Loading...
HomeMy WebLinkAbout832 Edgehill Drive - Approval Letter, } w . CITY OF BURLINGAME City Hall — 501 Primrose Road Buriingame, California 94010-3997 October 28, 2013 Donald Yu Yuflux Engineering LLC 5418 A Geary Boulevard San Francisco, CA 94121 Re: 832 Edgehill Drive Dear Mr. Yu, � CITY �� ' 1 ; ,� ` �:-. ��{ V COMMUNITY DEVELOPMENT DEPARTMENT Planning Division PH: (650) 558-7250 FAX: (650) 696-3790 Since there was no appeal to or suspension by the City Council, the October 15, 2013, Planning Commission approval of your application for Design Review, Side and Rear Setback Variances and Special Permit became effective October 25, 2013. This application was for a first floor addition (considered two-story at the rear of the house) and a new attached garage at 832 Edgehill Drive, zoned C-R. The October 15, 2013, minutes of the Plannirg �ommission state your application was approved with the follovving conditions: that the project shall be built as shown on the plans submitted to the Planning Division date stamped October 2, 2013, sheets A1 through A6, BMP and GB1; 2. that any changes tc roof height or pitch, Division or Planning staffl; � building materials, exterior finishes, windows, architectural features, and amount or type of hardscape materials shall be subject to Planning Commission review (FYI or amendment to be determined by Planning 3. that any changes to the size or envelope of the first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; 4. that the conditions of the Chief Building Official's August 23 and July 12, 2013 memos, the City Engineer's August 15, 2013 memo, the Fire Marshal's July 24, 2013 memo, the City Arborist's September 4, August 26 and July 18, 2013 memos, and the Stormwater Coordinator's July 17, 2013 memo shall be met; 5. that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; :C Register online to receive City of Burlingame e-mail updates at www.burlingame.org �m . , October 28, 2013 832 Edgehill Drive Page 2 6. that demolition or removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 7. that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; 8. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 9. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 10. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2010 Edition, as amended by the City of Burlingame; THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 11. prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; and 12. that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. All site improvements and construction work will require separate application to the Building Department. This approval is valid for one year during which time a building permit must be issued. An extension of up to one year may be considered by the Planning Commission if application is made before the end of the first year. .� �� Register online to receive City of Burtingame e-mail updates at www.burlingame.org �6 October 28, 2013 ' � 832 Edgehill Drive Page 3 The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section 1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within 90 days of the date of the decision unless a shorter time is required pursuant to state or federal law. Sincerely, ��'�� �2�� � William Meeker Community Development Director c. Marc Maniscalco, property owner 2818 Las Piedras Drive Burlingame, CA 94010 Chief Deputy Valuation, Assessor's Office (WLY 10 FT X 90 FT OF LOT H& ELY 35 FT X 90 FT OF LOT 1 BLOCK 1 BURLINGAME TERRACE NO 2 RSM 7/38; APN: 029-022-110) File �: Register online to receive City of Burlingame e-mail updates at www.burlingame.org �� �.