HomeMy WebLinkAbout2509 Easton Dr - Resolution� „f
0
0
RECORDING REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL T0:
COMMUNITY DEVELOPM�NT DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAME, CA 94010
� r -
_ _-2012-046591
10:24 am 04106112 R9 Fee: NO FEE
Count of Pages 18
Recorded in Officiai Records
County of San Mateo
Mark Church
I��I�II� II �II II�I II II II�� �Ilil I�I II I� III! Irllef I
* R 0 0 0 1 3 8 3 2 1 II I��I
Resolution No. 07-2012
2509 EASTON AVENUE — APN 027-195-060
TITLE OF DOCUMENT
I hereby certify this to be a full, true and correct copy of the
document it purports to be, the original of which is on fil -�
office. ���,;.:
Date:
March 9, 2012
� � c� � ; � �
�c�7nrrrmiit�E7evelop `°r�E�Dir�Cto� 5, ;
RESOLUTION APPROVING CATEGORICAL EXEMPTION, DESIGN REVIEW
AND SPECIAL PERMITS
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a categorical exemption has been proposed and application has been made for
Desiqn Review and Special Permits for attached qaraqe and declininq heiqht envelope for a
new two and one-half storV sinqle family dweilinq and attached claraqe at 2509 Easton Drive,
zoned R 1 Emporio Group Inc 1630 Balboa Way Burlinqame CA 94010 propertv owner,
APN: 027-195-060;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on
February 27, 2012, at which time it reviewed and considered the staff report and all other written
materials and testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
On the basis of the Initial Study and the documents submitted and reviewed, and
comments received and addressed by this commission, it is hereby found that there is
no substantial evidence that the project set forth above will have a significant effect on
the environment, and categorical exemption, per CEQA Article 19, Section 15303 (a),
which states that construction of a limited number of new, small facilities or structures
including one single family residence or a second dwelling unit in a residential zone is
exempt from environmental review. In urbanized areas, up to three single-fami�y
residences maybe constructed or converted under this exemption, is hereby approved.
2. Said Design Review and Special Permits are approved subject to the conditions set forth
in Exhibit "A" attached hereto. Findings for such Design Review and Special Permits are
set forth in the staff report, minutes, and recording of said meeting.
3. It is further directed that a certified copy of this resolution be recorded in the official
records of the County of San Mateo.
� airman
�, I, �i �� , Secretary of the Planning Commission of the City of
Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a
regular meeting of the Planning Commission held on the 27`" dav of February, 2012 by the
following vote:
2509 EASTON DRIVE - RESO 07-2012
AYES: Auran, Cauchi, Gaui, Terrones, Vistica
NOES: None
ABSENT: Lindstrom
RECUSE: Yie
,� �
Se e ary
EXHIBIT "A"
Conditions of approval for Categorical Exemption, Design Review and Special Permits.
2509 Easton Drive
Effective March 8, 2012
that the project shall be built as shown on the plans submitted to the Planning Division
date stamped January 31, 2012, sheets T1, C.O, A1 through A5, L-1, L-2 and GPC;
2. that the property owner shall be responsible for implementing and maintaining ail tree
protection measures in the Tree Protection Plan as defined in the arborist report
prepared by Kielty Arborist Services, dated August 30, 2011; all tree protection zones
shall be established and inspected by the City Arborist prior to issuance of a building
permit;
3. that the property owner shall obtain a protected-tree removal permit from the Parks
Division to remove any protected-sized trees;
4. that any changes to building materials, exterior finishes, windows, architectural features,
roof height or pitch, and amount or type of hardscape materiais shall be subject to
Planning Division or Planning Commission review (FYI or amendment to be determined
by Planning staffl;
5. that any changes to the size or envelope of the first or second fioors, or garage, which
would include adding or enlarging a dormer(s), shall require an amendment to this
permit;
6. that the conditions of the Park Supervisor's September 20 and July 27, 2011 memos, the
Chief Building Official's September 15 and July 26, 2011 memos, the City Engineer's
August 17, 2011 memo, the Fire Marshal's July 25, 2011 memo, and the NPDES
Coordinator's July 25, 2011 memo shall be met;
7. that any recycling containers, debris boxes or dumpsters for the construction project
shall be placed upon the private property, if feasible, as determined by the Community
Development Director;
8. that demolition for removal of the existing structures and any grading or earth moving on
the site shall not occur until a building permit has been issued and such site work shall
be required to comply with all the regulations of the Bay Area Air Quality Management
District;
9. that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of
approval adopted by the Planning Commission, or City Council on appeal; which shall
remain a part of ail sets of approved plans throughout the construction process.
Compliance with all conditions of approval is required; the conditions of approval shall
not be modified or changed without the approval of the Planning Commission, or City
Council on appeal;
10. that all air ducts, piumbing vents, and flues shall be combined, where possible, to a
single termination and installed on the portions of the roof not visible from the street; and
that these venting details shall be included and approved in the construction plans
before a Building permit is issued;
EXHIBIT "A"
Conditions of approval for Categorical Exemption, Design Review and Special Permits.
