Loading...
HomeMy WebLinkAboutReso - PC - 2023-11.13-9CDocuSign Envelope lD: EBF579C.:-3A4C4C64-BE55-49B5963F5760 RECORDING REQUESTED BY WHEN RECORDED MAIL TO: COMMUNITY DEVELOPMENT DEPARTMENT CITY OF EURLINGAI\,,!E 501 PRIMROSE ROAD BURLINGAME, CA 94010 2A24-04171A 2:35 Dtri 78107 2A2a R1 F-ra: NO FEE Co uni of Paqes i4 Recordrd in Oflicial RecordG Co!nry of Srn Mateo ivlark Church A66essor-County :16 i..-Re :rrdcr iXlilr tifll i[lfllflniflU iririlrl[lflllilirilllililiiilii]| l' rlli D +t Resolution No. 2023-1 1.13-9C 1870-1876 EL CAMINO REAL APNs 025-'150-160 AND 025-150-190 TITLE OF DOCUMENT Novemb€r 27, 2023 buan hrkwt Kevin Gardiner, AICP, Community Development Director Planning Department City of Burlingame I hereby certify this to be a full, true and conecl copy of the document it purports to be, the original o[ which is on file in my office. Datel RESOLUTION APPROVING CATEGORICAL EXEMPTION AND AMENDMENT TO DESIGN REVIEW RESOLVED, by the Planning Commission of the City of Burlingame that WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on November 13, 2023 . at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing; '1 . On the basis of the documents submitted and reviewed, and comments received and addressed by this Commission, it is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and the amendment to change the unit mix and associated minor design changes are within the scope of the previously approved CEQA Section 15183, Consistency with the General Plan, is hereby approved. 2. Said Amendment to Desrgn Review is approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such Amendment to Design Review are set forth in the staff report, minutes, and recording of said meeting. 3. lt is further directed that a certifled copy of thrs resolution be recorded in the official records of the County of San Mateo Chairperson f.WY+ ftL,nnr"J l-/, , Secretary of the Planning Commission of the City of Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the Planning Commission held on the 13th dav of November. 2023, by the following vote 1870-t876 EL CAItt{O REAL- RESO 2023-11-i3_9CAYES: HORAN,LOU,ENTHAL PFAFF, SCHIID, SHORES, TSENOES: NONE ABSENT GOMAROTO RECUSED: tlclxE Secretary WHEREAS, a Categorical Exemptron has been prepared and application has been made for an Amendment to Desiqn Review for chanoes to a oreviouslv aporoved 7-storv, 169-unit residential aoartment develooment at 187G-1876 El Camino Real. Zoned NBMU. Bay Area Oil Suoolv lnc. with Prime Plaza LLC, oropertv owners. APN: 025-150-160 and 025-150-190; NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that: /) EXHIBIT "A" Conditions of Approval for Amendment to Design Review '1870-1876 El Camino Real Effective November 27, 2023 Page 1 2 that the project shall be built as shown on the plans submitted to the Planning Division date stamped October 23, 2023, sheets A1.0 through A5.4, and sheets T0.1 through TMs.1, sheets P.1 and sheets L1 through 112 dated stamped October 9, 2020; that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the City Council; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; that any changes to the size or envelope of the building, which would include expanding the footprint or floor area of the structure, replacing or relocating windows or changing the roof height or pitch, shall be subject to Planning Commission review (FYl or amendment to be determined by Planning staff); that the pro.iect shall include seventeen (17) affordable units to households of "Moderate lncome" category, as defined as earning a maximum of 12Oo/o of the San l\ilateo County Area lvledian lncome; the City Manager shall be authorized to execute an agreement with the applicant and the applicant shall enter into an agreement for the administration of the renting or leasing of the affordable units at least 120 days before the flnal inspection; that the required affordable dwelling units shall be constructed concurrently with market- rate unitsl that the seventeen (17) moderate income restricted affordable units shall remain restricted and affordable to the designated income group for a minimum period of flfty- five (55) years (or a longer period of time if required by the construction or mortgage flnancing assistance program, mortgage insurance program, or rental subsidy program); that the seventeen (17) restricted affordable units shall be built on-site and be dispersed within the development. The number of bedrooms of the restricted affordable units shall be equivalent to the bedroom mix and average sizes of the non-restricted units in the development; except that the appllcant may include a higher proportion of restricted affordable units with more bedrooms. The design and construction of the affordable dwelling units shall be consistent with the design, unit layout, and construction of the total project development rn terms of appearance, exterior construction materials, and unit layout; that the applicant shall enter into a regulatory agreement with the Cityt the terms of this agreement shall be approved as to form by the City Attorney's Office, and reviewed and revised as appropriate by the reviewing City official; this agreement will be a form provided by the City, and will include the following terms:(a) The affordability of very low, Iower. and moderate income housing shall be assured in a manner consistent with Government Code Section 6591s(cX1);(b) An equity sharing agreement pursuant to Government Code Section 65915(c)(2); 3 4 5 6 7 1 8. I EXHIBIT "A" Conditions of Approval for Amendment to Design Review 1870-1876 El Camino Real Effective November 27, 2023 Page 2 10 11 12 13 14 (c) The location, dwelling unit sizes, rental cost, and number of bedrooms of the affordable units;(d) A description of any bonuses and incentives, if any, provided by the City; and(e) Any other terms as required to ensure implementation and compliance with this section, and the applicable sections of the density bonus law; that the above noted regulatory agreement regarding the seventeen (17) restricted affordable units shall be binding on all future owners and successors in interest; the agreement required by this Zoning Code Section 25.63.080 is hereby a condition of all development approvals and shall be fully executed and recorded prior to the issuance of any building or construction permit for the proposed project; that the project shall include the Transportation Demand Management l\,4easures as proposed in the Transportation lmpact Analysis, prepared by TDII Specialist Inc., dated September 16, 2019, that a TDM annual report shall be prepared by a qualified, independent consultant and paid for by the owner and submitted to the City of Burlingame annually; with the initial, or baseline, commute survey report to be conducted and submitted one (1) year after the granting of a certificate of occupancy for 75 percent or more of the pro.iect and annually after that; that the TDM annual report shall provide information about the level of alternative mode- uses and in the event a 25 percent reduction in peak-hour vehicle trips and reduction in overall parking demand is not met, the report shall explain how and why the goal has not been reached; in such a circumstance the annual report shall identify a work plan, to be approved by the City of Burlingame, which describes additional or alternatrve measures for implementation that would be necessary to enhance the TDM program to attarn the TDM goal of 25 percent mode split; that the City may consider whether the employer/tenant has made a good faith effort to meet the TDNI goals and may allow the owner a six-month "grace period" to implement additional TDM measures to achieve the 25 percent vehicle trip reduction; that prior to the issuance of building permits, a covenant agreement shall be recorded office with the San Mateo County Assessor and Recorder's Office to provide constructive notice to all future owners of the property of any ongoing programmatic requirements that discloses the required Transportation Demand Management (TDM) provisions and any condrtions of approval related herein to compliance and reporting for the TDM; 15 that the applicant shall prepare, and submit, a Construction Rask Management Plan to the San Mateo County Environmental Health's Groundwater Protection Program (GPP) for approval, prior to the issuance of a building permit. The