Loading...
HomeMy WebLinkAboutReso - PC - 2024-03.25 - 8ADocuS;gn Env--ktpe lD:' FBE65DDE-35 1 9-447C-880A-A7F336C2 1 0A1 RECORDING REOUESIED BY Planning Department City of Burlingame WHEN RECORDED II/AIL TO: COI\4I\,4UNIry DEVELOPI\,1ENT DEPARTMENT CITY 0F BURLINGAI/!E 501 PRIMROSE ROAD BURLINGAI\,IE, CA 94010 2024-025407 !O4pm Oih4lm24 R'l Fee: NO FEE Count of Pages4 Recorded in Off icialRecords County of San Mateo Mark Church Assessor-County Clerk-Rocod€r ililliii]ililfl!ilfiilillilililil]tiililiililllliltil]ilil1lli|ll* $ R000346 485 5$* Resolution No. 2024-03.25-8A 36 BLOOMFIELD ROAD APN 029-293-260 I hereby certify this to be a full. true and conect copy of the document it purports to be, the original of \,vhich is on file in my offce. 5 2024 Eu;w 6arkw.r TITLE OF DOCUMENT E!.!Fi,.:-l{iF ,t CiTY Kevin Gardiner, AICP, Community Development Di A?ED TJUNE Date: WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on March 25.2024, at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing; NOW THEREFORE, it is RESOLVED and DETERMTNED by this ptanning Commission that: On the basis of the lnitial Study and the documents submitted and reviewed, and comments received and addressed by this commission, it is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and categorical exemption, per section 15303 (a), which states that construction of a limited number of new, small facilities or structures including one single family residence or a second dwelling unit in a residential zone is exempt from environmental review. ln urbanized areas, up to three single-family residences maybe constructed or converted under this exemption, is hereby approved. Said Design Review is approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such Design Review are set forth in the staff report, minutes, and recording of said meeting. 3. lt is further directed that a certifled copy of this resolution be recorded in the official records of the County of San Mateo 2 o+bAA.^) Chairperson {,W,efl, n of the City of Burlingame, doSecretary of the Pla ng Commissio hereby certify that the foregoing Planning Commission held on the 36 BLoo FIELD RD - RESO 2o2,u8.25{AAYES; CO AROTO, HORAI{, LOENTHAL SCH[!D, S}IORES, TSENOES: NOI{E A&SEXT NONE RECUSED: PFAFF resolution was introduced and adopted at a regular meeting of the hda of March 2024 by the following vote Secretary RESOLUTION APPROVING CATEGORICAL EXEMPTION AND DESIGN REVIEW RESOLVED, by the Planning Commission of the City of Burlingame that: WHEREAS, a Categorical Exemption has been prepared and application has been made for Desiqn Review and Special Permit for a second storv balconv for a first and second story addition to an existinq sinole-unit dwellinq at 36 Bloomfield Rd. zoned R-1, Nasim Novin and Ali Daneshio, prooertv owners. APN: 029-293-260: 2 EXHIBIT "A" Conditions of Approval for Categorical Exemption, Design Review, and Special Permit 36 Bloomfield Road Effective April 4, 2024 Page 1 that the project shall be built as shown on the plans submitted to the planning Division date stamped March 14, 2024, sheets A-00.01 through A-00.02, sheets C-1 through C-5, sheets L-1 through L-5, sheets RA-01.01 through RA-02.02, sheets A-01.01 through A-04.02, and site survey; that any changes to building materials, exterior flnishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to planning Division or Planning Commission review (FYl or amendment to be determined by Planning staff); that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; that demolition for removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval ofthe Planning Commission, or City Council on appeal; that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or elterior, shall require a demolition permit; thatthe project shall meet all the requirements of the California Building and Unlform Fire Codes, in effect at time of building permit submittal, as amended by the City of Burlingame; 4 5 6 7 o 1 EXHIBIT "A" 12 11 Conditions of Approval for Categorical Exemption, Design Review, and Special permit 36 Bloomfield Road Effeclive April 4,2024 Page 2 THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residentlal design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Divisiont and that prior to flnal inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built accordrng to the approved Planning and Building plans. 10.