HomeMy WebLinkAboutReso - PC - 053-2002RiCORDINGREQUESTEDBY
Phw ing Dqp ment
City ofBU'Mg.n.
WHEN RECORDED MAIL TO:
PLANNINCIDEPARTM13NT
CITY OF I3TJRUNCTAME
501 PRIMROSE ROAD
BURLINGAME, CA940I0
Resolution No.53-2002
2821 TIBURON WAY; APN: 025-033-I10
TITLE OF DOCUMENT
I hereby certify this to be a full, true
and correct copy of the document it purports
to be, the original of which is on Me in
my office.
Date: ^ 06../0�4(.0022--,/��'Q"� ,,,
M- Irv/ XXs I I VW 1
Margar t Monroe, City Planner
RESOLUTION APPROVING CATEGORICAL EXEMPTION,
HILLSIDE AREA CONSTRUCTION PERMIT, DESIGN REVIEW, AND SPECIAL PERMIT
FOR AN ATTACHED GARAGE
RESOLUTION 53-2002
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a categorical exemption has been proposed and application has been made for a hillside
area construction permit, design review, and a special permit for a new two-story house with attached garage
at 2821 Tiburon Way, zoned, zoned R-1, George Tan, property owner, APN: 025-033-110;
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on. May
28, 2002, at which time it reviewed and considered the staff report and all other written materials and
testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
1. On the basis of the Initial Study and the documents submitted and reviewed, and
comments received and addressed by this commission, it is hereby found that there is no substantial evidence
that the project set forth above will have a significant effect on the environment, and categorical exemption,
per CEQA Article 19 Section: 15303, Class 3 - (a) construction of a limited number of new, small
facilities or structures including (a) one single family residence or a second dwelling unit in a residential
zone. In urbanized areas, up to three single-family residences maybe constructed or converted under this
exemption.
2. Said hillside area consti Liction permit, design review and special permit are approved, subject
to the conditions set forth in Exhibit "A" attached hereto. Findings for the hillside area construction permit,
design review and special permit are as set forth in the minutes and recording of said meeting.
3. It is further directed that a certified copy of this resolution be recorded in e official rec s of
the County of San Mateo. X�/C.
HAIRM AN
I, Ralph Osterliiig, Secretary of the Planning Commission of the City of Burlingame, do hereby certify
that the foregoing resolution was introduced and adopted at a regular meeting of the Planning Conunission
held on the 28th day of May, 2002, by the following vote:
AYES: COMMISSIONERS:
NOES: COMMISSIONERS: �� jf an, Bojues, Brownrigg, Keele, Keighran, Osterling and Vistica
ABSENT: COMMISSIONERS: NONE
NONE C
S CRETA
EXHIBIT "A"
Conditions of approval for hillside area construction permit, design review and special permit
2821 TIBURON WAY
effective JUNE 3, 2002
that the project shall be built as shown on the plans submitted to the Planning Department
date stamped May 16, 2002, sheets Al through A7 and Ll, and that any changes to the
footprint or floor area of the building shall require and amendment to this permit;
2. that any changes to the size or envelope of the first or second floors, which would include
adding or enlarging a dormer(s), moving or changing windows and architectural features or
changing the roof height or pitch, shall be subject to design review;
3. that the conditions of the City Engineer's and Recycling Specialists April 8, 2002, memos
shall be met;
4. that the project shall comply with the proposed demolition and construction recycling
ordinance recently approved by the City Council;
that a licensed surveyor shall survey the corners and sufficient points along erected story
poles and then survey the same points along the framed roof before framing inspection is
scheduled the City Engineer shall confirm that the height and slope of the new roof matches
what was demonstrated by the story poles; that the highest roof ridge shall be confirmed by
the licensed surveyor and shall be no greater than 90.47 feet; that surveys shall be submitted
to the City Engineer for verification, and that if the framing is different than the approved
plans or as demonstrated by the story poles the construction shall be corrected or the project
shall be reviewed by the Planning Commission;
6. that there shall be a gate with no fence installed at the left side of the house, running parallel
to the front property line; and that there shall never be a paved walk way installed along the
left side of the dwelling;
that the gravel used for the flat portion of the roof shall be a non -reflective medium gray
color to match the Northampton blend HE 8703 of the roof shingles; and
8. that the project shall meet all the requirements of the California Building Code and
California Fire Code, 1998 edition, as amended by the City of Burlingame,
AW&6c,"tj 646�pj & 4 a- w6.J4,
/ 4
dyclt-
ROUTING FORM
DATE: April8, 2002
TO: City Engineer
_Chief Building Official
Fire Marshal
ZRecycling Specialist
—Sr. Landscape Inspector
City Attorney
FROM: Planning Staff
SUBJECT: Request for design review and hillside area construction permit for a new two-story single
.family dwelling at 2821 Tiburon Way, zoned R-1, APN: 025-182-070.