Construction Risk Ivlanagement Plan shall address the possibility of encountering subsurface contaminants, including groundwater, during construction activities, and the relevant measures for identifying, handling, and disposing of subsurface contaminants. The EXHIBIT "A" Conditions of Approval for Amendment to Design Review 1870-1876 El Camino Real Effective November 27, 2023 Page 3 19 20 21 ZJ 22 Construction Risk lvlanagement Plan shall be submitted and approved by the San Mateo County Environmental Health Department's Groundwater Protection Program prior to issuance of a building permit; that the contractor shall ensure the appropriate handling, storing, and sampling of any soil to be removed from the subject property, as per the Construction Risk Management Plan so as to eliminate potential health and safety risks to the public, including construction workers; that in the event that groundwater, or other subsurface contaminants, are encountered during excavation, grading, or any other demolition/construction activities at the project site, the contractor shall ensure that the procedure for evaluating, handling, storing, testing, and disposing of contaminated groundwater is implemented, as per the Construction Risk Management Plan; that prior to issuance of a building permit for the proiect, the pro.lect applicant shall pay the first half of the North Burlingame/Rollins Road Development Fee in the amount of $88,505.35, made payable to the City of Burlingame and submitted to the Planning Division; that prior to scheduling the final framing inspection, the project applicant shall pay the second half of the North Burlingame/Rollins Road Development Fee in the amount of $88,505.35, made payable to the City of Burlingame and submitted to the Planning Division: that prior to final inspection or the date the certificate of occupancy is issued, whichever occurs first, the project applicant shall pay the Public lmpact Fee (final fee amount to be calculated based on the fee schedule in effect at the time the building permit is issued), payable to the City of Burlingame and submitted to the Planning Division; that the public plaza shall be owned, operated, and maintained by the developer or property manager in accordance with an approved maintenance plan to be reviewed and approved by the Community Development Director; that the public plaza shall be open to the public, without charge, each day of the year, except for temporary closures for necessary maintenance or public safety; that the conditions of the Building Division's October 29,2019 and January 28,2O2O memos, the Stormwater Division's October 17, 2019 and January 24,2020 memos, the Park's Division's October 16, 2019 memo, Fire Division's August 16, 2019 and January 28, 2020 memos and the Public-Works Engineering Division's October 17, 201 I and February 27,2020 memos related to the building permit submittal shall be met; 24 16. 17. 18.that workers handling demolition and renovation activities at the project site will be trained in the safe handling and disposal of any containments with which they are handling or disposing of on the project site; EXHIBIT "A" Conditions of Approval for Amendment to Design Review 1870-1876 El Camino Real Effective November 27, 2023 Page 4 25 It) 27 that the project shall be constructed in accordance with the December 2, 2019 "Request for Alternate Materials or Methods of Construction" agreement between the applicant (Studio T-Square Architecture or any future owner) and Central County Fire Department which requires the following: 1) The building shall be a minimum of Type IllA construction. This has already been stated on the Planning Department plan submittal: 2) Fire sprinklers at the garage level shall be of quick-response type; and 3) Two stair enclosures extend to the roof level with standpipe test located immediately outside of the roof level stair well doors and the positive pressures system within each stair enclosure of smoke control; prior to issuance of a building permit, the project sponsor shall verify that the August 23, 2019, FAA determination of no hazard to air navigation for the project is still current and has not expired (2123121) and if expired a new FAA determination of no hazard to air navigation shall be submitted to the City of Burlingame prior to building permit issuance; that that the project shall comply with the SFO Comprehensive Airport Land Use Compatibility Plan (ALUCP), specifically in accordance with Safety Compatibility Policy SP-2 pertaining to land uses; and that any future tenants of the commercial and office space comply with the Safety Compatibility Criteria for Safety Zone 2 as contained in Table lV-2 of the SFO ALUCP; this table defines uses to avoid and uses that are incompatible, summarized as follows: lncompatible Uses- Use is not com patible in the indicated zones and cannot be permitted: . Children's schools - Public and private schools serving preschool through grade 12, excluding commercial services. Large child day care centers and noncommercial em ployer-sponsored centers ancillary to a place of business - Commercial facilities defined in accordance with Health and Safety Code, Section 1596.70, et seq., and licensed to serve 15 or more children.. Hospitals, nursing homes. Hazardous uses - Uses involving the manufacture, storage, or processing of flammable, explosive, or toxic materials that would substantially aggravate the consequences of an aircraft accident. See Policy SP-3 of the SFO ALUCP for additional detail.. Critical public utilities - Facilities that, if disabled by an aircraft accident, could lead to public safety or health emergencies. They include the following: electrical power generation plants, electrical substations, wastewater treatment plants, and public water treatment facilities.. Theaters (Live, and Movie or Similar), meeting halls, places of assembly seating more than 300 people . Stadiums, arenas that all new development shall be required to comply with the real estate disclosure requirements of State law and General Plan as outlined in Policy lP-1 of the SFO ALUCP. The following statement must be included in the notice of intention to offer the property for sale or lease: 28 EXHIBIT "A" Conditions of Approval for Amendment to Design Review '1870-1876 El Camino Real Effective November 27, 2023 Page 5 "Notice of Airport in Vicinity This property is presently located in the vicinity of an airpoft, within what is known as an airport influence area. For that reason, the property may be subject to some of the annoyances or inconveniences associated with proximity to arrport operations (for example: noise, vibration, or odors). lndividual sensitivities to those annoyances can vary from person to person. You may wish to consider what airport annoyances, if any, are associated with the property before you complete your purchase or lease and determine whether they are acceptable to you."; that during construction, the applicant shall provide fencing (with a fabric screen or mesh) around the project site to ensure that all construction equapment, materials and debris is kept on site; that storage of conslruction materials and equipment on the street or in the public right- of-way shall be prohibited; that the applicant shall prepare a construction staging and traffic control plan for the duration of construction for review and acceptance by the City Engineer prior to the issuance of a building permit; the construction staging plan shall include construction equipment parking, construction employee parking, timing and duration of various phases of construction and construction operations hours, the staging plan shall address public safety and shall ensure that worker's vehicles and construction equipment shall not be parked in public parking areas with exceptions for construction parking along the street frontages of the project sile; that the project applicant and its construction contractor(s) shall develop a construclion management plan for review and approval by the City of Burlingame. The plan must include at least the following items and requirements to reduce. to the maximum extent feasible, traffic and parking congestion during construction: A set of comprehensive traffic control measures, including scheduling of major truck trips and deliveries to avoid peak trafflc hours, detour signs if required, lane closure procedures, signs, cones for drivers, and designated construction access routesl ldentiflcation of haul routes for movement of construction vehicles that would minimize impacts on motor vehicular, bicycle and pedestrian traffic, circulation and safety, and specifically to minimize impacts to the greatest extent possible on streets in the project area; Notification procedures for adjacent property owners and public safety personnel regarding when major deliveries, detours, and lane closures would occur; Provisions for monitoring surface streets used for haul routes so that any damage and debris attributable to the haul trucks can be identifled and corrected by the project applicant; and Designation of a readily available contact person for construction activities who would be responsible for responding to any local complaints regarding traffic or parking. This coordinator would determine the cause of the complaint and, where necessary, would implement reasonable measures to correct the problem. 