Loading...
HomeMy WebLinkAboutReso - CC - 024-1986that; RESOLUTION NO. 24-86 RESOLUTION APPROVING SPECIAL PERMIT RESOLVED by the CITY COUNCIL of the City of Burlingame WHEREAS, application has been made for a special permit '291 rnnm 1,,4-cl o.A i,l, rn' 4 - at 620 Airport Boulevard (APN 026-342-330 ) and WHEREAS, the Planning Commission held a public hearing on said application on January 27 ,1986 , at which time said application was approved; Council P Y and WHEREAS, this matter was called ll b / I. c ja hearing thereon held on February 18 ,198 6 Ii NOW, THEREFORE, it is hereby RESOLVED and DETERMINED by 1,this Council that said special permit is approved, subject to the (.conditions set forth in Exhibit "A" attached hereto. It is further directed that a certifed copy of this lution be recorded in the official records of the County of Mateo. AVay,r I, JUDITH A. MALFATTI, City Clerk of the City of 'Burlingame do hereby certify that the foregoing resolution was iintroduced at a regular meeting of the City Council held on the 18th day of February ,1986 , and adopted thereafter by the following vote: I' I AYES: COUNCILMEN: AMSTRUP, BARTON, LEMBI, MANGINI, PAGLIARO NOES: COUNCILMEN: NONE iABSENT: COUNCILMEN: NONE EXHIBIT "A" Conditions of approval - Spec al Permit - 321 room hotel - 620 Airport Boulevard (effective February 19, 1986) Property owner: Hilda Lai, 15 Quail Point Circle Sin Bruno, CA 94066 1. that the conditions of the Chief Building Inspector's November 15, 1985 memo, the Fire arshal's November 14, 1985 memo, the City Engineer's January 13, 1986 memo and the Director of Parks' August 5, 1985 memo shall b met; 2. that the final plans and construction of the project shall be consistent with the plans submitted to the.Planning Department and date stamped October 1, 1985 and that there shall be no occupied areas of the hotel below elevation 9' MSL; 3. that the applicant shall abide by the construction schedule including receiving BCDC approval by April, 1986; the schedule includes benchmarks of submitting final foundation plans July, 1986, picking up foundation permit September, 1986, submit structural final plans October, 1986, pick up final building permit December, 1986, final foundation March, 1987, final framing September, 1987 and occupancy April, 1988; 4. have title to use th entire site as shown on the project plans dated October 1, 198 ; 5. obtain permits from* S. Army Corps of Engineers, Federal Aviation Administration, San Francisco Regional Water Quality Control Board and other State and Federal agencies as required; 6. pay Bayfront Develo patrons to San Fran access/egress onto approved by the Cit regional transporta provide directional other motorists to Broadway interchang 7. provide access to reg that they do not occu employment to closer 8. conform to limitation City of Burlingame, c around pile drivers a construction workers; 9. undertake a detaile perimeter dike, imp report, properly en resistance to corro to accommodate diff sewer lines below n freestanding if hun drainage to avoid s elevations on site ent fee, provide shuttle service for hotel sco International Airport, manage project rport Boulevard and on-site circulation as Engineer, provide employees and guests with on information, car pool and van matching, igns and on-site information to guests and courage them to get on 101 southbound at instead of through the City of San Mateo; ional transit modes, schedule work shifts so r at peak hour traffic times, give priority in residents; on hours of construction established by the ply with Title 25,.install portable shrouds off-street parking be provided for soil investigation including evaluation of ement measures identified in preliminary soils ineer placement of fill, use pipe with greatest ion, install flexible joints on all utilities rential settlement, avoid placing water and n pile supported slabs, design lines to be from pipe supported slabs, provide positive anding water and pump water from lower ato storm drains; 10. that a private secu ity patrol shall be provided to police the project and its pub is access areas; 11. pay all required city fees including sewer connection fee, install on-site sewage pretreatment facilities for sewage from food preparation areas, to the standards set by the San Francisco Regional Water Quality Control Board; 12. that during construction measures will be followed to protect the adjacent lagoon fron siltation, landscaped areas will be designed to prevent runoff w ter from entering the Anza Lagoon, hardy plants shall be used which require a minimum of fertilization and pest and weed control; . 13. develop a final landscape plan which meets BCDC and State Lands Commission requirements for public access including public access walkways and landscaping compatible with those existing in the area and final plans to he approved by the Burlingame Parks Department prior to issuance of a building permit and all public access improvements to be installed and maintained by the developer/ property owner; 14. that no room in the hotel shall be rented or leased to a single person or corporate entity for more than 29 days and the rooms and buildings shall not be used for permanent residential purposes; 15. that use of the swi ming pool and health club facilities be limited to the use of regi s ered hotel guests only and not made available to the public throu h membership or other devices; 16. that the number of limited to 321; 17. that the wall be o increase sight lin 18. that the applicant water mains and con necessary to meet t under 101 or join a local and systemwid the requirements of doors for guest rooms in the hotel be ed on the ramp to the lower parking garage to into the garage for cars descending the ramp; all determine the capacity of the affected ibute proportionately to any improvements requirements of the city including a new main assessment district established to make these improvements, install fire hydrants to meet he city; 19. that an assessment shall be paid for this project's proportionate share of the cost of the sewer lift station improvement; and 20. that as installed t] responsibility of t] access improvements boat ramp the area ] other public access be provided. e boat ramp be the installation and maintenance e applicant along with the rest of the public in the BCDC jurisdiction and if there was no e landscaped and improved to integrate into the areas adjacent, and parking for public access