To: From: August 30, 2013 � Engineering Division (650) 558-7230 0 Building Division (&50j 558-7260 X Parks Division (650) 558-7334 0 Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650j 558-7204 Planning Staff Subject: Request for Design Review, Special Permit for attached garage, Side and Rear Setback Variances for a second story addition to an existing single family dwelling and new detached garage at 832 Edgehill Drive, zaned C-R, APN: 029-022-110 Staff Review: 1. No further Comments. Reviewed by: BD Date: 9/4/13 Project Comments Date: August 22, 2013 To: � Engineering Division (650) 558-7230 � Building Division (650) 558-7260 � Parks Division (650) 558-7334 From: Planning Staff � Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Subject: Request for Design Review, Special Permit for attached garage, Side J 1"i��� P�L Is !/:.: �.r�s a.F tr�r rJ 1 a7r3'17�... L- aiiu r��at ���uai;� vci� iai it;�a iui a��i;ui iu �«7i y iiuuiu�i i t� ai i existing single family dwelling and new detached garage at 832 Edgehill Drive, zoned C-R, APN: 029-022-110 Staff Review: .. r ` , .� � � �s e��►�.e r � � l��C-Gl��...�� t-t'1 --�✓'eC/-(� �dGic:/ ��� Mr-� G•t � G � ��%�''��� �.~'`-Eit.t'i' �.�- cl C� L (,�,�Q L� K�''� �G� �Q^�" ��- zt v--� Ca�clSc��, v'vEs1.�. C• L�� �'z . �c.� . �3� �.��u��e.,� ��:��- y �� � ���� �° �� i ��'vicricu Uy: ��'" �'�� Sr` ���- �,.�... q Z/� / va�c. 0 'F �1� Project Comments Date: To: From: � Engineering Division (65Q) 558-7230 0 Building Division (65�) 558-7260 X Parks Division (650) 558-7334 Planning Staff � Fire Division (650) 558-7600 0 Stormwater Division (650J 342-3727 � City Attorney (650) 558-7204 � Subject: Request for Design Review, Special Permit for attached garage, Side Setback Variance for a second story addition and new attached garage to an existing single-family dwelling at 832 Edgehill Drive, zoned C-R, APN: 029-022-110 , Staff Review: •�1. If Public Works requires sidewalk replacement, Policy for Expanding �dth of Planter Strip needs to be implemented � `2. s per requirements, landscape plan must include 1 landscape tree (non-fruit aring) per 1000 SF of li�ings space. Reviewed by: B Disco Date: 7/18/13 Date: To: From: Project Corr�ments � Engineering Division � Fire Division (650) 558-7230 (650) 558-7600 � Building Division (650) 558-7260 � Parks Division (650) 558-7334 X Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Planning Staff Subject: Request for Design Review, Special Permit for attached garage, Side Setback Variance for a second story addition and new attached garage to an existing single-family dwelling at 832 Edgehill Drive, zoned C-R, APN: 029-022-110 Staff Review: 1) Any construction project in the City, regardless of size, shall comply with the City's NPDES (stormwater) permit to prevent stormwater pollution from construction activities. Project proponent shall ensure all contractors implement appropriate and effective BMPs during all phases of construction, including demolition. When submitting plans for a building permit include a list of construction BMPs as project notes on a separate full size plan sheet, preferably 2' x 3' or larger. Project proponent may use the attached Construction BMPs plan sheet to comply with this requirement. Electronic file is available for download at: http://www.flowstobay.org/documents/business/construction/Cou ntywide_Program_B MP_Plan_Sheet_Jun2012.pdf 2) Best Management Practices (BMPs) requirements apply on any projects using architectural copper. To learn what these requirements are, see attached flyer "Requirements for Architectural Copper." Electronic file is available for download at: http://www.flowstobay.org/documents/municipalities/nd/Materials/2012%20Materials/__ e Architectural_copper_BMPs_FINAL.pdf : . For assistance