29. 30. 31. EXHIBIT "A" Conditions of Approval for Amendment to Design Review '1870-1876 El Camino Real Effective November 27, 2023 Page 6 34 Jb 37 38 40 that if construction is done during the wet season (October 1 through April 30), that prior to October 1 the developer shall implement a winterization program to minimize the potential for erosion and polluted runoff by inspecting, maintainrng and cleaning all soil erosion and sediment control prior to, during, and immediately after each storm even, stabilizing disturbed soils throughout temporary or permanent seeding, mulching matting, or tarping; rocking unpaved vehicle access to limit dispersion of mud onto public right-of-way; covering/tarping stored construction materials, fuels and other chemicals; that trash enclosures and dumpster areas shall be covered and protected from roof and surface drainage and that if water cannot be diverted from these areas, a self-contained drainage system shall be provided that discharges to an interceptor; that this project shall comply with the state-mandated water conservation program, and a complete lrrigation Water Management and Conservation Plan together with complete landscape and irrigation plans shall be provided at the time of building permit application; that all site catch basins and drainage inlets flowing to the bay shall be stenciled. All catch basins shall be protected during construction to prevent debris from entering, that this proposal shall comply with all the requirements of the Tree Protection and Reforestation Ordinance adopted by the City of Burlingame in 1993 and enforced by the Parks Department; complete landscape and irrigation plans shall be submitted at the time of building permit application and the street trees will be protected during construction as required by the City Arborist; that project approvals shall be condationed upon installation of an emergency generator to power the sump pump system; and the sump pump shall be redundant in all mechanical and electrical aspects (i.e., dual pumps, controls, level sensors, etc.). Emergency generators shall be housed so that they meet the City's noise requirement; that prior to issuance of a building permit, the applicant shall prepare and submit to the Department of Public Works - Engineering Division a sanitary sewer analysis that assesses the impact of this project to determine if the additional sewage flows can be accommodated by the existing sewer line. lf the analysis results in a determination that the existing sewer line requires upgrading, the applicant shall perform the necessary upgrades as determined by the Engineering Division: that a Protected Tree Removal Permit shall be required from the City of Burlingame Parks Division to remove any existing protected size trees on the subject property and that the pro.lect shall comply with the Tree Protection and Reforestation Ordinance adopted by the City of Burlingame and enforced by the Parks Department; complete landscape and irrigation plans shall be submitted at the time of building permit application and the street trees will be protected during construction as required by the City Arborist; 39. 44 EXHIBIT "A'' Conditions of Approval for Amendment to Design Review 1870-1875 El Camino Real Effective November 27, 2023 Page 7 41 42 that demolition or removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 43 that the applicant shall comply with Ordinance 1503, the City of Burlingame Storm Water Management and Discharge Control Ordinance; that the project shall meet all the requirements of the California Building and Uniform Fire Codes, as amended by the City of Burlingame; 45. that this project shall comply with Ordinance No. 1477, Exterior lllumination Ordinance; 46 that construction access routes shall be limited in order to prevent the tracking of dirt onto the public right-of-way, clean off-site paved areas and sidewalks using dry sweeping methods; The following conditions shall be met during the Building lnspection process prior to the inspections noted in each condition: 47. that prior to scheduling the foundation inspection a licensed surveyor shall locate the property corners, set the building envelope; 48 that prior to scheduling the framing inspection, the project architect, engineer or other licensed professional shall provide architectural certification that the architectural details such as window locations and bays are built as shown on the approved plans; if there is no licensed professional involved ln the project, the property owner or contractor shall provide the certiflcation under penalty of per.jury. Certifications shall be submitted to the Building Division; 49 50 that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the prolect has been built according to the approved Planning and Building plans; The following conditions of approval are from applicable policies of the 2040 General Plan or the Environmental lmpact Repoft prepared for the 2040 General Plan: 51. Policy HP-3:12: Project-Specif ic Construction Best Practices. The Project sponsor shall ensure implementation of the following BMPs during Project construction, in accordance with the BAAQMD's standard requirements: that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; EXHIBIT "A" PSM-CUL-I: Undiscovered Archaeological Resources. A qualifled archaeologist shall conduct a pre-construction archaeological sensitivity training session for the excavation crew. This training will include an overview of what cultural resources are and provide information regarding why such resources are important, archaeological terms (such as site, feature, deposit), project site history, the types of cultural resources that are Iikely to be uncovered durang excavation, the laws that protect cultural resources, and the protocol for unanticipated discoveries (see below). An "Alert Sheef' shall be posted in conspicuous locations on the project site to alert personnel to the procedures and protocols to follow after discovery of potentially signiflcant precontact archaeological resources. PSM-CUL-1: Undiscovered Archaeological Resources. ln the event that archaeological resources are encountered during construction, work shall be halted within 100 feet of the discovery and the area avoided until a qualified professional archaeologist has evaluated the situation and provided appropriate recommendations. lf the flnd is determined to be potentially significant, the archaeologist, in consultation with the Native American representative, shall develop a treatment plan, which could include site avoidance, capping, or data recovery. PSM-CUL-1: Undiscovered Archaeological Resources. lf human remains are unearthed during construction, pursuant to Sectron 50977.98 of the Public Resources Code and Section 7050.5 of the State Health and Safety Code, there shall be no further excavation or disturbance of the site or any nearby area reasonably suspected to overlie adjacent human remains. The county coroner shall be informed to evaluate the nature of 54 Conditions of Approval for Amendment to Design Review 1870-1876 El Camino Real Effective November 27, 2023 Page 8 . All exposed surfaces (e.9., parking areas, staging areas, soil piles, graded areas, unpaved access roads) shall be watered two times per day.. All haul trucks transporting soil, sand, or other loose material offsite shall be covered.. All visible mud or