2509 Easton Drive
Effective March 8, 2012
11. that the project shali comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects
to submit a Waste Reduction plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
12. that during demolition of the existing residence, site preparation and construction of the
new residence, the applicant shall use all applicable "best management practices" as
identified in Burlingame's Storm Water Ordinance, to prevent erosion and off-site
sedimentation of storm water runoff;
13. that the project shall meet all the requirements of the California Building and Uniform
Fire Codes, 2010 Edition, as amended by the City of Burlingame;
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
14. that prior to scheduling the framing inspection the applicant shall provide a certification
by the project architect or residential designer, or another architect or residential design
professional, that demonstrates that the project falis at or below the maximum approved
floor area ratio for the property;
15. that prior to scheduling the foundation inspection, a licensed surveyor shall locate the
property corners, set the building footprint and certify the first floor elevation of the new
structure(s) based on the elevation at the top of the form boards per the approved plans;
this survey shall be accepted by the City Engineer;
16. that prior to scheduling the framing inspection the project architect or residential
designer, or another architect or residential design professional, shall provide an
architectural certification that the architectural details shown in the approved design
which should be evident at framing, such as window locations and bays, are built as
shown on the approved plans; architectural certification documenting framing
compliance with approved design shall be submitted to the Building Division before the
final framing inspection shall be scheduled;
17. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the
height of the roof ridge and provide certification of that height to the Building Division;
and
18. that prior to final inspection, Planning Division staff will inspect and note compliance of
the architectural details (trim materials, window type, etc.) to verify that the project has
been built according to the approved Planning and Building plans.
u
Project Comments
Date:
To:
From
September 14, 2010
� City Engineer
(650) 558-7230
� Chief Building Official
(650) 558-7260
X Parks Supervisor
(650) 558-7254
� Recycling Specialist
(650) 558-7271
o Fire Marshal
(650) 558-7600
0 NPDES Coordinator
(650) 342-3727
� City Attorney
Planning Staff
Subject: Request for Design Review and Special Permits for attached garage
and declining height envelope for a new, two-story single family
dwelling and attached garage at 2509 Easton Drive, zoned R-1,
APN: 027-195-060
Staff Review:
Landscape Plan is required to meet `Water Conservation in Landscape
Regulations'. Complete attached Water Conservation in Landscape checklist.
2.
3
Protected Tree Permit required before construction begins. Application may
be obtained from Parks Division (5 7254).
Include Tree Protection Diagram (attached) on plans and note as determined
by Arborist Report.
_,.---Y„°- �.,�` � �(' .� � �j'� ,''�, a�;l i.t:�=e`_��`:
�.C�y 7 ,�`�-���4� c%�'� ..
���y ��'�� :7
fC �' ��.�; ,/� ��t �r�_;1
,,;.. � �'?�_ � 'z.r•' :v ,r'_> t��a ✓�,, /
�;� � L b--G� 4 C. �`t%;i s.v �) :�'�/� : P G° � f
:�.. ` '' ,.�? �f 3„ ru`
� ��� `.�` `���
I E`� .;��
�j�'
Reviewed by: B. Disco Date: 9/20/11
URBAN FOREST MANAGEN;_. JT PLAN
! ���
( �� --�
� � r �
� � / _
� �--� , �
� �-
,� �
� f__ r �,
� ` -.. .:-.. - �
� �� � �
; ��-�� �- . _ ..h-': .�>.-�.
��ClT Z�}tE)
e�rs. �:r�� rR�
TO 'R�M1�1N•
�R�9'tEGTlYE FE3�E��4G
�17 �.
1. PR�'TEG�9IE EE}�G.ifdG S}��-
0E BitIGH7 O�L+��#�f
Pi7LYFR€9i'YLEt�E FE7aClFiG.
2. t�4TH9NG IN�DE 1isE
�Ri�UNE k�FJ. �u-�- B�
RAstED. Gtli, Sf�Ht""�i . �JR
o�r€���s� aasr�e�,
3. Goii'�AA;�tOR �Hik#..� TkKa
EXSkf4�� tA�E Ak1Ls
�Rbl'ECd A�:L. �1571N�
iRE� TU RElie�l9i. _kS
E3ERiJ3RED BY ���ikPE
Pt�i.
�. TRE� P��i�CTi4N �tfJtL
BE 3N8T�d ?�
d,CGA'Ri?3t3C� �Y�i�rl
PRO�EGT o�ii��ST R�P(Jp'E
�B�ECT£b
-' — �lEi ��1dEL E� f�
_- T��E. P��T���€�P� �'ET��� �Y -�� ����� �����
( 7i7 'FFlE EM�PTIf7H C1F .Ett�"Y
„ _ _
WD3�
4�'�� T� ��;�LE
U�dated Julw 20, 2009 - 32 -
0
�' � � � eY _ _ 4 - � f _ _
I certify thaY the s ject roject meets the specifred requirements of [ha Water Conservation in Landsraping Qrdinance.
, `� �-ZB-l1
Si�nature C9ate
� Single Family O Multi-Family � Carnmereial d fnstitutinnai � Irrigation only �;ndustrial O Other:
Applicant Name (print}: ��Q y��j Y�I f�� Contact Phone #: 1aU '-�j�Z -D Z L
� ProjectSiteAddress: Z,�j'Q� �'��� ��, aU��iy� u�,i, e�•
Projeci Area jsq.ft. or acre): �� � Z j S.-t-T• # of Units: � # of Meters: �
i r _
. t ��? ,�����.t`�c�`�.-���r � Total Landscape Area {sq.ft.): L �"��a,.�`",��,�.t=�'a�:�,-�e'"��Q�
�" r�k.-h��" I � � •:.�. ��.q � '"` "Y � ._,!
