HomeMy WebLinkAboutReso - PC - 102-2003REQUESTED BY:
Planning Department
City of Burlingame
WHEN RECORDED MAIL TO:
PLANNING DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE
Resolution No. 102-2003
1432 CABRILLO AVENUE: APN: 026-051-160
TITLE OF DOCUMENT
I hereby certify this to be a full, true
and correct copy of the document it purports
to be, the original of which is on file in my office.
Date: 12/05/03
Mar aret Monroe, Ci y Planner
RESOLUTION 102-2003
RESOLUTION APPROVING CATEGORICAL EXEMPTION, CONDITIONAL USE
PERMIT, DESIGN REVIEW AND SPECIAL PERMIT
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a categorical exemption has been proposed and application has been made for
conditional use permit for re-emerging lots, design review and special permit for decliningheight
eight
envelope for construction of a new, two-story single family dwelling and detached garage at
1432 Cabrillo Avenue, zoned R-1, Robert and Cynthia Gilson, 30 Woodgate Court,
Hillsborough, CA 94010, property owners, APN: 026-051-160 (LOT 29 BLK 48 EASTON
ADD BURLINGAME NO 4 RSM A/45);
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on
November 24, 2003, at which time it reviewed and considered the staff report and all other
written materials and testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
On the basis of the Initial Study and the documents submitted and reviewed, and
comments received and addressed by this commission, it is hereby found that there is no
substantial evidence that the project set forth above will have a significant effect on the
environment, and categorical exemption, per CEQA Article 19, Section 15303, Class 3 —
(a) construction of a limited number of new, small facilities or structures including (a)
one single family residence or a second dwelling unit in a residential zone. In urbanized
areas, up to three single-family residences maybe constructed or converted under this
exemption, is hereby approved.
2. Said conditional use permit, design review and special permit are approved, subject to the
conditions set forth in Exhibit "A" attached hereto. Findings for such conditional use
permit, design review and special permit are as set forth in the minutes and recording of
said meeting.
3. It is further directed that a certified copy of this resolution be recorded in the
records of the County of San Mateo. t
I, l2a.l ph QS+PY-linq Secretary of the Planning Commis? i n of the City of Butngame,
do hereby certify that Me foregoing resolution was introduced an adopted at a regular meeting
of the Planning Commission held on the 24`h day of November, 2003, by the following vote:
AYES: COMMISSIONERS: Auran, Boju6s, Osterling, Vistica
NOES: COMMISSIONERS: NONE
p-
ABSENT:V
COMMISSIONERS: Brownrigg, Keele, K° l�, 1.
ABSTAIN: COMMISSIONERS: NONE Secretary l
EXHIBIT "A"
Conditions of approval for categorical exemption, conditional use permit, design review and
special permit.
1432 Cabrillo Avenue
Effective December 4, 2003
that the project shall be built as shown on the plans submitted to the Planning Department
date stamped October 29, 2003, sheets A.1 — A.6 and L1.0, and that any changes to the
footprint or floor area of the building shall require and amendment to this permit;
2. that any changes to the size or envelope of the first or second floors, or detached garage,
which would include adding or enlarging a dormer(s), moving or changing windows and
architectural features or changing the roof height or pitch, shall be subject to Planning
Commission review;
that the tree protection measures for the protected -sized trees described in the arborist
report, dated October 27, 2003, shall be installed and inspected by the City Arborist
before issuance of a building permit and shall be complied with during construction, and
that the property owner shall maintain the trees after construction as directed by the
arborist report;
4. that protective fencing shall be installed eight to ten feet around the redwood tree in the
front yard prior to any demolition, construction, or material/equipment staging on site and
shall be maintained until the final inspection has been completed;
5. that the required tree protection measures shall be monitored during construction by a
Certified Arborist who shall inspect the construction site once a week and certify in
writing to the City Arborist and Planning Department that all tree protection measures are
in place and requirements are being met;
6. that the front porch and single family dwelling shall be constructed using a pier and grade
beam foundation;
7. that the existing driveway shall be removed and new driveway installed only after the
existing garage has been removed and the new garage has been built;
8. that the applicant shall submit to the City Arborist for approval a Certified Arborist's
report detailing a three year protection plan with post -construction guidelines concerning
trimming and fertilizing the protected -sized trees prior to building permit issuance; the
applicant shall be responsible for the maintenance of the trees for three years after
construction is finaled by the City and shall bear the penalty fee should the trees not
survive the three-year period; the trees shall be inspected for compliance twice a year by
the City Arborist during the three-year period;
EXHIBIT "A"
Conditions of approval for categorical exemption, conditional use permit, design review and
special permit.