dirt track-out onto adjacent public roads shall be removed using welpower vacuum street sweepers at least once per day. The use of dry-power sweeping shall be prohibited.. All vehicle speeds on unpaved roads shall be limited to 15 mph.. All roadways, driveways, and sidewalks that are to be paved shall be paved as soon as possible. Building pads shall be laid as soon as possible after grading, unless seeding or soil binders are used.. ldling times shall be minimized, either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California Airborne Toxics Control Measure, Title 13, Section 2485 of California Code of Regulations). Clear signage shall be provided for construction workers at all access points.. All construction equipment shall be maintained and properly tuned, in accordance with manufacturer's specifications. All equipment shall be checked by a certified mechanic and determined to be running in proper condition prior to operation.. A publicly visible sign with the name and telephone number of the person to contact at the lead agency regarding dust complaints shall be posted. This person shall respond and take corrective action within 48 hours. The BAAQMD'S phone number shall also be visible to ensure compliance with applicable regulations. EXHIBIT "A" Conditions of Approval for Amendment to Design Review '1870-1876 El Camino Real Effective November 27, 2023 Page I 56 58 the remains. lf the remains are determined to be of Native American in origin, the lead agency shall work with the NAHC and the applicant to develop an agreement for treating or disposing of the human remains. PSM-CUL-I: Undiscovered Archaeological Resources. lf archaeological resources are identifled, a final report summarizing the discovery of cultural materials shall be submitted to the City's Community Development Director prior to issuance of building permits. This report shall contain a description of the mitigation program that was implemented and its results, including a description of the monitoring and testing program, a list of the resources found and conclusion, and a description of the disposition/curation of the resources. CS-4.7: Airport and Heliport Noise. Monitor noise impacts from aircraft operations at San Francisco lnternational Airport and Mills-Peninsula Medical Center, and implement applicable noise abatement policies and procedures as outlined in the Airport Noise Ordinance and Airport Land Use Compatibility Plan; GS4.8: Airport Noise Evaluation and Mitigation. Require project applicants to evaluation potential airport noise impacts if the project is located within the 60 CNEL contour line of San Francisco International Airport (as mapped in the Airport Land Use Compatibility Plan). All projects shall be required to mitigate impacts to comply with the interior and exterior noise standards established by the Airport Land Use Compatibility Plan, CS4.10: Project-Specific Construction Noise Control Measures. To reduce construction noise impacts, the project contracto(s) shall rmplement the following actions: . ln compliance with Chapter 18.07.110 of the Municipal Code, construction activities, including truck traffic coming to and from the construction site for any purpose, shall be limited to the hours of 8:00 a.m. to 7:00 p.m., Monday to Friday, and g:00 a.m. to 6:00 p.m. on Saturdays, unless permission is granted with a development permit or other planning approval. . Construction staging areas shall be established at locations that will create the greatest distance between the construction-related noise sources and noise- sensitive receptors nearest the project site during all project construction. . Avoid the use of circular saws, miter/chop saws, and radial arm saws near the adjoining noise-sensitive receptors. Where feasible, shield saws with a solid screen with material having a minimum surface density of 2 pounds per square foot (e.9., such as 0.74 inch plywood). . Unnecessary idling of internal combustion engines shall be strictly prohibited. . Control noise from construction workers' radios to a point where they are not audible at existing residences bordering the project site. . Maintain smooth vehicle pathways for trucks and equipment accessing the site and avoid local residential neighborhoods as much as possible. EXHIBIT "A" Conditions of Approval for Amendment to Design Review 1870-1876 El Camino Real Effective November 27, 2023 Page 1 0 59 During final grading, substitute graders for bulldozers, where feasable. Wheeled heavy equipment are quieter than track equipment and should be used where feasible. During interior construction, locate noise-generating equipment within the building to break the line-of-sight to the adjoining receptors. The contractor shall prepare a detailed construction plan adentifying the schedule for major noise-generating construction activities. The construction plan shall identify a procedure for coordination with adjacent residential land uses so that construction activities can be scheduled to minimize noise disturbance. Designate a "disturbance coordinator" who would be responsible for responding to any complaints about construction noise. The disturbance coordinator will determine the cause of the noise complaint (e.9. bad muffler, etc.) and will require that reasonable measures be implemented to correct the problem. Conspicuously post a telephone number for the disturbance coordinator at the construction site and include it in the notice sent to neighbors regarding the construction schedule. Policy CS4.12: Project-Specific Vibration Control Measures. To reduce construction vibration impacts, the project contracto(s) shall implement the following actions: . A list of all heavy construction equipment to be used for the proposed project known to produce high vibration levels (tracked vehicles, vibratory compaction, jackhammers, hoe rams, etc.) shall be submitted to the City of Burlingame by the contractor. This list shall be used to identify equipment and activities that would potentially generate substantial vibration and to define the level of effort for reducing vrbration levels below the thresholds. . Operating equipment on the construction site shall be placed as far as possible from vibration-sensitive receptors. . Smaller equipment shall be used where possible to minimize vibration levels below the limits. . Vibratory rollers and tampers shall not be used within 20 feet of the 1860 El Camino Real building. . Demolition methods not involving impact tools shall be used. . Alternative construction methods to reduce vibration levels below the limits shall be identifled and used. . Dropping of heavy objects or materials shall be avoided. . Neighbors within 100 feet of the construction site shall be notified of the construction schedule and that there could be noticeable vibrataon levels during project construction activaties. . lf heavy construction is proposed within 20 feet of the 1860 El Camino Real building, a construction vibration-monitoring plan shall be implemented prior to, during, and after vibration generating construction activities located within these setbacks. All plan tasks shall be undertaken under the direction of a licensed Professional Structural Engineer in the State of California and be in accordance with industry accepted standard methods. The construction vibration monitoring plan should be implemented to include the following tasks: EXHIBIT "A" Conditions of Approval for Amendment to Design Review 1870-1876 El Camino Real Effective November 27, 2023 Page '1 1 c Performance of a photo survey, elevation survey, and crack monitoring survey for the 1860 El Camino Real building. Surveys shall be performed prior to and after completion of vibration generating construction activities located within 20 feet ofthe structure. The surveys shall include rnternal and external crack monitoring in the structure, settlement, and distress, and shall document the condition of the foundation, walls and other structural elements in the interior and exterior of the structure. Conduct a post-survey on the 1860 El Camino Real building where either monitoring has indicated high levels or complaints of damage. Make appropriate repairs in accordance with the Secretary of the Interior's Standards where damage has occurred as a result of construction activities. The results of any vibration monitoring shall be summarized and