'`I �a ����t��r���t�,�`;,9, �! 7Z� Sq' ��� ��j'�����.��.��
; ��-,��� '��� ,� ,-��� rurflrcigatedArea{s9-�•}� IZI SQ- Fi"
' �� ,-�r`-�� = � � s�`r�,��� �`� ��
j _ � . � :� °����? Non TurF Irrigated Area (sq.ft.): `J� (Q Og Sq. -i�•
� o ,�! i.�! q! {€'�ck-�
'��, - � �" � -� �-'� Y��v�, Special landscape Area (SLA) (sq.ft_): N.yq .
F�. ., - -' mfE�. ' .' P
�
- - +;; . .� 1Nater Feature Surfiace Area (sq.ft.): . }'j .
I. s8 S �_n��. __� `.( _ �Jt 0E d C6RdF _
, -..._._._ _... • _ _ . . . _ ..
�€�G`��.r:�� __.4 t�, _
�
' Tueff �ess than 25% of the (andscape area is � Yes �
� turF ❑ No, See Water 6udget
� All turf areas are > 8 feet wide � Yes
? All turf is planted nn slopes <25% � Yes
�
i
Non YurF At least 80% of non-turF area is native � Yes .
or low water use plants � No, See lh/ater Budget
j Hydrozortes Plants are grouped 6y Hydrozones � Yes
� At least 2-inches of mulch on exposed � Yes
Mulch soil surFaces
irriga�ian System Effici�ncy 7d� Efo (100% ETo for SIAsj � Yes
No o�erspray or runoff ❑ Yes
1 i Irrigation System Design System efFiciency > 70% � Yes
I Automatic, self-adjusiing irrigation ❑ No, not required forTier i
i controllers � Yes
Moisture sensor/rain sensor shutoffs � Yes
No sprayheads in < 8-ft wide area. � Yes
IrrigaEion iim2 System only operaties between 8 PM � Yes
and 10 AM
iMietering Separate irrigation ineter � No, not requ�red because < S,OpQ sq.ft.
I ❑ Yes
Swimming Poois J Spas Cover highly recommended ❑ Yes �. a�
� � No, not required
IV4F�ter �eatures Recirculaiing Ci Yes
;j Less than 16%of landscape area ❑ Yes
';; Documentation Checitlist � Yes
,-i Landscape and Irrigation Design Pian f3 Prepared by applicant
� Prepared by professional
Water Budget (optional) � Prepared 6y applicant �� /�
❑ Prepared by professional r�r
Audi� Post-installation audit completed ❑ Completed by applicant N. j�c •
❑ Completed 6y professiona!
Project Comments
Date:
To:
From:
Subject:
Staff Review:
July 25, 2011
o City Engineer
(650) 558-7230
0 Chief Building Official
(650) 558-7260
x City Arborist
(650) 558-7254
Planning Staff
o Recycling Specialist
(650) 558-7279
o Fire Marshal
(650) 558-7600
� NPDES Coordinator
(650) 342-3727
o City Attorney
Request for Design Review for a new, two-story single-family
residence at 2509 Easton Drive, zoned R-1, APN: 027-195-060
July 25, 2011
1. Protected tree permit required for all trees proposed for removal that are 48
inches in circumference or over measured 54in from ground IeveL Contact
Parks Division (558.7334) for permit application.
"` 2�Lanciscape plan is required to meet `Water Conservation in Landscape
�--�eg�alations" (attached). Irrigation Plan required for Building permit. Audit due
for Final.
`(�3�`.Landscape plan must include 4(four) 24" box size tree as per Landscape
�requ�rements.
�4�'`Add new Street Tree in parking strip, if Public Works requires sidewalk
replacement, Policy for Expanding Width of Planter Strip needs to be
implemented. Street Tree list attached.
Reviewecl by: � Disco
Date: 7i271 � 1
Date:
To:
❑ City Attorney
From:
September 14, 2010
❑ City Engineer
(650) 558-7230
X Chief Building Official
(650) 558-7260
❑ Parks Supervisor
(650) 558-7254
8 Recycling Specialist
(650) 558-7271
❑ Fire Marshal
(650) 558-7600
❑ NPDES Coordinator
(650) 342-3727
Planning Staff
Subject: Request for Design Review and Special Permits for attached garage
and declining height envelope for a new, two-story single family
dwelling and attached garage at 2509 Easton Drive, zoned R-1,
APN: 027-195-060
Staff Review:
Nc further comments.
AIV conditions of approval as stated in the review dated 7-26-2011 will apply to
th�s project.
�-� ,f Date:9-1_
f2eviewed �
�
Date:
To:
From:
SGbject:
Staff Review:
July 25, 2011
❑ City Engineer
(650) 558-7230
X Chief Building Official
(650) 558-7260
❑ City Arborist
(650) 558-7254
❑ Recycling Specialist
(650) 558-7271
❑ Fire Marshal
(650) 558-7600
❑ NPDES Coordinator
(650) 342-3727
❑ City Attorney
Planning Staff
Request for Design Review for a new, two-story single-family
residence at 2509 Easton Drive, zoned R-1, APN: 027-195-060
July 25, 2011
1) On fihe plans specify that this project will comply with the 2010 California Building
Code, 2010 Californi'a Residential Code (where applicable), 2010 California
Mechanical Code, 2010 California Electrical Code, and 2010 California Plumbing
Cod�e, including all amendments as adopted in Ordinance 1856-2010. Note: If the
Planning Cammission has approved the project prior to 5:00 p.m. on December
31, 2010 then the building permit application for that project may use the
pro�risions found in the 2007 California Building Codes inciuding all amendments
as adopted in Ordinance 1813.
