HomeMy WebLinkAboutReso - CC - 071-2025 RESOLUTION NO. 071-2025 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BURLINGAME ACCEPTING IMPROVEMENTS – 2024 STREET RESURFACING PROJECT BY INTERSTATE GRADING AND PAVING, INC. CITY PROJECT NO. 86720 WHEREAS, on June 3, 2024, the City Council awarded the 2024 Street Resurfacing Project to Interstate Grading and Paving, Inc. in the amount of $2,157,153.50 (Resolution No. 079-2024); and WHEREAS, the project has been successfully completed to the City’s satisfaction, with all major work finalized in accordance with the City’s approved plans and specifications; and WHEREAS, the final project construction cost is $2,123,552.88, which is $33,600 lower than the original contract price. NOW, THEREFORE, BE IT RESOLVED by the CITY COUNCIL of the City of Burlingame, California, and this Council does hereby find, order and determine as follows: 1. The Director of Public Works of said City has certified the work done by Interstate Grading and Paving, Inc., under the terms of its contract with the City dated June 25, 2024, has been completed in accordance with the plans and specifications approved by the City Council and to the satisfaction of the Director of Public Works. 2. Said work is particularly described as City Project No. 86720. 3. Said work be and the same hereby is accepted. __________________________ Peter Stevenson, Mayor I, Meaghan Hassel Shearer, City Clerk of the City of Burlingame, do hereby certify that the foregoing Resolution was introduced at a regular meeting of the City Council held on the 7th day of July, 2025, and was adopted thereafter by the following vote: AYES: COUNCILMEMBERS: Brownrigg, Colson, Pappajohn, Stevenson, Thayer NOES: COUNCILMEMBERS: None ABSENT: COUNCILMEMBERS: None ____________________________ Meaghan Hassel Shearer, City Clerk Docusign Envelope ID: FDA91954-4F02-4521-9245-D4AA72B2AE31 DATE : 6 FOR THE MONTH OF :February 1, 2025 June 22, 2025 ITEM UNIT BID UNIT BID PREV PREV % Pay This AMOUNT : Total Quantity : Total Amount #ITEM DESCRIPTION PRICE QUANTITY SIZE AMOUNT Quantity PAID PAID Month This Month : to Date : to Date 1 Mobilization and Demobilization (@5%)62,000.00$ 1 LS 62,000.00$ 1.0 62000.00 100.00% -$ :1.00$: 62,000.00$ 2 Traffic Control and Construction Signs 134,400.00$ 1 LS 134,400.00$ 1.0 134400.00 100.00% -$ 1.00$134,400.00$ 3 Water Pollution Prevention Control 7,200.00$ 1 LS 7,200.00$ 1.0 7200.00 100.00% -$ 1.00$7,200.00$ 4 A.C. Digout Repair (+250 tons allowance) 285.00$ 931 TON 265,335.00$ 872.6 248691.00 93.73% -$ 872.60$ 248,691.00$ 5 Concrete Removal 190.00$ 138 C.Y.26,220.00$ 0.0 0.00 0.00% -$ -$-$ 6 Aggregate Base 510.00$ 1 TON 510.00$ 0.0 0.00 