submitted in a report shortly after substantial completion of each phase identified in the project schedule. The report will include a description of measurement methods, equipment used, calibration certificates, and graphics as required to clearly identify vibration-monitoring locations. An explanation of all events that exceeded vibration limits will be included together with proper documentation supporting any such claims. Designate a person responsible for registering and investigating claims of excessive vibration. The contact information of such person shall be clearly posted on the construction site. o C o 60 6'r HP-5.2: Migratory Birds. Avoid construction activities that involve tree removal betlveen March and June, unless a bird survey has been conducted to determine that the tree is unused during the breeding season by avian species protected under California Fish and Game Codes 3503, 3503.5, and 3511; MM 12-1: Paleontological Assessment. ln areas containing middle to late Pleistocene- era sediments where it is unknown if paleontological resources exist, prior to grading an assessment shall be made by a qualifled paleontological professional to establish the need for paleontological monitoring. Should paleontological monitoring be required after recommendation by the professional paleontologist and approval by the Communtty Development Director, paleontological monitoring shall be implemented. Paleontological Monitoring. A project that requires grading plans and is located in an area of known fossil occurrence or that has been demonstrated to have fossils present in a paleontological field survey or other appropriate assessment shall have all grading monitored by trained paleontological crews working under the directron of a qualified professional, so that fossils exposed during grading can be recovered and preserved. Should any potentially unique fossils be encountered during development activities, work shall be halted immediately within 50 feet of the discovery, the City of Burlingame Planning Department shall be immediately notifled, and a qualifled paleontologist shall be retained to determine the significance of the discovery. EXHIBIT "A" Conditions of Approval for Amendment to Design Review 1870-1876 El Camino Real Effective November ?7, 2023 Page 12 Paleontological Recovery, ldentification, and Curation. The City and a project applicant shall consider the mitigation recommendations of the qualifled paleontologist for any unanticipated discoveries. The City and the project applicant shall consult and agree upon implementation of measures that the City and project applicant deem feasible and appropriate. Such measures may include avoidance, preservation in place, excavation, documentation, curation, data recovery, or other appropriate measures. The project applicant shall be required to implement any mitigation necessary for the protection of paleontological resources. Paleontological Findings. Qualifled paleontological personnel shall prepare a report of findings (with an itemized appendix of specimens) subsequent to implementation of paleontological recovery, identiflcation, and curation. A preliminary report shall be submitted, subject to approval by the Community Development Director before granting of building permits, and a flnal report shall be submitted, subject to approval by the Community Development Director before granting of occupancy permits. Sheet Title: Scale: Job No. Date: Sheet No: THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO STUDIO T-SQ, INC. AND IS FURNISHED IN CONFIDENCE FOR THE LIMITED PURPOSE OF EVALUATION OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF STUDIO T-SQ., INC. ALL RIGHTS RESERVED, COPYRIGHT 2020. : Architecture : 1970 Broadway, Suite 500 : Oakland, California 94612 : (510) 451 - 2850 : Planning : Urban Design Drawn By:PRIME PLAZA1870/1876 EL CAMINO REALBURLINGAME, CALIFORNIAPRIME INVESTORS GROUP, LLCTITLE PAGE A 1.0 17019 10/08/2020 Author PRIME PLAZA 1870/1876 EL CAMINO REAL BURLINGAME . CALIFORNIA Residential Design Review Submittal Assessor’s Parcel Number: 025-150-190, 025-150-160 Project Location: 1870/1876 El Camino Real Burlingame, California Existing Zoning Designation: North Burlingame Mixed-Use Zone Proposed use: Multi-family Residential Gross Site Area: 49,964 sf Setback Requirements (see sheet A 2.3) Street Frontage: 15' from face of curb Internal Property Line: 10' OWNER Prime Investors Group, LLC. 1870 El Camino Real #100 Burlingame, CA 94010 Contact: Ryan Chang LANDSCAPE ARCHITECT Plat Studio, Inc. 809 Heinz Ave Berkeley, CA 94710 Contact: Fred Liao Fred.liao@platstudio.com ARCHITECT Studio T-SQ, Inc. 1970 Broadway, Suite 500 Oakland, CA 94612 Contact: Chek Tang CIVIL ENGINEER BKF Engineers 4670 Willow Rd, Suite 250 Pleasanton, CA 94588 Contact: Eric Girod Egirod@bkf.com PROJECT INFORMATION PROJECT TEAM THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO STUDIO T-SQ, INC. AND IS FURNISHED IN CONFIDENCE FOR THE LIMITED PURPOSE OF EVALUATION OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF STUDIO T-SQ., INC. ALL RIGHTS RESERVED, COPYRIGHT 2020. : Architecture : 1970 Broadway, Suite 408 : Oakland, California 94612 : (510) 451 - 2850 : Planning : Urban Design PRIME PLAZA Proposed Amendment1870/1876 EL CAMINO REALBURLINGAME, CALIFORNIAPRIME INVESTORS GROUP, LLCPROPOSED AMENDMENTENTITLEMENT AMENDMENT 09/15/2023 408 ENTITLEMENT AMENDMENTOccupancy Classification: Residential R-2, A Proposed Residential Units: 169 units Proposed Residential Density: 147 du/ac Parking Provided: 182 stalls Building Discription: 5-Story Type IIIA residential over 2-story Type IA residential over 2-story Type IA subteranean garage. Fully Sprinklered. Occupancy Classification: Residential R-2, Amenities A-3, Leasing Office B, Parking Garage S-2. THIS DOCUMENT CONTAINS INFORMATIONPROPRIETARY TO STUDIO T-SQ, INC. AND IS FURNISHED IN CONFIDENCE FOR THE LIMITED PURPOSE OF EVALUATION OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF STUDIO T-SQ., INC. ALL RIGHTSRESERVED, COPYRIGHT 2020.: Architecture: 1970 Broadway, Suite 408: Oakland, California 94612: (510) 451 - 2850: Planning: Urban DesignPRIME PLAZA Proposed Amendment1870/1876 EL CAMINO REALBURLINGAME, CALIFORNIAPRIME INVESTORS GROUP, LLCPROPOSED AMENDMENTEntitled Project DataENTITLED PROJECT DATAPROPOSED AMENDMENT09/15/2023FLEXIBLEWORKSPACEENTITLEMENT AMENDMENTUNIT TYPEAVG SF1A1B1B.11CCOUNTTOTAL: 169 UNITS59 (34.9%)103 (60.9%)1BR2BRUNIT COUNT642 SF651 SF748 SF767 SF12132212AMENITY TYPEGROSS SFFITNESS/YOGACLUB ROOMLEASINGCONFERENCEROOMFLEXABLE WORKSPACE1433 SF1216 SF1190 SF644 SF1426 SFAMENITIES (INTERIOR)TOTAL 5909 SF2A2B2B.12B.22C2D2D.12E1073 SF1137 SF1137 SF1134 SF1121 SF1139 SF1082 SF1053 SF21117574264A-3 : 2649 SF B: 3260 SFOCCUPANCY AREA 3BR3A 1397 SF77 (4.1%)REQUIRED PARKINGZONING REQUIRED1BR 1 STALL/DU 59 STALLS228 STALLS182 STALLS1.08 STALLS/DULEVEL B1LEVEL B2TOTALPROVIDED PARKING2BR 1.5 STALL/DU 155 STALLSTOTAL: 20% TDM REDUCTION: RATIO: ACCESSIBLEEV INSTALLEDNOTES:STANDARD RES. STALL 8'-6" x 17'-0". ALL RESIDENTIAL STALLS ASSIGNED4 (2%)18 (10%)--4 (2%)CLASS I CLASS IIBICYCLE PARKINGZONING 0.5/DU85 STALLS 9 STALLSPROVIDEDREQUIRED0.05/DU85 STALLS 9 STALLSNOTES:CLASS I STALLS LOCATED INSIDE STRUCTURED GARAGE. CLASS II STALLS LOCATED AT GROUND LEVEL - REFERENCE LANDSCAPE PLANS.18 (10%)STANDARD RES 65 95 16087 STALLS 95 STALLS 182 STALLS3BR 2 STALL/DU 14 STALLSGROSS FLOOR AREA, SF (EXCLUDES EXT. BALCONIES)211,433 SFTOTAL GROSS FLOOR AREA: LVL B240,670LVL B140,675LVL 131,089LVL 229,348LVL 330,711LVL 430,711LVL 530,711LVL 630,489LVL 728,35662%49,964 SF31,132 SFSITE COVERAGE:SITE AREA:BLDG FOOTPRINT (L1): PROJECT COUNT164 SF increase from entitled designFLEXIBLEWORKSPACE23.4 SF increase in site coverage,(0.05% change from entitled design).164 SF increase of total buildingarea in 7 stories62.3%PROJECT ZONING SUMMARY:1. Zoning Allowable density: 169 units2. Proposed density: 169 units3. Zoning Allowable height 9 stories / 100' (east side of El Camino Real)4. Proposed height 7 stories / 82'-9" The proposed plans is to amend the approved entitlement that wassubmitted to Planning Division date stamped October 9, 2020. Theamendment request is based on design changes as below:1. To provide diversified unit types that include a new family-oriented3-bedroom unit type.2. To modify unit mix percentage of 1-Bedroom and 2-bedroom, add3-bedroom in the mix.3. Slightly increase total building square footage of 164 SF (0.07% oftotal area) In order to be consistent with the approved design, thisamendment will keep the design criteria as below:1. Exterior building elevations will remain unchanged.2. Total unit count will remain the same.3. Site Coverage Ratio and Landscape Area will remain the same.4. Required vehicular and bicycle parking will remain the same percalculation. Thus the TDM plan will remain the same.OPEN SPACE CALCULATION:Private:7,989 SF private open spaceCommon:6,662 SF (podium)1,426 SF (roof decks)2,100 SF (plaza)10,188 sf Total Common open spaceTotal:10,188 SF (common)7,989 SF (private)18,177 SF/169 units = 107 SF/unit (meet the minimum requirement of 100 SF per unit)PROJECT BUILDING CODE SUMMARY1.This project will comply with the 2022 California Building Code, 2022California Residential Code (where applicable), 2022 CaliforniaMechanical Code, 2022 California Electrical Code, and 2022 CaliforniaPlumbing Code, including all amendments as adopted in Ordinance1889. 