� On the plans provide a copy of the GreenPoints checklist for this project at full
scale.
� Specify on the plans that this project will comply with the 2008 California Energy
Efficiency Standards.
Go to http�//www enerqv ca qov/title2412008standards/ for publications and
details.
�' � Specify the roofing material to be used. If the roofing material weighs more that
51bs/ft. then Indicafe on the plans that the roof will comply with Cool Roof
req�uirements of the 2008 California Energy Code. 2008 CEC §151 (f) 12. The
2008 Residential and Non-Residential Compliance Manuals are available on line
at http�l/www enerqv ca qov/title24/2008standards/
� PI'�ce the following information on the first page of the plans:
"Construction Hours"
Weekdays: 7:00 a.m. — 7:00 p.m.
Saturdays: 9:00 a.m. — 6:00 p.m.
Sundays and Holidays: 10:00 a.m. — 6:00 p.m.
(S�e City of Burlingame Municipal Code, Section 13.04.100 for details.)
C�6 On the first page of the plans specify the following: "Any hidden conditions that
require work to be performed beyond the scope of the building permit issued for
these plans may require further City approvals including review by the Planning
Commission." The building owner, project designer, and/or contractor must
submit a Revision to the City for any work not graphically illustrated in these
plans prior to performing this work.
7) Anyone who is doing business in the City must have a current City of Burlingame
business license.
8) Provide fully dimensioned plans.
9) When you submit your plans to the Building Division for plan review provide a
completed Supplemental Demolition Permit Application. NOTE: The Demolition
Permit will not be issued until a Building Permit is issued for the project.
10)Show the distances from all exterior walls to property lines or to assumed
property lines
11)Obtain a survey of the property lines.
�On the plans specify that the roof' eaves will not project within two feet of the
property line.
1�3 Indicate on the plans that exterior bearing walls less than five feet from the
property line will be built of one-hour fire-rated construction. (2010 CBC, Table
602)
�4 ooms that can be used for sleeping purposes must have at least one window or
door that complies with the egress requirements. Specify the size and location of
all required egress windows on the elevation drawings. Note: The areas labeled
"Guest Bedroom" and "Bonus Room" are rooms that can be used for sleeping
purposes and, as such, must comply with this requirement.
;15 Indicate on the plans that a Grading Permit, if required, will be obtained from the
Department of Public Works.
�Some guardrails, as shown, appear to be 36" in height. Revise the plans to show
that all exterior guards will be 42" in height per 2010 CBC §1013.2
17)Provide guardrails at all landings. NOTE: All landings more than 30" in height at
any point are considered in calculating the allowable lot coverage. Consult the
Planning Department for details if your project entails landings more than 30" in
height.
18)Provide handrails at all stairs where there are four or more risers.
19)Provide lighting at all exterior landings.
20)The fireplace chimney must terminate at least two feet higher than any portion of
the building within ten feet. 2010 CBC §2113.9
NOTE: A written response to the items noted here and plans that specifically
address items 2, 3, 4, 5, 6, 12, 13, 14, 15, and 16 must be re-submitted before
this project can move forward fos� Planning Commission action.
Reviewed by: �~� m��� �f, � Date: 7-26-2011
��
0
Project Comments
Date:
July 25, 2011
To: � City Engineer
(650) 558-7230
❑ Chief Building Official
(650) 558-7260
❑ City Arborist
(650) 558-7254
From:
Subject:
Planning Staff
❑ Recycling Specialist
(650) 558-7271
� Fire Marshal
(650) 558-7600
❑ NPDES Coordinator
(650) 342-3727
❑ City Attorney
Request for Design Review for a new, two-story single-family
residence at 2509 Easion Drive, zoned R-1, APIV: 027-195-OSO
Staff Review: July 25, 2011
, PUBI.�IC �VORKS DEPAR'�1VIENT EI�GINEERING DIVISIOlV
PLANNING REVIEW COMIVIENTS �'�� �3� �����L�
Project Name: �� �'� �`'��
- Project Address: �� ���''l �
The follov�ing requirements apply to the project
1 � A property boundary survey shall be preformed by a licensed land
surveyor. The survey shall show a11 property lines, property corners,
easements, iopographical features and utilities. (Required prior to the
building permit issuance.)
2 � The site aud roof drainage shall be shown on plans and should be made to
drain towards the Frontage Stree�� (Required prior to the building permit
issuance.) �YL -�a � �"�� �� CN!�'�s�f S'�ES't��1 �
3, The applicant shall submit project grading and drainage plans for
approval prior to the issuance of a Building permit.
4 The project site is in a flood zone, the project shall comply with the City's
flood zone requirements.
•� �� ���
5 � A sanitary sewer lateral s required for the project in accordanc�e with
the City's standards.
(, The project plans shall show the required Bayfront Bike/Pedestrian trail
and necessary public access improvements as required by San Francisco
Bay Conservation and Development Commission.
