HomeMy WebLinkAboutReso - CC - 003-1994RESOLUTION NO. 3-94
RESOLUTION AUTHORIZING EXECUTION OF RIGHT OF WAY CERTIFICATION
RESOLVED, by this CITY COUNCIL of the City of
Burlingame, California and this Council does hereby FIND, ORDER AND
DETERMINE as follows:
1. The public interest and convenience require execution
of the certification cited in the title above.
2. The Director of Pubic Works be, and he is hereby,
authorized to sign said certification for and on behalf of the City
of Burlingame.
3. The City Clerk is hereby ordered and instructed to
attest such signature.
MAYOR
I, JUDITH A. MALFATTI, City Clerk of the City of
Burlingame, do hereby certify that the foregoing resolution was
introduced at a regular meeting of the City Council held on the
19th
day of
JANUARY
1994, and was adopted
thereafter by the following vote:
AYES:
COUNCILMEMBERS:
KNIGHT, O'MAHONY,
PAGLIARO, SPINELLI
NOES:
COUNCILMEMBERS:
NONE
ABSENT:
COUNCILMEMBERS:
HARRISON,
CITY CLERK
1/11/94
Date
Right of Way Cert. No. 1
Exhibit 09-06-02
Page 1 of 1
RIGHT OF WAY CERTIFICATION 3-89
Local Agency City of Burlingame
Identification Number
STPL-5171(1)
Federal Project No (if applicable)
BROADWAY TRAFFIC SIGNAL INTERCONNECT
Street, Road, or Project Name
BROADWAY -CALIFORNIA TO ROLLINS ROAD
Job Limits
1. STATUS OF REQUIRED RIGHT OF WAY
The acquisition of R/W was not required. All work proposed is within existing R/W.
2. STATUS OF AFFECTED RAILROAD OPERATING FACILITIES
No railroad operating facilities are affected.
3. MATERIAL SITE(S): None required.
4. DISPOSAL SITE(S): None required.
5. STATUS OF REQUIRED UTILITY RELOCATIONS: None affected.
6. HIGH AND LOW RISK UNDERGROUND FACILITIES
High and low risk facilities exist within the limits of the project. However, all the conduits wherein
the wires are to be pulled for this project are existing and the high/low risk facilities will not be affected
by the construction. This will be a locally administered project; and I certify that the City of
Burlingame has been informed, in writing, of Caltrans' high and low risk underground facilities policy.
I am aware that the State assumes no liability for compliance or non-compliance with said policy.
7. RIGHT OF WAY CLEARANCE
There were no improvements or obstructions located within the limits of this project.
8. COMPLIANCE WITH RELOCATION ASSISTANCE PROGRAM REQUIREMENTS
Compliance was not required as there were no displacements for this project.
9. CERTIFICATION
I hereby certify the statements made above as to a Certification 1 or 2 are true and correct. The project
may be advertised with contract award being made at any time.
REVIEWED AND APPROVED
Authorized Right of Way
Representative
AGENCY
Title
Date Date