2. Construction Type: 2022 CBC Section 602.1 Type I-A: level B2 thru level 2 (Garage and Residential) Type III-A: level 3 thru level 7 (Residential)3. All dwelling unit interior doors will comply with CBC 1132A5.2.4. Building Area: 2022 CBC Section 506, Table 506.2 Type I-A: Basic Allowable Unlimited CBC 506.2 Type III-A: (See Sheet A5.3 for allowable area diagram calculations)5. The building is composed of 5-level Type III-A construction over 4-level Type I-A construction as a podium project in accordance withCBC Section 510.2.6. Building Height: 2022 CBC Section 504.3, Table 504.3 Type I-A: Max Building Height Allowed: Unlimited Type III-A: Max Building Height Allowed: 85' above average gradeplane (fully sprinklered, without area increase) Building height provided: Approximately 82'-9" above average gradeplane Highest occupied floor shall not be higher than 75' from the lowestpoint of Fire Department access. This is not a high rise building7. Opening Protection at Exterior Walls: 2022 CBC Table 705.8 See Sheet A5.4 for opening protection dimensions and calculationsAllowable Building AreaProposed Building AreaArea 1Area 2Area 3Area 448,000 sf48,000 sf58,080 sf48,000 sf27,348 sf42,189 sf48,845 sf35,218 sf 1CELEV. EQUIP3A2C2A.12A.1IDFIDFTRASH25.50 FF'- 0"0"- 1"6'- 9"1B.106/15/2023Sheet Title:Scale:Job No.Date:Sheet No:THIS DOCUMENT CONTAINS INFORMATIONPROPRIETARY TO STUDIO T-SQ, INC. AND IS FURNISHED IN CONFIDENCE FOR THE LIMITED PURPOSE OF EVALUATION OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF STUDIO T-SQ., INC. ALL RIGHTSRESERVED, COPYRIGHT 2020.: Architecture: 1970 Broadway, Suite 408: Oakland, California 94612: (510) 451 - 2850: Planning: Urban DesignDrawn By:1/16" = 1'-0"PRIME PLAZA Proposed Amendment1870/1876 EL CAMINO REALBURLINGAME, CALIFORNIAPRIME INVESTORS GROUP, LLCLEVEL 1 PLANA 2.31701906/15/2023Author06/20/2023PROPOSED AMENDMENT(ORIGINALENTITLEMENT PLAN)ENTITLEMENT AMENDMENT09/15/2023Unit Interior Layout Change(Unit Type Remains the same)Unit Types ChangeENTITLEMENT AMENDMENTTo replace two 2-Bedroom unitswith one 1-bedroom and one3-bedroom (from 1st floor to 7thfloor).Minor change of building envelop,results in 23.4 SF increase in sitecoverage (62.3 Site Coverage,0.05% change from entitleddesign). 164 SF increase of totalbuilding area in 7 stories.Original building envelop DN DN UP DNHCR UP (SINGLE HT) (DOUBLE HT) (DOUBLE HT) (SINGLE HT) (DOUBLE HT) 1 A 3.7 LEASING FITNESS ELEV. EQUIP. 1C ELEV. EQUIP POOL EQUIP./ CHANGING ROOM 3A2C 2A.1 2D 2A.1 1B 2D 2B.1 2D2D2E2E 1A 2B 2D 2A 2D 2D 24.40' 24.63' 23.60'21.58' 15.82' 15.55' PODIUM COURTYARD (REFER TO LANDSCAPE DWGS) IDF IDF TRASH FIRE PANELS A 3.3 1 A 3.0 1 A 3.11 A 3.2 1 PROPERTY LINE 15' FRONTAGE SETBACK LINE 10' SETBACK LINE 10' SETBACK LINE 25.50 FF' 25.50 FF' LOFT ABOVE 25.50 FF' 15' - 0"15' - 0"15' FRONTAGE SETBACK LINE 10' SETBACK LINE 15' FRONTAGE SETBACK LINE (FROM ORIGINAL CURB) 15' - 0" 7' - 0" 17' - 8" 14' - 9" 16' - 5" 41' - 6"4' - 6"12' - 6"A 5.0 3 FIRE BARRIER & HORIZONTAL EXIT A 5.0 1A 5.0 2 7' - 0"±8' - 0"5' - 4"6' - 0"6' - 0"9' - 1"8' - 5" 6' - 0"8' - 9"10' - 0"10' - 0"10' - 0"5' - 2"FIRE CONTROL ROOM A 3.5 2A 3.3 2 26' - 8" (SINGLE HT) YOGA ROOM ABOVE LOFT ABOVE (SINGLE HT) CLUB ROOM MAIL/PARCEL A 3.5 1 1' - 0"79' - 8"3' - 0"3' - 0"1B.1 N E S W Sheet Title: Scale: Job No. Date: Sheet No: THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO STUDIO T-SQ, INC. AND IS FURNISHED IN CONFIDENCE FOR THE LIMITED PURPOSE OF EVALUATION OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF STUDIO T-SQ., INC. ALL RIGHTS RESERVED, COPYRIGHT 2020. : Architecture : 1970 Broadway, Suite 408 : Oakland, California 94612 : (510) 451 - 2850 : Planning : Urban Design Drawn By: 1/16" = 1'-0"PRIME PLAZA Proposed Amendment1870/1876 EL CAMINO REALBURLINGAME, CALIFORNIAPRIME INVESTORS GROUP, LLCLEVEL 1 PLAN A 2.3 17019 06/15/2023 Author 1/16" = 1'-0"1 Level 1 Unit Interior Layout Change (Unit Type Remains the same) Unit Types Change (To replace two 2-Bedroom units with one 1-bedroom and one 3-bedroom (from 1st floor to 7th floor)).(DESIGN AMENDMENT) 09/15/2023ENTITLEMENT AMENDMENT DNHCRDN 1 A 3.7 OPEN TO BELOW OPEN TO BELOW OPEN TO BELOW A 3.3 1 A 3.0 1 A 3.11 A 3.2 1 IDF 107' - 5"62' - 6"236' - 6"116' - 8"A 5.0 3 FIRE BARRIER & HORIZONTAL EXIT A 5.0 1A 5.0 2 2D 1C 2C 2A.1 2D 2A.1 1B 2B 2D2D2E1A 2B 2D 2A 2D 2D 1B 181' - 1"A 3.3 2 8' - 5" 6' - 0"6' - 0"6' - 0"8' - 9"6' - 0" CONFERENCE ROOM 644 SF YOGA ROOM FLEXIBLE WORKSPACE FLEXIBLE WORKSPACE A 3.5 1 106' - 7"82' - 10"54' - 2"37' - 0" 1B.1 3A N E S W Sheet Title: Scale: Job No. Date: Sheet No: THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO STUDIO T-SQ, INC. AND IS FURNISHED IN CONFIDENCE FOR THE LIMITED PURPOSE OF EVALUATION OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF STUDIO T-SQ., INC. ALL RIGHTS RESERVED, COPYRIGHT 2020. : Architecture : 1970 Broadway, Suite 408 : Oakland, California 94612 : (510) 451 - 2850 : Planning : Urban Design Drawn By: 1/16" = 1'-0"PRIME PLAZA Proposed Amendment1870/1876 EL CAMINO REALBURLINGAME, CALIFORNIAPRIME INVESTORS GROUP, LLCLEVEL 2 PLAN A 2.4 17019 06/15/2023 Author 1/16" = 1'-0"1 Level 2 09/15/2023ENTITLEMENT AMENDMENT(DESIGN AMENDMENT) Unit Interior Layout Change (Unit Type Remains the same) Unit Types Change (To replace two 2-Bedroom units with one 1-bedroom and one 3-bedroom (from 1st floor to 7th floor)). HCRSTAIRS TO ROOF STAIR TO ROOF 1 A 3.7 2D 2D 2B.2 2B 2D 1B 1C ? 2A.1 2B.1 1B 2D106' - 10"HORIZONTAL EXIT STANDPIPE STANDPIPE 2B 1A 1B.1 1A 1B.1 2D 1C TRASH 2A.1 2D 1B.1 2C 2A 2D IDF IDF STOR. IDF STOR. 66' - 7"116' - 3"66' - 10"80' - 5" A 3.3 1 A 3.0 1 A 3.11 A 3.2 1 STOR. A 5.0 3 FIRE WALL & HORIZONTAL EXIT FIRE WALL X > 1/3 Y A 5.0 1A 5.0 2 179' - 1"236' - 6" A 3.3 2 LINE OF PODIUM BELOW A 3.5 1 1B.1 3A N E S W Sheet Title: Scale: Job No. Date: Sheet No: THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO STUDIO T-SQ, INC. AND IS FURNISHED IN CONFIDENCE FOR THE LIMITED PURPOSE OF EVALUATION OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF STUDIO T-SQ., INC. ALL RIGHTS RESERVED, COPYRIGHT 2020. : Architecture : 1970 Broadway, Suite 408 : Oakland, California 94612 : (510) 451 - 2850 : Planning : Urban Design Drawn By: 1/16" = 1'-0"PRIME PLAZA Proposed Amendment1870/1876 EL CAMINO REALBURLINGAME, CALIFORNIAPRIME INVESTORS GROUP, LLCLEVEL 3 PLAN (LVL 4-5 SIM.) A 2.5 17019 06/15/2023 Author 1/16" = 1'-0"1 Level 3 09/15/2023ENTITLEMENT AMENDMENT(DESIGN AMENDMENT) Unit Interior Layout Change (Unit Type Remains the same) Unit Types Change (To replace two 2-Bedroom units with one 1-bedroom and one 3-bedroom (from 1st floor to 7th floor)). 