HomeMy WebLinkAbout824 Edgehill Drive - Approval LetterCITY OF BURLINGAME
City Hall — 501 Primrose Road
Burlingame, California 94010-3997
June 6, 2018
JoAnn Gann
244 Fulton Street
Redwood City, CA 94062
Re: 825 Edgehill Drive
Dear Ms. Gann,
��'�
BURIvIN�'aAME
t ~ �, ,
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division
PH: (650) 558-7250
FAX: (650) 696-3790
Since there was no appeal to or suspension by the City Council, the May 14, 2018, Planning
Commission approval of your application for Design Review became effective May 24, 2018. This
application was for a first and second-story addition to convert a single-family dwelling to a duplex at 825
Edgehill Drive, zoned R-2.
The May 14, 2018, minutes of the Planning Commission state your application was approved with the
following conditions:
that the project shall be built as shown on the plans submitted to the Planning Division date
stamped April 27, 2018, sheets 1 through 9;
2. that prior to building permit issuance, the applicant shall submit an FYI for Planning
Commission review of revisions to the plans clarifying how the post at the front entry to the
rear unit appears on the front elevation and how it interfaces with the roof above;
3. that any changes to building materials, exterior finishes, windows, architectural features,
roof height or pitch, and amount or type of hardscape materials shall be subject to Planning
Division or Planning Commission review (FYI or amendment to be determined by Planning
staf fl;
4. that any changes to the size or envelope of the first or second floors, or garage, which
would include adding or enlarging a dormer(s), shall require an amendment to this permit;
5. that the conditions of the Building Division's February 14, 2018 and December 12, 2018
memos, the Parks Division's December 19, 2017 memo, the Engineering Division's
February 9, 2018 and December 18, 2017 memos and the Stormwater Division's July 13,
2017 memo shall be met;
6. that any recycling containers, debris boxes or dumpsters for the construction project shall
be placed upon the private property, if feasible, as determined by the Community
Development Director;
°`'-! Register online to receive City of Burlingame e-mail updates at www.burlingame.org ��
June 6, 2018
825 Edgehill Drive
Page 2
7. that demolition or removal of the existing structures and any grading or earth moving on the
site shall not occur until a building permit has been issued and such site work shall be
required to comply with all the regulations of the Bay Area Air Quality Management District;
8. that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of
approval adopted by the Planning Commission, or City Council on appeal; which shall
remain a part of all sets of approved plans throughout the construction process.
Compliance with all conditions of approval is required; the conditions of approval shall not
be modified or changed without the approval of the Planning Commission, or City Council
on appeal;
9. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that
these venting details shall be included and approved in the construction plans before a
Building permit is issued;
10. that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects to
submit a Waste Reduction plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
11. that the project shall meet all the requirements of the California Building and Uniform Fire
Codes, 2013 Edition, as amended by the City of Burlingame;
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
12. that prior to scheduling the framing inspection the applicant shall provide a certification by
the project architect or residential designer, or another architect or residential design
professional, that demonstrates that the project falls at or below the maximum approved
floor area ratio for the property;
13. prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural
certification that the architectural details shown in the approved design which should be
evident at framing, such as window locations and bays, are built as shown on the approved
plans; architectural certification documenting framing compliance with approved design
shall be submitted to the Building Division before the final framing inspection shall be
scheduled;
14. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height
of the roof ridge and provide certification of that height to the Building Division; and
15. that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been
built according to the approved Planning and Building plans.
All site improvements and construction work will require separate application to the Building Department.
This approval is valid for one year during which time a building permit must be issued. An extension of
= Register online to receive City of Burlingame e-mail updates at www.burlingame.org �`��:''
June 6, 2018
825 Edgehill Drive
Page 3
up to one year may be considered by the Planning Commission if application is made before the end of
the first year.
The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section
1094.6. If you wish to challenge the decision in a court of competent jurisdiction, you must do so within
90 days of the date of the decision unless a shorter time is required pursuant to state or federal law.
Sincerely,
William Meeker
Community Development Director
c. Greg Scopazzi, property owner
Chief Deputy Valuation, Assessor's Office
(LOT D BLOCK 2 BURLINGAME TERRACE NO 2 RSM 7/38; APN: 029-021-110)
File
'�" Re ister online to receive Ci of Burlin ame e-mail u dates at www.burlin ame.or `"'
9� tY 9 p 9 9=:=-