�, Sanitary sewer analysis is required for the project: The sewer analysis
shall identify the project's impact to the City's sewer system and any
sewer pump stations and identify mitigation measures.
g Submit traffic trip generation analysis for the proj ect.
9, Submit a traffic impact study for the project. The traffic study should
identify the project generated impacts and recommend mitigation
measures to be adopted by the project to be approved by the City
Engineer.
10. The project shall file a parcel map with the Public Works Engineering
Division. The parcel map shall show all existing property lines, easements,
monuments, and new property and lot lines proposed by the map.
Page 1 of 3
U:\private development�PLANNiNG REVIEW COMIv1ENTS.doc
PUSLIC WORKS DEPARTMEN'I' El�TGIl�TEERING DIVISIOI�
11. A latest preliminary title report of the subject parcel of land shall be
submitted to the Public Works Engineering Division with the parcel map
for reviews.
12 Map closure/lot closure calculations shall be submitted with the parcel
map.
13 The project shall submit a condominium map to the Engineering Divisions
in accordance with the requirements of the Subdivision Map Act.
14 � The project shall, at its own cost, design and construct frontage public
improvements including curb, gutter, sidewalk and other necessary
appurtenant work.
15 The project shall, at its own cost, design and construct frontage streetscape
improvements including sidewalk, curb, gutters, parking meters and poles,
trees, and streetlights in accordance with streetscape master plan.
16 By the prelimuiary review of plans, it appears that the project may cause
adverse impacts during construction to vehicular traffic, pedestrian traffic
and public on street parking. The projeci shall identify these impacts and
provide mitigation measure acceptable to the City.
1� The project shall submit hydrologic calculations from a registered civil
engineer for the proposed creek enclosure. The hydraulic calculations
must show that the proposed creek enclosure doesn't cause any adverse
impact to both upstream and downstream properties. The hydrologic
calculations shall accompany a site map showing the area of the 100-year
flood and e�sting improvements with proposed improvements.
1 g � Any work within the drainage area, creek, or creek banks requires a State
Department of Fish and Game Permit and Army Corps of Engineers
Pernuts.
19 `� No construction debris shall be allowed into the creek.
Zp � The project shall comply with the City's NPDES permit requirement to
prevent storm water pollution.
21 The project does not show the dimensions of e�sting driveways, re-
submit plans with driveway dimensions. Also clarify if the project is
proposing to widen the driveway. Any widening of the driveway is subject
to City Engineer's approval.
22 The plans do not indicate the slope of the driveway, re-submit plans
showing the driveway profile with elevations
Page 2 of 3
U:\private development�PLANNING REVIEW COMIv1ENTS.doc
PUSLIC WORKS DEPARTMENT ENGINEERING DIVISION
23 The back of the driveway/sidewalk approach shall be at least 12" above
the flow line of the frontage curb in the street to prevent overIlow of storm
water from the street into private property.
24. For the takeout service, a garbage receptacle shall be placed in front. The
sidewalk fronting the store shall be kept clean 20' from each side of the
property.
25. For commercial projects a designated garbage bin space and cleaning area
shall be located inside the building. A drain connecting the garbage area to
the Sanitary Sewer System is required.
Page 3 of 3
U:\private development�PLANNING REVIEW COMI��NTS.doc
.,..�,�.�-..-�.x-.�. ... �-. -�.,-.�, ....,o�
_ ��.-.--.,�:..s, .. ,
Project Comments
Date:
To:
From:
July 25, 2011
� City Engineer
(650) 558-7230
o Chief Building Official
(650) 558-7260
o City Arborist
(650) 558-7254
� Recycling Specialist
(650) 558-7271
� Fire Marshal
(650) 558-7600
� NPDES Coordinator
(650) 342-3727
� City Attorney
Planning Staff
Subject: Request for Design Review for a new, two-story single-family
residence at 2509 Easton Drive, zoned R-1, APN: 027-195-060
Staff Review: July 25, 2011
Provide a residential fire sprinkler throughout the residence.
�. Provide a minimum 1 inch water meter.
2, Provide backflow prevention device/double check valve assembly -
Schematic of water lateral line after meter shall be shown on Building
Pians prior to approval indicating location of the device after the split
between domestic and fire protection lines.
3. Drawings submitted to Building Department for review and approval shall
clearly indicate Fire Sprinklers shall be installed and shop drawings
shall be approved by the Fire Department prior to installation.
� Date: a.�'� ��
Reviewed by:
Project Comments
Date:
To:
From:
Subject:
Staff Review:
July 25, 2011
� City Engineer
(650) 558-7230
� Chief Building Official
(650) 558-7260
� City Arborist
(650) 558-7254
� Recycling Specialist
(650) 558-7279
� Fire Marshal
(650) 558-7600
X NPDES Coordinator
(650) 342-3727
� City Attorney
Planning Staff
Request for Design Review for a new, two-story single-family
residence at 2509 Easton Drive, zoned R-1, APN: 027-195-060
July 25, 2011
Any construction project in the City, regardless of size, shall comply with the City
NPDES permit requirement to prevent stormwater pollution from construction
activities. Project proponent shall ensure all contractors implement Best
Management Practices (BMPs) during construction.