0.00%-$ -$-$ 7 Asphalt Concrete Leveling and Overlay 142.00$ 4,320 TON 613,440.00$ 4,043.1 574118.78 93.59% -$ 4,043.09$ 574,118.78$ 8 Cold Plane Asphalt Concrete 142.00$ 2,080 C.Y.295,360.00$ 1,995.0 283290.00 95.91% -$ 1,995.00$ 283,290.00$ 9 Adjust Manholes & Utility Boxes to Grade 1,300.00$ 10 EA 13,000.00$ 4.0 5200.00 40.00% -$ 4.00$5,200.00$ 10 Adjust & Replace Water Valves, Boxes, Lampholes, Monumen 1,000.00$ 50 EA 50,000.00$ 50.0 50000.00 100.00% -$ 50.00$50,000.00$ 11 Fire Hydrant Pavement Markers Blue 23.00$ 15 EA 345.00$ 28.0 644.00 186.67%-$ 28.00$644.00$ 12 24" Solid Line - Thermoplastic 21.00$ 1,266 L.F.26,586.00$ 1,435.0 30135.00 113.35%-$ 1,435.00$ 30,135.00$ 13 12" Solid Line - Thermoplastic 11.00$ 314 L.F.3,454.00$ 994.0 10934.00 316.56% -$ 994.00$ 10,934.00$ 14 8" Solid Line and Pavement Markers - Thermoplastic - Detail 3 5.20$ 548 L.F.2,849.60$ 730.0 3796.00 133.21% -$ 730.00$ 3,796.00$ 15 6" Dashed Line (Thermoplastic) and Pavement Markers - Deta 5.20$ 12,078 L.F.62,805.60$ 13,125.0 68250.00 108.67% -$ 13,125.00$ 68,250.00$ 16 4" Solid - Thermoplastic 3.10$ 1,448 L.F.4,488.80$ 313.0 970.30 21.62% -$ 313.00$ 970.30$ 17 Thermoplastic Legends and Arrows 11.00$ 385 S.F.4,235.00$ 574.0 6314.00 149.09%-$ 574.00$ 6,314.00$ 18 Green Back Sharrows 1,550.00$ 12 EA 18,600.00$ 6.0 9300.00 50.00% -$ 6.00$9,300.00$ 19 Grind Existing Thermoplastic/Paint and Pavement Markers 3,000.00$ 1 LS 3,000.00$ 1.0 3000.00 100.00% -$ 1.00$3,000.00$ 20 Remove & Replace Curb & Gutter 150.00$ 266 L.F.39,900.00$ 318.0 47700.00 119.55% -$ 318.00$ 47,700.00$ 21 6' Concrete Valley Gutter 580.00$ 24 L.F.13,920.00$ 33.0 19140.00 137.50% -$ 33.00$19,140.00$ 22 Bike Proof Grates 1,000.00$ 22 EA 22,000.00$ 21.0 21000.00 95.45% -$ 21.00$21,000.00$ 23 Install (N) Loops 1,300.00$ 12 EA 15,600.00$ 12.0 15600.00 100.00% -$ 12.00$15,600.00$ 24 Engineered Paving Fabric 7.50$ 2,443 S.Y.18,322.50$ 0.0 0.00 0.00% -$ -$-$ 25 Decomposed Granite 9.00$ 2,075 S.F.18,675.00$ 2,075.0 18675.00 100.00% -$ 2,075.00$ 18,675.00$ 26 Sign and Post 620.00$ 2 EA 1,240.00$ 1.0 620.00 50.00% -$ 1.00$620.00$ B1 Mobilization / Demobilization 10,000.00$ 1 LS 10,000.00$ 1.0 10000.00 100.00% -$ 1.00$10,000.00$ B2 Traffic Control 3,000.00$ 1 LS 3,000.00$ 1.0 3000.00 100.00% -$ 1.00$3,000.00$ B3 Water Pollution Prevention Control 900.00$ 1 LS 900.00$ 1.0 900.00 100.00%-$ 1.00$900.00$ B4 AC Digout Repair 370.00$ 5 TONS 1,850.00$ 5.0 1850.00 100.00% -$ 5.00$1,850.00$ B5 Concrete Removal 195.00$ 1 CY 195.00$ 1.0 195.00 100.00%-$ 1.00$195.00$ B6 Armregate Base and Grading (Allowance) 510.00$ 2 TON 1,020.00$ 2.0 1020.00 100.00% -$ 2.00$1,020.00$ B7 Asphalt Concrete Leveling and Overlay 182.00$ 300 