please contact Stephen D. at 650-342-3727 �- ;,,;,-; Reviewed by: SD �� Date: 7/15/13 �- � SAN MpTEO COUNTYWIOE Water Pollution Prevention Program Clean Waiec Healthy Lommunity. Construction Best Management Practices B ( MPs) Construction projects are required to implement the stormwater best management practices ($Mp) on this page, as they apply to your project, all year long. N[aterials & VVaste i�Ianagement Non-Aaar�om Materinla ❑ Berm and cover �Ixkpiles oFmnd, dirt or olher construc�on materinl �viUi �mps when rein is Porecasl or if no� ac[ively being used within 14 dn s. ❑ Ux (bm don't o.�mue) �cciaimed wamr far dusl comroi. Hanrdous M1ta4ri:Js ❑ Label all hara�dous matcrials and im�ardaus wares (nich as P�sueides, peinta, Ihinnera wb�ents, fuel. oil, nnd nntifrceze) in accordnncc a•ith citp. counry, sm�c a�d Rdunl rcguimions. ❑ Srme ha¢srdous metcrials nnd wa�lcs in water Gght mnteincrs, store in appmpriale secondory� conlninmrn4 and cover diem nt Ihe rnd of evcn• woh day or during wcl �veather or n•hcn min is fiuecast. ❑ Folime manufaeU�rer's applicadon inswetions for Lmardous ma¢riole and be corefW no[ w use mofe than nec�ssa.v. Do nat ap0�y chemicul: ouldoors �vheu rain is fo�ecast wi�hin 24 hours. ❑ Arrange for appmpriele disposal of nll haLirdons �rasles. Waslr Managemrnt ❑ Cavtt w�a5[e dispos�l conqincrs sccu`cly .rith ierps at �hc end of eea}• work dey ond during ivet wmtlier. ❑ C6eck nasie disposol conminers frequrn�ly for leals and ro mele surt fM1ty e`e �ot over511ed. Ne�xr hose da�m a dumps�er un the CU11ltr11GllOp 91R. ❑ Clean or rcplace ponable Ioiletz aod i��specl Wem frequentlr For IcaF;s and spilk, ❑ Dispou oCall «restes end debris pmperk. Re�•cle ma�erials aM N'uYe+ �het can be re�-cled (sueb as uphelt. conerele. aggre�ate basc mmerieLs, wood. 6YP boerd. Pipe, c�c.) ❑ Dispox ofliquid residues F�om paints, thinners, solventt, glues, and ctraning flnids nv humdous �vasle. Connruetion E�nranees anJ Perimeler ❑ Eslablish end mninrsu� cRcclivc perime�cr wnwls a�M srabil'nc all wnstrucuon entrnnces md eues to su(6ciently emitrol emsion and udiment diuharga from site e�W vack�ng off sitc. ❑ S�veep or aacuum any slrett �mcking immedimeh� w�d senve sedinxnt swu ro prcvene [urther uacking. Nm�er hosc dor�n svats to cl�n up irecking. Equipment Nlanagement & Spill Control .� . �4" Mafnteaana and Parking ���8��� on area, fined rvilL eppropnek BMPs, {or vehicle ond equipment �wku�g ¢nd rtonge. ❑ Perfo'm mejor mnintenance, repairjoba, m�d vehicle ond eqnipment wushing off eite. ❑ lfrefuelingorvt}iidemaintennncemustbedm�e o�uilc, wo'k in a bemied erm aaay hom �ro�m drai�u nnd ovcr e drip pen big rnough to collec[ lluids. Recycle or dispose of 9uids os he�n�duuy �vaz1e. ❑ ItvahicleorcquipmentcleaningmurtbeAoneonsiR, cican w$li.��arcr only in a 6em�ed area thet �vill �wt allo�v rinse water to fun inlo guners. atrce2 sloim a�. o� s�u� ,.•si�. O Douatcltan�eliicleoreqnipmen[onsiteuAngsoops, sohanls, deQ.rcosers. smnm cleaiwig eqwpment etc, Spill Prc�xnuon anA Cootml � Keep spill cleanup materials (rags, ebsohcnU, ctc.) a��ailabic at Ihc ronshucuon si� a[ all Hmca. ❑ Inspoct vehicles and cquipmcnt Gequcntly for end �epair Irni3 pmmpllp. Usc drip pane ro cntch iuks unlil fcpniig a�e �mdc. ❑ Clenn up spilb or leal:s immcdinlely nnd dispou of clwnnp matuiaV pmpedr. ❑ Do not Iwsc don•n aurfaces �rhem fiuida heve apillcd Usc dm cieonup mc�hoda (absorbcnt meterials. cat littcr. ond/or rogs). ❑ Sivccp up spillcd drc meluials immcdiately. Do no1 w to wmh them m�-ay wilh water, or bnry them. � Clenn up spill� on dirt asns M digging up nnd pmperly� diaposiug oFwntamina�ed soil. ❑ Repor[ sigiuficant spills immediomW, yw me rcqni'eA q' lew lo roport all signi5cant roleasei of hazardom matcrinLr, inch�ding oil. To repon a spiil: 1) Die191i or your IoW eme�ency response nwnber. 