�.,�._ -.„.�w.._..�_.��........�...�_... �....... �..�..,._.,.�. � Project Comments Date: To: From: August 22, 2013 0 Engineering Division (650) 558-7230 X Building Division (650) 558-7260 � Parks Division (650) 558-7334 � Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Planning Staff Subject: Request for Design Review, Special Permit for attached garage, Side and Rear Setback Variances for a second story addition to an existing single family dwelling and new detached garage at 832 Edgehill Drive, zoned C-R, APN: 029-022-110 Staff Review: No further comments. All conditions of approval as stated in the review dated 7-12-2013 will apply to this project. J...�.. . -._\ f ; Reviewed � ; � Date: 8-23-2013 � Date: To: From: ,x�.,...__ .... . . ... .. ..e...�.�.,.. ;,.:,.x ,�.,�.m,.,., ,...,., : � n..._x...�- � Pro�ect Comments � � Engineering Division � Fire Division (650) 558-7230 (650) 558-7600 X Building Division (650) 558-7260 � Parks Division (650) 558-7334 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Planning Staff Subject: Request for Design Review, Special Permit for attached garage, Side Setback Variance for a second story addition and new attached garage to an existing single-family dwelling at 832 Edgehill Drive, zoned C-R, APN: 029-022-110 Staff Review: 1) On the plans specify that this project will comply with the 2010 California Building Code, 2010 California Residential Code (where applicable), 2010 California Mechanical Code, 2010 California Electrical Code, and 2010 California Plumbing Code, including all amendments as adopted in Ordinance 1856-2010. Note: If the Planning Commission has not approved the project prior to 5:00 p.m. on December 31, 2013 then this project must comply with the 2013 California Building Codes. 2) On the plans provide a copy of the GreenPoints checklist for this project at full scale. 3) Specify on the plans that this project will comply with the 2008 California Energy Efficiency Standards. Go to http�//www enerqv ca qov/title24/2008standards/ for publications and details. ��Place the following information on the first page of the plans: "Construction Hours" Weekdays: 7:00 a.m. — 7:00 p.m. Saturdays: 9:00 a.m. — 6:00 p.m. Sundays and Holidays: 10:00 a.m. — 6:00 p.m. (See City of Burlingame Municipal Code, Section 13.04.100 for details.) ��On the first page of the plans specify the following: "Any hidden conditions that require work to be performed beyond the scope of the building permit issued for these plans may require further City approvals including review by the Planning Commission." The building owner, project designer, and/or contractor must submit a Revision to the City for any work not graphically illustrated on the Job Copy of the plans prior to performing the work. 6) Anyone who is doing business in the City must have a current City of Burlingame business license. 7) Provide fully dimensioned plans. 8) Provide a fully dimensioned site plan which shows the true property boundaries, the location of all structures on the property, existing driveways, and on-site parking. 9) Provide existing and proposed elevations. 10)Provide a complete demolition plan that indicates the existing walls, walls to be demolished, new walls, and a legend. NOTE: A condition of this project approval is that the Demolition Permit will not be issued and, and no work can begin (including the removal of a� building components), until a Building Permit has been issued for the project. The property owner is responsible for assuring that no work is authorized or performed. 