Loading...
HomeMy WebLinkAboutReso - PC - 2024-05.13-9B - 1410 Carlos AvenueDocuSign Envetope i; DABTD3BG.oi 94-4225 97E6-8BA57OB882C2 RECORDING REOUESTED BY Planning Department City of Burlingame WHEN RECORDED [/A t TO COI\,IMUNITY DEVELOPMENT DEPARTMENT CITY OF BURLINGAt\.,!E 501 PRIMROSE ROAD BURLINGAME, CA 94010 2024-041703 2124 pm Ogt77;2OZ4Rl Fee: NO FEE Counr of pag€s4 Fecord6C in Off icial R6conJs Cou,lty of San Mateo Mark Church Asso6so r-Co u nly C le rk-Recor.jor , ilirjl iilii ifliLlfl[fli[ i,rlfl]lliiili l tn iiiiilili i ri lilr Resolution No. 2024-05. 1 3-9B 1410 CARLOS AVENUE APN 027-166-140 I hereby certjiy this to be a full, true and conect mpy oi the document it purports to be, the original of which is on tlle in my office. 24. 2424 Df,titor TITLE OF DOCUMENT . +.,&ff8 Date Rub€n Hurin, lnterjm Community Deve 47Eb r.rutsrE 4( 2.^W-*='rf?: RESOLUTION APPROVING CATEGORICAL EXEMPTION AND DESIGN REVIEW RESOLVED, by the Planning Commission of the City of Burlingame that WHEREAS Review for . a Categorical Exemption has been prepared and application has ft and second sto additi n an existin srn le-unit wellin been made for Desiqn at 1410 Carlos Avenue. Z oned R-1 Neda Hamadani a nd Bahram Razani. orooertv own ers APN: 027-166-140 WHEREAS, sald matters were heard by the Planning Commission of the City of Burlingame on Mav 13. 2024, al which time it reviewed and considered the staff report and all other written materials and testimony presented at sard hearing; NOW, THEREFORE, it is RESOLVED and DETERMINED by this Ptanning Commission that: On the basis of the lnitial Study and the documents submitted and reviewed, and comments received and addressed by this Commission, it is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and categorical exemption, per CEQA Section '15301 (e)(1) of the CEQA Guidelines, whrch states that additions to existing structures are exempt from environmental review, provided the addition will not result in an increase of more than 50% of the floor area of the structures before the addition. is hereby approved. Said Design Review is approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such Design Review is set forth in the staff report, minutes, and recording of said meeting. 3. lt is further directed that a certified copy of this resolution recorded in the official records of the County of San Mateo rperson j" h:llti: 1 2 t,, Secretary of the Planning Commission of the City of Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the Planning Commission held on the 13th dav of May, 2024 by the following vote 1410 CARLOS AVETUE - RESO 202lHl5.13{B AYES: COUAROTO, HORAN' LOWENTHAI- PFAFF, SCHTID, TSE I{OES: NONE ABSENT SHORES RECUSED: t{ONE 4t'rtr0 Secretary EXHIBIT "A" Conditions of Approval for Categorical Exemption and Design Review '1410 Carlos Avenue Effective May 23,2024 Page 1 2 4 7 8 that the project shall be built as shown on the plans submitted to the Planning Division date stamped April 1 9, 2024, sheets A1 through A16; that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to planning Division or Planning Commission review (FYl or amendment to be determined by Planning staff); that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Drrector; that demolition for removal of the existing structures and any grading or earth movlng on the site shall not occur until a building permit has been issued and such site work shall be reguired to comply with all the regulations of the Bay Area Air Quality Management District; that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; that the project shall comply with the Construction and Demolitron Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; that the project shall meet all the requirements of the California Building and Uniform Fire Codes, in effect at time of building permit submittal, as amended by the City of Burlingame; THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: b 1 o EXHIBIT "A" Conditions of Approval for Categorical Exemption and Design Revjew 1410 Carlos Avenue Effective May 23, 2024 Page 2 10 11 that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certrfication that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; and that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (kim materials. window type, etc.) to verify that the project has been built according to the approved Planning and Building plans.