Please include a list of construction stormwater pollution prevention best
management practices (BMPs), as project notes, when submitting plans for a
building permit. Please see attached brochure for guidance. The brochure may also
be down loaded directly from "flowstobay.org." It is recommended that the
construction BMP's be placed on a separate full size plan sheet (2' x 3` or larger as
appropriate) for readability.
For additional assistance, please contact Kiley Kinnon, Stormwater Coordinator, at
(650) 342-2727.
."._' �
, ,__ -
'�� � Date: ,r� ��� �'�f
Reviewed by: �,� �{j�J �, � ���.._.-� � � �
J
°�Y � 5mmwa�a
� Po�u¢auPccvmrivnPmgrzm
`.:� �^ °a
''*..,��'� ���
`5�.:!:.� _,��.r
r7rCriCffl� Y ry �'"'"�
CDIIStrI1CL10Il
� ..5'1tC .S'lT�TCI"S'1S10Il
Jsd.dNe�� �c��1a�m+e w�nmlm AY
-��q��'mYayY¢amx� m �eo� 4 �bolv�
Jlm�emd� ��dnb�W �uYNme
a.me,....auaw� s
�c�� �m gy... ar.�u�
;���oa ��.uwv�u�,�u `- n�w
mM
vunuc W¢�mpauY �S e� u Gom� vG:rt
�aamo����,..r� m�m.
m���..r.�m d��m.,m�trtrmlm^Twun �
Omlm�'m[p�m
pda.e m.am�aaeb mWvnf uu to. mm
m.�mm..emi4oJ�o� W� .b�Wm��.a��
w�i'm �Cadc�N Ifomo�
�v.�� - I�uQ
� �t .v�ayMpleo!
�n ylatic+6u+:n[v
ro"oQ�mmmuh
�'+9v eRuy�n«nRx'e.Ybcocssh�
�rtryatiuc�YW'buvuul2eY�w 'm�i<
✓bn �moy P^'� v�lav Wu d'.1u m rimm Mis.
wcptG�� xo5cu�a.km e o.r wl1v�� �al
apvlWbau
lakt �b ad omc mo� �d�.o-)l.a
�� om��knu�.vom�o�d�
rtJLrw R+a1 uGm Vn M��V �
.banncpmml� If�ocmuiue.w�,u.ajm
JCa.v���m.hnie�mm
pm1. d+t nuPmJY lm
emunm�mluw4cr wa wimmpr
Q^.VW+� ��� uwuWm�untlenofm
�ccmmmbtbymm
i..beoot�N�d� a�. a�v�, q
bJvt L dom m Ew muwae..l�a.
JA4Fa �m. pmwu� 141M� m miln��IW h. m�
.omvsmJm�JWcwu+s� ��wu
,m �uw•ui c�p�opah. auh m'v. e
v+.4�n��
.00m �m�iN
miwmis.+.r.m
Lt�bmY me�mw�lm �
Un �iay�lWbmvl�l�whmcwN�mlaN�w�
u�.�ei.ne wv W. a.a o e<ma�..
� �m�.t nmma a«�.. �m.a..s�
�� .�.s.�.a�,wwe.�
JDlqw� �w w�.e.et EmuWlm �brLVquly.
mawvp.am4 mttrow v��..*�,�ac nouk
���.����.���
k��v������,���,
e��e�wuuRm�.aw.,
....� m.b,ni, a w..
m��m, �am.�'. �s o. �.u.b
�tormwaier Polluti�n Prevention Progra�
P�llut�on Preventio� — It's Part of the Plan
It is your responsibility to do ilie j ob right!
Rtinofffrom sh'eets and other pavedazeas is a major sovrce ofpollurion in local creeks, San Fraucisco Bay and the Pacific Ocean.
Conshvetion activities can d'uecdy affectthe health of ourwaters unless contractors and crews plan ahead to keep dirt, debris, and other
construction waste away from sto� drains and creeks. Following thesa guidelines will ensure your compliance withlocal stonnwater
ordinance recruirements. Remember, ongoing monitoring and maintenance of installed controls is crucial to proper implementation_ .
1 � I• �\%i•i 1' 1 \1 - .lRI� �0� .II�1 .SI11:':-�11�
��• � I I" 1 11 II ': � '� � � 1 i � 13 '� � I" Y H : 1' t Y'
• � ' : � i �--" i�w,. ,:' : � � ' � � : � �:�� : r '
`► "�, tR �t � :
.�`�;�..�f , .,. � �
�. rf€' .�g� R� i j u, t
���� �'. � ���� �- �. '.�r..�..� Ji+� a . ,/ � �( ; � ��/ � �r�' �
.��`��, a :A�� � l R ��� f���� �{` —
��„�� l��. .���:�.��r�.�� � .... ... ... ......... �` �r _ :Yr� I'. I.�.�-1. i}
�' _
StuA'mMmiyrn�tl��edlU. ��ww�
lDein��e r. u�akidY �m.vd vu
�Mwf�4uYa nL PvliuyafmGrc
��.�w�•i�me.'mm�e.
J E4�wlvd m�m.mo �Ia���V� �^'
um oulu v�ixa �Avi� ace v�di�k avJ
J e��:pmat.uhbeeRut
�u me�m � ��..oa„a�.,«.�im.
hp Wo+a AoP auiL� m
�oe �ai. dna..0 wm� m�4 0� m
rpmkmnma.�� cwwlxcxtW�ltm
e;y�moruiw. ' .+��
I na aw uc �40.1 N m N6ium m�.q.�ymm m
! /•'kwod�b'�.6wai...