2) Ceil the Co�emor's 06ce ofFinagrnry- $en�ices Waming Crn�a, (800) 852-75i0 (24 6mus)_ Earthwork & Contaminated Soils t;�� — ��"�°=' �� �i�: L � 'a' � — - -.,.��.m,.�,it. . �'}e : e�'we i; t.��.� .�'_i E'vtian Cont'nl ❑ SchedWe grading and ecp�•ation nn`A Cor dq' wmthv only, ❑ Smbilin el1 denuded areas, inc�a�� end meiopin fcmporan• eroeion wnbols (auch av ero�ion wohol frbric or booded fibec mnui�) until vegemrion is esmblished ❑ Seed or plent �egerauon for e�oyion wntroi on slopes or ���hc�e conv Wction ie not immedin[ely plenncd SeAimmt Conhvl ❑ Protect arorm drein inkts, gullan, ditchq, end dminege courso nvh appmprinle BMPs, such ss gravcl bags, Gbcr mlls, be`ms. etc. ❑ PRvurtsedimen[5ommigrotmgoffsilt by installing wid moimeining sedimart � conhols. such as 56er mlls, sil( frnces. or sedimentbesins. ❑ Kap cscavand soil on Ihc sim whcre it �vill mt collect inm the strm� ❑ Tw�sCerrxcavalcd mahriels to dump tracks on tlm sitt not irt O�e etmt. O Cwtaminakd Soils ❑ lfmyofthefolloxingwnditiaisam oburved. icat for contamineuon and wnteci �he Rcgional Water Quatiry Contml Boe�d; � ■ Unusael saii conditions dixoloretioq ar odor. ■ Abendo�d m�dcrgmund �nnka. ■ Abmdoncd welis ■ Bwied 6nnels. deyri.q. or vaslt Paving/Asphalt Work nil � Y ' � A � a � a � ❑ Aanid ryrving ond seal wating in wei weatl�u, or when min is fmxcas[ befo'e Gcah pa�emdu will ha�x time m cure, ❑ Coversromi drain inlets end manholes whm epplying seel coeL mck coe4 slum� sW, fog sud, em. ❑ Collec[andrzrydeornppropriatel�• dispose oCexcess abrasire pa�zl or sand. Do NOT m�eep or wesh ic in�o gutters. ❑ Da nat nu wela ro nrosh do��•n fresh esphalt concretc po��rn�cnt San�wtting & AsphaltlConcrtie Rcmov2l 0 Cauple�ely emv or bortiwde srom� dmin intc� whrn sa,e cua;ng Uw fihcr febric, wtcli besin inl�i f Ilers, or greccl ��Bs w kcp shury out of fl�e stomi dmin spatcm. O Shwel, abosorb. or.•ncuwn ma�-cu� durty m�d dispoae aFall was¢ a� soon u yau erc finisFied in airc locatlon or m the eM of'ach �vod: de�� (n�hicfiecer is soonal). ❑[Cmnwt slucp• enrers a ulch buin. clean it �ry'vnmediatclp. Concrete, Grout & i�7ortar Application ❑ Smre concrcee. pvui and mariar under co�er, ou pellels end o�ray from dreinagc arC35. jLeQ m]ferials n�LLsl neYcr rcacL a s1orn� drain. ❑ Wss6 out concrete equipmcn✓wcl:s affsi�e or in a conlniocd arw, so Ihtrc na discharge imo We undedving mil ar ovto sw.nunding amas. Lc� concrece hudcn and dispose ofas gar6age. ❑ Collecflhe.voshnatcrf�om��asi�ing e<posed aggrega�e conc�ece end remore ii for app(oprinte dispasal aR iie. Dewatering A�. p.. r.. ( V _ ( . 4 � n ❑ E�Tcclivcly mnnagc all nu�-oti all rumRn•ithin tlie sim. and all runoll'�hei dLSLbJ�`CS �10111 �IC Si1C. �I�'GI IWOII iremr from oR:ilc aw�ay from nll disiwbed oreas w ollrcn.iu ensure wmpiiance, � When dnva�cnng, noiif � and obmin appro�al From lhe lawl munieipnliq� bcfom disd�arping �camr �o a slrcc� put�cr or sionn drain. Rluarion ordi.�ersion IlwugL a 6asin, tanl;, or sedimw trap may be mqnired. � �n areaz af I�nour conlamina�on, iesting is requircd pnor Io rcnw ardiscia�c of g'vund�rolcc Consuli u•iih Wc Engincu m deiumine �vtietlier msiing is rcquued and hoo• Io intcrpre� myy�ts. Comamimted S�wdwala must 6c trra�ed or hanled o9'-sitc forp�op�idisposol. Storm drain polluters may be liable for fines of up to $10,000 per day! PainNng & paintRemoval �!�=:�.i`: "':4� ::f.t' � �: - � � `,� � r������ ����� ❑ Nerer Geen bmshcs or rinse p�im commncrs imo o s�cet, guucr, s1om� drain. or sudacc w�lcrs. D For wslv-6ascd pnmts. painl ou1 bn¢hez lo Jre c�icnl possiblc. Rinsc �o ihc mnilnq• u��nronce you hu�n gaincd p�nnission from Wc local nns�e.voiv trcmmcnt autlioriiy. Nc�er pour paim dom�n a druin. ❑ Foroii-besed poinu. puinl oul bn.shct lo the e.