RESOLUTION NO. 24-86
RESOLUTION APPROVING SPECIAL PERMIT
RESOLVED by the CITY COUNCIL of the City of Burlingame
WHEREAS, application has been made for a special permit
'291 rnnm 1,,4-cl o.A i,l, rn' 4 -
at 620 Airport Boulevard (APN 026-342-330 )
and
WHEREAS, the Planning Commission held a public hearing
on said application on January 27 ,1986 , at which
time said application was approved; Council
P Y and
WHEREAS, this matter was called ll b /
I.
c
ja hearing thereon held on February 18 ,198 6
Ii NOW, THEREFORE, it is hereby RESOLVED and DETERMINED by
1,this Council that said special permit is approved, subject to the
(.conditions set forth in Exhibit "A" attached hereto.
It is further directed that a certifed copy of this
lution be recorded in the official records of the County of
Mateo.
AVay,r
I, JUDITH A. MALFATTI, City Clerk of the City of
'Burlingame do hereby certify that the foregoing resolution was
iintroduced at a regular meeting of the City Council held on the
18th day of February ,1986 , and adopted thereafter by
the following vote:
I' I
AYES: COUNCILMEN: AMSTRUP, BARTON, LEMBI, MANGINI,
PAGLIARO
NOES: COUNCILMEN: NONE
iABSENT: COUNCILMEN: NONE
EXHIBIT "A"
Conditions of approval - Spec al Permit - 321 room hotel -
620 Airport Boulevard (effective February 19, 1986)
Property owner: Hilda Lai, 15 Quail Point Circle
Sin Bruno, CA 94066
1. that the conditions of the Chief Building Inspector's November 15,
1985 memo, the Fire arshal's November 14, 1985 memo, the City
Engineer's January 13, 1986 memo and the Director of Parks' August
5, 1985 memo shall b met;
2. that the final plans and construction of the project shall be
consistent with the plans submitted to the.Planning Department and
date stamped October 1, 1985 and that there shall be no occupied
areas of the hotel below elevation 9' MSL;
3. that the applicant shall abide by the construction schedule
including receiving BCDC approval by April, 1986; the schedule
includes benchmarks of submitting final foundation plans July,
1986, picking up foundation permit September, 1986, submit
structural final plans October, 1986, pick up final building permit
December, 1986, final foundation March, 1987, final framing
September, 1987 and occupancy April, 1988;
4. have title to use th entire site as shown on the project plans
dated October 1, 198 ;
5. obtain permits from*
S. Army Corps of Engineers, Federal Aviation
Administration, San Francisco Regional Water Quality Control Board
and other State and Federal agencies as required;
6. pay Bayfront Develo
patrons to San Fran
access/egress onto
approved by the Cit
regional transporta
provide directional
other motorists to
Broadway interchang
7. provide access to reg
that they do not occu
employment to closer
8. conform to limitation
City of Burlingame, c
around pile drivers a
construction workers;
9. undertake a detaile
perimeter dike, imp
report, properly en
resistance to corro
to accommodate diff
sewer lines below n
freestanding if hun
drainage to avoid s
elevations on site
ent fee, provide shuttle service for hotel
sco International Airport, manage project
rport Boulevard and on-site circulation as
Engineer, provide employees and guests with
on information, car pool and van matching,
igns and on-site information to guests and
courage them to get on 101 southbound at
instead of through the City of San Mateo;
ional transit modes, schedule work shifts so
r at peak hour traffic times, give priority in
residents;
on hours of construction established by the
ply with Title 25,.install portable shrouds
off-street parking be provided for
soil investigation including evaluation of
ement measures identified in preliminary soils
ineer placement of fill, use pipe with greatest
ion, install flexible joints on all utilities
rential settlement, avoid placing water and
n pile supported slabs, design lines to be
from pipe supported slabs, provide positive
anding water and pump water from lower
ato storm drains;
10. that a private secu ity patrol shall be provided to police the
project and its pub is access areas;
11. pay all required city fees including sewer connection fee, install
on-site sewage pretreatment facilities for sewage from food
preparation areas, to the standards set by the San Francisco
Regional Water Quality Control Board;
12. that during construction measures will be followed to protect the
adjacent lagoon fron siltation, landscaped areas will be designed
to prevent runoff w ter from entering the Anza Lagoon, hardy plants
shall be used which require a minimum of fertilization and pest and
weed control; .
13. develop a final landscape plan which meets BCDC and State Lands
Commission requirements for public access including public access
walkways and landscaping compatible with those existing in the area
and final plans to he approved by the Burlingame Parks Department
prior to issuance of a building permit and all public access
improvements to be installed and maintained by the developer/
property owner;
14. that no room in the hotel shall be rented or leased to a single
person or corporate entity for more than 29 days and the rooms and
buildings shall not be used for permanent residential purposes;
15. that use of the swi ming pool and health club facilities be limited
to the use of regi s ered hotel guests only and not made available
to the public throu h membership or other devices;
16. that the number of
limited to 321;
17. that the wall be o
increase sight lin
18. that the applicant
water mains and con
necessary to meet t
under 101 or join a
local and systemwid
the requirements of
doors for guest rooms in the hotel be
ed on the ramp to the lower parking garage to
into the garage for cars descending the ramp;
all determine the capacity of the affected
ibute proportionately to any improvements
requirements of the city including a new main
assessment district established to make these
improvements, install fire hydrants to meet
he city;
19. that an assessment shall be paid for this project's proportionate
share of the cost of the sewer lift station improvement; and
20. that as installed t]
responsibility of t]
access improvements
boat ramp the area ]
other public access
be provided.
e boat ramp be the installation and maintenance
e applicant along with the rest of the public
in the BCDC jurisdiction and if there was no
e landscaped and improved to integrate into the
areas adjacent, and parking for public access