TON 54,600.00$ 357.1 64983.10 119.02% -$ 357.05$ 64,983.10$ B8 Cold Plane Asphalt Concrete 170.00$ 150 CY 25,500.00$ 150.0 25500.00 100.00% -$ 150.00$ 25,500.00$ B9 Parking Lot Striping, Pavement Markings & Signage 15,000.00$ 1 LS 15,000.00$ 1.0 15000.00 100.00% -$ 1.00$15,000.00$ B10 Remove and Replace 6' Wheel Stops 190.00$ 59 EA 11,210.00$ 58.0 11020.00 98.31% -$ 58.00$11,020.00$ B11 Remove & Replace 6" Vertical Curb 100.00$ 852 LF 85,200.00$ 879.0 87900.00 103.17% -$ 879.00$ 87,900.00$ B12 Remove & Replace Curb and Gutter 140.00$ 81 LF 11,340.00$ 122.0 17080.00 150.62% -$ 122.00$ 17,080.00$ B13 Flush Curb 100.00$ 38 LF 3,800.00$ 36.0 3600.00 94.74% -$ 36.00$3,600.00$ B14 3' concrete Valley Gutter 195.00$ 97 LF 18,915.00$ 97.5 19012.50 100.52% -$ 97.50$19,012.50$ B15 Parking Lot Curb With Opening 600.00$ 4 EA 2,400.00$ 4.0 2400.00 100.00% -$ 4.00$2,400.00$ B16 EV charging unit - concrete pad 2,400.00$ 1 LS 2,400.00$ 0.0 0.00 0.00% -$ -$-$ B17 Storm Drain Cleanout 290.00$ 3 EA 870.00$ 2.0 580.00 66.67%-$ 2.00$580.00$ B18 Storm Drain Bubbler Box 1,200.00$ 1 EA 1,200.00$ 1.0 1200.00 100.00% -$ 1.00$1,200.00$ B19 4" Slotted Underdrain Pipe 130.00$ 82 LF 10,660.00$ 82.0 10660.00 100.00% -$ 82.00$10,660.00$ B20 EV charging - electrical conduit and pull boxes 63,000.00$ 1 LS 63,000.00$ 1.0 63000.00 100.00% -$ 1.00$63,000.00$ B21 French Drain Earthwork, Filter Fabric, Drain rock 6,600.00$ 1 LS 6,600.00$ 1.0 6600.00 100.00% -$ 1.00$6,600.00$ B22 Reolace and install Mulch 1,750.00$ 1 LS 1,750.00$ 1.0 1750.00 100.00% -$ 1.00$1,750.00$ B23 Bioretention Area Earthwork and Planting 14,000.00$ 1 LS 14,000.00$ 1.0 14000.00 100.00% -$ 1.00$14,000.00$ B24 Wooden Header 38.00$ 25 LF 950.00$ 25.0 950.00 100.00%-$ 25.00$950.00$ B25 Bioretention Overflow Structure with Grate 4,900.00$ 1 LS 4,900.00$ 1.0 4900.00 100.00% -$ 1.00$4,900.00$ B26 Plant Establishment Period 1 Year 9,000.00$ 1 LS 9,000.00$ 1.0 9000.00 100.00% -$ 1.00$9,000.00$ B27 Drip Irrigation System 6,400.00$ 1 LS 6,400.00$ 1.0 6400.00 100.00% -$ 1.00$6,400.00$ C1 Mobilization / Demobilization 3,200.00$ 1 LS 3,200.00$ 1.0 3200.00 100.00% -$ 1.00$3,200.00$ C2 Traffic Control 4,000.00$ 1 LS 4,000.00$ 1.0 4000.00 100.00% -$ 1.00$4,000.00$ C3 Water Pollution Prevention Control 1,000.00$ 1 LS 1,000.00$ 1.0 1000.00 100.00% -$ 1.00$1,000.00$ C4 AC Digout Repair 415.00$ 15 TON 6,225.00$ 15.0 6225.00 100.00% -$ 15.00$6,225.00$ C5 Concrete Removal 700.00$ 1 CY 700.00$ 2.0 1400.00 200.00%-$ 2.00$1,400.00$ C6 Aggregate Base and Grading (Allowance) 80.00$ 5 TON 400.00$ 18.7 1493.60 373.40%-$ 18.67$1,493.60$ C7 AC Overlay & Leveling Course 230.00$ 90 TON 20,700.00$ 94.8 21799.40 105.31% -$ 94.78$21,799.40$ C8 