11)Show the distances from all exterior walls to property lines or to assumed property lines 12)Show the dimensions to adjacent structures. 13)Obtain a survey of the property lines for any structure within one foot of the �roperty line. (PWE letter dated 8-17-88) 4 dicate on the plans that exterior bearing walls less than five feet from the property line will be built of one-hour fire-rated construction. (2010 CBC, Table 602) �Rooms that can be used for sleeping purposes must have at least one window or door that complies with the egress requirements. Specify the /ocation and fhe nef clear opening height and width of all required egress windows on the elevation drawin s. 16 dicate on the plans that a Grading Permit, if required, will be obtained from the Department of Public Works. 17)Provide guardrails at all landings. NOTE: All landings more than 30" in height at any point are considered in calculating the allowable lot coverage. Consult the Planning Department for details if your project entails landings more than 30" in height. 18)Provide handrails at all stairs where there are four or more risers. 19)Provide lighting at all exterior landings. NOTE: A written response to the items noted here and plans that specifically address items 4, 5, 14, 15, and 16 must be re-submitted before this project can move forward for Planning om� ission action. Date: 7-12-2013 �o� Cy�;/CBO 650-�8-7270 Project Comments Date: To: X Engineering Division (650) 558-7230 � Building Division (650) 558-7260 0 Parks Division (650) 558-7334 � Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 From: Planning Staff Subject: Request for Design Review, Special Permit for attached garage, Side Setback Variance for a second story addition and new attached garage to an existing single-family dwelling at 832 Edgehill Drive, zoned C-R, APN: 029-022-110 Staff Review: 1. The proposed garage appears to be constructed within one foot of property line which requires a property boundary survey by a licensed land surveyor/engineer. 2. Storm drainage shall be designed to drain towards the street frontage or to the City storm drain system. 3. Replace all displaced/damaged sidewalk, driveway, curb and gutter. 4. Sewer backwater protection certification is required. Contact Public Works — Engineering Division at (650) 558-7230 for additional information. Reviewed by: V V Date: 8/15/2013 Project Comments Date: To: � Engineering Division (650) 558-7230 0 Building Division (650) 558-7260 0 Parks Division (650) 558-7334 From: Planning Staff �Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Subject: Request for Design Review, Special Permit for attached garage, Side Setback Variance for a second story addition and new attached garage to an existing single-family dwelling at 832 Edgehill Drive, zoned C-R, APN: 029-022-110 StafF Review: No comments at this time. Reviewed by: �� Date: �'z � ll3 _ �. . � Project Comments Date: August 30, 2013 To: � Engineering Division (650) 558-7230 � Building Qivision {E5�) 558-726Q X Parks Qivision (650) 558-7334 From: Planning Staff � Fire Division (650) 558-7600 � Stormwater Division (&50) 342-3727 � City Attorney (650) 558-7204 Subject: Request for Design Review, Special Permit for attached garage, Side and Rear Setback Variances for a second story addition to an existing single family dwelling and new detached garage at 832 �Edgehill Drive, zaned C-R, APN: 029-022-110 Staff Review: 1. No further Comments. Reviewed by: BD Date: 9/4/13 � 'a Project Gomments Date: August 22, 2013 To: � Engineering Division (650) 558-7230 � Building Division (650J 558-7260 � Parks Division (650) 558-7334 From: Planning Staff � Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 0 City Attorney (650) 558-7204 Subject: Request for Design Review, Special Permit for attached garage, Side .a n�__ �+_i�_ �. 