HomeMy WebLinkAbout2319 Easton Drive - Approval LetterDacuSign EnvelopelD:555112C8-D782-4546-B448-05C2D73736D0
CITY OF BURLINGAME
City Hall — 501 Primrose Road
Burlinga�ne, California 94010-3997
May 21, 2021
Lily Law and Phillip Law
2411 Easton Drive
Burlingame, CA 94010
Re: 2411 Easton Drive
Dear Property Owners,
� ��
a., t
� �J �
.
# _ _ '�
o +
•,.o.::�.
COMMUNITY DEVELOPMENT DEPARTMENT
Planning Division
PH: (650) 558-7250
FAX: (650) 696-3790
Since there was no appeal to or suspension by the City Council, the May 10, 2021, Planning Commission
approval of your application for Design Review became effective May 20, 2021. This application was for a
first and second floor addition to an existing single family dwelling at 2411 Easton Drive, zoned R-1.
The May 10, 2021, minutes of the Planning Commission state your application was approved with the
following conditions:
1
2.
that the project shall be built as shown on the plans submitted to the Planning Division date
stamped April 30, 2021, sheets A0.1 through A3.4;
that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or
Planning Commissian review (FYI or amendment to be determined by Planning staffl;
3. that prior to issuance of a building permit, the applicant shall submit an FYI application clarifying
the notations on the plans to note that all windows which were shown to be replaced will be new
windows; the notes shall identify the window material and window type for all existing and
proposed windows;
4.
5.
C:�
that any changes to the size or envelope of the basement, first or second floors, or garage, which
would include adding or enlarging a dormer(s), shall require an amendment to this permit;
that any recycling containers, debris boxes or dumpsters for the construction project shall be
placed upon the private property, if feasible, as determined by the Community Development
Director;
that demolition for removal of the existing structures and any grading or earth moving on the site
shall not occur until a building permit has been issued and such site work shall be required to
comply with all the regulations of the Bay Area Air Quality Management District;
7. that prior to issuance of a building permit for construction of the project, the project construction
plans shall be modified to include a cover sheet listing all conditions of approval adopted by the
Planning Corramission, or City Council on appeal; which shall remain a part of all sets of approved
plans throughout the construction process. Compliance with all conditions of approval is required;
the conditions of approval shall not be modified or changed without the approval of the Planning
Commission, or City Council on appeal;
�� Register online to receive City of Burlingame e-mail updates at www.burlingame.org ��
DocuSign Envelope ID: 555112C8-D782-4546-B448-05C2D7373BD0
May 21, 2021
2411 Easton Drive
Page 2
8. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that these
venting details shall be included and approved in the construction plans before a Building permit
is issued;
9. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance
which requires affected demolition, new construction and alteration projects to submit a Waste
Reduction plan and meet recycling requirements; any partial or full demolition of a structure,
interior or exterior, shall require a demolition permit;
10. that the project shall meet all the requirements of the California Building and Uniform Fire Codes,
in effect at time of building permit submittal, as amended by the City of Burlingame;
Tf-1E FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS
PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
11. that prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural certification that
the architectural details shown in the approved design which should be evident at framing, such
as window locations and bays, are built as shown on the approved plans; architectural certification
documenting framing compliance with approved design shall be submitted to the Building Division
before the final framing inspection shall be scheduled;
12. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the
roof ridge and provide certification of that height to the Building Division; and
13. that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.
Sincerely,
[DocuSigned by:
�iin, Ga�'�,i�uv�
26D6423C2E8B49F...
Kevin Gardiner, AICP
Community Development Director
c. Hector Estipona, J Deal Associates, designer
337 Beach Road, Suite A
Burlingame, CA 94010
Chief Deputy Valuation, Assessor's Office
(LOTS 16 & 17 BLK 57 EASTON ADDITION NO 6 RSM 8/34; APN: 027-195-210)