Cold Plane Asphalt Concrete 400.00$ 45 CY 18,000.00$ 45.0 18000.00 100.00% -$ 45.00$18,000.00$ C9 Parking Lot Striping, Pavement Markings & Signage 2,700.00$ 1 LS 2,700.00$ 1.0 2700.00 100.00% -$ 1.00$2,700.00$ C10 6' Wheel Stops 195.00$ 6 EA 1,170.00$ 6.0 1170.00 100.00% -$ 6.00$1,170.00$ C11 PVC sleeve for removable bollard 190.00$ 3 EA 570.00$ 3.0 570.00 100.00%-$ 3.00$570.00$ C12 Engineered Paving Fabric 8.00$ 474 SY 3,792.00$ 0.0 0.00 0.00% -$ -$-$ C13 Wooden Headers 35.00$ 130 LF 4,550.00$ 200.0 7000.00 153.85%-$ 200.00$ 7,000.00$ SUBTOTAL 2,157,153.50$ 2,072,036.68$ -$ 2,072,036.68$ PROJECT TOTAL 2,157,153.50$ -$-$ 2,072,036.68$ CHANGE ORDERS CCO UNIT :CCO :UNIT :BID :QUANTITY PREVIOUS % Pay AMOUNT : Total Quantity : Total Amount # DESCRIPTION PRICE :QUANTITY :SIZE :AMOUNT :TO DATE PAID PAID This Month THIS MONTH : to Date : to Date ********* ******************************************************************************************* ************************ * ************ * ********** * ************************* * ************* *********************** ************ * ************* ************************ * ************************* * *************************** CO1 Lot X 3" Conduit 3,471.00$ : 1 : 1 : 3,471.00$ : 1 3471.00 100.00% 0.00 -$ :1.00$: 3,471.00$ CO1 Lot X Blended Transitions 12,167.00$ : 1 : 1 : 12,167.00$ : 1 12167.00 100.00% 0.00 -$ :1.00$: 12,167.00$ CO1 Karen & Davis Court Mob TC 6,409.00$ : 1 : 1 : 6,409.00$ : 1 6409.00 100.00% 0.00 -$ :1.00$: 6,409.00$ CO2 Markers Reflective 13.20$ : 144 : 1 : 1,900.80$ : 144 1900.80 100.00% 0.00 -$ :144.00$ : 1,900.80$ CO2 Buttons Non Reflective 9.90$ : 700 : 1 : 6,930.00$ : 700 6930.00 100.00% 0.00 -$ :700.00$ : 6,930.00$ CO2 Karen Court SubBase 4,118.00$ : 1 : 1 : 4,118.00$ : 1 4118.00 100.00% 0.00 -$ :1.00$: 4,118.00$ CO2 AB at Parking Lot X 23,520.40$ : 1 : 1 : 23,520.40$ : 1 23520.40 100.00% 0.00 -$ :1.00$: 23,520.40$ CO3 El Prado Credit (7,000.00)$ : 1 : 1 : (7,000.00)$ : 0 0.00 0.00% 1.00 (7,000.00)$ :1.00$: (7,000.00)$ CHANGE ORDERS TOTAL 42,708.50$ 51,516.20$58,516.20$ (7,000.00)$ ::51,516.20$ 2,208,669.70$ (7,000.00)$ PREPARED BY: SubTotal (7,000.00)$ 2,123,552.88$ CONTRACTOR: Travis Modena DATE APPROVED BY 6/23/2025 CONSULTANT: Nick Panayotou DATE Retention Owed PP#1-5 106,527.65$ APPROVED BY Total to Pay 99,527.65$ CITY PM: Kevin Okada DATE BURLINGAME 2024 STREET RESURFACING PROJECT June 23, 2025 PAYMENT NO. CONTRACTOR: Interstate CITY PROJECT NO. 86720 6/23/2025 6/23/2025 Docusign Envelope ID: FDA91954-4F02-4521-9245-D4AA72B2AE31 WAYMILLS CREEKEL P O R T A L C H A N N E L EL P O R T A L C H A N N E L EL P O R T A L C H A N N E L CITY LI MI T CI T Y O F MI L L B R A E CITY