4 i,�� ....,,.�.�,� r,..� ,... � i�-... ,.�..�•L• i� C111U 1'[CdI JCLUdI:lC VC111d111:C� IUI d jCI:UIIU JWI� CIUUlUl11� LU clll existing single family dwelling and new detached garage at 832 Edgehill Drive, zoned C-R, APN: 029-022-110 Staff Review: � -� 1 i- c� �5C_'kt� 1'+� k �Gu...�..� t�'r .�L ;��,,_ %c��-rc� S - �- :, ; ` G� � � � � o? ��,�z�� �~d.�,s, �zs��l �r.��✓.�.�. f::,r.� �t c� Ctc�c�SC�� ��?,e��-- GL�:P u,c.�t�,f lCt� L�c.�-� �-��.�.t.�.e.-��.�' . , ���'��� 3: � ' ,� ,.�ica_� ��r'� ��s��e C'�-�s��°� ��u�.�e,� ,1��. .� � I � o.�.�.�_...a �... ��� �a�c: � �z� �i3 ��„ ��,��� .,y . r' � , � Project Comments Date: To: From: � Engineering Division (650) 55�7230 � Buiiding Division (654) 558-7260 X Parks Division (650) 558-7334 Planning StafF � Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 � City Attorney (650) 558-720�4 Subject: Request for Design Review, Special Permit for attached garage, Side Setback Variance for a second story addition and new aftached garage to an existing single-family dwelling at 832 Edgehifl Drive, zaned C-R, APN: 029-022-110 , Staff Review: • 1. If Public Works requires sidewalk replacement, Policy for Expanding �dth of Ptanter Strip needs to be implemented � ��.=" s per requirements, landscape plan must include 1 landscape tree (non-fruit , aring) per 1000 SF of livings space. Reviewed �y: B Qisco Date: 7t18l�! 3 � Date: To: From: Project Corr�ments � Engineering Division � Fire Division (650) 558-7230 (650) 558-7600 � Building Division (650) 558-7260 � Parks Division (650) 558-7334 Planning Staff i� Stormwater Division (650) 342-3727 � City Attorney (650) 558-7204 Subject: Request for Design Review, Special Permit for attached garage, Side Setback Variance for a second story addition and new attached garage to an existing single-family dwelling at 832 Edgehill Drive, zoned C-R, APN: 029-022-110 Staff Review: 1) Any construction project in the City, regardless of size, shall comply with the City's NPDES (stormwater) permit to prevent stormwater pollution from construction activities. Project proponent shall ensure all contractors implement appropriate and effective BMPs during all phases of construction, including demolition. When submitting plans for a building permit include a list of construction BMPs as project notes on a separate full size plan sheet, preferably 2' x 3' or larger. Project proponent may use the attached Construction BMPs plan sheet to comply with this requirement. Electronic file is available for download at: http://www.flowstobay.org/documents/business/construction/Countywide_Program_B MP_Plan_Sheet Jun2012.pdf 2) Best Management Practices (BMPs) requirements apply on any projects using architectural copper. To learn what these requirements are, see attached flyer "Requirements for Architectural Copper." Electronic file is available for download at: http://www.flowstobay.org/documents/municipalities/nd/Materials/2012%20Materials/ . Architectural_copper_BMPs_FINAL.pdf = �� � -A ;- ;r:- � - For assistance please contact Stephen D. at 650-342-3727 ;, �- 2�i i� . '_ Reviewed by: SD �� �� Date: 7/15/13 '� SpN Mk7E0�10E Water Pollution Prevention Program Clean Water. Healthy Community. Construction Best Management Practices B ( MPs) Construction projects are required to implement the stormwater best management practices (BMP) on this page, as they apply to your project, all year long. N[ateriais & VVaste l�Ianagement ��.,'�► • �� ���� �' �' �f � ',�"I, t;,;n,�, ~ �l Jr} fP � ? Y•i ,� , i. �� v .,•� �� .,if••"{�iea,.