1 A 3.7 LOW ROOF BELOW LOW ROOF BELOW A 3.3 1 A 3.0 1 A 3.11 A 3.2 1 3' - 0" FIRE WALL & HORIZONTAL EXIT FIRE WALL 1C2C 2A.1 2D 2A.1 1B 2B.1 2A2D1B.11B.1 1A 2B 2D.1 2A 2D.1 2D.1 1B 1C 1B.1 2B 2B.2 2D 1A LINE OF PODIUM BELOW 3A1B.1 N E S W Sheet Title: Scale: Job No. Date: Sheet No: THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO STUDIO T-SQ, INC. AND IS FURNISHED IN CONFIDENCE FOR THE LIMITED PURPOSE OF EVALUATION OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF STUDIO T-SQ., INC. ALL RIGHTS RESERVED, COPYRIGHT 2020. : Architecture : 1970 Broadway, Suite 408 : Oakland, California 94612 : (510) 451 - 2850 : Planning : Urban Design Drawn By: 1/16" = 1'-0"PRIME PLAZA Proposed Amendment1870/1876 EL CAMINO REALBURLINGAME, CALIFORNIAPRIME INVESTORS GROUP, LLCLEVEL 6 PLAN A 2.6 17019 06/15/2023 Author 1/16" = 1'-0"1 Level 6 09/15/2023ENTITLEMENT AMENDMENT(DESIGN AMENDMENT) Unit Interior Layout Change (Unit Type Remains the same) Unit Types Change (To replace two 2-Bedroom units with one 1-bedroom and one 3-bedroom (from 1st floor to 7th floor)). DN DN 1 A 3.7 6' - 0" A 3.3 1 A 3.0 1 A 3.11 A 3.2 1 ROOF TOP DECK 89.50 FF' 86.50 FF' FIRE WALL & HORIZONTAL EXIT FIRE WALL 1C1C 2B.2 2A.1 2D 1B.1 1A 2B 2D.1 2A 2D.1 2D.1 1B 1C 1B 2B.1 2A2D1B.11B.1 2D 2C 1A ROOF TOP DECK LINE OF PODIUM BELOW 1B.1 3A N E S W Sheet Title: Scale: Job No. Date: Sheet No: THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO STUDIO T-SQ, INC. AND IS FURNISHED IN CONFIDENCE FOR THE LIMITED PURPOSE OF EVALUATION OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF STUDIO T-SQ., INC. ALL RIGHTS RESERVED, COPYRIGHT 2020. : Architecture : 1970 Broadway, Suite 408 : Oakland, California 94612 : (510) 451 - 2850 : Planning : Urban Design Drawn By: 1/16" = 1'-0"PRIME PLAZA Proposed Amendment1870/1876 EL CAMINO REALBURLINGAME, CALIFORNIAPRIME INVESTORS GROUP, LLCLEVEL 7 PLAN A 2.7 17019 06/15/2023 Author 1/16" = 1'-0"1 Level 7 09/15/2023ENTITLEMENT AMENDMENT(DESIGN AMENDMENT) Unit Interior Layout Change (Unit Type Remains the same) Unit Types Change (To replace two 2-Bedroom units with one 1-bedroom and one 3-bedroom (from 1st floor to 7th floor)). MATERIAL INDEX 01 : METAL TRIM ACCENTS 02 : VINYL WINDOW 03 : PORCELAIN TILE CLADDING 04 : EXTERIOR PLASTER COLOR A 05 : EXTERIOR PLASTER COLOR B 06 : EXTERIOR PLASTER COLOR C 07 : PLASTER ACCENT TRIM 08 : CEMENT BOARD SIDING WOODTONE 09 : CEMENT BOARD SIDING 10 : STOREFRONT 11 : GLASS RAILING 12 : METAL RAILING 13 : METAL AWNING Reference Material Board -A3.5 Sheet Title: Scale: Job No. Date: Sheet No: THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO STUDIO T-SQ, INC. AND IS FURNISHED IN CONFIDENCE FOR THE LIMITED PURPOSE OF EVALUATION OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF STUDIO T-SQ., INC. ALL RIGHTS RESERVED, COPYRIGHT 2020. : Architecture : 1970 Broadway, Suite 408 : Oakland, California 94612 : (510) 451 - 2850 : Planning : Urban Design Drawn By: As indicatedPRIME PLAZA Proposed Amendment1870/1876 EL CAMINO REALBURLINGAME, CALIFORNIAPRIME INVESTORS GROUP, LLCNORTH ELEVATION A 3.3 17019 08/25/2023 Author * Roof overhangs greater than 12" must be constructed to support minimum 750 lbs weight California Dr.Murchison Dr.El Camino RealLevel 3 21' -0" Level 1 0' -0" Level 2 10' -0" Level 4 31' -0" Level 5 41' -0" Level 6 51' -0" Level 7 61' -0" ROOF 71' -6" NEIGHBORING PROPERTY NOT A PART 10' - 0" 11' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 6"83' - 6"TOP OF T 83' -6" TOP OF THE BUILDING HEIGHT (BUILDING CODE)82' - 8 3/8"AVG. OF HIGH ROOF + 25.5' FF + 35.5' FF + 46.5' FF + 56.5' FF + 66.5' FF + 76.5' FF + 86.5' FF + 97.0' FF + 104.1' FF + 108.5' FF + 20.4' FF + 14.7' FF 78' -7" AVG. GRADE PLANE LOWEST LEVEL OF FIRE DEPARTMENT ACCESS FROM LOWEST LEVEL OF FD ACCESS TO THE HIGHEST OCCUPIED FLOOR74' - 9 5/8"+ 89.5' FFROOF DECK 1/16" = 1'-0"1 North Elev. Murchison Dr 06 02 04 10010907 0805111303 Level 3 21' -0" Level 1 0' -0" Level 2 10' -0" Level 4 31' -0" Level 5 41' -0" Level 6 51' -0" Level 7 61' -0" ROOF 71' -6" NEIGHBORING PROPERTY NOT A PART 10' - 0" 11' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 0" 10' - 6"83' - 6"TOP OF T 83' -6" TOP OF THE BUILDING HEIGHT (BUILDING CODE)82' - 8 3/8"AVG. OF HIGH ROOF + 25.5' FF + 35.5' FF + 46.5' FF + 56.5' FF + 66.5' FF + 76.5' FF + 86.5' FF + 97.0' FF + 104.1' FF + 108.5' FF + 20.4' FF + 14.7' FF 78' -7" AVG. GRADE PLANE LOWEST LEVEL OF FIRE DEPARTMENT ACCESS FROM LOWEST LEVEL OF FD ACCESS TO THE HIGHEST OCCUPIED FLOOR74' - 9 5/8"+ 89.5' FFROOF DECK 1/16" = 1'-0"1 North Elev. Murchison Dr 06 02 04 10010907 0805111303 Minor changes on internal courtyard elevations DESIGN AMENDMENT ENTITLED DESIGN PENTHOUSE PENTHOUSE Level 3 21' -0" Level 1 0' -0" Level B1 -16' -0" Level 2 10' -0" Level 4 31' -0" Level 5 41' -0" Level 6 51' -0" Level B2 -26' -0" Level 7 61' -0" ROOF 71' -6"10' - 6"10' - 0"10' - 0"10' - 0"10' - 0"11' - 0"10' - 0"16' - 0"UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT UNIT PARKING PARKING FRONTAGE ROAD CALIFORNIA DR. POOL COURTYARD ELEVATOR PENTHOUSE BEYOND CORRIDOR BALCONIES BEYOND FROM THE LOWEST LEVEL OF FD ACCESS TO THE HIGHEST OCCUPIED FLOOR74' - 9 5/8"PL PL ECR STAIRS TO ROOF (BEHIND) TYPE IIIA CONSTRUCTION FACADE STEP BACK AT LVL 6 & 7 (3')10' - 0"RAMP POOL EQUIP. 1' - 0" ROOFTOP MECH. EQIP UNITS BEYOND TYPE IA CONSTRUCTION STAIRS TO ROOF (BEYOND) ELEC. 25.50 FF24.65 TC 25.50 FF 15.80 TC9' - 3"ROOF DECK (WHERE OCCURS)3' - 0"6' - 9"10.50 FF16' - 0"15' - 0"9.50 FF -0.50 FF -0.50 FF 89.50 FF 10' - 0"35.50 FF 46.50 FF 56.50 FF 66.50 FF 76.50 FF 86.50 FF 100.00 FF 9' - 6"106.50 101.00 97.00 FF 14' - 6"104.50 105.00 TOP OF THE ROOF 83' -6" ROOF DECK (LEVEL 3 - LEVEL7)TYPE IIIA CONSTRUCTION (LEVEL B2 - LEVEL 2)TYPE IA CONSTRUCTION14.70 TC BUILDING HEIGHT (BUILDING CODE)82' - 8 3/8"AVG. GRADE PLANE20.38 FF LOWEST LEVEL OF FD ACCESS 1/16" = 1'-0"1 Building Section Edited Sheet Title: Scale: Job No. Date: Sheet No: THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO STUDIO T-SQ, INC. AND IS FURNISHED IN CONFIDENCE FOR THE LIMITED PURPOSE OF EVALUATION OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF STUDIO T-SQ., INC. ALL RIGHTS RESERVED, COPYRIGHT 2020. : Architecture : 1970 Broadway, Suite 408 : Oakland, California 94612 : (510) 451 - 2850 : Planning : Urban Design Drawn By: As indicatedPRIME PLAZA Proposed Amendment1870/1876 EL CAMINO REALBURLINGAME, CALIFORNIAPRIME INVESTORS GROUP, LLCBUILDING SECTION A 3.7 17019 08/25/2023 Author UNIT 3A 3BR/2BA+DEN NET RENTABLE SIZE 1397 SF Sheet Title: Scale: Job No. Date: Sheet No: THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO STUDIO T-SQ, INC. AND IS FURNISHED IN CONFIDENCE FOR THE LIMITED PURPOSE OF EVALUATION OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF STUDIO T-SQ., INC. ALL RIGHTS RESERVED, COPYRIGHT 2020. : Architecture : 1970 Broadway, Suite 408 : Oakland, California 94612 : (510) 451 - 2850 : Planning : Urban Design Drawn By: 1/4" = 1'-0"PRIME PLAZA Proposed Amendment1870/1876 EL CAMINO REALBURLINGAME, CALIFORNIAPRIME INVESTORS GROUP, LLCUNIT 3A A 4.5 17019 06/15/2023 Author 09/15/2023 UNIT 3A 3BR/2BA+DEN NET RENTABLE SIZE 1397 SF ENTITLEMENT AMENDMENTDESIGN AMENDMENT (New unit type) (DESIGN AMENDMENT) DECK MASTER BED BED BATH W/D BATH W.I.C. DINING KITCHEN LIVING W.I.C DEN C.C. L P BED W.I.C33' - 3"49' - 5" 12' - 0"12' - 6"11' - 6"7' - 0"12' - 0"13' - 6" 12' - 0" 9' - 10"12' - 0" DECK BED W/D KITCHEN LIVING UNIT 1C 1BR/1BA NET RENTABLE SIZE: 767 SF W.I.C C.C.P BATH 24' - 1"12' - 0"11' - 4"33' - 2"31' - 4" 12' - 0" MOVEABLE ISLAND L 5' - 3" 20' - 4" Sheet Title: Scale: Job No. Date: Sheet No: THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO STUDIO T-SQ, INC. AND IS FURNISHED IN CONFIDENCE FOR THE LIMITED PURPOSE OF EVALUATION OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF STUDIO T-SQ., INC. ALL RIGHTS RESERVED, COPYRIGHT 2020. : Architecture : 1970 Broadway, Suite 408 : Oakland, California 94612 : (510) 451 - 2850 : Planning : Urban Design Drawn By: 1/4" = 1'-0"PRIME PLAZA Proposed Amendment1870/1876 EL CAMINO REALBURLINGAME, CALIFORNIAPRIME INVESTORS GROUP, LLCUNIT 1C & 2A PLANS A 4.1 17019 06/15/2023 Author DECK BED W/D KITCHEN LIVING UNIT 1C 1BR/1BA NET RENTABLE SIZE: 767 SF W.I.C C.C.P BATH 24' - 1"12' - 0"11' - 4"33' - 2"31' - 4" 12' - 0" MOVEABLE ISLAND L 5' - 3" 20' - 4" DECK BED W/D DINING KITCHEN LIVING UNIT 1C 1BR/1BA NET RENTABLE SIZE: 767 SF W.I.C C.C.P BATH 24' - 1"12' - 0"11' - 4"33' - 2"31' - 4" 12' - 0" MOVEABLE ISLAND L 5' - 3" 20' - 4" 09/15/2023 DESIGN AMENDMENT (Add a small den within the same unit envelope)ENTITLEMENT AMENDMENT(DESIGN AMENDMENT) ENTITLED DESIGN 36' - 5 1/2" 11' - 1 1/2"11' - 0"KITCHEN BATH W/D W.I.C. LIVING BED DECK LINEN BED W.I.C. BATH DINING12' - 0"12' - 2"12' - 0"33' - 0"LINEN PANTRYC.C.5' - 6"36' - 5 1/2" KITCHEN DEN W/D LIVING BED DECK BED W.I.C. BATH DINING 27' - 9 1/2"PANTRY11' - 1 1/2"11' - 0"12' - 0"12' - 2"12' - 0"5' - 6"BATH UNIT 2A 2BR/2BA NET RENTABLE SIZE: 1073 SF PUNIT 2A.1 2BR/2BA NET RENTABLE SIZE: 1073 SF DESIGN AMENDMENT (Add a small den within the same unit envelope) 2BR/2BA NET RENTABLE SIZE: 1073 SFUNIT 2A 