LI MI T CI T Y O F MI L L B R A E CITY L I M I T C I T Y O F M I L L B R A E S A N F R A N C I S C O W A T E R S H E D CITY LI MI T T O W N O F HI L L S B O R O U G H CITY L I MI T CI T Y O F S A N M A T E O CITY LI MI T CI T Y O F S A N M A T E O CI T Y L IM I T TOW N O F H I L L S BO RO UG H SOU TH ASH TON AV E MU R C H I S O N D R RA I L R O A D R . O . W . RA I L R O A D R . O . W . ATE ROADWAYPRIV LA R O S A LA S T R A D A C T HILLHOWLANDCOY O T E P OI N T D R AIRPO R T B L V D CAROLS K Y V I E W D R LOMA V ISTA DR CANY O N R DLOS MONTES DR CANY O N R D BURLI N G VI E W DR TI P T O E L N SUMMIT DR DEL MONTE DRFEY DRTIARA CTLOS ROBLES DRA L T U R A S D RVALDE F LORES DR LA MESA DR AD E L I N E D R VI S T A BAYS W A T E R A V E PENI N S U L A A V E A R U N D E L R D A N I T A R D M Y R T L E R D EA S T L N B L O O M F I E L D R DKILLARNEY LNCLOVELLY LNA L B E M A R L E W A Y HAMILTON LNROSEDALE AVEM E A D OW L N C O L UM B U S A V E H O O V E R A V E TRO U S D A L E D R FRONTE R A W A Y L O YO L A D R RAY DR S EQ UO I A A V E MALCOLM RDMITTEN RDCOWAN RDSTANTON RDHINCKLEY RDMAHLER RDBURLWAY RDADRIAN RD ADRIA N C T DAVID RDR O L L I N S R D INGOLD RDTROUSDALE DRM A R C O P O L O W A Y Q U E S A D A W A Y BAYSHORE H IGHWAY MURC HI S O N D R M A G N O L I A A V E E L C A M I N O R E A L O G D E N D RSEQUOIA AVEGARDE N D R TROUSDALE DRCLARICE LNDAVIS DRB A L B O A W A Y C O R O N A D O W A Y L A S S E N W A Y M A R C O P O L O W A Y M c D O N A L D W A YMO N T E C O R V I N O RAY DRB A L BO A A V E E A S TM O O R R D WE S T M O O R R D DEVEREUX DROXFORD RDCAMBRIDGE RDRA I L R O A D R . O . W . CA L I F O R N I A D R L AGUNA AVE PA LOMA AVECAPUCH INO A V E E L C AM INO REA L MARQUITA AVESUMMER AVEMILLS AVECASTE N A D A D R KAR E N C T TOLEDO AVE T O L E D O C T RIVE R A D R G R A N A D A D R MARTINEZDRLAS PIE D R A S DR MARIP O S A D R DOLO R E S W A Y M O N T E C I T O W A Y ATWATER DR ALCAZAR DR B A L B O A A V E C O R T E Z A V E C A B R I L L O A V E D R A K E A V E B E R N A L A V E V A N C O U V E R A V E LA G U N A A V E CH U L A V I S T A A V E PA L O M A A V E CA P U C H I N O A V E B A L B O A A V EJUANITA AVERHINETTE AVED W I G H T R D S T A N L E Y R DCHANNING RD B A N C R O F T R D V I C T O R I A R D H U M B O L D T R D BEACH RD FARRINGDON LNACACIA DRPALOMA AVESHERMAN AVED E SO T O A V E CO L UM B U S A V E C A R L O S A V E C A S T I L LO A V E MON T E RO A V E B E N I T O A V E A L V AR A DO A V E HILLSIDE DRPOPP Y D R HALE D R ADELINE DRWAY VALDIVIA CT.HAYWARD TIBU R O N W A Y ARGU E L L O D R RIVE R A D R ARG U E L L O D R SE B A S T I A N D R HILLSIDE DR CON C O R D W A Y VER N O N W A Y LEXI N G T O N W A Y PLYM O U T H W