�yS;�, � +�1 '.� Non-Ranrdous Mxlcrinl� ❑ Bcrm and cover stockpile¢ of mnd, die or olhcr conshucuon maarinl n'hh �e�ps when min is forecnx� or ifnoi oclively 6eing usod wilhin 14 dm e. ❑ Uw (but don'1 ocemse) mcloimed woter for dusl conUol. Hamrdous hlnteri:Je ❑ Label oll h,rurdous malerinl� and hn>prdous mosics (sicl� as pe9ueides, peinu, lliinne'a solvents, fucl, oil, und onliGceze) in oaordnnce ailh city. counry, smte and Cedavl �egulntione. ❑ Srom M1urardaus mntcriuls and waslcs in ��arcr Gght conlaincn, smm m appmpriele secondory containment, and cover Wom n[ Ihe end of m�em w�o`k day m during wcl weather or whcn rein is forecos�. O Follmc manufeclnrcr's applicntion i�uimcGons !or ha>a�dum mmuinls ond be coreCul not ta uw mofe U�en `rcce ya.y. pu �q apply chemiwls auWoon �vhen rain is fofecan wi�hin 24 houn. ❑ Mrnnge torappmpriete dispowl ofnll hornrdow nneles. Waslt Mamgcmcnf � Covcrn�¢ste dispoml conlaincn sccumlr ��•ith lerys al Ihc cnd of et•eq• �vorA dey and during ivet e•mUier. ❑ Check wnste disposol conminers f qnen�lY for Imks md w meke ame �hoy a¢ not m•erUlled. Ne�•er hase dmm n d�unps¢r on d¢ wnavucuon eim. ❑ Clean or replace ponnble toileis. nud i�apecl tl�em frequentlp for Iceks and apills. ❑ Dispou ofall �vasles end debris p�operW. Recycle materinls and »�utes [hat cen bc rmroled (snch os asphalt. concrole. aggregato basc molarinl; n•oad_ BYP b��. P�P�. ero.) ❑ Dispose ofliquid residoes fiom peims, �hinners. solvcnts, glue�, nnd c�eaoing Ouids a� hernrdous nnsle. Constnie[ion Env�nce� nnU Perlmcicr ❑ FslablisM1 and maimnin cRcclivc perimacrconlmb eiM sta6il'rcc all construcoon entrnnces ond exi[s to su[Gcicntly conoml emsion nnd xdimentdischarges Gom siee �uid �racking off aih. ❑ S�vecp or wy shu� �racking immediutch• mid xcure sed'unent sowce ro prevent Cu�Ler uncking. Necer hose doun sVeab Io cicun up trecking. Eguipment i�Ianugement & SQI�� COR�I'O� .. MaintcnaoccandPnrking � ❑ Doignele nn uea, 5t1ed �vith eppropriele BMPti for vduale md equipmrnt perkuig md �tonga ❑ Perform mejor mointuiencG RpairjoM, end vehicle ond cq�dpmrnt lvashing ofFeifa. ❑ V refoeGng ot vehicla maintenance must be dmro oiuilc, xmk (n a Mcmed erm anay hom sro�m Min� end ovcr e drip pen hig cnough Io colltt[ Iluidf. Recycle or dispose of Quids ea hewdoua �va�le. ❑ IFvehiclemeQuipmentcleaningmwtbedoneumire, dmn wi`L �ramr only in n humed eren thet nill mt allo�v rinu wotcr Io nm inlo guttcrs. at2cts, slotm � ami�u,ure�vua,eelus. ❑ Do nol clean vchicle or eqaipmen[ onsite asmg mep; solranls, de�eaaers, steom deonmg equipmenL etc. Sp11I Prercndon and Connol ❑ Keep �pill cleanup maleriele (rags, ebaotbentt, cic,) a�ailnblo el ILc rnmin¢uon �ilc at all Hmcs. ❑ Inspoctvehicle.�andequfpmcnthequcrtJyforend �ep�ir Irnla promptly. Use drippnne m cntch leeke Y�II� RP01f! eR ITOJC. ❑ Cleon up apilb or Iesl:s immedintely nnd dispose o( cleonop maluia� pmperly. ❑ Do not hosc do.vn nulfecn �rhne Buid� ha�x spillcd Usc dm eleanup metliodt (ebeor4rnl ma�arinta, wl littrr, ond/or mgs), ❑ S�recp up spillcd drr melcriale immedintely. Do not w �o rvo�l� them im�s• rviW �vaier. or bury them. ❑ Cleon up apiL� ou dirt e�eoe br digging up ond pmpnly dieposing a[wmemina�ed soil. ❑ Report algN6canr epllls inunediotely. Yrni me rtq��'ved q' lew �o �eport a0 eignificent aleaxs of 6nrnrdom matcriol� inch�ding oil. To rcpan � epill: I) piel 9I1 oryour lacel emergrncp �eeponse mm�ber, 2) GII Ihe Co�<mor'e 06ce ofEmmgencs Servlae Woming Ccnler. (80� BS2-75i0 (2d hours). Earfhwork & COIItAflilildtC(� Soils : zl°-'- - �'-.,.