CITY OF BURLINGAME
City Hall — 501 Primrose Road
Burlingame, California 94010-3997
September 6, 2019
Gary Diebel
Diebel and Company � Architects
PO Box 1044
Burlingame, CA 94011
Re: 2601 Easton Drive
Dear Gary,
r • '�
BURLItVGAME
�
,�
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division
PH: (650) 558-7250
FAX: (650) 696-3790
Document being re-sent
as confirmation of mailing.
Mailing date: 08.11.20
Since there was no appeal to or suspension by the City Council, the August 26, 2019, Planning
Commission approval of your application for Design Review and Special Permit for declining height
envelope and attached garage became effective September 5, 2019. This application was for a new, two-
story single family dwelling and a new attached garage at 2601 Easton Drive, zoned R-1.
The August 26, 2019, minutes of the Planning Commission state your application was approved with the
following conditions:
2
3
:�
that the project shall be built as shown on the plans submitted to the Planning Division date
stamped July 31, 2019, sheets A1.1 through A3.8, and sheets L1 through L3;
that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amount or type of hardscape materials shall be subject to Planning Division
or Planning Commission review (FYI or amendment to be determined by Planning staf�;
that any changes to the size or envelope of the first or second floors, or garage, which would
include adding or enlarging a dormer(s), shall require an amendment to this permit;
that any recycling containers, debris boxes or dumpsters for the construction project shall be
placed upon the private property, if feasible, as determined by the Community Development
Director;
that demolition or removal of the existing structures and any grading or earth moving on the site
shall not occur until a building permit has been issued and such site work shall be required to
comply with all the regulations of the Bay Area Air Quality Management District;
6. that prior to issuance of a building permit for construction of the project, the project construction
plans shall be modified to include a cover sheet listing all conditions of approval adopted by the
Planning Commission, or City Council on appeal; which shall remain a part of all sets of
approved plans throughout the construction process. Compliance with all conditions of approval
is required; the conditions of approval shall not be modified or changed without the approval of
the Planning Commission, or City Council on appeal;
7. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
�� Register online to receive City of Burlingame e-mail updates at www.burlingame.org ��
DocuSign Envelope ID: D2EB5DC9-2489-4C90-8628-5072E43A828E
September 6, 2019
2601 Easton Drive
Page 2
termination and installed on the portions of the roof not visible from the street; and that these
venting details shall be included and approved in the construction plans before a Building permit
is issued;
8. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance
which requires affected demolition, new construction and alteration projects to submit a Waste
Reduction plan and meet recycling requirements; any partial or full demolition of a structure,
interior or exterior, shall require a demolition permit;
9. that the project shall meet all the requirements of the California Building and Uniform Fire
Codes, in effect at the time of building permit submittal, as amended by the City of Burlingame;
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS
PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
10. that prior to scheduling the framing inspection the applicant shall provide a certification by the
project architect or residential designer, or another architect or residential design professional,
that demonstrates that the project falls at or below the maximum approved floor area ratio for
the property;
11. prior to scheduling the framing inspection the project architect or residential designer, or another
architect or residential design professional, shall provide an architectural certification that the
architectural details shown in the approved design which should be evident at framing, such as
window locations and bays, are built as shown on the approved plans; architectural certification
documenting framing compliance with approved design shall be submitted to the Building
Division before the final framing inspection shall be scheduled;
12. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of
the roof ridge and provide certification of that height to the Building Division; and
13. that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.
Sincerely,
DocuSipned by:
L'LV�I�+ l�(M ��r
28�6423C2E8B49F...
Kevin Gardiner
Community Development Director
c. Liz and Debanjan Ray, property owners
2601 Easton Drive, Burlingame
Chief Deputy Valuation, Assessor's Office
(LOT 25 BLOCK 57 EASTON ADD BURLINGAME NO 6 RSM 8/34; APN: 027-195-090)
File