A Y TRE N T O N W A Y ALPINE AVELINDEN AVELAUREL AVEMAPLE AVEWINCHESTER DRFRANCISCO DRMARIN DRCORBITT DRWINCHESTER PLC U M B E R L A N D D R M A R I N D R C H A T H A M R D ROLLINS RD AIRPORT BLVD AIRPORT BLVD RALSTON AVEHOWARDNEWLANDS AVECYPRESS AVEAVEBAYS W A T E R A V E EL C A M I N O R E A L EAST C A R O L CHAPIN A V E COSTAH U N T D R RAY CTMARG A RI T A A V E AL T U R A S D R LOS MONTES DR LOS A L TOS DR HILLSIDE DR LA M E S A D R CA N Y O N R DCRYSTAL TEREL QUANITO WAYKENMAR WYHI L L S I D E SANC H E Z A V E FOR E S T VI E W A V E N EW H A L L R D CR O S S W A Y R D NE U C H A T E L WI L L B O R O U G H OAK G R O V E A V E ALM E R R D AN S E L RD BELLEVUE AVEP A R K R D P R I M R O S E R D L O R T O N A V E ANZA B L V D C L A R E N D O N R D CA L I F O R N I A D R H I G H L A N D A V E CRESCENT AVE S K Y L I N E B L V D CON C O R D W A Y BA Y D W I G H T R D CA R O L A N A V E FLORIBUNDA AVEE L C AM I NO R E A L PALM D R BAYSHORE FREEWAY 101 LASUE N D R S BROADAVEHOW A R D A V E PEPPER AVEELM AVE CA L I F O R N I A D R LA U R E L A V E LI N D E N A V E PAR K A V E OAK G R O V E A V E MOR R E L L A V E LARK S P U R D R TOYON DRLI N D E N A V E AZ A L E A A V E MAJILLA AVESANCHEZ AVECARMELITA AVEBROADWAY E L C AM I N O R E A L C O R T E Z A V E C A B R I L L O A V E D R A K E A V E B E R N A L A V EHIGHW AY RD M A R S T E N R D MARSTEN RDNERLI LNB A Y S H O R E H I G H W A Y BURLW A Y R D DAVIS DRRIO CTARGUELLO DRMARIPOSAVALDI V I A EASTO N D R L O S R O B L E S D R EASTON DRRO L L I N S R D BROADWAY ADELINE DRV A N CO U V E R A V E CA L I F O R N I A D R WILLO W A V E B L O O M F I E L D R D BUR LI N G A M E A V E HOW A R D A V E PENI N S U L A A V E P R I M R O S E R DDOUGLAS AVENOR T H L N SOU T H L N W E S T L N FRO N T E R A W A Y CA L I F O R N I A D R TOYO N D R N I D A H O S T B L V DN AMPHLETT CANYON RD FOOTLN 20VALD E F L O R E S D R TULIP CTCANADAHALE DR HIL L S I D E D R OAK TREE PL BELLA VISTA DRDALEOAKRDTROUSDA L E D R GROVE AVEBAYSHORE FREEWAY 101BAYSHORE FREEWAY 101 LANG RD CITYPLAZ A L N FOX SA N M A T E O A V E PALM D RSTAR WAYPLAZA L N EASTMOOR RDMARCE L L A W AY PINON AVECTMILL S C A N Y O N C T SKY L INE B LVD LNLOMACANANEA AVELA MESA CT LA MESA LNA RM S B Y D R JACKL I N G DR JACKLING DRFAGAN DRHWY 2 8 0 >>>><<<< HWY 2 8 0 HWY 280 >>>><<<< HWY 280 << < < HW Y 2 8 0 HW Y 2 8 0 > > > > SANCHEZ CREEK CH A N N E L SANCHEZ CREEK CH A N N E LBAY FRONT CHANNELC I T Y L I M I T C I T Y O F S A N M A T E O BELL E V U E A V E H A T C H L NDUFFERIN AVEB A Y SHO R E F R E EW A Y 1 0 1 BAYSH O R E F R E E W A Y 1 0 1 ROLLI N S R D ROL L I N S R D ROLLIN S R D ROLLINS RD HOW A R D A V E HOW A R D A V E P A R K R D EL C A M I N