�ient possi6lc and cleun w�i�i �hinncr or wlrrn� in a pmper containcc Fihef m�d ae Ihinncrs vnd sol��rn�s. Dispose of 2s�a��.��a ����:�ei� ro����,iwi,�,,,: o: lu �ous wazic. Painf remuval ❑ Chemical paim stripping residuc and chips and dusi Gom mn`"v�c painls or paims camoining Icod or irihulyltin musi bc disposcd ofas harardaus wnsie. ❑ Pni �i chips and dust f m nonfio'rartlous dn�ztrippinp and sand blasling mnv ye seep� up or eollcucd in plu�ie d�op clo�hs and disposed ofaz vvsL, Landscape Nlaterials � �" . - %��E�.,` ❑ Cannin stockpiled Undscaping mamrials br noring O�em undcr mrps.nc�n ihq� are na aaively bcing �¢�y. ❑ $uck crodible londsenpe malcrinl on palic�s. Corcr ar Slorc Uicu malcriais �vhcn Ihc� nrc noi ecrirelr bcing usrd or npplicd. ❑ Discominuc applicntion ofam� erodi6lc lundscape ma�crinl �cill�in 2 dars befo�c a fo¢cxsl roin e�xm or during.vcl n•cnWer. � SAH HA1 EOCaUNTYRIp[ 1Nat��Po��ution PrevQ�on Program qc�nWater• Ni��hyCanqunny. Requirements for Architectural Copper Protect water quality during installation, cleaning, treating, and washing! Copper from Buildings May Harm Aquatic Life Copper can harm aquatic life in San Francisco Bay. Water that comes info contact with architectural copper may contribute to impacts, especially during installation, cleaning, treating, or washing. Patination solutions that are used to obtain the desired shade of green or brown typically contain acids. After treatment, when the copper is rinsed to remove these acids, the rinse water is a source of pollutants. M unicipalities prohibit discharges to the storm drain of water used in the in sfallation, cleaning, treating and washing of architectural copper. U se Best Management Practices (BMPs) The following Best Managemeni Practices (BMPs) discharges to storm drains. must be implemented to prevent prohibited During lnstallation • If possible, purchase copper materials that have been pre-patinated at the factory. • If patination is done on-site, implement one or more of the following BMPs: o Discharge the rinse water to landscaping. Ensure that the rinse water does not flow to the streef or storm drain. Block off storm drain inlet if needed. o Collect rinse water in a tank and pump to the sanitary sewer. Contact your local� sanitary sewer agency before discharging fo the sanitary sewer.. o Collect the rinse water in a tank and haul off-sife for proper disposal. • Consider coating the copper materials with an impervious coaiing that prevents further. corrosion and runoff. This will also maintain the desired color for a longer time, requiring less maintenance. Storm drain inlet is blocked to prevenf prohibited discharge. The wafer must be pumped and disposed of proper/y. During Maintenance Implement the following BMPs during routine maintenance activities, such as power washing the roof, re-patination or re-application of impervious coating: • Block storm drain iniets as needed to prevent runoff from entering storm drains. • Discharge the wash water to landscaping or to the sanitary sewer (with permission from the local sanitary sewer agency). If ihis is not an option, haul the wash water off-site for proper disposal. Protect the Bay/Ocean and yourself! If you are responsible for a discharge to the storm drain of non- stormwater generated by instaliing, cleaning, treating or washing copper archifectural features, you are in violation of the municipal stormwater ordinance and may be subject to a fine. Contact Information The San Mateo Countywide Water Pollution Prevention Program lists municipal sformwater contacts at www.flowstobay.orq (click on "Business", then "New Development", then "local permitting agency"). F/NAL February 29, 2012 Building with coppe.r flashing, guiter and drainpipe,