TLi �^Y wf+a N%lqp<
✓Nmv6aa Jvm�doM�Var�lu��am..bk
Uudry�lwqmn6
d.l s��ammv.mu¢�)wtmr�=
�roY u)+*�mw�w�w.i�m��nmtEp
Ido.n
J Sw�eyup�p�Lwenm�b�muti+iel%N�vs�4
vepmsvh Wm�Pmr'�''�wCw �mmvt� �4m.
Il.�ullW<wmu
J d��O+m NYL mr��t+luu+�Nami W am W W��Y
/�.,�v� : +W'aummww�xroiun+wm+
•_ •mmr.va�.n.pwwqm.a+w�+
,��.4+am�.m �,.e otamau=m,�r:. ^' s�^,,
va Rw^�s�.eumrouo-��.x�..:1��
9m�� om.o o[r8,��y sw�'� �me
��, �e om Bnassa �,n ma.y
�mP,��IX��m Jdakww'L'��fuY.�'nud�NazluYm¢eTe�mi J� JIYqvW9��P�fntl�vWwua��n� .
JAmowclmvevev�moohv4m�do '°mWn Coval➢��ha�tl.v B����^�tma.mmdvm..�-n Gom
�°" JP=(amm.jmmm�rq+mdMw6w�'WuLafa�uP v�mLW�vmvtr�uimdqYe+n� i�+.m�a4�RWamd� fWidsK JAvaaalakde.dlaLKw�oemdm.l�Emwtrd.d
m. m�a+'ryLomName.i...tloniln dTaNmlmam.lamiv�uvv.pmttlNL� bmvbumHmmdmWboG+➢ ofv�hemibu� �duMvwm[0�uodm'nPm��enedP4etic`8aliuP.
Jum ...�mw4Lltt+�"�m�ima�wemwi# aon�um¢hda1M'mvkmlafrmwiul wYutio¢vcl�l(mmaY�NNium..�r
6vNmm�F>'�'^�s�rmw.im�nol� � � nweu vurc swcw�'uedo.lentimcvneiEvcLmiewmaoovw
.��� IetrlYmwem.e.R.mry vm}
JtlW�+arrEmv�uu�uov'vart�eliu�hlP�^� Lvme4,m�m'v. � c�Wilmrc0.4c .oMxt
J11o�wcdbdo�b�ulvlNemrl�W' JS�..Wsof.mme.mm.Y.ueoCmee�cbMp
Pmvndo^^aWcLmoe«4��.aetl9�m v@mrmm Nmdblmroavmi�a�+tlSomywm4�tmm 'JN�rvv[sclmbnuh.mdwnWumuuluevinm• JS�eLa�6�a�aava�buOAiatIxJ.Y���
vf� �t��'aNmwavN�.au n.crmu.ved4wumm.mmNq, .. m^�^+.^�vu..m.wo¢ .
facet 'min(�tm. �te� .�rcKWusno.muu:am.wm
� lwb�.¢vourol� ✓wmhov�omw.mbu�wlYa4d�etAmo'*+3�u�tuvi ch..hu+m�orNcmmNu.n.wo¢my
xmQ.m�aonw 1'�N��nbreviuums�+eues+�cematv�v. m rudwpaawewumnmwaw Jeuw.iv-m..n�n��Krv�owix�+u=m�semm� r��a^u..
'� ' �mJaaoebd'vcSdameeb.�heldiw+eofu mblaAiuo a�tWuwamen�YnpNra
e�..edmdd—.. mitivm �y�6rmmurm+u �.g�Wem.�ewu3lN.aycbw.JmaMamwme v��ob+�Webd�ww..r.ewmm�rvSoM'. lemwvidu �ciel.xmah.`b:IKxw.�wwm.rc
P�'L�L advn'Nclw� mladw'.w�'Inmtwahv.mxim�vu muva �cuz arvA�Ybcfwulwtivb evupv+'WWaown�Enio. tto 'duPA wmuwc
1Cmaab wnhxoudm�➢am ufvautbYweGuhwvwatwJlWmfimo�om. 0�m.u.Mm�4�wd'Jct4a�e�m�
lCmw.vdmle�id.loamdmminl<�w6m�i47�e Fvwib..alYe4,� wtbwlab5e � � JSnm����nunllml(mmolxa�emnWIDr
J�ihmMlxudmlmmNeoiwwlnNmaot �dval��M'a4baw4� Au' Cm.o-uctim abWmlamwuh ' wwlvwt . mYua
lVuNVYNmiSenn.ab�awNwrzm�Pummd J�m'tmicuPmme4oEeme.moc�alW.nY�vW F�wmdm.zW�mmlwlr�4Pp�[rnev ..r���
tyvu..m m w� ss mmaau..ssm. '
JPn��amn�¢oruvbomd'N�mwwmola JNncv+.heuamvmilG6mopavlatvIP�coo- uua�A^l� .� JVnWPuu6de.aoAfolb..LbalNmctioocRlamwo-
m v .�mnr. mw.mu���n�a�ww�- �..mowv^�•u�.��eam�rvwm ',�.me r.� em..mewao....ir..wwo�r.a.v..°o[�.�a
Iatawlrxyke,mdWosclodvt�. dmp�ile5e. JP.in[ 'rn �.i mo-l�alloo��'d.iVPwv oommaaNw�u..n
JCwc�+ck mmdalw�mv�o'mmualebwl0 .ed�mdbluilvC�'6ewm�W�vmY�maP�+rc
wuoma�ra�«�wm�u�aum��d�a.w, �wv.���a�.n�aan,wr�am,.rc�amm.im mw�•�an�w�nocvc.,n. �w�wor�uaw�..s�mw�..,a.