2BR/2BA NET RENTABLE SIZE: 1073 SF ENTITLED DESIGN Area 1 Area 2 Area 3 Area 4 3 Hour Fire WallEL CAMINO REALCALIFORNIA DR.MURCHISON DR. P.L. P.L.P.L.W DISTANCE 28' - 4" TO CL OF STREET 71' - 3"45' - 0"116' - 3"W DISTANCE 34' - 7" TO CL OF STREET W DISTANCE 27' - 2" TO CL OF STREETW DISTANCE29' - 2" TO CL OF STREETW DISTANCE30' - 0" TO CL OF STREETW DISTANCE 40' - 4" TO CL OF STREET 36' - 1"36' - 9" 72' - 10"72' - 7"34' - 8"242' - 6"135' - 4"10' - 0"10' - 4"11' - 11"Sheet Title: Scale: Job No. Date: Sheet No: THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO STUDIO T-SQ, INC. AND IS FURNISHED IN CONFIDENCE FOR THE LIMITED PURPOSE OF EVALUATION OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF STUDIO T-SQ., INC. ALL RIGHTS RESERVED, COPYRIGHT 2020. : Architecture : 1970 Broadway, Suite 408 : Oakland, California 94612 : (510) 451 - 2850 : Planning : Urban Design Drawn By: 1/16" = 1'-0"PRIME PLAZA Proposed Amendment1870/1876 EL CAMINO REALBURLINGAME, CALIFORNIAPRIME INVESTORS GROUP, LLCALLOWABLE AREA CALCULATION A 5.3 17019 08/25/2023 Author TYPE III-A BUILDING AREAS CBC 2022 506.2.3 Single-Occupancy, Multistory Buildings The allowable area of a single-occupancy building with more than one story above grade plane shall be determined in accordance with Equation 5-2: Aa = [At + (NS x If)] x Sa (Equation 5-2) where: Aa =Allowable area (square feet). At =Tabular allowable area factor (NS, S13R or SM value, as applicable) in accordance with Table 506.2. NS =Tabular allowable area factor in accordance with Table 506.2 for a nonsprinklered building (regardless of whether the building is sprinklered). If =Area factor increase due to frontage (percent) as calculated in accordance with Section 506.3. Sa =Actual number of building stories above grade plane, not to exceed three. For buildings equipped throughout with an automatic sprinkler system installed in accordance with Section 903.3.1.2, use the actual number of building stories above grade plane, not to exceed four. No individual story shall exceed the allowable area (Aa) as determined by Equation 5-2 using the value of Sa = 1. 506.3.3 Amount of increase The area factor increase based on frontage shall be determined in accordance with Table 506.3.3: AREA1 P = 574'-4" F = 72'-10" + 135'-4" = 208.2' W@ MURCHISON DR. = 29.2', AT 36.1' LENGTH 30', AT 36.7' LENGTH W@ EL CAMINO REAL= 30', AT 135.3' LENGTH W = [(29.2X36.1)+(30X172)]/208.2 = 29.8 FRONTAGE INCREASE (If) If = 0.21 (SEE TABLE 506.3.3) ALLOWABLE AREA PER STORY (Aa) Aa = [At+(NS X If) X Sa Aa = [24,000+(24,000 X 0.21)] X 1 = 29,040 SF ALLOWABLE AREA SINGLE OCCUPANCY MULTISTORY BUILDING (Sa = 2) Aa = [At+(NS X If) X Sa Aa = [24,000+(24,000 X 0.12)] X 2 = 58,080 SF AREA2 P = 461'-6" F = 107'-3" FRONTAGE INCREASE (If) If = 0 (NOT NECESSARY) ALLOWABLE AREA PER STORY (Aa) Aa = [At+(NS X If) X Sa Aa = [24,000+(24,000 X 0)] X 1 = 24,000 SF ALLOWABLE AREA SINGLE OCCUPANCY MULTISTORY BUILDING (Sa = 2) Aa = [At+(NS X If) X Sa Aa = [24,000+(24,000 X 0)] X 2 = 48,000 SF AREA3 P = 322'-5" F = 0 FRONTAGE INCREASE (If) If = 0 (NOT NECESSARY) ALLOWABLE AREA PER STORY (Aa) Aa = [At+(NS X If) X Sa Aa = [24,000+(24,000 X 0)] X 1 = 24,000 SF ALLOWABLE AREA SINGLE OCCUPANCY MULTISTORY BUILDING (Sa = 2) Aa = [At+(NS X If) X Sa Aa = [24,000+(24,000 X 0)] X 2 = 48,000 SF AREA4 P = 429'-0" F = 116'-3" FRONTAGE INCREASE (If) If = 0 (NOT NECESSARY) ALLOWABLE AREA PER STORY (Aa) Aa = [At+(NS X If) X Sa Aa = [24,000+(24,000 X 0)] X 1 = 24,000 SF ALLOWABLE AREA SINGLE OCCUPANCY MULTISTORY BUILDING (Sa = 2) Aa = [At+(NS X If) X Sa Aa = [24,000+(24,000 X 0)] X 2 = 48,000 SF TYPE IIIA R2 LEVEL 3 10,135 SF TYPE IIIA R2 LEVEL 4 10,135 SF TYPE IIIA R2 LEVEL 5 10,135 SF TYPE IIIA R2 LEVEL 6 9,670 SF TYPE IIIA R2 LEVEL 7 8,770 SF PROPOSED BUILDING AREA 48,845 SF TOTAL ACTUAL AREA 48,845 SF BUILDING AREA(48,845 SF)<ALLOWABLE AREA(58,080 SF) TYPE IIIA R2 LEVEL 3 8,518 SF TYPE IIIA R2 LEVEL 4 8,518 SF TYPE IIIA R2 LEVEL 5 8,518 SF TYPE IIIA R2 LEVEL 6 8,369 SF TYPE IIIA R2 LEVEL 7 8,266 SF PROPOSED BUILDING AREA 42,189 SF TOTAL ACTUAL AREA 42,189 SF BUILDING AREA(42,189 SF)<ALLOWABLE AREA(48,000 SF) TYPE IIIA R2 LEVEL 3 5,449 SF TYPE IIIA R2 LEVEL 4 5,449 SF TYPE IIIA R2 LEVEL 5 5,449 SF TYPE IIIA R2 LEVEL 6 5,504 SF TYPE IIIA R2 LEVEL 7 5,497 SF PROPOSED BUILDING AREA 27,348 SF TOTAL ACTUAL AREA 27,348 SF BUILDING AREA(27,348 SF)<ALLOWABLE AREA(48,000 SF) TYPE IIIA R2 LEVEL 3 7,274 SF TYPE IIIA R2 LEVEL 4 7,274 SF TYPE IIIA R2 LEVEL 5 7,274 SF TYPE IIIA R2 LEVEL 6 7,261 SF TYPE IIIA R2 LEVEL 7 6,135 SF PROPOSED BUILDING AREA 35,218 SF TOTAL ACTUAL AREA 35,218 SF BUILDING AREA(35,218 SF)<ALLOWABLE AREA(58,080 SF) TYPE I-A BUILDING AREAS CBC 2022 OCCUPANCY TYPE: R-2 FRONTAGE INCREASE (If) ALLOWABLE AREA PER STORY (Aa) UNLIMITED ALLOWABLE AREA SINGLE OCCUPANCY MULTISTORY BUILDING (Sa = 2) UNLIMITED TYPE IA LEVEL B2 40,670 SF TYPE IA LEVEL B1 40,675 SF TYPE IA LEVEL 1 31,089 SF TYPE IA LEVEL 2 29,348 SF TOTAL ACTUAL AREA 141,782 SF BUILDING AREA (141,782 SF) <ALLOWABLE AREA (UNLIMITED) OCCUPANCY TYPE: R-2, S, A, B 0 to less than 25 25 to less than 50 50 to less than 75 75 to 100 PERCENTAGE OF BUILDING PERIMETER OPEN SPACE (feet) 0 to less than 20 20 to less than 25 25 to less than 30 30 or greater 0 0 0 0 0 0.17 0.33 0.50 0 0.21 0.42 0.63 0 0.25 0.50 0.75 (NOTE: THE TYPE III-A BUILDINGS ARE CALCULATED AS NON-SEPARATED OCCUPANCY WITH GROUP R-2 REQUIREMENTS) 11' - 0"10' - 0" > 25' - 0" PROPOSED 22% OPENING PER FLOOR (45% ALLOWABLE PER FLOOR) UP/S NO LIMIT UP/S PROPOSED 15% OPENING PER FLOOR (45% ALLOWABLE PER FLOOR) UP/S NO LIMIT UP/S PROPOSED 42% OPENING PER FLOOR (45% ALLOWABLE PER FLOOR) UP/S NO LIMIT UP/S FIRE SEPARATION DISTANCE > 25' - 0" > 25' - 0" NO LIMIT UP/S > 25' - 0"NO LIMIT UP/S NO LIMIT UP/S > 25' - 0" NO LIMIT UP/SEL CAMINO REALCALIFORNIA DR.MURCHISON DR. P.L. P.L.P.L.10' - 8"> 25' - 0"> 25' - 0"Sheet Title: Scale: Job No. Date: Sheet No: THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO STUDIO T-SQ, INC. AND IS FURNISHED IN CONFIDENCE FOR THE LIMITED PURPOSE OF EVALUATION OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY NOT BE USED FOR ANY OTHER PURPOSE AND MAY NOT BE REPRODUCED OR DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF STUDIO T-SQ., INC. ALL RIGHTS RESERVED, COPYRIGHT 2020. : Architecture : 1970 Broadway, Suite 408 : Oakland, California 94612 : (510) 451 - 2850 : Planning : Urban Design Drawn By: 1/16" = 1'-0"PRIME PLAZA Proposed Amendment1870/1876 EL CAMINO REALBURLINGAME, CALIFORNIAPRIME INVESTORS GROUP, LLCFIRE SEPARATION DISTANCE A 5.4 17019 08/25/2023 Author 2022 CALIFORNIA BUILDING CODE ELEVATION 1 ELEVATION 2 Elevation 1 Wall Area Window Area FSD Compliance Level 7 58’-8” x 10’-6” = 616-sf 34-sf + 22-sf + 22-sf + 22-sf = 100-sf 10’-0” = 45% UP/S allowed 100/616 = 16.2% Complies Level 3-6 Each Floor Identical 58’-8” x 10’-0” = 586-sf 34-sf + 22-sf + 22-sf + 22-sf = 100-sf 10’-0” = 45% UP/S allowed 100/586 = 17.1% Complies Level 2 58’-8” x 11’-0” = 645-sf 34-sf + 22-sf + 22-sf + 22-sf = 100-sf 10’-0” = 45% UP/S allowed 100/645 = 15.5% Complies Level 1 58’-8” x 10’-0” = 586-sf 22-sf 10’-0” = 45% UP/S allowed 22/586 = 3.8% Complies Elevation 2 Wall Area Window Area FSD Compliance Level 7 39’-6” x varies = 450-sf 15-sf + 22-sf + 20-sf + 72-sf = 129-sf 10’-8” = 45% UP/S allowed 129/450 = 28.7% Complies Level 3-6 Each Floor identical 69’-2” x 10’-0” = 691-sf 15-sf + 22-sf + 22-sf + 22-sf + 72-sf = 153-sf 10’-8” = 45% UP/S allowed 153/691 = 22.1% Complies Level 2 69’-2” x 11’-0” = 760-sf 34-sf + 22-sf + 22-sf + 22-sf = 100-sf 10’-8” = 45% UP/S allowed 100/760 = 13.2% Complies Level 1 69’-2” x 10’-0” = 691-sf 42-sf + 12-sf = 54-sf 10’-8” = 45% UP/S allowed 54/691 = 7.8% Complies Elevation 3 Wall Area Window Area FSD Compliance Level 7 239’-0” x 10’-6” = 2,509-sf 22-sf + 30-sf + 65-sf + 3x95-sf + 4x46-sf + 9x42-sf = 964-sf 11’-0” = 45% UP/S allowed 129/450 = 38.4% Complies Level 3-6 Each Floor identical 239’-0” x 10’-0” = 2,390-sf 65-sf + 75-sf + 2x22-sf + 4x46-sf + 11x42-sf = 830-sf 11’-0” = 45% UP/S allowed 830/2390 = 34.7% Complies Level 2 239’-0” x 11’-0” = 2,629-sf 65-sf + 75-sf + 2x22-sf + 4x46-sf + 11x42-sf = 830-sf 11’-0” = 45% UP/S allowed 830/2629 = 31.5% Complies Level 1 239’-0” x 10’-0” = 2,390-sf 65-sf + 75-sf + 2x22-sf + 4x46-sf + 11x42-sf = 830-sf 11’-0” = 45% UP/S allowed 830/2390 = 34.7% Complies ALLOWABLE WINDOW OPENING CALCULATIONS ELEVATION 3