Loading...
HomeMy WebLinkAbout2517 Easton Drive - Approval LetterC!?'Y �F �URLf��A�i� City Nall — 501 Primrose Road Burlingame, California 94010-3997 July 29, 2015 Peter Jaunich 2525 Easton Drive Burlingame, CA 94010 Re: 2525 Ea�ton �rive - Design Review Dear Mr. Jaunich, ,.3.�:1;T.Ys�f- ,Sa�` a s"" ���! �- =�. � ., � � � � b a� �64r`vrt--wi!c4�:�'� CONiMUNITY DEVELOPMENT DEPARTMENT Planning Division PH: (650) 558-7250 FAX: (650) 696-3790 Since there was no appeal to or suspension by the City Council, the June 8, 2015, Planning Commission approval of your application for Design Review became effective June 18, 2015. This application was for approval of an as-built trellis at the rear of an existing single family dwelling at 2525 Easton Drive, zoned R-1. The June 8, 2015, minutes of the Planning Commission state your application was appro��ed with the foflowing conditions: that the project shall be built as shown on the plans submitted to the Planning Division date stamped May 29, 2015, sheets S-1, S-2 and A1.01 and date stamped May 8, 2015, sheets A0.01, A0.02, A0.03 and A1.02; 2. that any changes to the exterior finishes or design of the treilis shall be subject to Planning Division or Planning Commission review (FYI or amendment to be determined by Planning staffl; 3 � that the conditions of the Parks Division memo dated March 18, 2015 and Stormwater Division memo dated March 10, 2015 shall be met; and that the project shall meet all the requirements of the California Building and Uniform Fire Codes, 2013 Edition, as amended by the City of Burlingame. All site improvements and construction work will require separate application to the Building Department. This approval is valid for one year during which time a building permit must be issued. An extension of up to one year may be considered by the Planning Commission if application is made before the end of the first year. The decision of the Council is a final administrative decision pursuant to Code of Civil Procedure Section 1094.6. If you wish to chailenge the decision in a court of competent jurisdiction, you must �� Register online to receive City of Burlingame e-mail updates at www.burlingame.org �� July 29, 2015 2525 Easton Drive Page 2 do so within 90 days of the date of the decision unless a shorter time is required pursuant to state or federal law. Sincerely, ���� �� William Meeker Community Development Director c. Daniel Nordson MH Architects 2325 3�d Street, Studio 224 San Francisco, CA 94107 Chief Deputy Valuation, Assessor's Office (LOT 24 BLOCK 57 EASTON ADD BURLINGAME NO 6 RSM 8/34; APN: 027-195-080) File e� Register online to receive City of Burlingame e-mail updates at www.burlingame.org �� n Pr����t ���l�i�r��s Date fi/larch 9p 2�11 � To: o Engine�ring Division (s�� ��-�2�0 Q Buildsng Qivision (650) �58-72� � Parks Ciivision (6�) 5�8-733�4 Frorrn: Planning Staff 0 Fire Division (650) 558-7600 0 Stormwafier Division (650J 342-3727 Q City Attorney (650) 558-7204 �ubj���: Request Eor Design Review for a single-story additiar� with a p{ate height that dc� not rnaich existir�g at 2525 Easton C�ri��, zon�ci F�-i, �P�: i)27-195-d8t3 ��af� �eview: Marc� �, ��15 i. No existing tree c�ver 48 iraches in circumference at 54 inches form base of tree may be remcreret9 �arithout a Protected Tree Permit from the Par4cs Division. (558-7330} Re�6e��d �a�: �D Daf�: 3/1 �/15 2. Protect trees d�aring C;anstruction � ��� �Project Cornr�aents Date: To: From: March 9, 2015 o Engineering Division (650) 558-7230 o Building Division (650) 558-7260 o Parks Division (650) 558-7334 o Fire Division (650) 558-7600 � Stormwater Division (650) 342-3727 o City Attorney (650) 558-7204 Planning Staff Subject: Request for Design Review for a single-story addition with a piate height that does not match existing at 2525 Easton Drive, zoned R-1, APIV: 027-195-080 Staf� Revievv: fl�arch 9, 2015 Any construction project in the City, regardless of size, shali comply with the city's stormwater NPDES permit to prevent construction activity stormwater pollution. Project proponents shall ensure that all contractors implement appropriate and effective Best Management Practices (BMPs) during all phases of construction, including demolition. When submitting plans for a building permit, please include a list of construction BMPs as project notes, preferably, on a separate full size (2'x 3' or larger), plan sheet. A downloadable electronic file is available at: http://www.flowstobay.orglConstruction Please contact Kiley Kinnon, NPDES Stormwater Coordinator, for assistance at (650) 342-3727. Reviewed by: FCJf�C Date: 03/10/15