2002
P6A44
awl
n^) 4
V
I
A- vt C �"
Reviewed By: i>/1 Date of Comments: �/0�0 Z
ROUTING FORM
DATE: April 8, 2002
TO: ✓ City Engineer
_Chief Building Official
_Fire Marshal
_Recycling Specialist
—Sr. Landscape Inspector
__City Attorney
FROM: Planning Staff
SUBJECT: Request for design review and hillside area construction permit for a new two-story.single
.family dwelling at 2821 Tiburon Way, zoned R-1, APN: 025-182-070.
PUBLIC WORKS DEPARTMENT ENGINEERING DIWISION
PLANNING REVIEW COMMENTS '11-0—Slwy
Project Namer�� rxcW fh+$*
Project Address:_ OV 110"
The following requirements apply to the project
1 _ A property. boundary survey shall be preformed by a licensed land
surveyor. The survey shall show all property lines, property corners,
easements, topographical features and utilities. (Required prior to the
building permit issuance.)
2 u The site and roof drainage shall be shown on plans and should be made to
drain towards the Frontage Street. (Required prior to the building permit
issuance.)
3. The applicant shall submit project grading and drainage plans for
approval prior to the issuance of a Building permit.
4 The project site is in a flood zone, the project shall comply with the City's
flood zone requirements.
5 Asa sanitary sewer lateral4" is required for the project in accordance with
the City's standards. (Required prior to the building permit issuance.)
6. The project plans shall show the required Bayfront Bike/Pedestrian trail
and necessary public access improvements as required by San Francisco
Bay Conservation and Development Commission.
7. Sanitary sewer analysis is required for the project. The sewer analysis
shall identify the project's impact to the City's sewer system and any
sewer pump stations and identify mitigation measures.
8 Submit traffic trip generation analysis for the project.
9. Submit a traffic impact study for the project. The traffic study should
identify the project generated impacts and recommend mitigation
measures to be adopted by the project to be approved by the City
Engineer.
10. The project shall file a parcel map with the Public Works Engineering
Division. The parcel map shall show all existing property lines, easements,
monuments, and new property and lot lines .proposed by the map.
Page 1 of
U:lprivate developmentTLANNING REVIEW COMMENTS.doc
PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
11. A latest preliminary title report of the subject parcel of land shall be
submitted to the Public Works Engineering Division with the parcel map
for reviews.
12. Map closure/lot closure calculations shall be submitted with the parcel
map.
13 The project shall submit a condominium map to the Engineering Divisions
in accordance with the requirements of the Subdivision Map Act.
14 The: project shall, at its own cost, design and construct frontage public
improvements including curb, gutter, sidewalk and other necessary
appurtenant work.
15 The project shall, at its own cost, design and construct frontage streetscape
improvements including sidewalk, curb, gutters, parking meters and poles;
trees, and streetlights in accordance with streetscape master plan.
16 By the preliminary review of plans, it appears that the project may cause
adverse impacts during construction to vehicular traffic, pedestrian traffic
and public on street parking. The project shall identify these impacts and
provide mitigation measure acceptable to the City.
17 The project shall submit hydrologic calculations from a registered civil
engineer for the proposed creek enclosure. The hydraulic calculations
must show that the proposed creek enclosure doesn't cause any adverse
impact to both upstream and downstream properties. The hydrologic
calculations shall accompany a site map showing the area of the 100-year
flood and existing improvements with proposed improvements.
18 Any work within the drainage area, creek, or creek banks requires a State
Department of Fish and Game Permit and Army Corps of Engineers
Permits.
19 No construction debris shall be allowed into the creek.
20 The project shall comply with the City's NPDES permit requirement to
prevent storm water pollution.
22
���riil�� y�i ��/+�✓.�J/ r��%����/,�// ��'r
4 NMI
i ell l��r����
1 1 �
The. plans do not indicate the slope of the driveway, re -submit plans
showing the -driveway profile with elevations
Page 2 of 3
U:lprivate developmentlPLANMNG REVIEW COMMENTS.doc
PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
23 The back of.the driveway/sidewalk approach shall be at least 12" above
the flow line of the frontage curb in the street to prevent overflow of storm
water from the street into private property.
24. For the takeout service, a garbage receptacle shall be placed in front. The
sidewalk fronting the store shall be kept clean 20' from each side of the
property.
25. For commercial projects a designated garbage bin space and cleaning area
shall be located inside the building. A drain connecting the garbage area to
the Sanitary Sewer System is required.
Page 3 of 3
UAprivate developmentTLANNING REVIEW COMMEWS.doe