1432 Cabrillo Avenue
Effective December 4, 2003
Page 2
9. that the conditions of the City Engineer's September 12, 2003 memo, the Chief Building
Official's and Fire Marshal's September 15, 2003 memos, the Recycling Specialist's
September 10, 2003 memo, and the City Arborist's November 18 and September 19,
2003, memos shall be met;
10. that prior to scheduling the framing inspection, the project architect, engineer or other
licensed professional shall provide architectural certification that the architectural details
such as window locations and bays are built as shown on the approved plans; if there is
no licensed professional involved in the project, the property owner or contractor shall
provide the certification under penalty of perjury. Certifications shall be submitted to the
Building Department;
11. that prior to final inspection, Planning Department staff will inspect and note compliance
of the architectural details (trim materials, window type, etc.) to verify that the project
has been built according to the approved Planning and Building plans;
12. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a
single termination and installed on the portions of the roof not visible from the street; and
that these venting details shall be included and approved in the construction plans before
a Building permit is issued;
13. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the
height of the roof ridge and provide certification of that height to the Building
Department;
14. that prior to scheduling the foundation inspection a licensed surveyor shall locate the
property corners and set the building envelope;
15. that prior to underfloor frame inspection the surveyor shall certify the first floor elevation
of the new structure(s) and the various surveys shall be accepted by the City Engineer;
16. that during demolition of the existing residence, site preparation and construction of the
new residence, the applicant shall use all applicable "best management practices" as
identified in Burlingame's Storm Water Ordinance, to prevent erosion and off -site
sedimentation of storm water runoff,
EXHIBIT "A"
Conditions of approval for categorical exemption, conditional use permit, design review and
special permit.
1432 Cabrillo Avenue
Effective December 4, 2003
Page 3
17. that the applicant shall submit an erosion and sedimentation control plan describing
BMPs (Best Management Practices) to be used to prevent soil, dirt and debris from
entering the storm drain system; the plan shall include a site plan showing the property
lines, existing and proposed topography and slope; areas to be disturbed, locations of
cut/fill and soil storage/disposal areas; areas with existing vegetation to be protected;
existing and proposed drainage patterns and structures; watercourse or sensitive areas on -
site or immediately downstream of a project; and designated construction access routes,
staging areas and washout areas;
18. that the erosion and sedimentation control plans should include notes, specifications,
and/or attachments describing the construction operation and maintenance of erosion and
sediment control measures, including inspection frequency; methods and schedule for
grading, excavation, filling clearing of vegetative cover and mulch, including methods
and schedules for planting and fertilization; and provisions for temporary and permanent
irrigation;
19. that off -site runoff shall be diverted around the construction site and all on -site runoff
shall be diverted around exposed construction areas;
20. that fiber rolls and other erosion prevention products are installed around the construction
site as a barrier to prevent erosion and construction runoff into the storm drain;
21. that oils, fuels, solvents, coolants and other chemicals stored outdoors shall be protected
from drainage by structures such as berms and roof covers; bulk materials stored
outdoors shall be protected from drainage with berms and covers; equipment stored
outdoors shall be stored on impermeable surfaces, shall be covered and shall be inspected
for property functioning and leaks; all storage areas shall be regularly cleaned, including
sweeping, litter control and a spill cleanup plan;
22. that landscape areas shall be designed to reduce excess irrigation run-off, promote surface
filtration and minimize the use of fertilizers, herbicides and pesticides;
23. that demolition of the existing structures and any grading or earth moving on the site
shall be required to comply with all the regulations of the Bay Area Air Quality
Management District;
24. that the applicant shall comply with Ordinance 1503, the City of Burlingame Storm
Water Management and Discharge Control Ordinance; and
EXHIBIT "A"
Conditions of approval for categorical exemption, conditional use permit, design review and
special permit.