�"""�„ ',,,��r_� � �� 'th� �- u���..' Em�lon Caoltol ❑ SchcdNe gnding and escaraeon ��vd; Cor dry• rveutha only. ❑ S�nbiliu ell denuded o as, ins�all end meintnin Mnponry emsiam m�trob (meh A+em�ion wohol fabric or bonded fiber maai<) unul vegeNrion ie esm6lished ❑ Seed ar plent sxgeMuoa f efoeion wntrvl on slopn or ni�em comWcHon is no[ immedinlely plenned SMfmmf Contml ❑ Pm�ec1 erorm dmin inleb, quuen, dim6a, end dminege crn�nn �vi�h eppmplinle BMPe, such es gnvol bagi, llber ml�, bertne, e1c, O P�event sedimeut6om migrnling odsile byinslnllingondmoinleiningeediment � �onhota, such es 66cr mlle, silt fencca. ar �a��� e,.��.. ❑ Kcep c�avand mil on �he sim n�he�e i[ �ri0 nol collect into Ihe streel, ❑ T�ansfer excn�elcd maleriqla lo dump Luckt on We zit4 not in t6e etrat. ❑ c��iasous O Ife� of the follo��ing wndirim�s e�c ubtensd, �eR For conremineCon ond eomaci �he Regionel Weter Quelitv Conwl Boud: � ■ Unumnl eoil ronditioro, diacolomtioq or odor. ■ Abendoned undcrgmund tanke. ■ Abmdoned wella ■ Bwied bnrteb, debris, or troslt Paving/Asphait Work .�� � � ti - `f, -' ��A��a�a ❑ A�roid prving ond eenl woting In w-el iemWer, orwhrn rain is finecan befo�e Gesfi pe�xmc�n will hnee iimc la cure. O Coeererorni drein inletsand menholca whco epplying seel coe1. mck coe4 slum� su�, fog senl, ea. O Cupectandrzrycleoroppmprialcly dicpox ofexuse a6nsi�e �e�el or iaM. Do NOT srceep or wesh it imo gutters. ❑ Da �mr nse rvelc ro�wsh down fresh asphelt conere�e pnremene Snmcutting & Asph�ItlConcrete Removil ❑ Campletelv em.v or bomude nonn dmin inleb whrn snv wning USc fillcr fabric, cmch bssin inlcl fihefs, or gra��cl bogs w leep shrtn out of tlm stom� dlein �•e�an. O Shovel, ahoeorb. or rocumn um�cu[ durry end dispose of all wuoc u soon u yoa erc finished in onc Iouuon or e� �e e� oCmch �vork do�� (whichttxr if roanal). ❑ ltsanxut slurty enmrs � nlch bnsiti clenn itup immediatcly. Concrete, Grout & b•Iortar Application ❑ Smre wncrc�c, gou� and monar under cocer, on pellels end mcap fmm d`ainngo uras. "Ihese marcrials niusl ncrer rench u nom� d`ain. ❑ Wssh our umcrem equipmcn✓wcls affsi�e or in p Conlniued nrc�, so Il�cm is no discharge inw �m unded��ing soil or ouro surtnunding am.as. Le� cn�cm.�c I�arden and disposc ofns garbage. O Collcct ihe w�osh �catcr fmm .vnshing C<P06CdlpgrosqlGCOn[RIC N�d Ie1n0�'C II foroppmpriote dispasnl alfsi�e. Dewatering f 4 - � � lc� ❑ EITcclivch� monegc ell run-on, all NIIOR\PII�IIII �IC SIIC. ]tld iII �u110R111p1 dischargcs fmm Wc siic. Oircn run.on rralcr from oRsilc oway (rom all disiurbed arem or aWen.�u ensure wmplioncc. ❑ Nhen de�ve�ering, nati7y and obuin eppfo�al Cmm Ihe local municipnli�' 6efom disdurging watcr io a s�cci gmmr orrtv'm d(nin. Flunrion or di��crsion �Iwugh a bosin. �aN;. or sedimenl tnp n� be mquircd. ❑ In eieas of Ynown conbminetion, � cting is requircd priar m rcnsc ordischa�g<of gmwid�volec Cansull wiih Om Engincc lo dclumine �rheWrrtcsting is required nnd uo,.• io �«mrc� �iu, co�ia�u�u«a smundweicr mus� be tree�ed or h�uled o6-ritc for pmper disposnl. Storm drain polluters may be liable for fines of up to $10,000 Painting & paint Removal .�_. .'•Y�,. .�hi:'t�'.. � � t� .. � �, �, �y` - ralnNou ��e���p ❑ Nevcrelcon bmslws or rinse p�rm wmoincrs inw a s�cc�, guuer, slom� dmin, orsudecc wolcrs. O Far irelcr-bazcd pcinls, pxinl oul bmshcs lo Jm crlrn� possiblc. Rinsc �o ihc som�np' sca'cr once pou hocc goined pcnuission fram We Iocal was�co�o�v �rcoimcnl auJ�orin�. Nc�xr po�v paim do���n n droin. ❑ For oil-beud pnints, pnini ont bn�shes m �he ercnl possi6le ond elenn sri�� ihinncr or mlcrn� in e proper containcr. Fihu m�d .se ihinnm ond solcems. Dispose of msidue and umrsabte ihinneqmh�ems os lu �ous �vasic. Puin! remural ❑ Chemiral paint svipping rtsiduc ond cLips nnd dus� from mur'vic painls nr paints wnmiaing Icod or vibuhitin musi bc disposcd afes ha•rardous x�ns�c. ❑ Pain1 cLip� end dn�1 fmm non-hem`dm�s drr soripping ond sind blosling mey 6e wcpi up ar callcc�ed in plaslic drop clo�l�s ond disposed ofu wsli, Landscape htaterials � y: �' l - !