issm�e��..am.m..,e�c�m.un.mw� � �rtao�.w��..mu� ,R.,,
.racn�aawr�e.Rwtmaoacm�mwu�a.�i � m�.�e�e�'a �ma,:�r��w rcne�aw�•�onams,waema��.oaaw rraum�earr��romm,m�ew+dc.�a�
�nA�miea�amm�m�Fmwmmoiotoiw t�k�v.,'�)w�+�mmv�=w�mm�mw� � . rmmw.�eWmorpmN�mouva�lmwmbwr� ��•et�¢�^�r.�..umma��
1Cm�T�Lm�wam4elivmi'x.�+'m.moEv(x'uh JPmat+6&�P�w.uiGvmJdrcr�qh��movmm fmm�mbedNpawGofcT�Nw�mskr.
w��c..mm..�m����m.�� ,x��ewm.ea),mmcwm���. r,wm�a,o-�a�rm�.��av�w,mamoa� .room�r�rw.�„emo-s�w�w�.�w
,beJattwJM.uvhrvi0�'vc�omple4�lY�adun+u'ry w1�duS uwmlryukwbd'ut JM�ma¢qPmLm'n�66e1&u6ewiasvriO�Eieb- J Y�wvkm�sl'mPhverliW�9��le'-'�'S
fiv.uc�Mmi. lCoOiclmdrtY��+TJflW�YJ4po�eo(arws onuenexyLbckdamdems.NWmicoomaJin u+YefarPu�'W�WTP�hgormoWoa�USW'^ I
.Murte�+�dmuvd JPlmd�rbaksaroOaw�Nv�wYdmvwbP=b wud�diuNmJ.U4eh�hmlWlhebulxannWv w.IwdfillYW�oNY�wub. .
Jeom�v.ea�adollml�bioao�daunN'a�mw� Jnvmdm<wrotimimMwa�cwchfm�stmvwt �vv��wo¢cmymFmmnrsammueleai[rerSu �w� bm5cdami[rvaemw�xt(m^e� JWmee�uvmNx�.+re.euwumc.wa.
Ibov��4ea. ..mv�ltWldiosdeuiv6�v�caed�Wpowpl6.mii+ry
NitdWdlMP�dedII�o���'@um0'Inmo- n���tl��°aN uwc.�tin¢oCWemw.mYbcr.v�'v^fineW�Wc
lnwuvwineacwma+Nm�i�vlioS+R��mron. JwpabmL�c�Pv�t meronirxWdlWvv�u.. ww ama�[eu0wuymml�BiYdvi�iva FoaVPomw'a3p+M.lo�mwn
�mr�thoeeRmm�ti�.ncaro�ma4wita�mmaeuqo aec .dd'uw:eaw�r. � x�.eaWmv ��.�+-'����n.ucw.m�,nQ
���RsmN�v�oa1H�J: lM�66mNe_w ��=•�tb�wnw�w.all BiN�b%m^ . P�+�Bmr+rAa34 f Nwmd!vm
J&cMo�m=�halNNmmovi.u�ti�ul ua�axwperKom..nm•b.:edP�W�u�
•• .mOmoNtimt� ��.o�oJm JM.FenneWaYmP�•wm�LozmiamemmuenriL hew.I.iWWaNweovnemWctiauficLb.muecW. JR3mmPb'��1��¢Rakl�ilmmstlia+a�fm5b
• �mduGumleatr JPm�iw�*nA nmJnmidN �8mw �L�va �u�1�of�llmoumal�aM�NCP�� a�^�M1•Y+rtiww��Ydn.�qYw�m+.uM ]M'�ihm.c��vamMA.Na¢Hp.awnlmbt
��4mP.mINm.0.�Iham�➢MdIVWMnCss1Y' ��0.ttddv�InJa-LMmvMmt¢m�vum
. ame'em.4�.arms m.,o.mmsm�n�wm Imow , bwamd. y�;�.m�wy�e�. '
JNe.e6aeummzwnamolmvvPv.NeaeN.UeM' N...mbvYwl'qo.Im.�urcvammumial newoldlvmull�6urdP��D'eww�eoevY4+�. Jaiom��wnamqL.ud�m5�t�wme�� .
maymewaev J:W�z.M1�w...l�m..m�m . �c.�c(v.uo�lMwebulxn.¢��h��samnH)M
. .�ma.mam.�w9'�te Wwa�w�rv�
.f SmJ1a��HL'�+�'�*•.wm�MxtxiwWoSuM.im
[omny�Pnvg'vo�mblmB�d�DhlJmnA+dberccsi�¢ , ��0�-il� +W�•�e J
�m���
Storm drain. polluters may be liable. for fines of up to $Z5,000 per day! 'a,� m�� �����:° �`°���� °`"�'���..