1432 Cabrillo Avenue
Effective December 4, 2003
Page 4
25. that the project shall meet all the requirements of the California Building and Uniform
Fire Codes, 2001 Edition, as amended by the City of Burlingame.
Project Comments
Date: 9/9/03
To: & City Engineer
❑ Chief Building Official
❑ Fire Marshal
❑ Recycling Specialist
❑ City Arborist
❑ City Attorney
From: Planning Staff
Subject: Request for design review and special permit for declining height
envelope for a new two story single family dwelling at 1432 Cabrillo
Avenue, zoned R-1, APN:026-051-160
Staff Review: 9/15/03
s
Reviewed by: Date: /� / _
vv `�'j?-Lc75
PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
PLANNING REVIEW COMMENTS
Project Name: 004AO.,i: 7
-Project Address:_ 1 3.2 wxg w
The following requirements apply to the project
1" A property. boundary survey shall be preformed by a licensed land
surveyor. The survey shall show all property lines, property corners,
easements, topographical features and utilities. (Required prior to the
building perurit issuance.)
2 V The site and roof drainage shall be shown on plans and should be made to
drain towards the Frontage Street. (Required prior to the building permit
issuance.)
3. The applicant shall submit project grading and drainage plans for
approval.prior to the issuance of a Building permit.
4 The project site is in a flood zone, the project shall comply with the City's
flood zone requirements.
5 n: A sanitary sewer lateral i t is required for the project in accordance with
the City's standards. (Required prior to the building permit issuance.)
6. The project plans shall show the required Bayfront Bike/Pedestrian trail
and necessary public access improvements as required by San Francisco
Bay Conservation and Development Commission.
7. .Sanitary sewer analysis is required for the project. The sewer analysis
shall identify the project's impact to the City's sewer system and any
sewer pump stations and identify mitigation measures.
8 . - Submit traffic trip generation analysis for the project
9. Submit a traffic impact study for the .project. The traffic study should
identify the project generated impacts and recommend mitigation
measures to be adopted by the project to be approved by the City
Engineer.
10. The project shall file a parcel map with the Public Works Engineering
Division. The parcel map shall show all existing property lines, easements,
monuments, and new property and lot lines proposed by the map.
Pagel of3
U.Wvate development\PLANNING REVIEW COMMENTS.doe
PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
11. A latest preliminary title report of the subject parcel of land shall be
submitted to the Public Works Engineering Division with the parcel map
for reviews.
12, Map closure/lot closure. calculations shall be submitted with the parcel
map.
13 The project shall submit a condominium map to the Engineering Divisions
in accordance with the requirements of the Subdivision Map Act.
14 N/ Theproject shall, at its own cost, design and construct frontage. public
improvements including curb, gutter, sidewalk and other necessary
appurtenant work.
15 The project shall, at its own cost, design and construct frontage streetscape
improvements including sidewalk, curb, gutters, parking meters and poles,
trees, and streetlights in accordance with streetscape master plan.
16 By the preliminary review of plans, it appears that the project may cause
adverse impacts during construction to vehicular traffic, pedestrian traffic
and public on street parking. The project shall identify these impacts and
provide mitigation measure acceptable to the City.
17 The project shall submit hydrologic calculations from a registered civil
engineer for the proposed creek enclosure. The hydraulic calculations
must show that the proposed creek enclosure doesn't cause any adverse
impact to both upstream and downstream properties. The hydrologic
calculations shall accompany a site map showing. the area of the 100-year
flood and existing improvements with proposed improvements.
18 Any work within the drainage area, creek; or creek banks requires a State
Department of Fish and Game Permit and Army Corps of Engineers
Permits.
19 No construction debris shall be allowed into the creek.
20 is The project shall comply with the City's NPDES permit requirement to
prevent storm water pollution.
21 N! The project does not show the dimensions of existing driveways, re-
submit plans with .driveway, dimensions. Also clarify if the project is
proposing to widen the driveway. Any widening of the driveway is subject
to City Engineer's approval.