�'�E�_�. i:�:�'.,'' ❑ Connin stockpiled Irnds�ping ma�eriols br sloring Jicm undcr mqrs n•hcn ihcr uc na ectivclr 6cing �ued. ❑ Suck undihlc lundscnpc mnlcrial on polltts. [o�cror nore Oicsc moicriols �chen Iher orc no� acrirelc bcing used or opplicd. O Discontinue opplieulion af�i�• crodi6lc lundseape molcrial x�itl�in 2 dars before a fomfxs� rnin crrnt ar during wet �eenWer. � sAx wA� [ocaunrrwio� WatefPo���tion Preverr�on Program 4elnWacer• N���'y Co+nnunny. Requirements for Architectural Copper Protect water quality during installation, cleaning, treating, and washing! Copper from Buildings May Harm Aquatic Life Copper can harm aquatic life in San Francisco Bay. Water that comes info contact with architectural copper may contribute to impacts, especially during installation, cleaning, treating, or washing. Patination solutions that are used to obtain the desired shade of green or brown typically contain acids. After treatment, when the copper is rinsed to remove these acids, the rinse water is a source of pollufants. M unicipalities prohibit discharges to the storm drain of water used in the in sta[fation, cleaning, treating and washing of architectural copper. U se Best Management Practices (BMPs) The foliowing Best Management Practices (BMPs) discharges to storm drains. Building with coppe.r gutter and drainpipe. must be implemented io prevent prohibited During Installation • If possible, purchase copper materials that have been pre-patinated at the factory. • If patination is done on-site, impfement one or more of the following BMPs: o Discharge the rinse water to landscaping. Ensure that the rinse water does not flow to the street or storm drain. Block off storm drain iniet if needed. o Collect rinse wafer in a tank and pump to the sanitary sewer. Contact your local� sanitary sewer agency before discharging to the sanifary sewer.. o Colfect the rinse water in a tank and haul off-site for proper disposal. • Consider coafing the copper materia(s with an impervious coating that prevents further. corrosion and runoff. This will also maintain the desired color for a longer time, requiring less maintenance. During Maintenance ' Impfement the following BMPs during routine maintenance activiiies, such as power washing the roof, re-patination or re-app[ication of impervious coating: . Bfock sform drain inlets as needed to prevent runoff from entering storm drains., • Discharge ihe wash water to landscaping or to the sanitary sewer (with permission from the local sanifary sewer agency). If this is not an option, haul the wash water off-site for proper disposal. Protect the Bay/Ocean and yourseff! If you are responsible for a discharge to the storm drain of non- stormwater generated by installing, cleaning, treating or washing copper architectural features, you are in violation of the municipal stormwater ordinance and may be subject to a fine. Confact Information The San Mateo Countywide Wat�r Polfution Prevention Program lists municipal stormwater contacts at www.flowstobay.orq (ciick on "Business", then "New Development", then "local permif�ing agency"). " v � FINAL February 29, 2012 prohibited discharge. The water must be pumped and disposed of proper/y.