O R E A L BARR O I L H E T A V EOCCIDENTAL AVEBURLINGAMEP R I M R O S E R D E L C AM I N O R E A L E L C A M I NO R E A L A C A C I A D R P A L O M A A V E B A L B O A A V E C O R T E Z A V E E L C AM I N O R E A LPA LOMA AV ECAPUCHINO A VE C A B R I L LO A V E D R A K E A V E EUXDEV DRER Q U E S A D A SKYLINE BLVD S K Y L I N E B L V D EL P R A D O R D CANYON RDCA L I F O R N I A D R PENI N S U L A A V E AT W A T E R D R LINCOLN AVEED G E H I L L D R EDG E HI L L D R D R A K E A V ETROUSDALE DROGDEN DRE L C A M I N O R E A L GROVE AVEOAK G R O V E A V E HWY 280 >>>><<<< HWY 280 ADRIAN RDADRIAN RD R O L L I N S R D AIRPORT BLVD CADILLAC WAYCASTENADA DR CA R O L A N A V E EASTON DRRDSUMMIT DRCHAPIN AVERALST O N A V E GLE N A U L I N L N MUR C HI S O N D R LASUEN C T R A I L R O A D R . O . W . RA I L R O A D R . O . W . RA I L R O A D R . O . W .GILBRETH RD TROUSD A L E D R HILLSIDE DRCARMELITA AVEBUR LI N G A M E A V EADELINE DRRIVER A D R HILLSIDE DRBAYSHORE FREEWAY 101LIVE O A K L N N H U M B O L D T S T N EL CAM INO REAL BAILEYANA DR CHESTER WY BARR OI L H E T A V E PARK SI D E A V E N I D A H O S T N D E L A W A R E S T N C L A R E M O N T S T STUDI O CI R WO O D S I D E W A Y N S A N M A T E O D R J E F F E R S O N C T WARR E N R D HURLINGHAM AVECOSTA R ICA AVEASTER AVEG R E E NW O O DGAVILAN WAY ADRI A N R D SEQU O I A A V E VALLEJO DRMURCHI SON DR HAWT H O R N E W A Y LAKE S T IRWIN P L R O L L I N S R D ADRI A N R D E MI L L B R A E A V E C A L I F O R N I A D R E MI L L B R A E A V E FRO N T E R A W A Y P R O S P E C T R O W KA M M E R E R C T LAT H A M C T PE P P E R A V E COUNTRY CLUB DRGENEVRA RDWI N D S O R D R SHARON AVE HIGHG A T E LN FAIRW A Y C I R FLORI B U N D A A V E HILLSBOROUGH BLVDCRO C K E T T L N SH A R O N A V EMANOR DRFOREST VIEW AVEFOREST VIEW AVE GERI LNFORE S T V I E W A V E EUCALYPTUS AVEREYN O L D S C T DOW N E Y W A Y MARGO LNSHELDON WAYJACKLING DR P A NO R AM A C T WOODGATE CTPATTON PLCHURCHIL L DR MACADA M I A D RKINDER LNFAWN CTEDESSA CTFORREST VIEW A V E EDEN WAY BAILEYANA CTIRWIN DRLOMA V ISTA LNMARTINEZ DRDAVIS DRLAGUN A A VE D R A K E A V E HILLSIDE DRV A N CO U V E R A V E OXFORD RD EAST O N D R HI L LV IEW CT L A G U N A A V E LI N D E N A V EVALDIVIA WAY E S C A L A N T E W A Y H U N T D R BELVEDERE CTSUMMIT D R VA N C O U V E R A V E EDWARDS CTBE R N A L A V E SEBASTIAN DRPINION AVEAIRPORT BLVD VI E W P L NORTHBOUND LANE ONLY TRE N T O N W A Y PAR KI N G L O T X FS 3 5 P A R K I N G L O T PENI N S UL A A V E KAR E N C T DAVIS CT 2024 STREET RESURFACING PROJECTS PROJECT MAP LEGEND PROJECT STREET TO BE RESURFACED PAVEMENT SECTION REPAIRS ONLY Docusign Envelope ID: FDA91954-4F02-4521-9245-D4AA72B2AE31