22 The plans do not indicate the slope of the driveway, re -submit plans
showing the.driveway profile with elevations
Page 2 of 3
U.\private development\PLANNINC, REVIEW COMAIENTS.doc
PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION
23 The back of.the driveway/sidewalk approach shall be at least 12" above
the flow line. of the frontage curb in the street to prevent overflow of storm
water from the street into private property.
24. For the takeout service, a garbage receptacle shall be placed in front. The
sidewalk fronting the store shall be kept clean 20' from each side of the
property.
25. For commercial projects a designated garbage bin space and cleaning area
shall be located inside the building. A drain connecting the garbage area to
the Sanitary Sewer System is required.
Page 3 of 3
U:lprivate developmentTLANNING REVIEW COI\MENTS.doc
Project Comments
Date: 9/9/03
To: ❑City Engineer
C(/Chief Building Official
O Fire Marshal
Recycling Specialist
❑ City Arbodst
❑ City Attorney
From: Planning Staff
Subject: Request for design review and special permit for declining height
envelope for a new two story single family dwelling at 1432 Cabrillo
Avenue, zoned R-1, APN:026-051-160
Staff Review: 9/15/03
CP"� �G/��✓ LSae^I adit��de G�s,�•�na rvtO l�rs
Reviewed by: Date:
•u�asn •neaBm>rvcus'ua..xva.��
Project Comments
Date: 9/9/03
To: ❑ City Engineer
VIlr
ief Building Official
e Marshal
❑ Recycling Specialist
❑ City Arborist
❑ City Attorney
From: Planning Staff
Subject: Request for design review and special permit for declining height
envelope for a new two story single family dwelling at 1432 Cabrillo
Avenue, zoned R-1, APN:026-051-160
Staff Review: 9/15/03
Ty�eti �/ �c�_ 0. 'Y—e s , V�v�-I `Lt-Q 'Y'i ✓'C' �iO � �
S
Reviewed by:
Date:
k
Date: 9/9/03
To: ❑ City Engineer
❑ Chief Building Official
❑//Fire Marshal
C0'Recycling Specialist
❑ City Arborist
❑ City Attorney
From: Planning Staff
Subject: Request for design review and special permit for declining height
envelope for a new two story single family dwelling at 1432 Cabrillo
Avenue, zoned R-1, APN:026-051-160
Staff Review: 9/16/03
Applicant shall submit a Waste Reduction Plan and
Recycling Deposit for this and all covered projects and
sections of projects prior to any demolition, construction
or permitting.
Project Comments
Date: 9/9/03
To: ❑ City Engineer
❑ Chief Building Official
❑ Fire Marshal
El Recycling Specialist
City Arborist
❑ City Attorney
From: Planning Staff
Subject: Request for design review and special permit for declining height
envelope for a new two story single family dwelling at 1432 Cabrillo
Avenue, zoned R-1, APN:026-051-160
Staff Review: 9/15/03
�6�14s �fL®4+�c�E� 5i2� -Tkc6s y -�
2 ..s®oc ® t". W Oc- crK
i�cG.9vE Lq t Zan -E. mx WAe
/D Ma ate �t-a��•� �Zvb� 'b'.O aa..�Gr,� /d- �> � 2 t--�6'�G.t�
iP� �ov.wYSAruv., tut' 4 r3E
Reviewed by:
Project Comments
Date: November 12, 2003
To: ❑ City Engineer
❑ Chief Building Official
❑ Fire Marshal
❑ Rec ling Specialist
19 City Arborist
❑ City Attorney
From: Planning Staff
Subject: Request for design review for two new single family dwellings at 1428
& 1432 Cabrillo Avenue, zoned R-1, APN: 026-051-160
Staff Review:
rloukE7��lm
�oaao2�s� ,e�,00�4-'
/o
TA
%
klouc�
.iZ6Gmn.+��.cv� .4Gct✓Ev& i1
y� jq�"dfg&
r6lOY;�"
t \74AT-
TflE /26musav'�j 'T%GE� ��/ 1 fi2QY�t alkSY7¢ t
sd��?
r��ry
02 oTii�1Z 'f'yr`�rf_ of
�ESidN
Reviewed by:
Date: