Loading...
HomeMy WebLinkAboutAgenda Packet - PC - 2024.01.22Planning Commission City of Burlingame Meeting Agenda BURLINGAME CITY HALL 501 PRIMROSE ROAD BURLINGAME, CA 94010 Council Chambers/Online7:00 PMMonday, January 22, 2024 Consistent with Government Code Section 54953, this Planning Commission Meeting will be held in person and virtually via Zoom. To maximize public safety while still maintaining transparency and public access, members of the public can observe the meeting virtually or attend the meeting in person. Below is information on how the public may observe and participate in the meeting. To Attend the Meeting in Person: Location: Council Chambers, 501 Primrose Road, Burlingame, California 94010 To Attend the Meeting via Zoom: To access the meeting by computer: Go to www.zoom.us/join Meeting ID: 852 3616 6145 Passcode: 441188 To access the meeting by phone: Dial 1-669-444-9171 Meeting ID: 852 3616 6145 Passcode: 441188 To Provide Public Comment in Person: Members of the public wishing to speak will be asked to fill out a "Request to Speak" card located on the table by the door and then hand it to staff. The provision of a name, address, or other identifying information is optional. Speakers are limited to three minutes each, however, the Chair may adjust the time limit in light of the number of anticipated speakers. Page 1 City of Burlingame Printed on 1/18/2024 January 22, 2024Planning Commission Meeting Agenda To Provide Public Comment via Email: Members of the public may provide written comments by email to publiccomment@burlingame.org to be read aloud during the public comment period for an agenda item. Emailed comments should include the specific agenda item on which you are commenting, or note that your comment concerns an item that is not on the agenda or is on the Consent Calendar. The length of the comment should be commensurate with the three minutes customarily allowed for verbal comments which is approximately 250-300 words. To ensure that your comment is received and read to the Planning Commission for the appropriate agenda item, please submit your email no later than 5:00 p.m. on January 22, 2024. The City will make every effort to read emails received after that time but cannot guarantee such emails will be read into the record. Any emails received after the 5:00 p.m. deadline which are not read into the record will be provided to the Planning Commission after the meeting. 1. CALL TO ORDER - 7:00 p.m. - Council Chambers/Online 2. ROLL CALL 3. REQUEST FOR AB 2449 REMOTE PARTICIPATION Announcements/consideration and approval of requests by Planning Commissioners to participate remotely pursuant to AB 2449 (Government Code Section 54943(f)). 4. APPROVAL OF MINUTES Draft January 8, 2024 Planning Commission Meeting Minutesa. Draft January 8 2024 Planning Commission Meeting MinutesAttachments: 5. APPROVAL OF AGENDA 6. PUBLIC COMMENTS, NON-AGENDA The public is permitted to speak on items that are listed under the Consent Calendar, Commissioner ’s Reports, Director Reports, Requests for Future Agenda Items, new items, or items not on the agenda . Public comments for scheduled agenda items should wait until that item is heard by the Planning Commission. Persons are required to limit their remarks to three (3) minutes unless an extension of time is granted by the Chair. Speakers desiring answers to questions should direct them to the Planning Commission and, if relevant, the Commission may direct them to the appropriate staff member. The Ralph M. Brown Act (the State local agency open meeting law) prohibits the Planning Commission from acting on any matter that is not on the agenda. 7. STUDY ITEMS There are no Study Items. Page 2 City of Burlingame Printed on 1/18/2024 January 22, 2024Planning Commission Meeting Agenda 8. CONSENT CALENDAR Items on the consent calendar are considered to be routine. They are acted on simultaneously unless separate discussion and /or action is requested by the applicant, a member of the public or a commissioner prior to the time the Commission votes on the motion to adopt. 1409 Castillo Avenue, zoned R-1- Application for Design Review and Special Permit for building height for a new, two -story single-unit dwelling and attached garage. This project is Categorically Exempt from review pursuant to the California Environmental Quality Act (CEQA), per Section 15303(a) of the CEQA Guidelines. (Antonio Mora, DTA Architecture, applicant and architect; Sean Cafferkey, property owner) (55 noticed) Staff Contact: Catherine Keylon a. 1409 Castillo Ave - Staff Report 1409 Castillo Ave - Attachments 1409 Castillo Ave - Plans Attachments: 9. REGULAR ACTION ITEMS 2204 Hillside Drive, zoned R -1- Application for Design Review and Special Permits for first story plate height and attached garage for a new, two -story single-unit dwelling and attached garage. The project is Categorically Exempt from review pursuant to the California Environmental Quality Act (CEQA), per Section 15303 (a) of the CEQA Guidelines. (Morris Architecture LLC, applicant and architect; Glenn and Corinne Chiu, property owners) (58 noticed) Staff Contact: Catherine Keylon a. 2204 Hillside Dr - Staff Report 2204 Hillside Dr - Attachments 2204 Hillside Dr - Plans Attachments: 10. DESIGN REVIEW STUDY ITEMS There are no Design Review Study Items. 11. COMMISSIONER’S REPORTS 12. DIRECTOR REPORTS - Commission Communications - City Council regular meeting of January 16, 2024 13. FUTURE AGENDA ITEMS 14. ADJOURNMENT Page 3 City of Burlingame Printed on 1/18/2024 January 22, 2024Planning Commission Meeting Agenda Notice: Any individuals who require special assistance or a disability-related modification or accommodation to participate in this meeting, or who have a disability and wish to request an alternative format for the agenda, meeting notice, agenda packet or other writings that may be distributed at the meeting, should contact Ruben Hurin, Planning Manager, by 10:00 a.m. on Monday, January 22, 2024 at rhurin@burlingame.org or 650-558-7256. Notification in advance of the meeting will enable the City to make reasonable arrangements to ensure accessibility to this meeting, the materials related to it, and your ability to comment. Any writings or documents provided to a majority of the Planning Commission regarding any item on this agenda will be made available for inspection via www.burlingame.org/planningcommission/agenda or by emailing the Planning Manager at rhurin@burlingame.org. If you are unable to obtain information via the City's website or through email, contact the Planning Manager at 650-558-7256. An action by the Planning Commission is appealable to the City Council within 10 days of the Planning Commission's action on January 22, 2024. If the Planning Commission's action has not been appealed or called up for review by the Council by 5:00 p.m. on February 1, 2024, the action becomes final. In order to be effective, appeals must be in writing to the City Clerk and must be accompanied by an appeal fee of $784.00, which includes noticing costs. Page 4 City of Burlingame Printed on 1/18/2024 BURLINGAME CITY HALL 501 PRIMROSE ROAD BURLINGAME, CA 94010 City of Burlingame Meeting Minutes Planning Commission 7:00 PM Council Chambers/OnlineMonday, January 8, 2024 Consistent with Government Code Section 54953, this Planning Commission Meeting will be held in person and virtually via Zoom. To maximize public safety while still maintaining transparency and public access, members of the public can observe the meeting virtually or attend the meeting in person. Below is information on how the public may observe and participate in the meeting. To Attend the Meeting in Person: Location: Council Chambers, 501 Primrose Road, Burlingame, California 94010 To Observe the Meeting via Zoom: To access the meeting by computer: Go to www.zoom.us/join Meeting ID: 828 7378 5194 Passcode: 538775 To access the meeting by phone: Dial 1-669-444-9171 Meeting ID: 828 7378 5194 Passcode: 538775 To Provide Public Comment in Person: Members of the public wishing to speak will be asked to fill out a "Request to Speak" card located on the table by the door and then hand it to staff. The provision of a name, address, or other identifying information is optional. Speakers are limited to three minutes each, however, the Chair may adjust the time limit in light of the number of anticipated speakers. To Provide Public Comment via Email: Members of the public may provide written comments by email to publiccomment@burlingame.org to be read aloud during the public comment period for an agenda item. Emailed comments should include the specific agenda item on which you are commenting, or note that your comment concerns an item that is not on the agenda or is on the Consent Calendar. The length of the comment should be commensurate with the three minutes customarily allowed for verbal comments which is approximately 250-300 words. To ensure that your comment is received and read to the Planning Commission for the appropriate agenda item, please submit your email no later than 5:00 p.m. on January 8, 2024. The City will make every effort to read emails received after that time but cannot guarantee such emails will be read into the record. Any emails received after the 5:00 p.m. deadline which are not read into the record will be provided to the Planning Commission after the meeting. 1. CALL TO ORDER - 7:00 p.m. - Council Chambers/Online The meeting was called to order at 7:01 p.m. Staff in attendance: Community Development Director Kevin Gardiner, Planning Manager Ruben Hurin, Senior Planner Erika Lewit, and City Attorney Michael Guina. Page 1City of Burlingame January 8, 2024Planning Commission Meeting Minutes 2. ROLL CALL Comaroto, Horan, Lowenthal, Pfaff, Schmid, Shores, and TsePresent7 - 3. REQUEST FOR AB 2449 REMOTE PARTICIPATION Commissioner Horan requested remote participation per AB 2449. He was granted the request and attended the meeting remotely. 4. APPROVAL OF MINUTES a.Draft December 11, 2023 Planning Commission Meeting Minutes Draft December 11, 2023 Planning Commission Meeting MinutesAttachments: Commissioner Pfaff made a motion, seconded by Commissioner Comaroto, to approve the meeting minutes. The motion carried by the following vote: Aye:Comaroto, Horan, Lowenthal, Pfaff, Schmid, Shores, and Tse7 - 5. APPROVAL OF AGENDA There were no changes to the agenda. 6. PUBLIC COMMENTS, NON-AGENDA There were no public comments, non-agenda. 7. STUDY ITEMS There were no Study Items. 8. CONSENT CALENDAR There were no Consent Calendar Items. 9. REGULAR ACTION ITEMS a.234 Victoria Road, zoned R-1- Application for Design Review for a new, two -story single-unit dwelling and detached garage. This project is Categorically Exempt from review pursuant to the California Environmental Quality Act (CEQA), per Section 15301 (e)(1) of the CEQA Guidelines. (Hector Estipona, HGE Building Design Inc. designer; Jeffrey Woo and Bingtao Shi, property owners) Staff Contact: Brittany Xiao (38 noticed) 234 Victoria Rd - Staff Report 234 Victoria Rd - Attachments 234 Victoria Rd - Plans Attachments: All Commissioners have visited the project site. Community Development Director Gardiner provided an overview of the staff report. Acting Chair Lowenthal opened the public hearing. Page 2City of Burlingame January 8, 2024Planning Commission Meeting Minutes Public Comments: >There were no public comments. Acting Chair Lowenthal closed the public hearing. Commission Discussion/Direction: > Very much appreciate the changes made on the gable in front. It is a good-looking project. > Appreciate the changes made by the applicant. Commissioner Pfaff made a motion, seconded by Commissioner Tse, to approve the application. The motion carried by the following vote: Aye:Comaroto, Horan, Lowenthal, Pfaff, Schmid, Shores, and Tse7 - b.1826 Loyola Drive, zoned R-1 - Application for Design Review and Hillside Area Construction Permit for a first and second story addition to an existing single -unit dwelling. This project is Categorically Exempt from review pursuant to the California Environmental Quality Act (CEQA), per Section 15301 (e)(1) of the CEQA Guidelines. (Daniel Pho, Pho Architects, applicant and architect; Patricia Swen, property owner) (33 noticed) Staff Contact: 'Amelia Kolokihakaufisi 1826 Loyola Dr - Staff Report 1826 Loyola Dr - Attachments 1826 Loyola Dr - Plans Attachments: All Commissioners have visited the project site. Commissioners Tse, Pfaff and Horan noted that they had a zoom meeting with the applicant. Senior Planner Lewit provided an overview of the staff report. Acting Chair Lowenthal opened the public hearing. Daniel Pho, designer, represented the applicant and answered questions regarding the application. Public Comments: >There were no public comments. Acting Chair Lowenthal closed the public hearing. Commission Discussion/Direction: > For the painted metal awning above the front door, consider using a straight piece across the front which can give a perception of it being straight then do a slight slope with the ridge down the middle. The ridge shall be below the front piece so it will be concealed at the elevation. That would direct the water to go to the planters on either side of the house. > Looking at the roof design, consider extending the one roof element over the front door a little bit deeper to incorporate the depth of the blade. It will slightly modify the slope of that part of the roof, but because it is a unique element and it is not attached to anything else, it could work. It can be a potential solution to simplify the ability to have an overhang at the front door. > I appreciate the efforts put in. We spent quite some time talking during the last meeting, not to make it difficult but, in the hopes of bringing back a better project. I am quite pleased with the overhangs and everything because it is starting to add depth to the project that would have otherwise come out flat. It is Page 3City of Burlingame January 8, 2024Planning Commission Meeting Minutes still a good modern house; it is just not overly modern. The roof pitch and it being a single level does fit within the neighborhood well yet taking that modern look, which there are quite a few in that area. It’s not like it is a whole neighborhood of traditional homes and you are the only one doing a modern home. You’ve done a good job. Some of the reduction in glass in some areas is going to reduce heat and refine views. I am pleased with the overall changes. It will be a good-looking project. > Appreciate and commend the architect for putting both the original and revised drawings on the same sheet. It would be nice if that could be the best practice for future commission meetings. It can be a lot easier for us commissioners, so thank you for that. >I agree with that wholeheartedly. It is a very nice set of plans altogether. Commissioner Schmid made a motion, seconded by Commissioner Comaroto, to approve the application. The motion carried by the following vote: Aye:Comaroto, Horan, Lowenthal, Pfaff, Schmid, Shores, and Tse7 - 10. DESIGN REVIEW STUDY ITEMS a.2204 Hillside Drive, zoned R -1- Application for Design Review and Special Permit for attached garage for a new, two -story single-unit dwelling and attached garage. (Morris Architecture LLC, applicant and architect; Glenn and Corinne Chiu, property owners) (58 noticed) Staff Contact: Catherine Keylon 2204 Hillside Dr - Staff Report 2204 Hillside Dr - Attachments 2204 Hillside Dr - Plans Attachments: All Commissioners have visited the project site. Community Development Director Gardiner provided an overview of the staff report. Acting Chair Lowenthal opened the public hearing. Ryan Morris, designer, represented the applicant and answered questions regarding the application. Public Comments: >There were no public comments. Acting Chair Lowenthal closed the public hearing. Commission Discussion/Direction: > At the rear of the house, the first floor has an 11’-3” plate height. It will require a Special Permit because it exceeds the allowable 9’-0” plate height on the first floor. > For the terrace deck on the rear of the house, be aware of the building code requirement of having railings on drops of that height. The steps cannot be more than 7-3/4” and then you have this drop off . Consider revising before you proceed to construction documents. > I’ve never seen a raised -floor garage that does not go down a hillside. I know it is not within our purview but consider doing the engineering portion earlier than planned to avoid the mess and allow time to review impacts on the neighbors and potential changes to the design. > Please revisit the windows. I agree with my fellow commissioners, the discrepancies especially on the front elevation having different windows is not pulling the house together. It’s a bit of a mix and match . Keep it consistent throughout. I don ’t have a problem with the Special Permit request in the garage and the 11-foot first floor plate height on the kitchen because it is tucked in the back. I agree with the comment about the deck. The back porch seems odd to have stairs. If the deck is going to remain, you Page 4City of Burlingame January 8, 2024Planning Commission Meeting Minutes don’t need the stairs. Let the deck be your stairs down, put lights on it, make it beautiful and one piece . Or close the deck and it becomes its own entity and you have your stairs going down. Consider creating some difference there to make it a little bit better. I would also ask when you come back for the next meeting if you provide some 3D rendering because it is easier to visualize and see the details. >I agree with my fellow commissioner about the windows. There are some alignment issues. There should be better consistency of shape and operation type. Overall, there is a nice order to the look of the house right now. On Hillside Drive where there are so many traditional homes, the front elevation seems in need of more articulation, a little bit more shaping or massing and some other design details. It seems bland. Something is not coming together for me. I have no problem with the attached garage being setback and 12’-6” off from the current location of the garage. I also don ’t have an issue with the plate height at the back, but I just wanted to call them out because it is something that needs to be identified . The back reads better than the front because the back has hipped roofs and some articulation on the first and second stories. The front is a little bit apartment-building looking, flat and not enough interest. >I agree with my fellow commissioners. This can be really cool but is still not there. It seems top-heavy, maybe because of the repetitive windows. The consistency of the materials and such should be throughout. Please provide a detail on the front door, it looks very solid and closed to have a 5 -foot-wide door. Consider using bands on the material transitions and some clean -up of drawings for clarity. >The front elevation reads flat because of the low pitches of the roof. It needs a little more depth and articulation. Some details on the window trims will make us understand if anything comes out from the siding and how you get more depth to this. The 3D renderings help, but without color or texture they read flat to us, that may be a way to show richness of what you intend for us to see. The stone looks like just a texture on the wall, and it is in the same plane as the siding above it. There is no cap and no shadow or anything happening. We need to better understand the layering of the materials so we can start to see the details. >It does look top heavy on the second floor because the roof around the first floor just does not go very high. We do not see as much roof as we are used to on steeper roof pitches so therefore the siding and windows look big. Proportions need to be worked out to make those larger faces look a little reduced and help with the depth issue. I too do not have an issue with the garage moving forward, I just want to make sure that the structural pieces get worked out well. >Because you are not sticking to the vocabulary of hillside, sheet A 9.1 is critical for us in being able to see the depth of the architecture being proposed. I agree that the architecture is there, we just need to have a better understanding of it for the next round. Whether it is more color, more texture or more shadows, putting in more information on sheet A 9.1 is a huge deal for us. Provide more details about the front door and what it will look like. The doors that go out the back on the patio, I assume they are glass doors that you would see in but right now it is showing as white. I am not sure if they are frosted or panel doors. The elevations come out flat because they are just line work. >I wasn’t quite sure what to think of it while going past the project site. Picking up from my fellow commissioner’s comments, there are parts of the design that has the DNA of the prairie style. That is the core, there is a really good idea and design in here that I ’d like to see more of. If that is what you are going for, I do like it and it just needs to be developed a little bit more. >From first glance, I like the design. With the flatness of the second story, having some box windows or something that gives texture can help. Providing a colored rendering will be a game changer. I don ’t have any issues with the Special Permit for the garage. The increased plate height in the kitchen also does not bother me. >I want to clarify for the public that the Special Permit for the plate height is in the room that is located at the rear of the house. It is not changing the scale of the front elevation. The intent of that regulation is to try and control scale from the front. We’ve had a lot of projects proposing them and have been subsequently denied because it is changing the front elevation. Commissioner Lowenthal made a motion, seconded by Commissioner Schmid, to place the item on the Regular Action Calendar when plans have been revised as directed. The motion carried by the following vote: Aye:Comaroto, Horan, Lowenthal, Pfaff, Schmid, Shores, and Tse7 - Page 5City of Burlingame January 8, 2024Planning Commission Meeting Minutes b.1025 and 1029 Capuchino Avenue, zoned R-2 - Application for Design Review for two new, two-story detached condominium dwellings on each of the two existing lots, Front Setback Variances, Minor Modification for parking space width, and Tentative Condominium Map. (Paul and Neena Goswamy, owners and applicants; Gregg Kawahara, architect) (51 noticed) Staff Contact: Erika Lewit 1025 & 1029 Capuchino Ave - Staff Report 1025 & 1029 Capuchino Ave - Attachments 1025 & 1029 Capuchino Ave - Plans Attachments: All Commissioners have visited the project site. Senior Planner Lewit provided an overview of the staff report. Acting Chair Lowenthal opened the public hearing. Gregg Kawahara, designer, represented the applicant and answered questions regarding the application. Public Comments: >I am quite concerned about the impact on our neighborhood from the proposed new condos at the above address. 1. That many units will create the need for a huge amount of parking to be adequate . Another duplex on our block with two units with two bedrooms has 5 cars and 2 motorcycles. Additional living spaces required full parking. 2. The culvert under the property is deteriorating. Neighbors and my friends have explored the culvert last summer and spoke of large pieces of concrete fallen from the ceiling and walls with cracks everywhere along the way. Also, a large sinkhole has developed in front of the property. The driveways are warped and buckled. Please rethink approving the permit. Parking issues are important to the neighbors and the deterioration of the tunnel under their property is a safety issue . Thank you. >Planning Commission members, this is regarding 1025 & 1029 Capuchino Avenue item on the agenda for the 1/8/24 meeting. I am a neighbor on that block. Myself and several others are extremely concerned regarding any new development of this parcel for several reasons. Firstly, the tunnel running under the street and property is severely compromised. I walked the tunnel along with neighbor Tom Hall and Victor Vergara as recently as June 2nd of last year. A long section of the bottom of the tunnel is completely washed away with the concrete ending up downstream into the back of Susanne Button at 1016 Capuchino Avenue. Because of the exposed dirt beneath, massive undercutting of the bottom and south side of the tunnel has occurred. Many yards of supporting infrastructure are now gone. It’s only a matter of time before a sinkhole /total collapse of the street occurs leading into 1025-1029 Capuchino Avenue. I urge the members of this commission along with the City Engineer to walk the tunnel and see for yourselves. Hopefully you can properly see the damage through the winter rain runoff. Especially keep an eye out for the south side undercutting. Other red flags include a sidewalk sinkhole already developing and clearly observable in the front 1025 Capuchino Avenue. We have had several other major incidents with the properties. A beautiful Canary Island Palm tree was chopped down under false pretenses. This was a decades old heritage tree that some phony arborist report stated was “poorly maintained”. The only issue with the tree had been some older fronds that hadn ’t been trimmed back. The tree service crew that came to remove the tree reaffirmed to me the tree was in excellent condition except for the lower fronds. But they were being paid to remove it, so they did. Then a huge near disaster. The owner commissioned un -permitted backhoe digging which resulted in his illegal crew breaking a gas main last summer. We nearly had a San Bruno type pipeline explosion. The Fire Department and PG&E responded to address it. I spoke with the PG&E supervisor. He told me that when he approached the crew to get information in writing his report, the crew “ran off” and left the scene. I Page 6City of Burlingame January 8, 2024Planning Commission Meeting Minutes asked why they would do that. He replied that they must have illegal workers in violation of permits/business licenses. Another issue is a hired crew dug a large hole directly next to the sidewalk in front of 1025 Capuchino Avenue. It was as large as a washing machine and probably 5 feet deep. It was left uncovered for days putting the public at risk. I eventually called Burlingame Public Works to report it . They responded immediately and followed up to me that it was indeed a hazard, and they called the owner to quickly cover it up. These examples are just a few showcasing the total disregard the owner of the properties has for public safety and adherence to existing laws. Many developers were initially offered this parcel when it came up for sale. All declined for many months until the present owner saw dollar signs and is now trying to shove this parcel and his new plans down the throats of the good people of Burlingame. I hope the commission does the right thing and vetoes this project. Regards from a very concerned resident of our city. Acting Chair Lowenthal closed the public hearing. Commission Discussion/Direction: >Please clarify required setback for the culvert. >Please confirm and provide information from the Public Works Department if the culvert is in good shape and what was proposed is a viable solution. >The east elevation on sheet A 2.4, there are two parallel vertical lines that were supposed to be a chimney, it looks funny. On sheet A 3.4, the south elevation of the lower floor doesn ’t look like it was resolved well. It does not look like a traditional house. The 4-panel sliding doors connected to the two double hung windows can be improved by putting space in between the doors and the windows. Consider putting belly bands to break the long verticality of the elevations. I regret the removal of the palm tree . Provide information on the landscape plan for the corner of the property. > Knowing that this is zoned R -2 and the constraints of the culvert, I ’m not questioning the condition of it. This is a clever design to fit within all the constraints and get this in. I don ’t have a problem with the setback. The 34-foot average setback is a little bit artificial. When you look at it from the satellite view, a lot of the houses are up front. There are a few that are so far up that it is driving the average up. I counted 12 parking spaces on site between covered and uncovered which addresses the parking concerns. The only thing that struck me is the amount of driveway pavers used between the two housing units. It seems a bit expansive. Consider using different landscape materials to break that up a bit. > The elevations are drawn nicely but suggest arranging the drawings so we are looking at each elevation showing all the houses next to each other so it will be easier for us to compare the design elements of each house. Overall, they are nicely designed. This is a big project, there are four homes being proposed. We are looking at one small rendering and another that is covered with trees. The one covered with trees is not helpful for us to see the design of the four homes. Please provide more renderings, bigger and preferably a different perspective, so we can see the collection of the homes better. >I agree, the renderings provided were not helpful. Since there are four separate structures, you need to provide different views of each one. There are two buildings that I like and the elevations for the other two that I don’t like do not sell them. I am struggling on how to like them. It is a clever solution to try and resolve a challenging site, but it has created some odd shapes for us and not traditional houses we typically see in this area. Please provide additional renderings so we can see more views of the proposed homes. >Looking at the site plan, none of the adjacent structures on other properties were shown and how they relate to the four different buildings. I’m trying to grapple with how each one of these buildings impacts the neighbors and where their structure is. Show location of existing adjacent structures on the site plan as a simple box. I don’t have an issue with the setback but a sheet like A 07, I know it is for the fire hydrants, but it is a great sheet. It doesn ’t have any structures on it. It would then otherwise show us how the neighborhood works, what the rhythm is and what this project is doing to the rhythm. Since there is nothing in this area that has a street in the middle of two properties, it is unique. I’d like to see the relationship of these proposed buildings to the adjacent properties so if we approve a Special Permit for that, we will have informed decisions. Page 7City of Burlingame January 8, 2024Planning Commission Meeting Minutes >The parking seems fine, they have provided more than required. >At the front elevation on 1025 Capuchino Avenue, the siding is very vertical and there are a lot of two-story surfaces. It is not reading well for me. Maybe in 3D rendering it will read better. The rear elevation of 1029 Capuchino Avenue is not reading for me at all. It has an odd shape; it has a lot of odd surfaces and a lot of odd roof shapes that I am not grasping in these elevations. For the other two homes, the proportion seems to work. I would like to get more information on the culvert before we bring this back because it will be better to come back with a full package that we can get behind than to be halfway and not really understand if we got all these things resolved before we can move forward. > I am pleased with the design. I like how every house has a completely different vibe going for it. I also agree with my fellow commissioners’ comments. 1025 Capuchino Avenue needs a little bit of work on the two-story vertical board and batten siding. I also agree that there are a lot of pavements in the middle, usually it is to meet fire code requirements. But if it is not, I’d like to see it reduced in some way. > I like the project. I totally agree that with the amount of pavement it feels like they are tract homes . Anything we can do to soften the look will be helpful. We certainly don ’t want a mini tract house in this neighborhood. I totally understand the Setback Variance, I do not have any issues with that. The parking is great, a lot of parking spaces were provided. The neighbors who are concerned about that will be pleased to see the amount of parking spaces. As a builder myself, the general contractor will be bound to the plans to build it safely and to code. The general contractor relies on the structural engineer and the structural engineer is going to rely on the soils engineer. The soils engineer will rely on the civil engineer to make sure the water is properly taken care of. The civil engineer will rely on the Public Works Department to approve their plans. There’s a lot of people involved here, and I totally understand the commission ’s concern regarding this culvert. As a general contractor, we can ’t build all these without that level of approval and information. I totally understand the need to see that because a lot of the neighbors have concerns. I agree with all the other comments. I do think that some of these units need a little bit of work. > I was looking at the driveway and I agree with my fellow commissioners that it has too many pavers. I know we have a culvert but would like to see it softened, maybe with a turf in the middle. If there are some issues with the culvert on that property, maybe this is an opportunity for the city to do our part on the street at the same time to resolve this issue on that street. > I'd rather see a continuance to allow them to coordinate with the Public Works Department, together with our architectural feedbacks, and come back with a coordinated effort to make it an easy jump to Action. I am concerned that if we come back to Action we're required to move forward and miss the chance to provide the appropriate feedback this size of project needs. I don't necessarily think it is a punishment but and opportunity to come back with a fuller package so we can make an easy transition. > Gardiner: Through the chair, looking at the Public Works' comments on the design review, they have a few mentions of the culvert. At least there is some assurance that Public Works have looked into this. They have some conditions about the inspection of the culvert prior to construction, also as mentioned, the various conditions with the CC&Rs. The notes do not answer all of the questions raised, but I want to convey that the culvert is something that is in Public Works' radar. One of the notes mentioned the need for trees to be at least 10 feet back from the culvert. Commissioner Lowenthal made a motion, seconded by Commissioner Comaroto, to continue the application. The motion carried by the following vote: Aye:Comaroto, Horan, Lowenthal, Pfaff, Schmid, Shores, and Tse7 - c.925 Howard Avenue, zoned MMU - Application for Commercial Design Review and Front Setback Variance for a first and second story addition and facade changes to an existing commercial building. (Maria Bermudez, Feldman Architecture, applicant and architect; Copeland Park Properties, property owner) (32 noticed) Staff Contact: 'Amelia Kolokihakaufisi Page 8City of Burlingame January 8, 2024Planning Commission Meeting Minutes 925 Howard Ave - Staff Report 925 Howard Ave - Attachments 925 Howard Ave - Plans Attachments: All Commissioners have visited the project site. Community Development Director Gardiner provided an overview of the staff report. Acting Chair Lowenthal opened the public hearing. Anjali Iyer, designer, represented the applicant and answered questions regarding the application. Public Comments: >There were no public comments. Acting Chair Lowenthal closed the public hearing. Commission Discussion/Direction: > As one of the commissioners who was here when this project was last heard, I remember a lot of the discussion about parking, but I don ’t recall us being against a larger garage door. In this case, as the applicant was saying, I don ’t feel there is significant change that the proposed garage door is two feet wider. I don’t recall that we had an issue about that before. I am ok with the proposed garage door size. I do recall that there was a lot of discussion about putting in some planters at the front. With this new design, there is a deeper planting bed area than was originally proposed. I agree with the applicant that the addressing of protection and shade over the entry door has been handled by the recessed front door area . The front is generally getting indirect lighting as it is located northeast, so I am not as concerned about the requirement of shade along the front fa çade. The originally approved design did not have the overhang . I like the proposed changes. I don ’t think that the upstairs extension is significant in that it changes much of our perspective of it from street level. This is approvable. > I understand that it is trying to be industrial, but there is something about it that it has a sterile look to it. I know there are some interesting materials in here, but it can be improved by breaking up the height by providing some horizontal element and making it look less prominent. Unfortunately, trees will not be allowed on this street. It needs to be set in better and it looks like a cake on the top. >I was on the commission when this came last, and I don ’t remember any concerns other than the left side next to the neighbor with a residential house. I was trying to minimize the shading and the impact of that second story on that, which really hasn ’t changed from one generation to the next. The changes made are minor from the big scheme of things. I don ’t have a problem with the enlarged garage door. It is a blank side, so the two extra feet of door does not bother me at all. I too would love to see the trees on the street, but I understand why we can’t. I supported it then and it is still a good project now. >I don’t have any major outstanding issues. With the garage door, I am not concerned about the size of it, but because it has become larger, it has taken away one of the sets of windows at the current building . It would be nice if that door could be shortened a little bit or moved over so we can keep the windows . Right now, it does not mean a lot because that side faces a parking lot, but that parcel will see different uses in the coming years. The street goes directly towards one of those new apartment complexes that has been built in the next block. A lot of people walk from here to get to downtown Burlingame. It would be nice if we could keep four windows instead of three. The storefront will look better in person with how the windows are set back with the planters, but they look flat on the renderings. >Consider adding a thick belly band to break up the verticality in the front. I do like the project and don’t have a problem with the garage door or anything else. Commissioner Schmid made a motion, seconded by Commissioner Comaroto, to place on the item on the Regular Action Calendar. The motion carried by the following vote: Page 9City of Burlingame January 8, 2024Planning Commission Meeting Minutes Aye:Comaroto, Horan, Lowenthal, Pfaff, Schmid, Shores, and Tse7 - 11. COMMISSIONER’S REPORTS There were no Commissioner's Reports. 12. DIRECTOR REPORTS Community Development Director Gardiner reported that the City Council adopted the Housing Element at its meeting on December 18, 2023. He also reported that YIMBY Law has moved to dismiss its lawsuit against the City since the City has now adopted a certified Housing Element. 13. FUTURE AGENDA ITEMS There were no Future Agenda Items. 14. ADJOURNMENT The meeting was adjourned at 9:25 p.m. Notice: Any individuals who require special assistance or a disability-related modification or accommodation to participate in this meeting, or who have a disability and wish to request an alternative format for the agenda, meeting notice, agenda packet or other writings that may be distributed at the meeting, should contact Ruben Hurin, Planning Manager, by 10:00 a.m. on January 8, 2024 at rhurin@burlingame.org or 650-558-7256. Notification in advance of the meeting will enable the City to make reasonable arrangements to ensure accessibility to this meeting, the materials related to it, and your ability to comment. Any writings or documents provided to a majority of the Planning Commission regarding any item on this agenda will be made available for inspection via www.burlingame.org/planningcommission/agenda or by emailing the Planning Manager at rhurin@burlingame.org. If you are unable to obtain information via the City's website or through email, contact the Planning Manager at 650-558-7256. An action by the Planning Commission is appealable to the City Council within 10 days of the Planning Commission's action on January 8, 2024. If the Planning Commission's action has not been appealed or called up for review by the Council by 5:00 p.m. on January 18, 2024, the action becomes final. In order to be effective, appeals must be in writing to the City Clerk and must be accompanied by an appeal fee of $784.00, which includes noticing costs. Page 10City of Burlingame City of Burlingame Design Review and Special Permit Address: 1409 Castillo Avenue Meeting Date: January 22, 2024 Request: Application for Design Review and Special Permit for building height for a new, two-story single- unit dwelling and attached garage. Applicant and Architect: DTA Architecture, Antonio Mora APN: 027-174-070 Property Owner: Sean Cafferkey Lot Area: 5,493 SF General Plan: Low Density Residential Zoning: R-1 Environmental Review Status: The project is Categorically Exempt from review pursuant to the California Environmental Quality Act (CEQA), per Section 15303 (a) of the CEQA Guidelines, which states that construction of a limited number of new, small facilities or structures, including one single-unit residence, or a second dwelling unit in a residential zone, is exempt from environmental review. In urbanized areas, this exemption may be applied to the construction or conversion of up to three (3) single-unit residences as part of a project. Project Description: The subject property is an interior lot with an existing single-unit dwelling and an attached garage. The lot slopes up from the street, with an approximately ten-foot difference between the front and rear property lines; the lot also has a cross slope from right to left. The applicant is proposing to demolish the existing dwelling and attached garage and build a new, two-story single-unit dwelling and attached garage. The proposed floor area would be 2,856 SF (0.52 FAR) where 2,857 SF (0.52 FAR) is the maximum allowed (includes covered porch and basement exemptions). The new dwelling would contain four bedrooms. Two parking spaces, one of which must be covered, are required for a four-bedroom house. The new attached one-car garage measures 10’ x 18’ (clear interior dimensions) and provides the required covered parking space; one uncovered parking space (9’ x 18’) is provided in the driveway. Staff would note that a Special Permit for an attached garage is not required since the project includes replacing an attached garage in the same location on the lot (C.S. 25.10.035). The subject property slopes upward approximately 10’-0” from the front to the rear of the property which as a result affects the measurement of the overall building height. The proposed finished floor of the house is 9’-5” above average top of curb which closely matches the finished floor of the existing house (existing finished floor is 1’-7” lower than proposed). A Special Permit is required for the proposed building height of 33'-7" (Special Permit required for a height between 30 and 36 feet). All other zoning requirements have been met. The site contains five landscape trees and with this application four of the existing, non-protected sized trees would be removed. The proposed Planting Plan on sheet L1.1 shows eight new 24-inch box landscape trees to be planted on-site. The Parks Division determined that three landscape trees are required on-site; therefore as proposed the project exceeds the requirement of the tree reforestation ordinance. Currently, there are no street trees in front of this property. The Parks Division notes that one street tree will be required to be planted as part of this project. The applicant is requesting the following applications: • Design Review for a new, two-story single-unit dwelling and attached garage (C.S. 25.68.020 (C)(1)(a)); and • Special Permit for building height (33’-7” proposed where 30’-0” is the maximum allowed) (C.S. 25.10.030 and 25.78.020(A)(1). Item No. 8a Consent Calendar Item Design Review and Special Permit 1409 Castillo Avenue -2- 1409 Castillo Avenue Lot Area: 5,493 SF Plans date stamped: January 9, 2024* PROPOSED ALLOWED/REQ’D Front Setbacks (Att Garage): (1st flr): (2nd flr): 25’-0” 19’-4” 26’-6” 25’-0” (single car w/attached garage 15’-10” (block average) 20’-0” Side Setbacks (left): (right): 4’-0” 6’-9” 4'-0” 4’-0” Rear Setbacks (1st flr): (2nd flr): 38’-2” 38’-2” 15'-0” 20’-0” Lot Coverage: 1,901 SF 34.6% 2,197 SF 40% FAR: 2,856 SF 0.52 FAR 2,857 SF¹ 0.52 FAR # of bedrooms: 4 --- Off-Street Parking: 1 covered (10’-0” X 18’-0”) 1 uncovered (9’ x 18’) 1 covered (10’-0” X 18’-0”) 1 uncovered (9’ x 18’) Building Height: 33’-7” ² 30’-0” Plate Height: (1st flr): (2nd flr): 9’-0” 8’-0” 9’-0” 8’-0” Declining Height Envelope: Complies C.S. 25.10.055 * The revised plans dated January 9, 2024 include no changes to the zoning code standards provided in this table. ¹ (0.32 x 5,493 SF) + 1,100 SF = 2,857 SF (0.52 FAR) ² Special Permit requested for building height (33’-7” proposed where 30’-0” is the maximum allowed; Special Permit required for a height between 30 and 36 feet). Summary of Proposed Exterior Materials: • Windows: aluminum clad wood windows with simulated true divided lites • Doors: aluminum clad wood front door; wood sectional garage door • Siding: stained cedar shingles or synthetic alternative; stucco • Roof: composite shingle roof • Other: 2X wood fascia, 4X wood outrigger, 2X wood header, wood belly band Staff Comments: None. Design Review and Special Permit 1409 Castillo Avenue -3- Design Review Study Meeting: At the Planning Commission Design Review Study meeting on December 11, 2023, the Commission complimented the design of the project and requested that a rendering be provided. The Commission also had questions related to the exterior lighting at the front of the house and the finish of the front stairs. The Commission voted to place this item on the Consent Calendar when all information has been submitted and reviewed by the Planning Division (see attached December 11, 2023 Planning Commission Minutes). The applicant submitted a response letter and revised plans and rendering, dated January 9, 2024, to address the Planning Commission’s comments. Staff would note that the revised plans address the Commission's comments, but do not include changes to any of the zoning criteria (no change to setbacks, building envelope, lot coverage or FAR). Design Review Criteria: The criteria for design review as established in Ordinance No. 2000 adopted by the City Council on December 6, 2021 are outlined as follows: 1. Consistency with any applicable design guidelines; 2. Compatibility of the architectural style with that of the existing character of the neighborhood; 3. Respect for the parking and garage patterns in the neighborhood; 4. Architectural style and consistency and mass and bulk of structures, including accessory structures; 5. Interface of the proposed structure with the structures on adjacent properties; 6. Landscaping and its proportion to mass and bulk of structural components; and 7. In the case of an addition, compatibility with the architectural style and character of the existing structure as remodeled. Required Findings for Design Review: Any decision to approve a Major Design Review application shall be supported by written findings addressing the criteria set forth in Chapter 25.68. In making such determination, the following findings shall be made: 1. The project is consistent with the General Plan and is in compliance with all applicable provisions of Title 25, all applicable design guidelines, all other City ordinances and regulations, and most specifically, the standards established in the Design Review Criteria above, as applicable. 2. The project will be constructed on a parcel that is adequate in shape, size, topography, and other circumstances to accommodate the proposed development; and 3. The project is designed and arranged to provide adequate consideration to ensure the public health, safety, and general welfare, and to prevent adverse effects on neighboring property. Suggested Findings for Design Review: 1. The proposed new single-unit dwelling is consistent with the General Plan designation of Low Density Residential and is in compliance with all applicable provisions of Title 25; the proposed dwelling is consistent with the design guidelines; that the mass and bulk of the proposed structure is in scale with the lot and in relation to neighboring properties, and that architectural details follow a traditional design, including the aluminum clad wood windows with simulated true divided lites, aluminum clad wood front door, wood sectional garage door with stained cedar shingles with wood trim, wood fascia, roof eave brackets and horizontal band, making the project compatible with the character of the neighborhood. 2. The project will be constructed on a parcel that is adequate in shape, size, topography, and other circumstances to accommodate the proposed development as shown on the proposed plans. Design Review and Special Permit 1409 Castillo Avenue -4- 3. The project is designed and arranged to provide adequate consideration to ensure the public health, safety, and general welfare, and to prevent adverse effects on neighboring property because the project complies with setback, lot coverage, floor area ratio, declining height envelope, and parking requirements (with a Special Permit request for building height). For these reasons, the project may be found to be compatible with the requirements of the City's design review criteria. Required Findings for a Special Permit: In order to grant a Special Permit for a building height, the Planning Commission must find that the following conditions exist on the property (Code Section 25.51.020 a-d): (a) The blend of mass, scale and dominant structural characteristics of the new construction or addition are consistent with the existing structure’s design and with the existing street and neighborhood; (b) the variety of roof line, facade, exterior finish materials and elevations of the proposed new structure or addition are consistent with the existing structure, street and neighborhood; (c) the proposed project is consistent with the residential design guidelines adopted by the city; and (d) removal of any trees located within the footprint of any new structure or addition is necessary and is consistent with the city’s reforestation requirements, and the mitigation for the removal that is proposed is appropriate. Suggested Special Permit Findings (Building Height): 1. The blend of mass, scale, and dominant structural characteristics of the new dwelling are consistent with the character of the street and compliment the neighborhood with a unique style of its own. 2. The variety of roof line, façade, exterior finish materials, and elevations of the proposed new dwelling are consistent with the existing street and neighborhood in that the added height results from the topography of the lot and if the lot did not slope upward by approximately 10’-0” from the front to the rear of the property, then the proposed building height would be under the maximum building height. 3. The proposed project is consistent with the residential design guidelines adopted by the City in that the proposed structure is compatible with the requirements of the City's design review criteria as noted above. For these reasons, the project may be found to be compatible with the requirements of the City's Special Permit criteria. Planning Commission Action: The Planning Commission should conduct a public hearing on the application and consider public testimony and the analysis contained within the staff report. Action should include specific findings supporting the Planning Commission’s decision and should be affirmed by resolution of the Planning Commission. The reasons for any action should be stated clearly for the record. At the public hearing the following conditions should be considered: 1. that the project shall be built as shown on the plans submitted to the Planning Division date stamped January 9, 2024, sheets A0.0 through A8.1, sheet L1.1 through L2.1 and BMP1.1; 2. that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYI or amendment to be determined by Planning staff); Design Review and Special Permit 1409 Castillo Avenue -5- 3. that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; 4. that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; 5. that demolition for removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 6. that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; 7. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 8. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 9. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, in effect at time of building permit submittal, as amended by the City of Burlingame; THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 10. that prior to scheduling the framing inspection the applicant shall provide a certification by the project architect or residential designer, or another architect or residential design professional, that demonstrates that the project falls at or below the maximum approved floor area ratio for the property; 11. that prior to scheduling the foundation inspection, a licensed surveyor shall locate the property corners, set the building footprint and certify the first-floor elevation of the new structure(s) based on the elevation at the top of the form boards per the approved plans; this survey shall be accepted by the City Engineer; 12. that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; 13. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; and Design Review and Special Permit 1409 Castillo Avenue -6- 14. that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. Catherine Keylon Senior Planner c. Antonia Mora, DTA Architecture, applicant and architect Sean Cafferkey, property owner Attachments: December 11, 2023 Planning Commission Minutes Applicant’s Response Letter, dated January 9, 2024 Project Application Form Special Permit Application Form Planning Commission Resolution (Proposed) Notice of Public Hearing – Mailed January 12, 2024 Area Map BURLINGAME CITY HALL 501 PRIMROSE ROAD BURLINGAME, CA 94010 City of Burlingame Meeting Minutes Planning Commission 7:00 PM Council Chambers/OnlineMonday, December 11, 2023 c.1409 Castillo Avenue, zoned R -1- Application for Design Review and Special Permit for building height for a new, two -story single-unit dwelling and attached garage. (Antonio Mora, DTA Architecture, applicant and architect; Sean Cafferkey, property owner) (55 noticed) Staff Contact: Catherine Keylon 1409 Castillo Ave - Staff Report 1409 Castillo Ave - Attachments 1409 Castillo Ave - Plans Attachments: All Commissioners have visited the project site. Planning Manager Hurin provided an overview of the staff report. Chair Pfaff opened the public hearing. Richard Terrones, designer, represented the applicant and answered questions regarding the application. Public Comments: >There were no public comments. Chair Pfaff closed the public hearing. Commission Discussion/Direction: > Please provide 3D rendering. >Consider adding lights on the sidewall of the stairs and the left side of the garage. >I was pleasantly surprised, this is a creative design. The front fa çade is different but fits the neighborhood. It looks great. >It is beautiful and very well done. It’s got personality but is rooted in traditions. Very interesting and nice. >It is not just a copy of the ones in the neighborhood; it is actually a stretch beyond. You did a great job. >I was really impressed. The design is going for the early 20th century design, it is pretty evident. I appreciate all the single -style cues and how the roof pitch works. I am interested in how this might look because of how high it is from across the street. I visited the site and you can see almost all the fa çade. But there has been a decent amount of attention given to that side. I especially like the garage dormer; it is an interesting detail. >With the beautiful design of the house, it definitely has its own character and interest. When considering the average front and rear elevation, from that point to the top of the roof ridge looks like under 30 feet. I can see supporting the Special Permit for height application. Commissioner Tse made a motion, seconded by Commissioner Comaroto, to place the item on the Consent Calendar. The motion carried by the following vote: Page 1City of Burlingame December 11, 2023Planning Commission Meeting Minutes Aye:Comaroto, Horan, Lowenthal, Pfaff, Schmid, Shores, and Tse7 - Page 2City of Burlingame 10 November 2024 City of Burlingame Building Department 501 Primrose Road Burlingame, CA 94010 Re: Cafferkey Residence 1409 Castillo Ave. Plan Check Comments received 12 December 2023 The following information is provided to assist your department in rechecking the subject documents. The original plan check consisted of written comments from various departments. We have responded to those comments and made appropriate changes to the drawings. Below is a list of responses to the plan check comments. They are listed in the order they appear on the original comment pages. Each comment explains our response and locates any changes within the drawings. Plan Check Response DTA Item # Department Item Comment Response Location Planning Comments 1 Please provide a rendering of the proposed project. Rendering has been included in plan submittal. A8.1 2 Clarify if the concrete stairs at the front will have a finish or other details. Note has been added to site plans that concrete stairs, walkway, and landing will have a tile finish. A 1 . 1 3 Will you have lighting on the front stairs or the garage? Note added to plans that aisle lights will be provided at side walls of steps. Note added to elevations to provide a light fixture at the front of the garage. A1.1,A2.1 A4.1 If there are any further questions or comments regarding the project, please contact our Office at 650 696 1200. Richard Terrones / Antonio Mora City of Burlingame Plan Check Response - 1 01/09/2024 09.12.23 City of Burlingame Š Community Development Department Š 501 Primrose Road Š P (650) 558-7250 Š www.burlingame.org City of Burlingame Special Permit Application (R-1 and R-2) The Planning Commission is required by law to make findings as defined by the City’s Ordinance (Chapter 25.78). Your answers to the following questions can assist the Planning Commission in making the decision as to whether the findings can be made for your request. Refer to the end of this form for assistance with these questions. 1. Explain why the blend of mass, scale and dominant structural characteristics of the new construction or addition are consistent with the existing structure’s design and with the existing street and neighborhood. 2. Explain how the variety of roof line, facade, exterior finish materials and elevations of the proposed new structure or addition are consistent with the existing structure, street and neighborhood. 3. How will the proposed project be consistent with the residential design guidelines adopted by the City? 4. Explain how the removal of any trees located within the footprint of any new structure or addition is necessary and is consistent with the City’s reforestation requirements. What mitigation is proposed for the removal of any trees? Explain why this mitigation is appropriate. SPECIAL PERMIT FOR HEIGHT The existing house is a single unit dwelling (SUD) on an up-sloping lot, and will be razed entirely. The new home will be an SUD similar in character to other homes on the block and in the neighborhood. The proposed massing is two stories, with the second story tucked under the roof with attic dormers, so as to NOT present a full second floor layer on top of the first. The new structure will have a traditional primary gable roof with outcropping dormers, similar to the traditional homes of the Easton Addition. The exterior finishes, wood trims, fascias and other wood details, will be similar in scale and character as other traditional craftsman style homes, and as encouraged by the Design Guidelines. The proposed height is exacerbated by the up sloping lot, and therefore requires the Special Permit. Though 33'-7" above average top of curb, the house is actually only approximately 27' above adjacent grade - similar to other typical two story homes. The proposed meets the design review criteria established under the Burlingame Ordinances, as follows: 1. The structure is compatible in architectural style with that of the existing character of the neighborhood. 2. The proposed attached garage is similar to many of the existing attached garages in the neighborhood. 3. The architectural style, mass, and bulk is that of a traditional craftsman home in the Easton Addition, and as encouraged by the Design Guidelines. 4. The proposed home will interface nicely with other residences on the block and will not infringe on the rights of other properties. 5. The proposed landscaping will all be new, and will be compatible in scale and character with the residential use and proposed structure. There are no protected sized trees that will be removed as part of this project. The only trees being removed are overgrown and woody. The new landscaping will include new landscape trees, intended to meet or exceed the City's reforestation requirements and goals. Secretary RESOLUTION APPROVING CATEGORICAL EXEMPTION, DESIGN REVIEW AND SPECIAL PERMIT RESOLVED, by the Planning Commission of the City of Burlingame that: WHEREAS, a Categorical Exemption has been prepared and application has been made for Design Review and Special Permit for height for a new, two-story single-unit dwelling and attached garage at 1409 Castillo Avenue, zoned R-1, Sean and Erika Cafferkey, property owner, APN: 027-174-070; WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on January 22, 2024, at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing; NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that: 1. On the basis of the Initial Study and the documents submitted and reviewed, and comments received and addressed by this Commission, it is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and categorical exemption, per Section 15303 (a), which states that construction of a limited number of new, small facilities or structures including one single family residence or a second dwelling unit in a residential zone is exempt from environmental review. In urbanized areas, up to three single-family residences maybe constructed or converted under this exemption, is hereby approved. 2. Said Design Review and Special Permit are approved subject to the conditions set forth in Exhibit “A” attached hereto. Findings for such Design Review and Special Permit are set forth in the staff report, minutes, and recording of said meeting. 3. It is further directed that a certified copy of this resolution be recorded in the official records of the County of San Mateo. Chairperson I, _____________ , Secretary of the Planning Commission of the City of Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the Planning Commission held on the 22nd day of January, 2024 by the following vote: EXHIBIT “A” Conditions of Approval for Categorical Exemption, Design Review and Special Permit 1409 Castillo Avenue Effective February 1, 2024 Page 1 1. that the project shall be built as shown on the plans submitted to the Planning Division date stamped January 9, 2024, sheets A0.0 through A8.1, sheet L1.1 through L2.1 and BMP1.1; 2. that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYI or amendment to be determined by Planning staff); 3. that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; 4. that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; 5. that demolition for removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 6. that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; 7. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 8. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 9. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, in effect at time of building permit submittal, as amended by the City of Burlingame; THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 10. that prior to scheduling the framing inspection the applicant shall provide a certification by the project architect or residential designer, or another architect or residential design professional, that demonstrates that the project falls at or below the maximum approved floor area ratio for the property; EXHIBIT “A” Conditions of Approval for Categorical Exemption, Design Review and Special Permit 1409 Castillo Avenue Effective February 1, 2024 Page 2 11. that prior to scheduling the foundation inspection, a licensed surveyor shall locate the property corners, set the building footprint and certify the first-floor elevation of the new structure(s) based on the elevation at the top of the form boards per the approved plans; this survey shall be accepted by the City Engineer; 12. that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; 13. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; and 14. that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. 1409 Castillo Avenue 300’ noticing APN: 027-174-070 1103 Juanita AvenueBurlingame, California94010650 696 1200314 Center Street #220Healdsburg, California65448707 343 1305DTADreiling Terrones Architecture Inc.ArchitectureInfrastructureEnvironmentsCafferkey Residence1409 Castillo WayBurlingame CA, 940102318New Residence A0.0 Abbrev., Green measures, Proj. Dat, Index, Directory, Legend, Vicinity Map Owner Review 01: 06/19/2023 Schematic Update 02: 07/21/2023 Planning Submittal 01: 09/08/2023 Planning resubmittal 02: 11/3/2023 Planning resubmittal 03: 01/05/20242 1 Height Fireproof Foundation Floor Drain Fire Alarm Fire Extinguisher Footing Face Of Stud Face Of Finish Face Of Conc Glass Grade Galvanized Gauge Galvanized Iron Hose Bib Hollow Core Inside Diameter Hollow Metal Insulation Interior Janitor Joist Hanger Finish Lavatory Laminate Mounted Minimum Maximum Membrane Metal Manufacturer Nominal Not To Scale Not In Contract Opening Opposite Overhang On Center J.H. N.T.S. E.P.Electrical Panel EQ. EQUIP. ENCL. EMER. ELEV. ELEC. EA. Equal Equipment Enclosure Emergency Elevation Electrical Each O.H. OPG. OPP. O.C. Expansion JointE.J. E.F. DWG. DN. DIA. DIM. DET. DEPT. DBL. Exhaust Fan Drawing Down Diameter Dimension Department Detail Double D.S. CW CONST. CONC. COMP. CONT. CORR. CTR. Cold Water Downspout Concrete Composition Construction Continuous Corridor Center MFR. MTL. MTD. MIN. N.I.C. NOM. JT. JAN. LT. LAV. LAM. MEMB. MAX. Light Joint Approximately Clean Out To Grade Construction Joint CLG. CL. COL. CLR. CEM CAB. C.O.T.G. C.J. C.B. C.I. C. Cabinet Column Cement Ceiling Closet Clear Cast Iron Catch Basin Conduit BM. BOT. BLKG. BLDG. BLK. B.U. ASPH. ARCH. BD. Bottom Blocking Building Beam Block Built-Up Asphalt Architectural Board HT. I.D. HR. H.M. H.C. H.B. INSUL. INT. Hour FTG. F.O.S. GL. GR. GA. G.I. GALV. Abbreviations Asphalt Concrete ADJ. A.C. A.B. APPROX. ALUM. Adjustable Anchor Bolt Aluminum F.D. F.E. FDN. F.P. F.A. F.O.C. F.O.F. FIN. WD. W/O WP. WT. Without Waterproof Weight Wood W/ W.C. W T.O.W. T.O.S. T.O.P. U.O.N. SUSP. STRUC. STD. T.O.C. Water Closet With Waste Unless Otherwise Top Of Sidewalk Top Of Pavement Top Of Concrete Top Of Wall Noted Suspended Structural Standard SHT. SEC. STA. SPL. SPEC. SCHED. S.S. S.O.V. S.C. S.B. RWD. RM. REQD REINF. REF. R.W.L. R.O. RESIL. Sewer System Shut Off Valve Section Specification Station Splash Sheet Schedule Solid Blocking Rain Water Leader Rough Opening Solid Core Redwood Room Resilient Required Reinforced Refer To: PTDF PLWD. PLAS. P.LAM. PL. Plastic Laminate Pressure Treated Plywood Plaster Douglas Fir Plate E.N.End Nailing Green Building Mandatory Measures Checklist will be submitted w/ Building Permit submittal. Walls with 2x6 and larger framing require R-19 insulation Hot water piping insulation as specified in CPC Section 609.11 New Third party HERS verification for ventilation and indoor air quality Water Efficiency and Conservation Plumbing fixtures (water closets and urinals) will comply with the following: 1.The effective flush volume of all water closets will not exceed 1.28 gal/flush. 2022 CGC 4.303.1.1 2.The effective flush volume of urinals will not exceed 05. gal/flush. 2022 CGC 4.303.1.2 The fittings for faucets and showerheads shall meet the following standards: 1.5 GPM for faucets and 2.0 GPM for showers. 2022 CGC 4.303.1.3 and 4.303.1.4 Enhanced Durability and Reduced Maintenance: Annular spaces around pipes, electric cables, conduits, or other openings in sole/bottom plates at exterior walls will be rodent-proofed by closing such openings with cement mortar, concrete masonry, or similar method acceptable to enforcing agency. 2022 CGC 4.406.1 Construction Waste Reduction, Disposal and Recycling: A minimum of 60% of the non-hazardous construction demolition waste generated at the site will be divertedto an offiste recycle, diversion, or salvage facility per City of Burlingame Ordinance #1704 and 2022 CGC Section 4.408 Building Maintenance and Operation: An operation and maintenance manual will be provided to the building occupant or owner. 2022 CGC 4.410.1 Fireplaces: Any gas fireplaces will be direct-vent, sealed-combustable type. 2022 CGC 4.503.1 Pollutant Control 1.At the time of rough installation, during storage on the construction site, and until final startup of the heating, cooling and ventilation equipment, all duct and other related air distribution components will be covered w/ tape, plastic, sheet metal, or other methods acceptable to the enforcing agency to reduce the amount of water, dust, or debris that may enter the system. 2022 CGC 4.504.1 2.Adhesives, sealants, and caulks used on the project shall follow local and regional air pollution or air quality management district standards per 2022 CGC 4.504.2.1 3.Paints and coatings will comply with VOC limits per 2022 CGC 4.504.2.2 4.Aerosol paints and coatings will meet the Product-wighted MIR limits for ROC and other requirements. 2022 CGC 4.504.2.3 5.Documentation provided that verifies compliance with VOC finish materials. 2022 CGC 4.504.2.4 6.Carpet system installed in the building interior will meet testing and product requirements found in the 2019 California Green Building Code. 2022 CGC 4.504.2.2 7.Where resilient flooring is installed, at least 80% of the floor area receiving resilient flooring will comply with the California Green Building Code requirements. 2022 CGC 4.504.4 8.Hardwood plywood, particleboard, and medium density fiberboard composite wood products used on the interior and exterior of the building will comply with the low formaldehyde emission standards. 2022 CGC 4.504.5 Interior Moisture Control: A capillary break will be installed if a slab on grade foundation system is used per 2022 CGC 4.502.2. Bldg. materials with the visible signs of water damage will not be installed. Wall and floor framing will not be enclosed when the framing members exceed 19% moisture content. Moisture content will be verified prior to finish material being applied per 2022 CGC 4.505.3. Green Building Measures General Notes These Drawings and their content are and shall remain the property of Dreiling Terrones Architecture whether the project for which they were prepared is executed or not. They are not to be used by any person other than the Owner or for any other project or extension to this project except by agreement in writing with the Architect. The Architect expressly reserves his common law copyright and other property rights relating to these Drawings and their content. These Drawings are not to be reproduced, altered or otherwise modified in any manner whatsoever except by the Architect. These Drawings and their content may not be assigned to a third party without written consent of the Architect. In the event of unauthorized use of these Drawings by a third party, the third party shall hold harmless and indemnify the Architect. These Drawings are an instrument of services performed by the Architect for the benefit of the Owner. They are intended for use in a negotiated construction contract and, therefore, may not detail or specify all materials, manufacturers or assemblies. Details, assemblies and products commonly known to be industry standard for any given trade may not be fully detailed or specified. Where necessary, the Contractor shall provide samples, data, product literature as required to assist the Owner or the Owner's agent in making selections. For the purpose of estimating items not fully detailed the Contractor shall provide an allowance amount and so condition such estimates. The Owner and/or Contractor shall submit to the Architect, in writing, any requests for modifications to the plans or specifications by means of shop drawings, samples or other means as appropriate. Shop drawings that are submitted to the Architect for review do not constitute "in writing" unless it is brought to the attention of the Architect that specific changes are being suggested. No guarantee for quality of construction is implied or intended by these Documents. The Contractor shall assume full responsibility for any construction deficiencies. The Owner and Contractor shall hold harmless, indemnify and defend the Architect from any action initiated by the initial Owner, or any subsequent owner, for construction deficiencies, modifications, substitutions, maintenance or any such condition which is beyond the control of the Architect. All Contract Documents described in the Construction Contract shall be considered one document and are intended to be used as one document. Contractor and all sub-contractors shall review all documents prior to bidding. Sub-contractors are responsible for any information pertaining to their work no matter where it may occur in these Documents. It is the intent of these Documents to provide for the construction of a moisture proof enclosure of interior space. If the Owner, Contractor or any Sub-contractors become aware of any assembly or condition, either shown in the Drawings or constructed on-site, which does not, in their opinion, satisfy this intent, it is their responsibility to notify the Architect within a reasonable amount of time so that the condition or assembly can be reviewed, and, if necessary, modifications can be made to the Documents or to the Work without impacting the progress of the Work. All information pertaining to the site shall be, and shall remain, the Owner's responsibility. This information shall include legal description, deed restrictions, easements, site survey, topographic survey, location of existing improvements, soils report, and all related data. Code Compliance All work shall comply with applicable codes and trade standards including but not limited to the latest adopted edition of the following: 2022 California Building Codes, 2022 Residential Building Code (where applicable), 2022 California Mechanical Code, 2022 California Electrical Code, 2022 California Plumbing Code, including all amendments as adopted in Ordinance 1989, and 2022 California Energy Efficiency Standards (Title 24), including Cool Roof requirements. All applicable state and local codes, ordinances, legislation, as adopted by the Town of Hillsborough at time of permit application. This includes the 2022 Reach Code Ordinance #1979. It is the Contractors responsibility to identify and familiarize himself with current codes and ordinances including local variations on national or regional codes Requirements of adopted codes shall supersede any conflicting requirements defined in these Documents. When a conflict is suspected the Contractor shall so advise the Architect in writing within a reasonable time so that the conflict, if it exists, can be resolved without impacting the progress of the Work. The Contractor shall include and implement all pertinent requirements of this project as set forth in any conditions of approval attached to the project by governing agencies. These conditions shall become a part of the Contract Documents. Site Examination The Contractor shall thoroughly examine the site and satisfy himself as to the conditions under which the Work is to be performed. The Contractor shall verify at the site all measurements and conditions affecting his work and shall be responsible for same unless brought to the attention of the Owner or his agent prior to proceeding with the Work. Dimension Control It is the responsibility of the Contractor to check and verify all conditions, dimensions, lines and levels alignments indicated; proper fit and attachment of all parts is required. Should there be any differences between the Documents and the actual conditions, the Contractor shall notify the Owner or his agent in writing for clarification and/or adjustment. In the event of failure to do so, the Contractor shall be responsible for corrections required or subsequent changes occurring as a result of these differences. Note to Subcontractors: Location of many items or assemblies is critical for alignment of other assemblies which may be installed by other trades and which may not be installed at the time of installation of your work. All Sub-contractors shall review the manner in which their work fits, aligns or comes into contact with work of other trades. The Contractor and each Sub-contractor shall review all Documents and will be responsible for information contained at any location within the Documents which pertains to their work. Deficiencies resulting from failure to do so will be removed and corrected at Contractors expense. All dimensions and conditions shall be checked and verified, both in the Documents and on the job, by each Sub-contractor before they proceed with their work. Any errors, omissions, discrepancies or deficiencies shall be brought to the attention of the General Contractor prior to proceeding with the Work. The Contractor shall notify the Owner in writing for resolution. No person shall erect (including excavation and grading), demolish, alter, or repair any building or structure other than between the following hours except in the case of urgent necessity in the interest of public health and safety, and then only with prior written approval from the Building Official, which approval shall be granted for a period not to exceed three days. Holidays are the first day of January, the third Monday of January, the third Monday of February, the last Monday of May, the fourth day of July, the first Monday of September, the second Monday of October, the eleventh day of November, the fourth Thursday in November and the twenty-fifth day of December. If the first day of January, the fourth day of July, the eleventh day of November, or the twenty-fifth day of December falls upon a Sunday, the following Monday is a holiday. Construction hours per Burlingame Municipal Code Section Monday through Friday:8AM to 7PM Saturdays:9AM to 6PM Sundays and Holidays:No work Construction hours in the City Public right-of-way are limited to weekdays and non-City Holidays between 8:00 AM and 5:00 PM. Construction Hours Project Data Zoning R-1 Occupancy R-3 (Single family dwelling with garage) Building Code 2022 CBC Construction Type V-B Stories 2 (E) Lot Area 5,493 s.f (N) Residence & Garage 1,683 s.f Lot Coverage Percentage Proposed:1,683 s.f / 5,493 s.f =30% Max Lot Coverage Allowed:40% First Floor / Garage 1,683 s.f Second Floor 1,173 s.f Total Living space 2,856 s.f (5,493) x (.32) + 1,100 =2,857 s.f Sheet Index Architectural A0.0 Directory, Vicinity Map, Abbreviation, General Notes, Index SU-1 Topographic Survey A1.0 Block Average Calculation A1.1D Demo Site Plan A1.1 Site Plan A1.2 Site Utility Pan A2.0 Area Calculations A2.1 Floor Plans: First Floor A2.2 Floor Plans: Second Floor A2.3 Floor Plans: Basement / Garage A3.1 Roof Plans A4.1 Exterior Elevations A4.2 Exterior Elevations A5.1 Sections A8.1 Rendering Landscape L1.1 Landscape Plan: Vegetation L1.2 Planting Pictures L1.3 MWELO Forms L2.1 Landscape Plan: Irrigation Erosion Control BMP1.1 Best Management Practices Project Directory Owner / Builder: 1409 Castillo Way Burlingame, CA 94010 Architect Richard Terrones 1103 Juanita Avenue Burlingame, CA 94010 Voice:(650) 696-1200 Cell: (650) 759-1211 Fax: (650) 343-9685 Legend # # # # SHT # SHT Grid Number Door Number Keynote Detail Sheet Number Section Sheet Number Interior Elevation Sheet Number New wood / framed wall Object to be demolished Line of object above Fence line Center line Scope of Work - Demo existing residence - Construct new 2 story residence - Deferred Submittal for New fire sprinkler system Vicinity Map New Residence at Cafferkey Residence 1409 Castillo Way Burlingame, California APN # 027-174-070 Project Location 1409 Cafferkey way Indoor Air Quality and Exhaust 1.Exhaust fans that are ENERGY Star-compliant, ducted, and that terminate outside the building will be provided in every bathroom. 2022 CGC 4.506.1 2.Unless functioning as a component of a whole-house ventilation system, fans must be controlled by a humidistat. 2022 CGC 4.506.1 Environmental Comfort The heating and air-conditioning system has been sized, designed, and have their equipment selected using the following methods: 1.Heat Loss/Heat Gain values in accordance with ANSI/ACCA 2 Manual J-2016 or equivalent; 2.Duct systems are sized according to ANSI/ACCA 1, Manual D-2016 or equivalent; 3.Select heating and cooling equipment in accordance with ANSI/ACCA 3, Manual S-2014 or equivalent. 2022 CGC 4.507 Installer Special Inspector Qualification: HVAC system installers will be trained and certified in the proper installation of HVAC systems and equipment by a recognized training/certification program per 2022 CGC 702.1. When required by the enforcing agency, shall employ Special Inspectors. 2022 CGC 702.2 Verification: Upon request, verification of compliance w/ this code may include construction documents, plans, specifications, builder/installer certification, inspection reports, or other methods acceptable to the Building Div that show substantial conformance w/ the 2022 Code requirements. 2022 CGC 703.1 Commencement of work by any Sub-contractor shall indicate a knowledge and acceptance of all conditions described in the Documents or existing on site which could affect their work. All dimensions take precedent over scale. Where dimensions are not entirely clear the Contractor shall notify the Architect and request clarification. DRAWINGS SHALL NOT BE SCALED. Moisture Protection During Construction Should any special situations or climatic conditions occur during construction the Owner, Contractor and Sub-contractors shall so notice and implement any measures required to assure the protection of materials and assemblies. The Contractor shall take all necessary measures to protect new or existing construction and materials from damage due to weather or any other adverse conditions. Any hidden conditions that require work to be performed beyond the scope of the building permit issued for these plans may require further City approvals including review by the Planning Commission No existing tree over 48 inches in circumference at 54 inches from base of tree may be removed without a Protected Tree Permit from the Parks Division. Any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director The project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction and Recycling plan and meet requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit Prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled Per SB 407 (2009), all non-compliant plumbing fixtures shall be replaced with water conserving fixtures. B e nito Ave Alvara d o Ave Hillside Dr.M o ntero Ave C astillo Ave C arlos Ave C olu m b us Ave D esoto Ave Poppy DrEaston DrHale Dr# SHT # SHT Concrete Wall 2 Castillo Ave. 1401 (Corner not included) 1409 1417 1425 1427 1429 1431 2501 (Corner not included)± 15'-11"± 19'-5"± 26'-8"± 15'-6"± 12'-6"± 11'-5"(E) Concrete sidewalk Property line refer to site plan Corner lot not included in calculations Corner lot not included in calculations Least existing front setback not included in calculations Greatest existing front setback not included in calculations Project Location 1103 Juanita AvenueBurlingame, California94010650 696 1200314 Center Street #220Healdsburg, California65448707 343 1305DTADreiling Terrones Architecture Inc.ArchitectureInfrastructureEnvironmentsCafferkey Residence1409 Castillo WayBurlingame CA, 940102318New Residence A1.0 Block Average Calcs. Owner Review 01: 06/19/2023 Schematic Update 02: 07/21/2023 Planning Submittal 01: 09/08/2023 Planning resubmittal 02: 11/3/2023 Planning resubmittal 03: 01/05/20242 1 Block Average Calcs. Address Distance Description Project address Greatest existing front setback (not used) 1409 Castillo 15'-11" 1417 Castillo 19'-5" 1425 Castillo 26'-8" 1427 Castillo 15'-6" 1429 Castillo 12'-6" 1431 Castillo 11'-5"Least existing front setback (not used) 63'-4" / 4 =15'-10" (N) Front SetbackTotal: Note: The R1 zoning district requires the front setback line for any new structure to be the average of the actual front setback of such existing structures, including the existing structure on the subject property, located on the same side of the same block, if such average exceeds 15 feet. The measurment shall be taken from the front property line to the nearest wall or covered projection of any existing structures. Excluded from the average front setback calculation shall be corner lots and the least and greatest existing front setbacks. For blocks that contain fewer than five parcels, the average front setback shall be based on the interior lots. Concrete Sidewalk Concrete Curb Site Demolition Plan 1/8" = 1'-0"1 Castillo Ave. Adjacent House Upper Level Adjacent Existing Garage Adjacent Existing Garage Lot 4 Lot 5Lot 3 Lot 14 Lot 15 Lot 12 SSMH SSCO SSMH S34°56'00" W 122.07'N55°04'00" W45.00'JP JP 10' Alley6' Alley45.00'N55°04'00" WSSCO W SSMH E G (E) Residence to be removed Demo / Remove (E) planters (E) Wood fence to remain (E) 12" Tree to remain Remove (E) 8" Tree Remove (E) multi-trunk tree Demo / Remove (E) Conc. walkaway throughout (E) Wood fence to remain Remove (E) 18" Tree Demo (E) block retaining wall Demo (E) conc. walkway Demo (E) porch and steps Demo / Remove (E) Concr. driveway and walkway Demo / Remove (E) gas meter Cap line bellow ground Demo / Relocate (E) Electrical meter. Ref. site utility plan for (N) location Relocate (E) Water meter. Ref. site utility plan for (N) location Remove / Replace (E) wood fence 122.07' N34°56'00" E 1103 Juanita AvenueBurlingame, California94010650 696 1200314 Center Street #220Healdsburg, California65448707 343 1305DTADreiling Terrones Architecture Inc.ArchitectureInfrastructureEnvironmentsCafferkey Residence1409 Castillo WayBurlingame CA, 940102318New Residence A1.1D Site Plan Demo Plan Owner Review 01: 06/19/2023 Schematic Update 02: 07/21/2023 Planning Submittal 01: 09/08/2023 Planning resubmittal 02: 11/3/2023 Planning resubmittal 03: 01/05/20242 1 1.Topographic information used for design and represented in these Documents has been obtained entirely from boundary and topographic survey prepared by others. The Architect bears no responsibility for accuracy of this information. 2.Design contours and drainage shown are schematic only and shall not be taken to represent final grading and drainage plans. 3.Refer to Floor Plans and Sections for all dimensional information. 4.Existing landscaping shall be protected as required to prevent any damage to plants and trees unless specified for removal in plans or by Owner. 5.Existing finish grades shall be restored upon completion of construction unless changes are specified in the Drawings. 6.The work zone limits are shown on the plans. The Contractor shall confine all operations, including delivery of materials, to the Work Zone unless explicit agreement has been made with the Owner. 7.Roadways shall be maintained clear of construction equipment and materials at all times. 8.The Contractor shall notify all adjacent tenants and the Property Owner on days when deliveries or other operations may impact areas outside the Work Zone. 9.The contractor shall maintain a clean work site. Construction debris and materials to be recycled shall be removed in a timely manner. Construction equipment and materials awaiting installation shall be stored in an orderly manner that reduces both damage to materials and reduces the visual impacts of the work site to the surrounding neighborhood. 10.Dust control measures shall be implemented as necessary. Measures may include watering, application of ground treatments, placement of rock and any other measure required to reduce or eliminate excessive dust. 11.The minimum front setback requirement is 15'-0" to 1st floor and 20'-0" to 2nd floor, or the block average, whichever is greater. 12.Addresses and Numbers shall contrast with their background, shall be min. of 1/2" stroke by 4" high. The power of such illumination shall not be normally switchable. City of Burlingame Municipal Code 18.08.010 Site Notes Concrete Sidewalk Curb Proposed Site Plan 1/8" = 1'-0"1 Castillo Ave.5% slope Adjacent House Upper Level Adjacent Existing Garage Adjacent Existing Garage Lot 4 Lot 5Lot 3 Lot 14 Lot 15 Lot 12 SSMH SSCO SSMH S34°56'00" W 122.07'N55°04'00" W45.00'JP JP JP (N) Patio Driveway 10% slope 10' Alley6' Alley(N) Wood fence and gate max 6' tall with lattice Up (N) Concrete retaining wall (E) 12" Tree to remain (N) Wood fence and gate max 6' tall with lattice SSCO W SSMH±6'-9"Side Setback±4'-0"Side SetbackReplace all curb, gutter, driveway and sidewalk fronting property. Coordinate with City for encroachment permit±19'-4" Front Setback ±57'-5"±38'-2" Rear Setback (N) Concrete walkway, landing and steps with tile finish 25'-0" Front Setback ±58'-11"±38'-3" Rear Setback D.S 122.07' N34°56'00" E D.S D.S D.S D.S D.S 7% slope 7% slopeUp Dn. (N) Concrete low wall Dn. 5% slope (N) Gravel path (N) Concrete slab BBQ. Seat wall (N) Lawn ±12'-4"Side SetbackP.A P.A (N) PorchNew 4 Bedroom / 3 Ba. Main Residence EL: 129.08' (2836 s.f) Garage EL: 120.08' D.S 2% slope 5% slope EL: 128.83' Up Up 45.00'N55°04'00" WP2: 9'-0" x 18'-0"P1: 10'-0" x 18'-0" ±7'-2"±25'-11"±6'-9"Side Setback(N) Driveway, construct with permeable pavement refer to detail (E) City tree location, Big Leaf Maple tree, ± 3'-0" trunk dia. (E) Monterrey Pine, located on neighbors yard, (E) tree is cut back to neighbors property do to overhead lines Dn. Provide aisle lights at side walls of steps 1103 Juanita AvenueBurlingame, California94010650 696 1200314 Center Street #220Healdsburg, California65448707 343 1305DTADreiling Terrones Architecture Inc.ArchitectureInfrastructureEnvironmentsCafferkey Residence1409 Castillo WayBurlingame CA, 940102318New Residence A1.1 Site Plan Owner Review 01: 06/19/2023 Schematic Update 02: 07/21/2023 Planning Submittal 01: 09/08/2023 Planning resubmittal 02: 11/3/2023 Planning resubmittal 03: 01/05/20242 1 1.Topographic information used for design and represented in these Documents has been obtained entirely from boundary and topographic survey prepared by others. The Architect bears no responsibility for accuracy of this information. 2.Design contours and drainage shown are schematic only and shall not be taken to represent final grading and drainage plans. 3.Refer to Floor Plans and Sections for all dimensional information. 4.Existing landscaping shall be protected as required to prevent any damage to plants and trees unless specified for removal in plans or by Owner. 5.Existing finish grades shall be restored upon completion of construction unless changes are specified in the Drawings. 6.The work zone limits are shown on the plans. The Contractor shall confine all operations, including delivery of materials, to the Work Zone unless explicit agreement has been made with the Owner. 7.Roadways shall be maintained clear of construction equipment and materials at all times. 8.The Contractor shall notify all adjacent tenants and the Property Owner on days when deliveries or other operations may impact areas outside the Work Zone. 9.The contractor shall maintain a clean work site. Construction debris and materials to be recycled shall be removed in a timely manner. Construction equipment and materials awaiting installation shall be stored in an orderly manner that reduces both damage to materials and reduces the visual impacts of the work site to the surrounding neighborhood. 10.Dust control measures shall be implemented as necessary. Measures may include watering, application of ground treatments, placement of rock and any other measure required to reduce or eliminate excessive dust. 11.The minimum front setback requirement is 15'-0" to 1st floor and 20'-0" to 2nd floor, or the block average, whichever is greater. 12.Addresses and Numbers shall contrast with their background, shall be min. of 1/2" stroke by 4" high. The power of such illumination shall not be normally switchable. City of Burlingame Municipal Code 18.08.010 Site Notes Legend W Water Meter B Backflow Preventer E Electric Meter Cold Water Line Sanitary Sewer Line Electric LinePermeable Pavement N.T.S2 Typ. No. 8, 89 or 9 aggregate in openings Concrete pavers min. 3 1/8 in. thick (for vehicular traffic) Curb / edge resistant with cut-outs for overflow drainage Bedding course 11/2 to 2 in. thick (typ. NO. 8 aggregate) 4 in. thick No. 57 stone open graded base Geotextile on top and sides of subbase under/beyond curb Min. 6 in. thick No. 2 stone subbase Soil subgrade Notes: 1.2 3/8in. thick pavers may be used in pedestrian and residential applications. 2.No. 2 stone subbase thickness varies with design 3.No. 2 stone may be substituted w/ No.3 or No. 4 stone 2 2 D.S Concrete Sidewalk Concrete Curb Site Utility Plan 1/8" = 1'-0"1 5% slope Adjacent House Upper Level Adjacent Existing Garage Adjacent Existing Garage Lot 4 Lot 5Lot 3 Lot 14 Lot 15 Lot 12 SSMH SSCO SSMH 122.07' N34°56'00" EN55°04'00" W45.00'JP JP JP (N) Lawn Driveway 10' Alley6' AlleyNew Porch 45.00'N55°04'00" WSSCO W SSMH Replace all curb, gutter, driveway and sidewalk fronting property. Coordinate with City for encroachment permit±12'-4"Side SetbackE ±19'-4" Front Setback ±57'-5"±38'-2" Rear Setback CO Castillo Ave.±6'-11"Side Setback±4'-0"Side Setback(N) Water meter location, min. 1" water meter (N) Storm drain catch basin Abandoned water service line shall be disconected at the main, and per city requirments. New service shall be installed per city requirements and via encroachment permit W 25'-0" Front Setback slope slope (N) Electrical panel location. Coordinate with PG&E for (N) services Plug existing sanitary sewer lateral connections and install a new 4" lateral and wye to existing main in Alley. Abandoned sewer lateral shall be disconnected at the main and per city requirements slope Dn. D.S (N) Patio 10% slope 7% slope 7% slopeUp Dn.BBQ. Seat wall B EL: 128.83' D.S Up slope slope 2% slope D.S 5% slope D.S (3) Storm drain outlet holes in face of curb Perf. storm drain pipe at base of basement retaining wall Up Up P2: 9'-0" x 18'-0" ±7'-2" Dn. D.S New 4 Bedroom / 3 Ba. Main Residence EL: 129.08' (2836 s.f) P1: 10'-0" x 18'-0" Garage EL: 120.08'1103 Juanita AvenueBurlingame, California94010650 696 1200314 Center Street #220Healdsburg, California65448707 343 1305DTADreiling Terrones Architecture Inc.ArchitectureInfrastructureEnvironmentsCafferkey Residence1409 Castillo WayBurlingame CA, 940102318New Residence A1.2 Site Utility Plan Owner Review 01: 06/19/2023 Schematic Update 02: 07/21/2023 Planning Submittal 01: 09/08/2023 Planning resubmittal 02: 11/3/2023 Planning resubmittal 03: 01/05/20242 1 Public Work Notes 1.Any work in the City right-of-way, such as street, sidewalk area, public easements, utility easements, or use of the right-of-way such as placement of debris box or construction parking is required to obtain an Encroachment Permit prior to starting work. For requirements related to issuance of City Encroachment Permit, visit the City of Burlingame website. Work without the benefit of an encroachment permit will be charged double the permit fee. It is the applicant's responsibility to obtain all required permits. Porta potty's are not allowed to be placed in the City right-of-way. 2.All work within City right-of-way shall comply with City Standards and Details. Standard Details are available at the City of Burlingame website. 3.Public Work Construction hours in the City Public right-of-way are limited to weekdays and non-City Holidays between 8am and 5pm. This includes construction hauling. If applicant / contractor wishes to work beyond the normal construction hours, a waiver of working hour may be submitted to the public works department ten (10) days in advance for review and approval by public works and building department. 4.Per Municipal Code section 18.08.090, no storm water or underground water draining from any lot, building, or paved area shall be allowed to drain to adjacent properties nor shall this water be connected to the City's sanitary sewer system. Regardless of the slope of the source property, such water shall drain to either artificial or natural storm drainage facilities by gravity or pumping. 5.All water line connections to City water mains for services or fire line protection are to be installed per City standard procedures and material specifications. Contact City Water Department for connection fees. If required, all fire services and services 2" and over will be installed by builder. All underground fire service connections shall be submitted as separate Underground Fire Service permit for review and approval. 6.Sewer Backwater Protection Certification is required for the installation of any new sewer fixture per Ordinance No. 1710. The Sewer Backwater Protection Certificate is required prior to the issuance of Building Permit and the backwater device must be placed on private property. 7.The sanitary sewer lateral (building sewer) shall be tested per Ordinance Code Chapter 15.12. A encroachment permit for the Sewer Lateral Test is required. A PASSED sewer lateral test certificate must be in place prior to final of Building Permit. 8.The sanitary sewer lateral from the accessory dwelling unit shall be connected to the existing lateral on private property side per municipal code 15.08.050, no sublateral to the main sewer is permitted. 9.The project shall comply with the City's NPDES permit requirements to prevent storm water pollution. All construction work shall be done in accordance with the most current APWA-AGC Standard Specifications for Public Works Construction, the California Stormwater Quality Association's Stormwater Best Management Practice Handbook, and the City of Burlingame Stormwater Management and Discharge Control Ordinance (Municipal Code Chapter 15.14). A copy of the Stormwater Construction Best Management Practices can be found at http://www.flowstobay.org Upon completion of the work, all stormwater protection measures shall be entirely removed and the right of way shall be left in as presentable a condition as existed before work started. Please be aware that during winter months (October 15th to April 15th) applicant c/contractor are responsible to remove projects stormwater inlet protection devices (sandbags/filters/etc.) in the public right of way to prevent flooding during rain events, and reinstall devices once the rain event ends. All private property stormwater protection measures must be protected and repaired after each rain event. 10.All debris/garbage containers location shall be on property. In a situation where that is not possible, an encroachment permit is required from Public Works Department for placing debris/garbage containers in public right-of-way. No wet garbage fluid shall enter public right-of-way or the storm drain system. 11.It is the responsibility of the owner and/or contractor to notify Underground Service Alert (USA) at least 48 hours before the start of any excavation work. 12.No permanent structures (retaining walls, fences, columns, mailboxes, etc.) shall be built beyond the property line and into the public right-of-way. 13.The design and installation of the fire service line shall follow City of Burlingame Water System Standard Specifications and Standard Drawings and directions from the Water Yard. 14.Based on the scope of work, this is a “Type I” project that requires a Stormwater Construction Pollution Prevention Permit. This permit is required prior to issuance of a Building Permit. An initial field inspection is required prior to the start of any construction (on private property or in the public right-of-way). 15.For projects in the Burlingame Plaza, Broadway, and the Burlingame downtown districts; construction in the public right-of-way is prohibited during the holiday shopping moratorium period, from first Saturday of November through the first Saturday after new years day. 16.For downtown Burlingame Avenue projects, per City of Burlingame municipal code 12.05, any work within the public right of way shall require approval from the public works department and sjhall comply with the following special conditions, specifications, details, and constructions moratorium. 17.For projects facing El Camino Real: Any work in the caltrans right of way, such as street and sidewalk area is required to obtain an encroachment permit from Caltran prior to start of work. It is the applicants responsibility to obtain all required permits. 18.For new single family or substantial remodels (greater than 50% remodel/ addition): show on the site plan - (1) Replacement of all curb, gutter, driveway and sidewalk fronting site, (2) plug all existing sewer lateral connections and install new 4" or 6" lateral to sewer main including wye, (3) new water service to water meter, and when applicable, (4) water lines above 2" and all fire services of any size are to be installed by applicant and per city standard procedures and specifications. 20.For remodel projects (less than 50% remodel) All damaged and displaced curbs, gutter, sidewalks and driveway approach fronting site must be replaced prior to final of building permit. A pre inspection by public works of the condition of the sidewalk is recommended, but not required. However if a pre-inspection is not conducted, the applicant / contractor waives the right to contest the limits of the repairs caused by the construction activities. 21.Front landscape (hardscape) improvements that are not shown on the plans, this will be subject to a public works inspection prior to building permit final to confirm that no encroachment existing beyond the property line. Legend W Water Meter B Backflow Preventer E Electric Meter Cold Water Line Sanitary Sewer Line Electric Line Impervious Areas Location Description Area Main residence, Garage, Porch Driveway, Walkways, Patio Foot Print Area Foot Print Area 1,806 s.f 1,330 s.f Proposed Impervious Areas 3,136 s.f (57% of 5,498 s.f lot) Storm Drain Line Fire Division Notes 1.Provide a fire sprinkler system throughout building. Fire sprinkler plans shall be submitted under seperate permit through the fire department for approval prior to instalation. 2.Minimum water meter size shall accomadate both domestic and fire sprinkler system demand totals. 3.Fire flow shall meet fire requirements of California Fire Code Apendix B. Fire flow for residential buildings less than 3600 sq.ft shall be provided at 1,000 gpm unless protection by an automatic fire sprinkler system then it may be reduced by 50% contact Burlingame Engineering Department. Storm Water Mitigation Measures: 1.All downspouts shall drain to planting areas. 2.Any new paving shall be sloped to drain into planting areas. 3.No drainage shall flow to adjacent properties. 4.Construct driveway with permeable pavement Roof Drainage: Refer to Roof Plan for all new downspouts from Roof. All Downspouts shall flow into new landscape planting areas. All landscape planting areas are sloped with sufficient grade to maintian drainage within the property. First Floor Plan - Area Calculations 1/8" = 1'-0"2 P1 A2 A4A5 A8 A7 A6 A9 A1A3 1 2 3 4 5 6 7 A B C D 1103 Juanita AvenueBurlingame, California94010650 696 1200314 Center Street #220Healdsburg, California65448707 343 1305DTADreiling Terrones Architecture Inc.ArchitectureInfrastructureEnvironmentsCafferkey Residence1409 Castillo WayBurlingame CA, 940102318New Residence A2.0 Floor Plans: Area Calculations Owner Review 01: 06/19/2023 Schematic Update 02: 07/21/2023 Planning Submittal 01: 09/08/2023 Planning resubmittal 02: 11/3/2023 Planning resubmittal 03: 01/05/20242 1 Basement Floor Plan - Area Calculations 1/8" = 1'-0"3 Crawlspace L1L2 G1 1 2 3 4 5 6 7 A B C D Second Floor Plan - Area Calculations 1/8" = 1'-0"1 B1 B2 B4 B3B6 B5 B7 B8 1 1 2 2 3 3 4 4 5 5 6 6 7 7 A A B B C C D D Floor Area Label Description B1 Primary Bedroom Area 343 s.f B2 Primary Bathroom 107 s.f B3 Bedroom #2 261 s.f B4 Bedroom #3 179 s.f B5 Hall Bath 78 s.f Laundry Room 41 s.f Hallway 78 s.f Stairs 86 s.f 1,173 s.f B6 B7 B8 Label Description A1 Foyer / Powder Room / Closet Area 140 s.f A2 Bedroom #4 241 s.f A3 Hallway / Mudroom / Pantry 64 s.f A4 Kitchen 316 s.f A5 Living Room 283 s.f Dining Room 142 s.f Mudroom / Rear Porch 134 s.f Stairs / Closet 85 s.f A6 A7 A8 Stairs 36 s.fA9 Porch (Exempt) refer. (25.30.600)-1 124 s.fP1 1,683 s.f Label Description G1 Garage Area 242 s.f L1 Basement (Exempt) refer. (25.30.600)-2 600 s.f L2 Utility Closet (Exempt) refer. (25.30.600)-3 54 s.f 785 s.f Total 2,856 s.f 25.30.600 1.Covered porches or decks on the first floor totaling 200 square feet or less which face a street and are not located on the rear of the dwelling. 2. Basements up to 600 square feet in area with a ceiling height of seven feet or greater if it meets both of the following standards: i.The top of the finished floor above the basement is less than two feet above existing grade; and ii No part of the basement is intended or used for parking. 3.Lower floor or basement of 100 square feet or less solely used for mechanical equipment. a.Crawl space between the surface of the ground or floor and the bottom of the first floor joists that measures less than seven feet in height. Exmpt Areas Kitchen Up Living Room Mud Room Dining Room Cl. Ba. #3 Bedroom #4 Pwdr. Cl. Mud / Pantry Dn. Foyer Queen: 60"x80" 57'-3" 9'-0"7'-11"12'-8"9'-11"5'-9"3'-6"34'-1"5'-11"8'-2"36'-11" Cl. 11'-11" Dn. Porch 1 1 2 2 3 3 4 4 5 5 6 6 7 7 A A B B C C D D 22'-4"8'-4"20'-8"8'-4"11'-0"58'-10" 1'-7"Step Dn.1 A5.1 1 A5.1 2 A4.1 2 A5.1 2 A5.1 4 A4.2 1 A4.1 3 A4.2 15141312111098 7 6 5 4 3 2 19101112131487654321 Planter boxRidge Roof of Garage Dn. Cased Opening R. Rear Porch 17'-7"25'-9"Guardrail Guardrail Dn. 7'-2"2'-1"6'-2"4'-11" 6'-5"5'-7"Aisle lights at side walls of steps, typ. Concrete walkway, ref site plan for continuation Floor Plan - First Floor 1/4" = 1'-0"1 1103 Juanita AvenueBurlingame, California94010650 696 1200314 Center Street #220Healdsburg, California65448707 343 1305DTADreiling Terrones Architecture Inc.ArchitectureInfrastructureEnvironmentsCafferkey Residence1409 Castillo WayBurlingame CA, 940102318New Residence A2.1 Floor Plans : First Floor Owner Review 01: 06/19/2023 Schematic Update 02: 07/21/2023 Planning Submittal 01: 09/08/2023 Planning resubmittal 02: 11/3/2023 Planning resubmittal 03: 01/05/20242 1 Coordinate in Field w/ Architect for all trims, fixtures & accessories not shown, and for critical alignments of openings, trims and millwork. All dimensions given take precedence over scale. Contractor shall not scale drawings to determine dimensions without consulting with the Architect. Incorrect dimensions and resulting construction deficiencies due to scaling of Documents by the Contractor are the Contractor's responsibility and required corrections will be performed at the Contractor's expense. Critical alignments may occur between items installed by different trades. Contractor to note all such items and notify affected trades. Subcontractors shall review Documents and identify all such items that affect their work in any way. Contractor shall review all dimensions for accuracy prior to construction. Dimensions given are to face of stud unless otherwise noted. Variations include: C : Centerline FOF: Face of Finish Contractor to coordinate framing to accommodate recessed fixtures and other items with critical locations. Repeating items or assemblies may not be noted or dimensioned at all locations where repetition is obvious. Refer structural details for location of special floor and wall framing, special connections. Adhesives, sealants, and caulks used on the project shall follow local and regional air polution or air quality management district standards. 2022 CGC sec 4.504.2.1 Exterior bearing walls less than five feet from the property line will be built of one-hour fire-rated construction. 2022 CRC Table R302.1(1) § or 2022 CBC, Table 602) Provide positive drainage for all roof surfaces. Provision shall be tested by application of water at all areas. Roof shall be installed per Roof Manufacturer's standards such that all warranties are maintained. Contractor shall note any conflicts between Roof manufacturer's instructions and requirements of these drawings. Roofing substrate, base sheets and any installed components shall be fully protected from subsequent construction activities until completion of project. Contractor shall provide temporary protection for all roof components where subsequent work may occur. Contractor shall protect all roof components from exposure to sunlight where such exposure may damage materials. Installation of felts or base sheets shall be covered immediately by either subsequent roof layers or protective materials to avoid exposure to sun or general drying of materials. Contractor shall fully seal all roof penetrations per roof manufacturer's specifications. Provide flashing, counter flashing, coping and reglets as necessary to ensure positive drainage across all surfaces. Gutters shall be fully soldered. Fire sprinkler plans shall be submitted under separate permit through the fire department for approval prior to installation. Floor Plan Notes New wood / framed wall One-hour rated wall (5/8" type 'X' interior sides w/ 7/8" stucco exteriors New concrete Wall Legend Line of object above 2 Primary Bedroom #1 King: 76"x84"Bedroom #2 Bedroom #3 Ba. #1 Ba. #2 Cl. Cl. Laundry Cl.Cl. Full: 53"x72" 7'-5" 8'-4" 57'-3"7'-11"25'-9"7'-2"11'-10"5'-2"4'-1"8'-4" 11'-1"9'-6" 6'-0"3'-10"10'-10" Desk Ridge Ridge 28'-4"20'-8" 1 1 2 2 3 3 4 4 5 5 6 6 7 7 A A B B C C D D3'-1"5'-10"7'-3"7'-9"3'-1"5'-1"34'-1"25'-9"2'-10"3'-4"7'-11"3'-5"8'-4"W/D Dn. 1'-7" 1 A5.1 1 A5.1 2 A4.1 2 A5.1 2 A5.1 4 A4.2 1 A4.1 3 A4.2 Line of dormer roof above - refer elevations 16151413121110987654321Line of wall below Line of wall below Desk Desk Queen: 60"x80"Area under roof, Ceiling height < 6'-8", typ.3'-5"7'-11"19'-3"3'-4"Line of dormer roof above - refer elevations Centerline of vaulted ceiling Garage Dormer Floor Plan - Second Floor 1/4" = 1'-0"1 1103 Juanita AvenueBurlingame, California94010650 696 1200314 Center Street #220Healdsburg, California65448707 343 1305DTADreiling Terrones Architecture Inc.ArchitectureInfrastructureEnvironmentsCafferkey Residence1409 Castillo WayBurlingame CA, 940102318New Residence A2.2 Floor Plans : Second Floor Owner Review 01: 06/19/2023 Schematic Update 02: 07/21/2023 Planning Submittal 01: 09/08/2023 Planning resubmittal 02: 11/3/2023 Planning resubmittal 03: 01/05/20242 1 Coordinate in Field w/ Architect for all trims, fixtures & accessories not shown, and for critical alignments of openings, trims and millwork. All dimensions given take precedence over scale. Contractor shall not scale drawings to determine dimensions without consulting with the Architect. Incorrect dimensions and resulting construction deficiencies due to scaling of Documents by the Contractor are the Contractor's responsibility and required corrections will be performed at the Contractor's expense. Critical alignments may occur between items installed by different trades. Contractor to note all such items and notify affected trades. Subcontractors shall review Documents and identify all such items that affect their work in any way. Contractor shall review all dimensions for accuracy prior to construction. Dimensions given are to face of stud unless otherwise noted. Variations include: C : Centerline FOF: Face of Finish Contractor to coordinate framing to accommodate recessed fixtures and other items with critical locations. Repeating items or assemblies may not be noted or dimensioned at all locations where repetition is obvious. Refer structural details for location of special floor and wall framing, special connections. Adhesives, sealants, and caulks used on the project shall follow local and regional air polution or air quality management district standards. 2022 CGC sec 4.504.2.1 Exterior bearing walls less than five feet from the property line will be built of one-hour fire-rated construction. 2022 CRC Table R302.1(1) § or 2022 CBC, Table 602) Provide positive drainage for all roof surfaces. Provision shall be tested by application of water at all areas. Roof shall be installed per Roof Manufacturer's standards such that all warranties are maintained. Contractor shall note any conflicts between Roof manufacturer's instructions and requirements of these drawings. Roofing substrate, base sheets and any installed components shall be fully protected from subsequent construction activities until completion of project. Contractor shall provide temporary protection for all roof components where subsequent work may occur. Contractor shall protect all roof components from exposure to sunlight where such exposure may damage materials. Installation of felts or base sheets shall be covered immediately by either subsequent roof layers or protective materials to avoid exposure to sun or general drying of materials. Contractor shall fully seal all roof penetrations per roof manufacturer's specifications. Provide flashing, counter flashing, coping and reglets as necessary to ensure positive drainage across all surfaces. Gutters shall be fully soldered. Fire sprinkler plans shall be submitted under separate permit through the fire department for approval prior to installation. Floor Plan Notes New wood / framed wall One-hour rated wall (5/8" type 'X' interior sides w/ 7/8" stucco exteriors New concrete Wall Legend Line of object above Floor Plans - Basement / Garage 1/4" = 1'-0"1 1103 Juanita AvenueBurlingame, California94010650 696 1200314 Center Street #220Healdsburg, California65448707 343 1305DTADreiling Terrones Architecture Inc.ArchitectureInfrastructureEnvironmentsCafferkey Residence1409 Castillo WayBurlingame CA, 940102318New Residence A2.3 Floor Plans : Basement / Garage Owner Review 01: 06/19/2023 Schematic Update 02: 07/21/2023 Planning Submittal 01: 09/08/2023 Planning resubmittal 02: 11/3/2023 Planning resubmittal 03: 01/05/20242 1 Crawl Space Basement (600 s.f) UP Garage 1 1 2 2 3 3 4 4 5 5 6 6 7 7 Utility Cl. Pwdr. Room WH HP HVAC Crawl Space 63'-6" 27'-3"5'-2"18'-10"5'-11"25'-9"11'-7"8'-6"5'-8"8'-4"52'-11"17'-7"8'-2"19'-2"4'-11"5'-5"29'-4" D C B A A Driveway Concrete retaining wall UP Concrete steps 12345678910111213 1-1/2"Ø handrail, +32" above risings 1 A5.1 1 A5.1 2 A4.1 4 A4.2 1 A4.1 3 A4.2 UPConcrete Slab Access hatch to crawl space 12345678 3'-2 1/2"34'-3 1/2"20'-1"6'-3" 2 A5.1 2 A5.1 P1: 10'-0" x 18'-0" P2: 9'-0" x 18'-0"10'-10 1/2"Dn. Coordinate in Field w/ Architect for all trims, fixtures & accessories not shown, and for critical alignments of openings, trims and millwork. All dimensions given take precedence over scale. Contractor shall not scale drawings to determine dimensions without consulting with the Architect. Incorrect dimensions and resulting construction deficiencies due to scaling of Documents by the Contractor are the Contractor's responsibility and required corrections will be performed at the Contractor's expense. Critical alignments may occur between items installed by different trades. Contractor to note all such items and notify affected trades. Subcontractors shall review Documents and identify all such items that affect their work in any way. Contractor shall review all dimensions for accuracy prior to construction. Dimensions given are to face of stud unless otherwise noted. Variations include: C : Centerline FOF: Face of Finish Contractor to coordinate framing to accommodate recessed fixtures and other items with critical locations. Repeating items or assemblies may not be noted or dimensioned at all locations where repetition is obvious. Refer structural details for location of special floor and wall framing, special connections. Adhesives, sealants, and caulks used on the project shall follow local and regional air polution or air quality management district standards. 2022 CGC sec 4.504.2.1 Exterior bearing walls less than five feet from the property line will be built of one-hour fire-rated construction. 2022 CRC Table R302.1(1) § or 2022 CBC, Table 602) Provide positive drainage for all roof surfaces. Provision shall be tested by application of water at all areas. Roof shall be installed per Roof Manufacturer's standards such that all warranties are maintained. Contractor shall note any conflicts between Roof manufacturer's instructions and requirements of these drawings. Roofing substrate, base sheets and any installed components shall be fully protected from subsequent construction activities until completion of project. Contractor shall provide temporary protection for all roof components where subsequent work may occur. Contractor shall protect all roof components from exposure to sunlight where such exposure may damage materials. Installation of felts or base sheets shall be covered immediately by either subsequent roof layers or protective materials to avoid exposure to sun or general drying of materials. Contractor shall fully seal all roof penetrations per roof manufacturer's specifications. Provide flashing, counter flashing, coping and reglets as necessary to ensure positive drainage across all surfaces. Gutters shall be fully soldered. Fire sprinkler plans shall be submitted under separate permit through the fire department for approval prior to installation. Floor Plan Notes New wood / framed wall One-hour rated wall (5/8" type 'X' interior sides w/ 7/8" stucco exteriors New concrete Wall Legend Line of object above 1 1 2 2 3 3 4 4 5 5 6 6 7 7 A A B B C C D D3:123:1212:1212:12 12:1212:1212:1212:12 RidgeRidgeValleyValleyV a ll e y ValleyD.S D.S D.SD.S D.S D.S D.S GSM gutter, painted Line of roof below - see elevations Dormer roof - see elevations Class A comp shingle roofing throughout Class A comp shingle roofing throughout Line of Roof belowRidge 12:12 12:123:123:1212:12 Ridge RidgeValleyValleyValleyV a ll e y D.SD.S D.S Line of Roof below3:12D.S D.S Dormer roof - see elevations Roof Plan 1/4" = 1'-0"1 1103 Juanita AvenueBurlingame, California94010650 696 1200314 Center Street #220Healdsburg, California65448707 343 1305DTADreiling Terrones Architecture Inc.ArchitectureInfrastructureEnvironmentsCafferkey Residence1409 Castillo WayBurlingame CA, 940102318New Residence A3.1 Roof Plan Owner Review 01: 06/19/2023 Schematic Update 02: 07/21/2023 Planning Submittal 01: 09/08/2023 Planning resubmittal 02: 11/3/2023 Planning resubmittal 03: 01/05/20242 1 All roof materials shall all be part of a specified roofing system as defined by the system manufacturer specified. All materials shall be from a single source and shall be assembled and integrated as specified. by the manufacturer. In no case materials be subsituted which are not listed in specified manufactureer information. Provide positive drainage for all roof surfaces. Provisions shall be tested by application of water at all areas. Roof shall be installed per roof manufacturer's standard such that all warranties are maintained. Contractor shall note any conflicts between manufacturer's instructions and requirements of these drawings. Roofing substrate, base sheets and any installed components shall be full protected from the subsequent construction activities until completion of project. Contractor shall provide temporary protection for all roof components where subsequent work may occur. Contractor shall protect all roof components from exposure to sunlight where such sun exposure may damage materials. Instalation of felts or base sheets shall be covered immediately by either subsequent roof layers or protective materials to avoid exposure to sun or general drying of materials. Contractor shall fully seal all roof penetrations per roof manufactureers specifications. Provide flashing, counter flashing, coping and reglets as necessary to ensure a positive drainage across all surfaces. Provide gutters, rainwatter leaders and down spouts. Integrated gutters shall be constructed in simmilar fashion. Gutters shall be fully soldered and shall be fabricated in minimum of 20' lengths, or single piece lengths if less than 20', to reduce the number of joints. Roofs shall comply with the requirements of section R337.5 and R902 including: R337.5.2 Roof coverings: Where the roof profile allows a space in between the roof covering and roof decking, the spaces shall be constructed to prevent the intrusion of flames and embers, be fire stopped with approved materials or have one layer of minimum 72 pound mineral-surfaced non perforated cap sheet complying with ASTM D 3909 installed over the combustible decking. R337.5.3 Roof valleys: Where valley flashing is installed, the flashing shall not be less than 0.019-inch NO.26 gage galvanized sheet corrosion-resistant metal installed over not less than one layer of minimum 72 pound mineeral surfaced non perforated cap sheet complying with ASTM D 3909, at least 36-inch-side running with full length of the valley. R337.5.4 Roof gutters: Roof gutters shall be provided with the means to prevent the accumulation of leaves and debris in the gutter. Roof shall have a roofing assembly installed in accordance with its listing and the manufactureers installation instructions. Roof Plan Notes Property Line1234567 T.O Plate EL: ±147.08' 8'-0"T.O Ridege EL: ±153.44' 33'-0"T.O Plate EL: ±147.08' T.O Ridege EL: ±153.44' 8'-0"7.1 12 12 7.2 8.1 typ.7.2 typ.6.1 typ.6.2 typ. typ. 9.16.2 F.F First Floor EL: ±129.08' F.F Second Floor EL: ±139.08' T.O Plate EL: ±138.08' 9'-0"9'-0"Exterior Elevation - Right 1/4" = 1'-0"2 F.F First Floor EL: ±129.08' Avg. T.O Curb EL: ±119.86' 8'-1"F.F Basement EL: ±120.08' T.O Plate EL: ±128.08' 8.1 typ.2.2 typ.3.3 9.2 typ.Guardrail set at 42" above finished floor Basement in background F.F Second Floor EL: ±139.08' T.O Plate EL: ±138.08' Line of (E) grade 6.4 typ.7.3 typ. [EW]1103 Juanita AvenueBurlingame, California94010650 696 1200314 Center Street #220Healdsburg, California65448707 343 1305DTADreiling Terrones Architecture Inc.ArchitectureInfrastructureEnvironmentsCafferkey Residence1409 Castillo WayBurlingame CA, 940102318New Residence A4.1 Exterior Elevations Owner Review 01: 06/19/2023 Schematic Update 02: 07/21/2023 Planning Submittal 01: 09/08/2023 Planning resubmittal 02: 11/3/2023 Planning resubmittal 03: 01/05/20242 1 Exterior Elevation - Front 1/4" = 1'-0"1 F.F Garage EL: ±120.08' Avg. T.O Curb EL: ±119.86' Property Line12 12 12 3 F.F First Floor EL: ±129.08' Avg. T.O Curb EL: ±119.86' F.F Second Floor EL: ±139.08' T.O Plate EL: ±138.08' T.O Plate EL: ±147.08' 9'-0"8'-0"T.O Ridge EL: ±153.44' Property Line33'-7"Avg. Front + Rear EL: ±127.85' 12'-0"7'-6"45.00°BCD A 12'-0"45.00°7'-6"F.F Second Floor EL: ±139.08' T.O Plate EL: ±138.08' T.O Ridge EL: ±153.44' Declining height envelopeAvg. Front + Rear EL: ±124.05' 6.1 7.2 7.1 6.1 6.2 6.39.1 6.7 6.3 8.1 typ. typ. typ. 8.1 9.1 typ. 3.3 6.68.2 2.26.3 Guardrail set at 42" above finished floor3.42.1 Declining height envelope3.0 8.3 7.3 typ. 3.16.3 3.3 1409 [EW] 9.2 typ. ± 2'-10" ± 4'-0" 12 12 12 12 12 3 12 12 16.1 typ. Provide carriage light at garage wall, max 40w equiv., downcast light w/ obscured glass Refer floor plans for additional detail references. Refer roof plans for roof detail callouts. Refer site plan drawings for grading, drainage. Coordinate location of all items shown on these elevations via the floor plans to ensure proper alignments. Many items are not dimensioned but occur in explicit relationship to other items (such as alignment of centerlines or grid lines.) The contractor shall become fully familiar with the overall plans to ensure that items shown on the exterior elevations can occur where intended. Coordination may require early consideration of exterior elements long before work on the exterior portions of the building occurs. Removal or repair of any items not properly coordinated shall be performed at no expense to the Owner. Coordinate locations of all light fixtures, electrical equipment, plumbing equipment not shown on these elevations. All pre-manufactured equipment may vary from these elevations based on changes in product design or manufacturing. Should such variations occur the Contractor shall notify the Architect within a reasonable time to allow for a timely resolution. All exterior surfaces shall be cleaned and painted. Maintenance Notes: Exterior finishes shall be cleaned and/or replaced regularly by Owner. Paint shall not be allowed to crack, peel or otherwise fail in any way without immediate replacement. Windows shall be cleaned and maintained by Owner per mfr.'s recommendations. Insect debris (spider webs, etc.) shall be removed regularly. Landscape irrigation shall not be allowed to spray on any portion of structure. Downspouts and splash blocks shall be adjusted so that no water splashes onto structure. Slope all finish grades away from structure at 2% for min. 18" to swale. Proposed lighting to meet code section 18.16.030 410.10(G). The cone of the light and or/glare from the lighting element is kept entirely on the property or below the top of any fence, edge or wall. All exterior lightings outlets and fixtures shall not be located more than nine (9) feet above adjacent grade or required landing, walls or portions of walls shall not be floodlit; only shielded light fixtures which focus light downward shall be allowed, except for illuminated street numbers required by the fire department. Exterior Elevation Notes Allign as indicated Mark Description Key Notes 1.0 2.1 Existing finished grade New concrete landing3.1 New concrete slab3.2 2x Wood Fascia 6.1 4x Wood Outrigger6.2 2.2 New finished grade New concrete driveway3.0 2x Wood Header6.3 Comp-A shingle Roof 7.1 Aluminum Clad Wood Windows w/ sim. True Divided Lites8.1 Aluminum Clad Wood Doors8.2 Wood Sectional Garage Door 8.3 New window / door8.4 Stained cedar shingles or synthetic alternative, typ.9.1 3-coat, exterior cement plaster (stucco)9.2 2x Wood Sill6.4 Wood Wall Base6.5 Wood Fence / Gate Stained 6.6 GSM Gutter 7.2 GSM Downspout7.3 Insulation 7.4 5/8" Gyp. Brd.9.3 Hardwood Flooring9.4 Tile Flooring9.5 New light-max. 40w equiv. downcast16.1 New concrete stairs3.3 Wood Belly Band, painted6.7 Foundation walls3.4 [EW]Indicates Egress windows that meet the requirements of the 2022 California Residential Code (CRC) Sec. 310 including, but not limmited to the following: 1.Min. opening area = 5.7 s.f 2.Sill height no more than 44 inches above the floor. 3.Min. opening height = 24 inches 4.Min. opening width = 20 inches 2 1103 Juanita AvenueBurlingame, California94010650 696 1200314 Center Street #220Healdsburg, California65448707 343 1305DTADreiling Terrones Architecture Inc.ArchitectureInfrastructureEnvironmentsCafferkey Residence1409 Castillo WayBurlingame CA, 940102318New Residence A4.2 Exterior Elevations Owner Review 01: 06/19/2023 Schematic Update 02: 07/21/2023 Planning Submittal 01: 09/08/2023 Planning resubmittal 02: 11/3/2023 Planning resubmittal 03: 01/05/20242 1Property Line7'-6"B C D T.O Ridge EL: ±134.58' F.F Second Floor EL: ±139.08' T.O Plate EL: ±138.08' T.O Ridge EL: ±153.44' F.F Second Floor EL: ±139.08' T.O Plate EL: ±138.08' T.O Plate EL: ±147.08' T.O Ridge EL: ±153.44' Declining height envelope45.00° A 8'-0"Property Line7'-6"Declining height envelope45.00°12 3 12 12 12 12 12 3 7.1 7.26.2 6.1 typ.9.16.1 typ.8.1 F.F Garage / Basement EL: ±120.08' Avg. T.O Curb EL: ±119.86' Avg. Front + Rear EL: ±127.85' F.F First Floor EL: ±129.08' Avg. T.O Curb EL: ±119.86' Avg. Front + Rear EL: ±127.85' F.F Garage / Basement EL: ±120.08' Exterior Elevation - Rear 1/4" = 1'-0"1 8.2 8.26.36.6 6.7 9.2 9.2 6.18.12.2 2.13.212'-0"9'-0"33'-7"12'-0"16.1 Line of (E) grade [EW] 12 3 8'-0"Property LineF.F Second Floor EL: ±139.08' T.O Plate EL: ±138.08' T.O Plate EL: ±147.08' T.O Ridege EL: ±153.44' T.O Plate EL: ±147.08' T.O Ridege EL: ±153.44' 1 2 3 4 5 6 77.1 7.2 8.1 6.1 9.1 6.26.28.1 F.F First Floor EL: ±129.08' Avg. T.O Curb EL: ±119.86' F.F First Floor EL: ±129.08' F.F Garage EL: ±120.08' Avg. T.O Curb EL: ±119.86' 8.16.3 7.2 3.12.2 3.3 9.2 3.4 3.39.1 3.2 9'-0"33'-7"Exterior Elevation - Left 1/4" = 1'-0"2 Line of (E) grade F.F Second Floor EL: ±139.08' T.O Plate EL: ±138.08' 3.4 7.3 [EW] 16.1 8.1 9.1 Allign as indicated Mark Description Key Notes 1.0 2.1 Existing finished grade New concrete landing3.1 New concrete slab3.2 2x Wood Fascia 6.1 4x Wood Outrigger6.2 2.2 New finished grade New concrete driveway3.0 2x Wood Header6.3 Comp-A shingle Roof 7.1 Aluminum Clad Wood Windows w/ sim. True Divided Lites8.1 Aluminum Clad Wood Doors8.2 Wood Sectional Garage Door 8.3 New window / door8.4 Stained cedar shingles or synthetic alternative, typ.9.1 3-coat, exterior cement plaster (stucco)9.2 2x Wood Sill6.4 Wood Wall Base6.5 Wood Fence / Gate Stained 6.6 GSM Gutter 7.2 GSM Downspout7.3 Insulation 7.4 5/8" Gyp. Brd.9.3 Hardwood Flooring9.4 Tile Flooring9.5 New light-max. 40w equiv. downcast16.1 New concrete stairs3.3 Wood Belly Band, painted6.7 New Concrete walls3.4 Refer floor plans for additional detail references. Refer roof plans for roof detail callouts. Refer site plan drawings for grading, drainage. Coordinate location of all items shown on these elevations via the floor plans to ensure proper alignments. Many items are not dimensioned but occur in explicit relationship to other items (such as alignment of centerlines or grid lines.) The contractor shall become fully familiar with the overall plans to ensure that items shown on the exterior elevations can occur where intended. Coordination may require early consideration of exterior elements long before work on the exterior portions of the building occurs. Removal or repair of any items not properly coordinated shall be performed at no expense to the Owner. Coordinate locations of all light fixtures, electrical equipment, plumbing equipment not shown on these elevations. All pre-manufactured equipment may vary from these elevations based on changes in product design or manufacturing. Should such variations occur the Contractor shall notify the Architect within a reasonable time to allow for a timely resolution. All exterior surfaces shall be cleaned and painted. Maintenance Notes: Exterior finishes shall be cleaned and/or replaced regularly by Owner. Paint shall not be allowed to crack, peel or otherwise fail in any way without immediate replacement. Windows shall be cleaned and maintained by Owner per mfr.'s recommendations. Insect debris (spider webs, etc.) shall be removed regularly. Landscape irrigation shall not be allowed to spray on any portion of structure. Downspouts and splash blocks shall be adjusted so that no water splashes onto structure. Slope all finish grades away from structure at 2% for min. 18" to swale. Proposed lighting to meet code section 18.16.030 410.10(G). The cone of the light and or/glare from the lighting element is kept entirely on the property or below the top of any fence, edge or wall. All exterior lightings outlets and fixtures shall not be located more than nine (9) feet above adjacent grade or required landing, walls or portions of walls shall not be floodlit; only shielded light fixtures which focus light downward shall be allowed, except for illuminated street numbers required by the fire department. Exterior Elevation Notes [EW]Indicates Egress windows that meet the requirements of the 2022 California Residential Code (CRC) Sec. 310 including, but not limmited to the following: 1.Min. opening area = 5.7 s.f 2.Sill height no more than 44 inches above the floor. 3.Min. opening height = 24 inches 4.Min. opening width = 20 inches 1 2 3 4 5 6 7 Basement Cl.Bedroom # 4 Utility Cl. Cl.Dining Room Living Room Mud Room Primary Bedroom #1 Bath 1 Bath 2 Bedroom #2 Hall T.O Plate EL: ±128.16' F.F Basement EL: ±120.08' F.F Second Floor EL: ±139.08' T.O Plate EL: ±147.08' 9'-0"8'-0"F.F First Floor EL: ±129.08' 8'-1"F.F Basement EL: ±120.08' 9.3 9.2 6.2 F.F Utility Closet EL: ±121.74' T.O Plate EL: ±128.16' F.F Second Floor EL: ±139.08' T.O Plate EL: ±138.08' T.O Plate EL: ±147.08' F.F First Floor EL: ±129.08' 6'-5"1'-8"Longitudinal Section 1/4" = 1'-0"2 6.2 9.1 9.3 6.5 9.4 9.5 3.23.1 3.33.4 Crawl SpaceCrawl Space 16.1 Line of (E) grade 1103 Juanita AvenueBurlingame, California94010650 696 1200314 Center Street #220Healdsburg, California65448707 343 1305DTADreiling Terrones Architecture Inc.ArchitectureInfrastructureEnvironmentsCafferkey Residence1409 Castillo WayBurlingame CA, 940102318New Residence A5.1 Sections Owner Review 01: 06/19/2023 Schematic Update 02: 07/21/2023 Planning Submittal 01: 09/08/2023 Planning resubmittal 02: 11/3/2023 Planning resubmittal 03: 01/05/20242 1 Allign as indicated Mark Description Key Notes 1.0 2.1 Existing finished grade New concrete landing3.1 New concrete slab3.2 2x Wood Fascia 6.1 4x Wood Outrigger6.2 2.2 New finished grade New concrete driveway3.0 2x Wood Header6.3 Comp-A shingle Roof 7.1 Aluminum Clad Wood Windows w/ sim. True Divided Lites8.1 Aluminum Clad Wood Doors8.2 Wood Sectional Garage Door 8.3 New window / door8.4 Stained cedar shingles or synthetic alternative, typ.9.1 3-coat, exterior cement plaster (stucco)9.2 2x Wood Sill6.4 Wood Wall Base6.5 Wood Fence / Gate Stained 6.6 GSM Gutter 7.2 GSM Downspout7.3 Insulation 7.4 5/8" Gyp. Brd.9.3 Hardwood Flooring9.4 Tile Flooring9.5 New light-max. 40w equiv. downcast16.1 New concrete stairs3.3 Wood Belly Band, painted6.7 Foundation walls3.4 Exterior Elevation Notes These drawings are intended to represent the basic configuration of the new construction as well as the existing construction. Sections include standard framing methods and circumstances but may not include all structural members or represent all special situations. Refer to noted details for all special construction. Refer structural drawings for all framing sizes not shown. Refer structural drawings for actual footing profiles. Profiles shown here are schematic only. Interior elevations shown here are for reference only and shall not take precedence over interior elevation sheets. Insulation, gaskets, sealants, barriers shall be installed in compliance with CAC Title 24 as represented in Title 24 compliance forms included as part of these Documents (under separate cover). Contractor to provide required insulation certification. 1 S2.1 1 S2.2 - SD1 ABCD Lateral Section 1/4" = 1'-0"1 T.O Plate EL: ±128.16' F.F Basement / Garage EL: ±120.08' F.F Second Floor EL: ±139.08' T.O Plate EL: ±138.08' T.O Plate EL: ±147.08' 9'-0"8'-0"T.O Ridege EL: ±153.44' F.F First Floor EL: ±129.08' 8'-1"F.F Basement / Garage EL: ±120.08' T.O Plate EL: ±134.66' 11'-2"Garage Basement Foyer Mud Room / Pantry Bedroom # 4 Bedroom # 3 7.2 9.1 7.1 6.2 3.2 3.2 3.1 8.2 7.4 (N) Drain slope 1/4" per ft.(N) Drain, slope 1/4" per ft. 1103 Juanita AvenueBurlingame, California94010650 696 1200314 Center Street #220Healdsburg, California65448707 343 1305DTADreiling Terrones Architecture Inc.ArchitectureInfrastructureEnvironmentsCafferkey Residence1409 Castillo WayBurlingame CA, 940102318New Residence A8.1 Rendering Owner Review 01: 06/19/2023 Schematic Update 02: 07/21/2023 Planning Submittal 01: 09/08/2023 Planning resubmittal 02: 11/3/2023 Planning resubmittal 03: 01/05/20242 1 Concrete Sidewalk Curb Landscape Plan 1/8" = 1'-0"1 Castillo Ave.EL: 128.83' 5% slope Adjacent House Upper Level Adjacent Existing Garage Adjacent Existing Garage Lot 4 Lot 5Lot 3 Lot 14 Lot 15 Lot 12 SSMH SSCO SSMH S34°56'00" W 122.07'N55°04'00" W45.00'JP JP JP (N) Lawn Driveway 10' Alley6' Alley(N) Wood fence and gate max 6' tall with lattice Up (N) Planting area (E) 12" Tree to remain (N) Wood fence and gate max 6' tall with lattice SSCO W SSMH ±19'-4" Front Setback ±57'-4"±38'-3" Rear Setback 1'-8" Rear Setback 45.00'N55°04'00" W±25'-0" Front Setback ±58'-11" D.S D.S 122.07' N34°56'00" E Dn. D.S D.S D.S D.S D.S (N) Concrete walkway, landing and steps with tile finish Up 5% slope (N) Gravel path Dn Concrete pavers 1 A 1 2 3 4 1 7 BBQ. Seat wall B (N) Patio C B Vegetable Garden New Porch Garage EL: 120.08' New 4 Bedroom / 3 Ba. Main Residence EL: 129.08' (2836 s.f) 5 5 566 8 6 61 Planter boxes 4 5% slope 1 A 1 7 2 1 277 7 7 7 7112 2% slope ±7'-2" C B B 8 2 (E) Location of Big Leaf Maple tree, ± 3'-0" trunk dia. (E) Monterrey Pine, located on neighbors yard, (E) tree is cut back to neighbors property do to overhead lines Dn 1103 Juanita AvenueBurlingame, California94010650 696 1200314 Center Street #220Healdsburg, California65448707 343 1305DTADreiling Terrones Architecture Inc.ArchitectureInfrastructureEnvironmentsCafferkey Residence1409 Castillo WayBurlingame CA, 940102318New Residence L1.1 Landscape Plan Owner Review 01: 06/19/2023 Schematic Update 02: 07/21/2023 Planning Submittal 01: 09/08/2023 Planning resubmittal 02: 11/3/2023 Planning resubmittal 03: 01/05/20242 1 1.Irrigation system shall be installed and fully functional prior to installation of any planting. 2.A certificate of completion shall be filled out and crtified by either the designer of the landscape plans, irrigation plans, or the licensed landscape contractor for the project. 3.Existing topsoil shall be removed from work area and stockpiled to be used for finish grading upon completion. 4.Top soil in excess of that required finished grading shall be stored on site or disposed as directed by the Owner. Waste excavation from foundation trenches that s not suitable for landscape use and is in excess of that required for foundation backfill shall be removed by contractor. 5.Existing landscape shall be protected as required to prevent any damage to plants and trees unless specified by the Owner. 6.Protect existing trees in work zone with fencing and barricades. Barricades shall form a minimum encompasses all sides of the tree and provide a min. 6" clear from the base of the tree. 7.Protect existing roots during excavation. Ensure that equipment is placd outside of the drip line. 8.Provide watering of exposed roots during excavation. Backfill around exposed roots shall include previously removed topsoil. 9.Installation shall include a new automatic irrigation system throughout. 10.All landscaped and hardscaped areas shall be graded and finished, so as not to drain onto adjacent properties. 11.Landscape is classified as Tier 2 Per section 17.17.020 of the "water conversation and landscape regulations" 12.Recirculating water systmes shall be used for water features. 13.At least 80% of the plants shall be native plants, low water using plants, or no-water using plants. 14.Fire-prone plant materials and highly flammable mulches will not be used. 15.Invasive and/or noxious plant species will not be used. 16.A minimum 3" layer of mulch will be applied on all exposed soil surfaces of planting areas except turf area, creeping or rooting groundcovers, or direct seeding applications where mulch is contraindicated. 17.Soil amenddments, such as compost, will be incorporated according to the soil conditions at the project site and based on what is appropriate for the slected plants. 18.For soil less than 6% organic matter in the top 6" of soil, compost at a rate of a minimum of 4 cubic yards per 1,000 square feet of permeable area shall be incorporated to a depth of 6" into the soil. 19.No existing tree over 48 inches in circumfrence measured at 54 inches from natural grade may be removed without a Protected Tree Removal Permit froom the parks division. Contact Parks Division (558-7330) for link to application. Planting Notes Planting List Trees Common Name Botanical Name Size WUCOLS Factor A Sunset Zone Western Dogwood H:16' W:15' Cornus Sericea 24" Box 4-9, 14-24 0.85 Plants & Shrubs Common Name Botanical Name Size WUCOLS Factor Sunset Zone African Iris Dietes iridiodes 5 gal.8-9, 12-24 0.21 English Lavender Lavandula 'Hidcote' 1 gal.0.225-9, 2-24 Purple Three Awn Aristida purpurea 5 gal.0.233B-24 McMinn Manzanita Arctostaphylos viridissima 5 gal.0.247-9, 14-24 Bigleaf Hydrangea Hydrangea macrophylla 5 gal.0.553B-9, 14-24 Dwarf Loropetalum Loropetalum 'Dwarf' 5 gal.0.567-10B, Blue Eyed Grass Sisyrinchium bellum 5 gal.0.17 4, 9, 14-24 B Chinese Pistache H:16' W:15' Pistacia chinensis 24" Box 4-23 0.85 C Western Redbud H:15' W:10' Cercis occidentalis 24" Box 2-24 0.1 Breath of Heaven Coleonema pulchellum 5 gal.0.28 7-9, 14-24 1103 Juanita AvenueBurlingame, California94010650 696 1200314 Center Street #220Healdsburg, California65448707 343 1305DTADreiling Terrones Architecture Inc.ArchitectureInfrastructureEnvironmentsCafferkey Residence1409 Castillo WayBurlingame CA, 940102318New Residence L1.2 Planting Pictures Owner Review 01: 06/19/2023 Schematic Update 02: 07/21/2023 Planning Submittal 01: 09/08/2023 Planning resubmittal 02: 11/3/2023 Planning resubmittal 03: 01/05/20242 1 Western Dogwood Cornus sericea A English Lavender Lavandula 'Hidcote' African Iris Dietes iridiodes1 2 Purple Thee Awn 3 Aristida purpurea Bigleaf Hydrangea Hydrangea macrophylla McMinn Manzanita Arctostaphylos viridissima4 5 Dwarf Loropetalum 6 Loropetalum 'Dwarf' Blue Eyed Grass 7 Sisyrinchium bellum Breath of heaven 8 Coleonema pulchellum Chinese Pistache Pistachia chinensis B Western Redbud Cercis occidentalis C 1103 Juanita AvenueBurlingame, California94010650 696 1200314 Center Street #220Healdsburg, California65448707 343 1305DTADreiling Terrones Architecture Inc.ArchitectureInfrastructureEnvironmentsCafferkey Residence1409 Castillo WayBurlingame CA, 940102318New Residence L1.3 MWELO Forms Owner Review 01: 06/19/2023 Schematic Update 02: 07/21/2023 Planning Submittal 01: 09/08/2023 Planning resubmittal 02: 11/3/2023 Planning resubmittal 03: 01/05/20242 1 PRESCRIPTIVE APPROACH (For 500 - 2,500 sq ft of new landscape area or aggregate new and rehabilitated landscape area OR 2,500 sq ft of rehabilitated landscape area) Plant Material (Title 23, Chapter 2.7, Appendix D (b) (3))  For residential areas, 75% of landscape, excluding edibles and areas using recycled water, shall consist of plants that average a WUCOLS plant factor of 0.3. WUCOLS plants database can be found online at: http://ucanr.edu/sites/WUCOLS/  For non-residential areas, 100% of the plants, excluding edibles and areas using recycled water, shall consist of plants that average a WUCOLS plant factor of 0.3.  Pools and water features are included in landscape square footage for one-family and two-family dwellings  The following WUCOLS plant factors shall be used in calculating the average WUCOLS plant factor:  Very low = .1  Low = .2  Moderate = .5  High = .85  The following formula shall be used to calculate the average WUCOLS factor: [(# of Very low water use plants x 0.1) + (# of Low water use plants x 0.2) + (# of Moderate water use plants x 0.5) + (# of High water use plants x 0.85)] / Total number of plants = WUCOLS average for project  Include a landscape and irrigation design plan.  Include square footages of new landscaping and rehabilitated landscaping.  Include a plant list on the landscape plan that identifies all plant material by botanical names and common names, WUCOLS factor, Sunset and/or USDA Hardiness zone, and the total quantity of each plant.  The average spread of each tree shall be noted on the plant list.  Add note to plans: “A minimum 3-inch layer of mulch shall be applied on all exposed soil surfaces of planting areas except turf areas, creeping or rooting groundcovers, or direct seeding applications where mulch is contraindicated.” Turf (Title 23, Chapter 2.7, Appendix D (b) (4))  Turf is considered living plant material. MWELO regulations do not apply to artificial turf.  Note areas of existing turf and new turf and the square footage of each.  Add note to plans: “Turf shall not exceed 25% of the landscape area in residential areas.”  Add note to plans: “No turf permitted in non-residential areas.”  Add note to plans: “Turf not permitted on slopes greater than 25%.”  Add note to plans: “Turf is prohibited in parkways less than 10 feet wide.” Irrigation (Title 23, Chapter 2.7, Appendix D (b) (5))  The irrigation plans, at a minimum, shall contain the following:  Location and size of water meters for landscape (if a separate water meter is installed)  Location, type, and size of all components of the irrigation system, including, at a minimum, main and lateral lines  Add note to plans: “Automatic weather-based or soil-moisture based irrigation controllers shall be installed on the irrigation system.”  Add note to plans: “Pressure regulators shall be installed on the irrigation system to ensure dynamic pressure of the system is within the manufacturer’s recommended pressure range.” X X X X X X X X X X X X X X X X X X X X X  Add note to plans: “Manual-shut-off valves shall be installed as close as possible to the point of connection of the water supply.”  Add note to plans: “Areas less than 10-feet in width in any direction shall be irrigated with subsurface irrigation or other means that produces no runoff or overspray.”  Add note to plans: “For non-residential projects with landscape areas of 1,000 sq.ft. or more, private sub- meter(s) to measure landscape water use shall be installed.”  Add note to plans: “At the time of final inspection, the permit applicant must provide the owner of the property with a certificate of completion, certificate of installation, irrigation schedule of landscape and irrigation maintenance.”  Add note to plans: “Unless contradicted by a soils test, compost at a rate of a minimum of four cubic yards per 1,000 sq. ft. of permeable area shall be incorporated to a depth of six inches into the soil.” X X X X X Concrete Sidewalk Curb Irrigation Plan 1/8" = 1'-0"1 Castillo Ave.EL: 128.83' Adjacent House Upper Level Adjacent Existing Garage Adjacent Existing Garage Lot 4 Lot 5Lot 3 Lot 14 Lot 15 Lot 12 SSMH SSCO SSMH S34°56'00" W 122.07'N55°04'00" W45.00'JP JP JP (N) Lawn Driveway 10' Alley6' AlleyUp SSCO SSMH ±19'-4" Front Setback ±57'-5"±38'-1" Rear Setback 45.00'N55°04'00" W±25'-0" Front Setback ±53'-4" D.S 122.07' N34°56'00" E Dn. D.S D.S D.S Up Dn BBQ. Seat wall (N) Patio New Porch Garage EL: 120.08' New 4 Bedroom / 3 Ba. Main Residence EL: 129.08' (2836 s.f) D.G Irrigation Zone #1 (Turf) Irrigation Zone #2 Irrigation Zone #3 Irrigation Zone #4 (Turf) Irrigation Zone #6Irrigation Zone #5 W B V3 V2 V4 V5 V6 V1 CController -wall mounted in Garage Up ±7'-3" Dn.1103 Juanita AvenueBurlingame, California94010650 696 1200314 Center Street #220Healdsburg, California65448707 343 1305DTADreiling Terrones Architecture Inc.ArchitectureInfrastructureEnvironmentsCafferkey Residence1409 Castillo WayBurlingame CA, 940102318New Residence L2.1 Irrigation Plan Owner Review 01: 06/19/2023 Schematic Update 02: 07/21/2023 Planning Submittal 01: 09/08/2023 Planning resubmittal 02: 11/3/2023 Planning resubmittal 03: 01/05/20242 1 1.Irrigation system shall be installed and fully functional prior to installation of any planting. 2.Automatic irrigation controllers that utilize either evapotranspiration or soil moisture sensor data for irrigation scheduling will be installed. 3.A pressure regulators shall be installed on the irrigation system to ensure dynamic pressure of the system is within the manufacturer's recommended preassure range. 4.Manual-shut-off valves shall be installed as close as possible to the point of connection of the water supply. 5.Areas less than 10-feet in width in any directionshall be irrigated with subsurface irrigation or other means that produces no runoff or overspray. 6.For no-residential projects with landscapes areas of 1,000 sq.ft or more, private submeter(s) to measure landscape water use shall be installed. 7.At the time of final inspection, the permit applicant must provide the owner of the property with a certificate of completion, certificate of installation, irrigation schedule of landscape and irrigation maintenance. 8.Sensors, either integral or auxillary, that suspend or alter irrigation operation during unfavorable weather conditions will be installed. 9.The irrigations system will be designed to prevent runoff, low head drainage, overspray, or other simmilar conditions. 10.In areas with slope greater than 25% and within 24-inches of a non-permeable surfaces, or in narrow or odd shaped areas that are less than eight feet in width, low volume irrigation will be installed in mulched areas. 11.Irrigation systems shall be designed, maintained, and managed to meet an average landscape irrigation efficiency of 70% or more. 12.Irrigation shall be scheduled between 8:00 pm and 10:00 a.m. 13.Install all piping and valves in common trenches where feasible and inside planting areas whenever possible. All vlves shall be located in groundcover or shrub areas. 14.Install irrigation in accordance with local codes and manufactureers specifications. 15.Connect backflow assembly with the point of connection using brass fittings. 16.Install sleeves at the necessary depths prior to pavement installation. Sleeving shall extend 1'-0" from edge of pavement into planting areas. 17.Install controller per drawings and fasten securely to wall. All above grade conduit either low voltage or line voltage, shall be rigid steel and securely fastned to structure and controller. 18.The automatic irrigation system controllers shall be weather-based to conform with all CALGreen requirements. 19.Irrigation controller programming data will not be lost due to an interruption in the primary source of power. 20.Each valve will irrigate a hydrozone with similar site, slope, sun exposure, soil conditions, and plant materials with simmilar water use. 21.Sprinkler heads and other emissin devices will be selected based on what is appropriate for the plant type within that hydrozone. 22.Where feasible, trees will be placed on seperate valves from shrubs, groundcovers and turf. Irrigation Notes Hydrozone & Valve Schedule Zone Water Use Type Valve Size Irrigation Schedule GPM Moderate Spray 3/4"0.05 GPM Every other day 30-40 mins. ea. Legend W Water Meter B Backflow Preventer C Irrigation Controller Irrigation Valve, w/ valve # (indicates zone) Mainline (PVC) - Schedule 40 Lateral (PVC) - 3/4" Schedule 40 V# V1 Low-moderate Spray 0.016 GPM Every day 5 mins. V2 Moderate Spray 0.05 GPM Every other day 30-40 mins. ea. V3 Low-moderate Spray 0.033 GPM Every day 5 mins. V4 Moderate Spray 0.05 GPM Every other day 30-40 mins. ea. V5 Low Drip 0.016 GPM Every other day 30-40 mins. ea. V6 1103 Juanita AvenueBurlingame, California94010650 696 1200314 Center Street #220Healdsburg, California65448707 343 1305DTADreiling Terrones Architecture Inc.ArchitectureInfrastructureEnvironmentsCafferkey Residence1409 Castillo WayBurlingame CA, 940102318New Residence BMP1.1 Best Management Practices Owner Review 01: 06/19/2023 Schematic Update 02: 07/21/2023 Planning Submittal 01: 09/08/2023 Planning resubmittal 02: 11/3/2023 Planning resubmittal 03: 01/05/20242 1 City of Burlingame Design Review and Special Permit Address: 2204 Hillside Drive Meeting Date: January 22, 2024 Request: Application for Design Review and Special Permits for first floor plate height and attached garage for a new, two-story single unit dwelling and attached garage. Architect and Applicant: Morris Architecture LLC APN: 027-165-080 Property Owners: Glenn and Corinne Chiu Lot Area: 6,000 SF General Plan: Low Density Residential Zoning: R-1 Environmental Review Status: The project is Categorically Exempt from review pursuant to the California Environmental Quality Act (CEQA), per Section 15303 (a) of the CEQA Guidelines, which states that construction of a limited number of new, small facilities or structures, including one single-unit residence, or a second dwelling unit in a residential zone, is exempt from environmental review. In urbanized areas, this exemption may be applied to the construction or conversion of up to three (3) single-unit residences as part of a project. Project Description: The subject property is an interior lot that contains an existing split-level single-unit dwelling with an attached one-car garage. The applicant is proposing to demolish all structures on the site and build a new, two-story single-unit dwelling with an attached one-car garage. The project proposes a total floor area of 3,015 SF (0.50 FAR) where 3,020 SF (0.50 FAR) is the maximum allowed (includes 72 SF front porch and ADU exemptions). A Special Permit is being requested for first floor plate height (9’-0” maximum allowed without a Special Permit). This request is for the kitchen at the rear, right side of the first floor where an 11’-4” plate height is proposed and for the front porch where a 10’-0” plate height is proposed. The remainder (majority) of the first floor has a 9’-0” plate height. The applicant is also requesting a Special Permit for an attached garage. Code Section 25.10.035 requires a Special Permit for an attached garage, unless it is replacing an existing attached garage that extends no more than 10’-0” beyond the existing location. However, the proposed garage setback of 36’-1” is approximately 12’-7” forward from the face of the existing attached garage, therefore requiring a Special Permit. There would be a total of four bedrooms in the proposed main dwelling. Two parking spaces, one of which must be covered, are required for a four-bedroom house. The new attached one-car garage measures 12’-0” x 21’-0” (clear interior dimensions) and provides the required covered parking; one uncovered parking space (9’ x 18’) is provided in the driveway. All other Zoning Code requirements have been met. The site contains 11 existing non-protected sized trees in the rear yard that would all be removed with the construction of the proposed accessory dwelling unit (ADU). Based on the proposed floor area, three landscape trees are required on-site. The proposed landscape plan includes three new 24-inch box landscape trees to be planted; two vine maples and one western rosebud. Therefore, the project complies with the Urban Reforestation Ordinance requirements. Staff would note that currently there is one street tree along the parcel frontage which would remain. Accessory Dwelling Unit (ADU) This project includes a new detached ADU (797 SF) that would be located at the rear of the property. Review of the ADU application is administrative only and is not reviewed by the Planning Commission. Staff has determined that the ADU complies with the ADU regulations. Item No. 9a Regular Action Item Design Review and Special Permits 2204 Hillside Drive -2- The applicant is requesting the following applications:  Design Review for a new, two-story single-unit dwelling with an attached garage (C.S. 25.68.020(C)(1)(a));  Special Permit for first story plate height (11’-4” plate height at kitchen and 10’-0” plate height at front porch proposed where 9’-0” is allowed) (C.S. 25.10.030 and 25.78.020(A)(6)); and  Special Permit for a new attached garage (C.S. 25.10.035 (1)). 2204 Hillside Drive Lot Area: 6,000 SF Plans date stamped: January 10, 2024 PREVIOUS PLANS 11/13/23 REVISED PLANS 01/10/24 ALLOWED/REQUIRED Front Setbacks (attached garage¹): (1st floor): (2nd floor): 36’-1” 20’-8” 25’-2” No change 25’-0” 20’-8” (block average) 20’-8” (block average) Side Setbacks (left): (right): 4’-0” 4’-0” No change 4’-0" 4’-0” Rear Setbacks (1st flr): (2nd flr): 44’-11” 53’-9” No change 15’-0” 20'-0" Lot Coverage: 2,139 SF 35.6% 2,317 SF 38.6% 2,400 SF 40% FAR: 3,015 SF 0.50 FAR No change 3,020 SF ² 0.50 FAR # of bedrooms: 4 No change --- Off-Street Parking: 1 covered (12’-0” x 21’-0”) 1 uncovered (9' x 18') No change 1 covered (10’-0” x 18’-0”) 1 uncovered (9' x 18') 1 Special Permit required for an attached garage. 2 (0.32 x 6,000 SF) + 1,100 SF = 3,020 SF (0.50 FAR) Table continued on next page. Design Review and Special Permits 2204 Hillside Drive -3- PREVIOUS PLANS 11/13/23 REVISED PLANS 01/10/24 ALLOWED/REQUIRED Plate Heights (1st flr): (2nd flr): 11’-4” kitchen / 10’-0” entrance 3 8’-0” 11’-4” kitchen / 10’-0” entrance 3 8’-0” 9’-0” 8’-0” Building Height: 20’-11” No change 30'-0" Declining Height Envelope: complies No change C.S. 25.10.55(A)(1) 3 Special Permit required for first story plate height at kitchen and front entrance. Summary of Proposed Exterior Materials: • Windows: aluminum clad wood • Doors: wood entry and garage doors • Siding: combination of stucco, stained horizontal wood siding and grey tone stone siding • Roof: asphalt shingles • Other: stone clad columns, wood railings, tongue and groove eave Staff Comments: None. Design Review Study Meeting: At the Planning Commission Design Review Study meeting on January 8, 2024, the Commission had questions about the project and recommended some changes (see attached January 8, 2024, Planning Commission Minutes). The Commission asked for clarification regarding the first floor plate height at the kitchen, which was shown with a plate height greater than nine (9) feet, requiring a Special Permit, which had not been identified in the staff report. The Commission voted to place this item on the Regular Action Calendar when all information has been submitted and reviewed by the Planning Division. The applicant submitted a response letter, revised plans and rendering, dated January 10, 2024, to address the Planning Commission’s comments along with a Special Permit application for first floor plate height (for kitchen and front porch). Staff would note that the revised plans address the Commission's comments and include only a minor change to the lot coverage with the revision to the rear deck area, as reflected in the zoning compliance table. Staff would also note that the Special Permit for plate height for the kitchen and also the front porch was an oversight by staff and the project application materials and staff report have now been updated to reflect this requirement and request. Design Review Criteria: The criteria for design review as established in Ordinance No. 2000 adopted by the City Council on December 6, 2021 are outlined as follows: 1. Consistency with any applicable design guidelines; 2. Compatibility of the architectural style with that of the existing character of the neighborhood; 3. Respect for the parking and garage patterns in the neighborhood; 4. Architectural style and consistency and mass and bulk of structures, including accessory structures; 5. Interface of the proposed structure with the structures on adjacent properties; 6. Landscaping and its proportion to mass and bulk of structural components; and 7. In the case of an addition, compatibility with the architectural style and character of the existing structure as remodeled. Design Review and Special Permits 2204 Hillside Drive -4- Required Findings for Design Review: Any decision to approve a Major Design Review application shall be supported by written findings addressing the criteria set forth in Chapter 25.68. In making such determination, the following findings shall be made: 1. The project is consistent with the General Plan and is in compliance with all applicable provisions of Title 25, all applicable design guidelines, all other City ordinances and regulations, and most specifically, the standards established in the Design Review Criteria above, as applicable. 2. The project will be constructed on a parcel that is adequate in shape, size, topography, and other circumstances to accommodate the proposed development; and 3. The project is designed and arranged to provide adequate consideration to ensure the public health, safety, and general welfare, and to prevent adverse effects on neighboring property. Suggested Findings for Design Review: 1. The proposed new single-unit dwelling is consistent with the General Plan designation of Low Density Residential and is in compliance with all applicable provisions of Title 25; the proposed dwelling is consistent with the design guidelines; that the mass and bulk of the proposed structure is in scale with the lot and in relation to neighboring properties, and that architectural details follow a simple contemporary design, including the aluminum clad wood windows, solid wood front door, wood garage door, with stucco and horizontal wood siding and stone detailing, making the project compatible with the character of the neighborhood. 2. The project will be constructed on a parcel that is adequate in shape, size, topography, and other circumstances to accommodate the proposed development as shown on the proposed plans. 3. The project is designed and arranged to provide adequate consideration to ensure the public health, safety, and general welfare, and to prevent adverse effects on neighboring property because the project complies with setback, lot coverage, floor area ratio, building height, declining height envelope, and parking requirements (with a Special Permit request for attached garage and first floor plate height). For these reasons, the project may be found to be compatible with the requirements of the City's design review criteria. Required Findings for a Special Permit: In order to grant a Special Permit for first floor plate height and an attached garage, the Planning Commission must find that the following conditions exist on the property (Code Section 25.51.020 a-d): (a) The blend of mass, scale and dominant structural characteristics of the new construction or addition are consistent with the existing structure’s design and with the existing street and neighborhood; (b) the variety of roof line, facade, exterior finish materials and elevations of the proposed new structure or addition are consistent with the existing structure, street and neighborhood; (c) the proposed project is consistent with the residential design guidelines adopted by the city; and (d) removal of any trees located within the footprint of any new structure or addition is necessary and is consistent with the city’s reforestation requirements, and the mitigation for the removal that is proposed is appropriate. Design Review and Special Permits 2204 Hillside Drive -5- Suggested Special Permit Findings (Attached Garage): 1. The blend of mass, scale, and dominant structural characteristics of the attached garage are consistent with the character of the street and neighborhood which consists of one and two-story single-unit dwellings in a variety of architectural styles and massing with attached and detached garages and is appropriate proportionality on this interior lot. 2. The existing house has an attached garage that is not easily usable given the slope of the lot. The new garage will be made to be more usable with the floor lifted and the garage slab to be supported by concrete footings. The attached garage is integrated into the design of the new dwelling with its matching materials and roof design to cohesively tie into the front façade. 3. The proposed project is consistent with the residential design guidelines adopted by the City in that the proposed structure is compatible with the requirements of the City's design review criteria as noted above. Suggested Special Permit Findings (Plate Height): 1. The blend of mass, scale, and dominant structural characteristics of the house, with the predominant plate height of 9’-0” for first floor, are consistent with the character of the street and neighborhood which consists of one and two-story single-unit dwellings in a variety of architectural styles, massing and plate heights and is appropriate proportionality on this interior lot. Only the front porch with a 10’- 0” plate height varies from the 9’-0” plate height along the front façade by pronouncing the entrance; the rear kitchen plate height at 11’-4” adds articulation along the right side elevation and is located at the rear of the house and not visible from the street. 2. The variety of roof lines, façade, exterior finish materials, and elevations of the house are consistent with the existing street and neighborhood; the 10’-0” plate height at the front porch provides visual interest to the front façade and only the kitchen at rear, which has an 11’-4” plate height, varies from the rest of the first floor plate height of 9’-0”; the modifications to the plate heights in these locations are integrated well into the design and add articulation; and 3. The proposed project is consistent with the residential design guidelines adopted by the City in that the proposed structure is compatible with the requirements of the City's design review criteria as noted above. For these reasons, the project may be found to be compatible with the requirements of the City's Special Permit criteria. Planning Commission Action: The Planning Commission should conduct a public hearing on the application and consider public testimony and the analysis contained within the staff report. Action should include specific findings supporting the Planning Commission’s decision and should be affirmed by resolution of the Planning Commission. The reasons for any action should be stated clearly for the record. At the public hearing the following conditions should be considered: 1. that the project shall be built as shown on the plans submitted to the Planning Division date stamped January 10, 2024, sheets A0.1 through A9.2 and sheet L1.0; 2. that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYI or amendment to be determined by Planning staff); 3. that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; Design Review and Special Permits 2204 Hillside Drive -6- 4. that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; 5. that demolition for removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 6. that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; 7. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 8. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 9. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, in effect at time of building permit submittal, as amended by the City of Burlingame; THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 10. that prior to scheduling the framing inspection the applicant shall provide a certification by the project architect or residential designer, or another architect or residential design professional, that demonstrates that the project falls at or below the maximum approved floor area ratio for the property; 11. that prior to scheduling the foundation inspection, a licensed surveyor shall locate the property corners, set the building footprint and certify the first-floor elevation of the new structure(s) based on the elevation at the top of the form boards per the approved plans; this survey shall be accepted by the City Engineer; 12. that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; 13. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; and 14. that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. Design Review and Special Permits 2204 Hillside Drive -7- Catherine Keylon Senior Planner c. Morris Architecture, applicant and architect Glenn and Corinne Chiu, property owners Attachments: January 8, 2024, Planning Commission Minutes Applicant’s Response Letter, dated January 10, 2024 Project Application Form Special Permit Application Forms o Attached Garage o First Floor Plate Height Planning Commission Resolution (Proposed) Notice of Public Hearing – Mailed January 12, 2024 Area Map BURLINGAME CITY HALL 501 PRIMROSE ROAD BURLINGAME, CA 94010 City of Burlingame Meeting Minutes Planning Commission 7:00 PM Council Chambers/OnlineMonday, January 8, 2024 a.2204 Hillside Drive, zoned R -1- Application for Design Review and Special Permit for attached garage for a new, two -story single-unit dwelling and attached garage. (Morris Architecture LLC, applicant and architect; Glenn and Corinne Chiu, property owners) (58 noticed) Staff Contact: Catherine Keylon All Commissioners have visited the project site. Community Development Director Gardiner provided an overview of the staff report. Acting Chair Lowenthal opened the public hearing. Ryan Morris, designer, represented the applicant and answered questions regarding the application. Public Comments: >There were no public comments. Acting Chair Lowenthal closed the public hearing. Commission Discussion/Direction: > At the rear of the house, the first floor has an 11’-3” plate height. It will require a Special Permit because it exceeds the allowable 9’-0” plate height on the first floor. > For the terrace deck on the rear of the house, be aware of the building code requirement of having railings on drops of that height. The steps cannot be more than 7-3/4” and then you have this drop off . Consider revising before you proceed to construction documents. > I’ve never seen a raised -floor garage that does not go down a hillside. I know it is not within our purview but consider doing the engineering portion earlier than planned to avoid the mess and allow time to review impacts on the neighbors and potential changes to the design. > Please revisit the windows. I agree with my fellow commissioners, the discrepancies especially on the front elevation having different windows is not pulling the house together. It’s a bit of a mix & match. Keep it consistent throughout. I don ’t have a problem with the Special Permit request in the garage and the 11 -foot first floor plate height on the kitchen because it is tucked in the back. I agree with the comment about the deck. The back porch seems odd to have stairs. If the deck is going to remain, you don ’t need the stairs. Let the deck be your stairs down, put lights on it, make it beautiful and one piece. Or close the deck and it becomes its own entity and you have your stairs going down. Consider creating some difference there to make it a little bit better. I would also ask when you come back for the next meeting if you provide some 3D rendering because it is easier to visualize and see the details. >I agree with my fellow commissioner about the windows. There are some alignment issues. There should be better consistency of shape and operation type. Overall, there is a nice order to the look of the house right now. On Hillside Drive where there are so many traditional homes, the front elevation seems in need of more articulation, a little bit more shaping or massing and some other design details. It seems barely bland. Something is not coming together for me. I have no problem with the attached garage being setback and 12’-6” off from the current location of the garage. I also don ’t have an issue with the plate height at the back, but I just wanted to call them out because it is something that needs to be identified. The back reads better than the front because the back has hipped roofs and some articulation Page 1City of Burlingame January 8, 2024Planning Commission Meeting Minutes on the first and second stories. The front is a little bit apartment -building looking, flat and not enough interest. >I agree with my fellow commissioners. This can be really cool but is still not there. It seems top-heavy, maybe because of the repetitive windows. The consistency of the materials and such should be throughout. Please provide a detail on the front door, it looks very solid and closed to have a 5 -foot-wide door. Consider using bands on the material transitions and some clean -up of drawings for clarity. >The front elevation reads flat because of the low pitches of the roof. It needs a little more depth and articulation. Some details on the window trims will make us understand if anything comes out from the siding and how you get more depth to this. The 3D renderings help, but without color or texture they read flat to us, that may be a way to show richness of what you intend for us to see. The stone looks like just a texture on the wall, and it is in the same plane as the siding above it. There is no cap and no shadow or anything happening. We need to better understand the layering of the materials so we can start to see the details. It does look top heavy on the second floor because the roof around the first floor just does not go very high. We do not see as much roof as we are used to on steeper roof pitches so therefore the siding and windows look big. Proportions need to be worked out to make those larger faces look a little reduced and help with the depth issue. I too do not have an issue with the garage moving forward, I just want to make sure that the structural pieces get worked out well. Because you are not sticking to the vocabulary of hillside, sheet A 9.1 is critical for us in being able to see the depth of the architecture being proposed. I agree that the architecture is there, we just need to have a better understanding of it for the next round . Whether it is more color, more texture or more shadows, putting in more information on sheet A 9.1 is a huge deal for us. Provide more details about the front door and what it will look like. The doors that go out the back on the patio, I assume they are glass doors that you would see in but right now it is showing as white. I am not sure if they are frosted or panel doors. The elevations come out flat because they are just line work. >I wasn’t quite sure what to think of it while going past the project site. Picking up from my fellow commissioner’s comments, there are parts of the design that has the DNA of the Perry -style. That is the core, there is a really good idea and design in here that I ’d like to see more of. If that is what you are going for, I do like it and it just needs to be developed a little bit more. >From first glance, I like the design. With the flatness of the second story, having some box windows or something that gives texture can help. Providing a colored rendering will be a game changer. I don ’t have any issues with the Special Permit for the garage. The increased plate height in the kitchen also does not bother me. >I want to clarify for the public that the Special Permit for the plate height is in the room that is located at the rear of the house. It is not changing the scale of the front elevation. The intent of that regulation is to try and control scale from the front. We’ve had a lot of projects proposing them and have been subsequently denied because it is changing the front elevation. Page 2City of Burlingame DESIGN REVIEW STUDY SESSION - COMMENT RESPONSE Project Address: 2204 Hillside Drive Permit No.: Planning Commission – Design Review Study Items Date: 01.10.24 GENERAL COMMENTS 1. Kitchen 11’ plate height will require a Special Permit application or reduce the plate height to not more than 9’ (SP fee paid for garage SP so you would only need to provide a SP application for the first floor plate height); a. RESPONSE – We will keep the 11’ plate height at the rear facing kitchen and apply for a Special Permit. 2. Front entrance also exceeds 9’ first floor plate height limit and will require a Special Permit application or reduce the plate height to not more than 9’ (SP fee paid for garage SP so you would only need to provide a SP application for the first floor plate height)- another option would be to remove the columns and have only the canopy above (this change would not require a SP); a. RESPONSE – We will keep the 10’ plate height at the front entrance and apply for a Special Permit. This element at the front façade was not brought up as an issue with the PC, and it is an important feature to add the depth and articulation we are seeking. Reducing it to 9’ tall or removing the columns would take away the hierarchy of the front door and make the front feel more ‘plain’. 3. Clarify materials along right side where kitchen is located; a. RESPONSE – The materials along the right side of the building consist of horizontal wood siding at the second floor, stucco at the first floor, and a stone wainscot (variable height) which wraps around the front and rear of the building. 4. Look at rear “stadium seating” at the deck in terms of compliance with the Building Code (rise & run); a. RESPONSE – See also response to #12 explaining the design intent and changes to the rear deck. The building code requirements are satisfied with “stadium seating”, as the vertical drop is less than 30” and does not require a guardrail. Each step is considered an independent ‘walking surface’ above and below the edge, rather than being considered a tall staircase, one might think of it as a series of independent walkways next to each other at different levels. The risk of falling is mitigated by the short drop down to each walkway. A legal staircase will be incorporated into the “stadium seating” which will comply with rise & run and handrail requirements. An example of this type of seating can be seen in the image below. 5. Raised floor garage? Figure out how you are doing that 1) fill and slab 2) or raised floor with concrete – look at how this will affect your neighboring properties in terms of grade changes and drainage; a. RESPONSE – The new garage slab will be supported by concrete footings directly below the exterior walls of the garage. This will be the same whether it is slab over backfill or raised floor over crawl space. The footing depth and size will be determined by the geotechnical and structural engineers. Any excavation for those footings should not disturb the soil extending out at an imaginary line 45 degrees below the neighbors footing. So if the neighbor’s house is 10’ away, we should avoid digging 10’ down. We are not proposing any changes to grade along the side setbacks, and perimeter drainage will be provided around the house. The garage is treated no differently than the rest of the house in this regard, and there is no concern of affecting the neighboring properties. 6. Clarify front door – wide front door or two doors; look at softer more inviting entry door or provide more details; a. RESPONSE – See the picture below for a more specific representation of the front door style that is proposed. This will be included as a reference along with the colored renderings. A solid door is preferred for privacy from the busy street, and a transom window has been provided above the door to allow natural light and visual interest to the entryway. The columns and roof canopy provide the invitation and the stunning front door generate interest and curiosity as one approaches the home. 7. Revisit windows a. RESPONSE – At the front façade, the second floor windows have been changed to match the first floor and reduced from 4 different windows, to 2 of the same. This reduces the visual ‘heaviness’ of the second floor, reinforces a consistent window pattern, and still aligns with windows on each side of the house. 8. Look at windows on all elevations; not pulling the house together a. RESPONSE – This house has a strong pattern of 2 basic window types and alignments – tall vertical casements, and long skinny transoms. Those 2 types are combined to form the windows at the front elevation. The design has a consistent balance of both window types around the house, and each one directly relates to the interior room function and configuration. However, there were a few areas that were improved. i. Front elevation, second floor windows changed as described in #7 above ii. Left / north elevation, no changes. The repeated transom windows align with the front and rear nicely. iii. Rear elevation, second floor center window changed from pair of transoms to a single casement to match the bathroom window on the left side. iv. Right / south elevation, second floor window on right side changed from pair of transom windows to a single transom window. 9. Need consistency throughout the house in terms of shape and operability a. RESPONSE – See #8 above 10. Especially revisit discrepancy on front elevation with different windows a. RESPONSE – See #7 above 11. Okay with SP for attached garage and okay with plate height of kitchen; a. No response needed 12. Back porch is odd- revisit design; a. RESPONSE - The rear deck design has been changed in the architectural plans to better match the landscape design on sheet L1.0. The code-compliant stairs blend more seamlessly with the “stadium seating” feature. We considered the commission’s suggestions of traditional deck railings or extending standard deck steps across the entire deck, but we feel the “stadium seating” is a creative and efficient solution to maximum the use of the entire yard. i. The upper deck surface must be a minimum size to accommodate an outdoor eating area that is not too close the edge of the deck. ii. A railing at the edge of the deck would bisect a yard that is already on the smaller side (due to the new ADU), so we wanted to keep the deck and yard spaces open and connected, while at different levels. iii. A standard staircase often juts out into the yard and creates dead spaces on either side, so we propose the “stadium seating” solution as a way to expand the lower yard spaces and soften the transition. Integrated planters on either side will further help the transition and reduce the need for obtrusive guardrails. 13. Provide more detailed renderings; include color and / or texture to help understand project and materials install/layering; a. RESPONSE – Colored 3D renderings will be provided. 14. Front elevation needs more articulation and design details, a bit bland, flat and not coming together; a. RESPONSE – We considered the addition of different trims, columns, ornamentation, or other details to the front elevation, but decided against new additive treatments for this contemporary design. We feel the strength of the design is in it’s simplicity and balanced proportions. The modifications to the second story windows are less distracting, and attention is drawn to the front entry. The colored renderings reveal much more depth and character than the black and white elevations, and the additional details we explored were not feeling natural to the design. 15. Rear elevation reads better than front in terms of roof framing and articulation; a. No response needed 16. Design feels top heavy- proportions need to be worked out to help with this; a. RESPONSE – See #7 and #14. 17. Look at making all exterior materials consistent throughout all elevations; a. RESPONSE – As the colored renderings show, the primary material pattern is the use of stucco with stone wainscot at the first floor, and a combination of horizontal wood siding and stucco at the second floor. The windows and doors and roof eaves add an extra layer of detail which tie the house together at both floors. The elevations will have a consistent first and second floor distinction, without alternating or overdoing the colors too much. 18. Front elevation needs more depth and articulation; a. RESPONSE – See #7 and #14. 19. Consider adding detail trim around the windows; a. RESPONSE – See #14 City of Burlingame  Community Development Department  501 Primrose Road  P (650) 558-7250  www.burlingame.org City of Burlingame Special Permit Application (R-1 and R-2) The Planning Commission is required by law to make findings as defined by the City’s Ordinance (Chapter 25.78). Your answers to the following questions can assist the Planning Commission in making the decision as to whether the findings can be made for your request. Refer to the end of this form for assistance with these questions. 1. Explain why the blend of mass, scale and dominant structural characteristics of the new construction or addition are consistent with the existing structure’s design and with the existing street and neighborhood. 2. Explain how the variety of roof line, facade, exterior finish materials and elevations of the proposed new structure or addition are consistent with the existing structure, street and neighborhood. 3. How will the proposed project be consistent with the residential design guidelines adopted by the City? 4. Explain how the removal of any trees located within the footprint of any new structure or addition is necessary and is consistent with the City’s reforestation requirements. What mitigation is proposed for the removal of any trees? Explain why this mitigation is appropriate. This is for a new house. We are requesting that the new attached garage be allowed to exceed 10'-0" from the front face of the existing garage. The entire existing house will be demolished and the site will be graded. The proposed design respects the block avg. front setback, the garage respects the 'garage front setback' and is positioned subordinate to the rest of the front façade. Currently the 2nd floor front wall aligns above the garage front wall and is 2.5' beyond the allowed 10' from the front of the existing garage. Setting the garage back 2/5 would cause an abnormal overhang above the garage, looking incongruous with house and neighborhood. Proposed design respects the block avg. front setback, the 'garage front setback', the 2nd floor setback and all daylight planes. The proposed attached garage is and is positioned subordinate to the rest of the front façade. The two story volume broken up by a wrapping 'apron' roof is consistent with the design of the house and attempts to fit in the mixed neighborhood context. Attached garages are common in the neighborhood and allows the owners a more generous, secure backyard for their family. The proposed design meets or exceeds all required setbacks in the design guidelines. The parking and garage patterns in the neighborhood currently include a mix of attached and detached garages. The new attached garage respects req'd setbacks in the guidelines as does the architectural style, mass and bulk of structure. Requiring the garage to be setback behind the second floor above [per the setback requirement] creates a 2nd floor mass over the driveway that woud be incongruous with mass & scale in the neighborhood context. No trees will be removed for this special permit City of Burlingame  Community Development Department  501 Primrose Road  P (650) 558-7250  www.burlingame.org City of Burlingame Special Permit Application (R-1 and R-2) The Planning Commission is required by law to make findings as defined by the City’s Ordinance (Chapter 25.78). Your answers to the following questions can assist the Planning Commission in making the decision as to whether the findings can be made for your request. Refer to the end of this form for assistance with these questions. 1.Explain why the blend of mass, scale and dominant structural characteristics of the new construction or addition are consistent with the existing structure’s design and with the existing street and neighborhood. 2.Explain how the variety of roof line, facade, exterior finish materials and elevations of the proposed new structure or addition are consistent with the existing structure, street and neighborhood. 3.How will the proposed project be consistent with the residential design guidelines adopted by the City? 4.Explain how the removal of any trees located within the footprint of any new structure or addition is necessary and is consistent with the City’s reforestation requirements. What mitigation is proposed for the removal of any trees? Explain why this mitigation is appropriate. FRONT ENTRY City of Burlingame  Community Development Department  501 Primrose Road  P (650) 558-7250  www.burlingame.org City of Burlingame Special Permit Application (R-1 and R-2) The Planning Commission is required by law to make findings as defined by the City’s Ordinance (Chapter 25.78). Your answers to the following questions can assist the Planning Commission in making the decision as to whether the findings can be made for your request. Refer to the end of this form for assistance with these questions. 1.Explain why the blend of mass, scale and dominant structural characteristics of the new construction or addition are consistent with the existing structure’s design and with the existing street and neighborhood. 2.Explain how the variety of roof line, facade, exterior finish materials and elevations of the proposed new structure or addition are consistent with the existing structure, street and neighborhood. 3.How will the proposed project be consistent with the residential design guidelines adopted by the City? 4.Explain how the removal of any trees located within the footprint of any new structure or addition is necessary and is consistent with the City’s reforestation requirements. What mitigation is proposed for the removal of any trees? Explain why this mitigation is appropriate. REAR PLATE HEIGHT Secretary RESOLUTION APPROVING CATEGORICAL EXEMPTION, DESIGN REVIEW AND SPECIAL PERMITS RESOLVED, by the Planning Commission of the City of Burlingame that: WHEREAS, a Categorical Exemption has been prepared and application has been made for Design Review and Special Permits for first floor plate height and attached garage for a new, two-story single unit dwelling and attached garage at 2204 Hillside Drive, zoned R-1, Glenn and Corinne K. Chiu, property owners, APN: 027-165-080; WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on January 22, 2024, at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing; NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that: 1. On the basis of the Initial Study and the documents submitted and reviewed, and comments received and addressed by this Commission, it is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and categorical exemption, per Section 15303 (a) of the CEQA Guidelines, which states that construction of a limited number of new, small facilities or structures, including one single-unit residence, or a second dwelling unit in a residential zone, is exempt from environmental review. In urbanized areas, this exemption may be applied to the construction or conversion of up to three (3) single-unit residences as part of a project, is hereby approved. 2. Said Design Review and Special Permits are approved subject to the conditions set forth in Exhibit “A” attached hereto. Findings for such Design Review and Special Permits are set forth in the staff report, minutes, and recording of said meeting. 3. It is further directed that a certified copy of this resolution be recorded in the official records of the County of San Mateo. Chairperson I, _____________ , Secretary of the Planning Commission of the City of Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the Planning Commission held on the 22nd day of January, 2024 by the following vote: EXHIBIT “A” Conditions of Approval for Categorical Exemption, Design Review and Special Permits 2204 Hillside Drive Effective February 1, 2024 Page 1 1. that the project shall be built as shown on the plans submitted to the Planning Division date stamped January 10, 2024, sheets A0.1 through A9.2 and sheet L1.0; 2. that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYI or amendment to be determined by Planning staff); 3. that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; 4. that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; 5. that demolition for removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; 6. that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; 7. that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; 8. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 9. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, in effect at time of building permit submittal, as amended by the City of Burlingame; THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 10. that prior to scheduling the framing inspection the applicant shall provide a certification by the project architect or residential designer, or another architect or residential design professional, that demonstrates that the project falls at or below the maximum approved floor area ratio for the property; EXHIBIT “A” Conditions of Approval for Categorical Exemption, Design Review and Special Permits 2204 Hillside Drive Effective February 1, 2024 Page 2 11. that prior to scheduling the foundation inspection, a licensed surveyor shall locate the property corners, set the building footprint and certify the first-floor elevation of the new structure(s) based on the elevation at the top of the form boards per the approved plans; this survey shall be accepted by the City Engineer; 12. that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; 13. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; and 14. that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. 2204 Hillside Drive 300’ noticing APN: 027-165-080 Chiu Residence 01.15.24 1/8” = 1’-0” REFDblOvnW D REFARCHITECT MORRIS ARCHITECTURE LLC 12 COZZOLINO CT. MILLBRAE, CA 94030 T. 650.995.1360 RYAN@MORRIS-ARCH.COM STRUCTURAL ENGINEER MORRIS SHAFFER ENGINEERING 1300 INDUSTRIAL RD. SUITE 14 SAN CARLOS, CA 94070 T. 650.595.2973 PROJECT DIRECTORY GEOTECHNICAL ENGINEER: MICHELUCCI & ASSOCIATES, INC. 1801 MURCHISON DRIVE, SUITE 210 BURLINGAME, CA 94010 T. 650.692.0163 JOE@MICHELUCCI.COM TITLE 24 ENERGY & GREEN: A PLUS GREEN ENERGY SERVICES 41 C HANGAR WAY WATSONVILLE, CA 95076 T. 408.310.0081 REMOVAL OF EXISTING RESIDENCE. CONSTRUCTION OF NEW TWO STORY RESIDENCE, AND DETATCHED ADU PROJECT DESCRIPTION VICINITY MAP N GENERAL NOTES CODES THE WORK SHALL CONFORM TO THE CALIFORNIA TITLE 24: PART 2 2022 CALIFORNIA BUILDING CODE PART 2.5 2022 CALIFORNIA RESIDENTIAL CODE PART 3 2022 CALIFORNIA ELECTRICAL CODE PART 4 2022 CALIFORNIA MECHANICAL CODE PART 5 2022 CALIFORNIA PLUMBING CODE PART 6 2022 CALIFORNIA ENERGY CODE PART 9 2022 CALIFORNIA FIRE CODE PART 11 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE AND THE BURLINGAME MUNICIPAL CODE DRAWINGS 1. GENERAL CONDITIONS. THE STANDARD A.I.A. GENERAL CONDITIONS ARE HEREBY MADE A PART OF THESE DRAWINGS. 2. DIMENSIONS. WRITTEN DIMENSIONS SHALL GOVERN. DO NOT SCALE THE DRAWINGS. 3. DIMENSIONS. ALL DIMENSIONS ARE TO THE FACE OF STUD OR FACE OF CONCRETE, OR TO THE CENTERLINE OF GRIDS, COLUMNS, WINDOWS, DOORS, AND FIXTURES, UNLESS OTHERWISE NOTED. 4. DIMENSIONS. 'CLR' DENOTES MEASUREMENT FROM FINISH SURFACES, TYP. 5. COMPLETION. THESE DRAWINGS INCLUDE THE GENERAL EXTENT OF NEW CONSTRUCTION NECESSARY FOR THE WORK, BUT ARE NOT INTENDED TO BE ALL- INCLUSIVE. GENERAL CONTRACTOR'S RESPONSIBILITIES 6. PLANS ON SITE. THE GENERAL CONTRACTOR (HEREAFTER G.C.) SHALL MAINTAIN A CURRENT AND COMPLETE SET OF CONSTRUCTION DRAWINGS ON THE JOB SITE DURING ALL PHASES OF CONSTRUCTION FOR USE BY ALL TRADES AND SHALL PROVIDE ALL SUBCONTRACTORS WITH CURRENT CONSTRUCTION DRAWINGS. 7. DISCREPANCIES. THE G.C. IS RESPONSIBLE FOR THOROUGH REVIEW OF THESE DOCUMENTS AND EXISTING FIELD CONDITIONS PRIOR TO THE COMMENCEMENT OF ANY WORK. ANY ERRORS, OMISSIONS, OR CONFLICTS FOUND ARE TO BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ARCHITECT IN WRITING FOR CLARIFICATION. 8. SUBSTITUTIONS. THE G.C. IS REQUIRED TO NOTIFY ARCHITECT IN WRITING OF ANY SUBSTITUTION, REVISION OR PROPOSED ALTERNATE AT LEAST TWO WEEKS PRIOR TO THE ORDER OR INSTALLATION OF SAID ALTERNATE IN ORDER TO ALLOW FOR NECESSARY COORDINATION AND APPROVALS. 9. INSPECTIONS. THE G.C. IS RESPONSIBLE FOR THOROUGH REVIEW OF THE ARCHITECTURAL AND STRUCTURAL DRAWINGS, GEOTECHNICAL REPORT, AND THE ENERGY AND GREEN COMPLIANCE MANDATORY MEASURES AND IS RESPONSIBLE FOR SCHEDULING AND BEING PRESENT FOR ANY INSPECTIONS OR OBSERVATIONS REQUIRED. (MIN. 48 HOURS NOTICE FOR SITE VISITS) 10. SAFETY. THE G.C. SHALL BE SOLELY RESPONSIBLE FOR SAFETY ON THE JOB SITE AND ADHERE TO ALL FEDERAL, STATE, LOCAL AND OSHA SAFETY REGULATIONS. 11. DEFERRED SUBMITTALS. DEFERRED SUBMITTAL DOCUMENTATION SHALL BE SUBMITTED TO THE ARCHITECT OR ENGINEER OF RECORD WHO SHALL REVIEW THEM AND FORWARD THEM TO THE BUILDING OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE WITH THE DESIGN OF THE PROJECT. THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THEIR DESIGN AND SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING OFFICIAL. 12. WORKMANSHIP. ALL WORKMANSHIP IN ALL TRADES SHALL BE OF THE HIGHEST QUALITY, BY PERSONS ESPECIALLY SKILLED AT ASSIGNED TASKS, AND SHALL RESULT IN A NEAT AND CLEAN INSTALLATION. ALL WORK SHALL BE INSTALLED TRUE, PLUMB, LEVEL, SQUARE, AND IN PROPER ALIGNMENT. NOTIFY ARCHITECT AND OWNER OF EXISTING CONDITIONS WHICH DO NOT MEET THESE EXPECTATIONS. 13. MANUFACTURER'S REQUIREMENTS. THE G.C. SHALL INSTALL ALL MATERIALS, EQUIPMENT, AND FIXTURES IN CONFORMANCE WITH THE REQUIREMENTS OF THE MANUFACTURER. 14. BRACING AND SHORING. DESIGN AND INSTALLATION OF ALL TEMPORARY BRACING AND SHORING IS THE SOLE RESPONSIBILITY OF THE G.C. GENERAL NOTES 15. CAL GREEN. SEE SHEET GB.1 FOR CAL GREEN MANDATORY REQUIREMENTS 16. HERS VERIFICATION. SEE SHEET EN.1 FOR MANDATORY HERS VERIFICATION REQUIREMENTS 17. WILDLAND URBAN INTERFACE (WUI). SEE SHEETS A6.1, A8.1, A8.2 FOR ALL DETAILS AND NOTES REGARDING REQUIRED FIRE PROTECTION MEASURES OF BUILDING EXTERIOR PER CRC R337 AND CBC CHAPTER 7A PROJECT DATA APN #027165080 ZONE R1 OCCUPANCY GROUP R-3/U CONSTRUCTION TYPE V-B AUTOMATIC SPRINKLERS YES STORIES 2 SPECIAL HAZARD ZONES N/A SITE AREA 6000 SF FLOOR AREA -INTERIOR LOT WITH ATTACHED GARAGE: .32 x LOT AREA [6000] + 1,100 SF = 3020 SF LOCATION EXISTING PROPOSED GROUND FLOOR CONDITIONED AREA 391 SF ------SF FIRST FLOOR CONDITIONED AREA 1535 SF 1496 SF SECOND FLOOR CONDITIONED AREA ------SF 1202 SF ATTACHED GARAGE 417 SF 320 SF TOTAL 2343 SF 3018 SF SITE COVERAGE -MAX. ALLOWED (40%) = 2400 SF LOCATION EXISTING PROPOSED MAIN HOUSE FOOTPRINT 1535 SF 1816 SF FRONT PORCH 115 SF 63 SF REAR DECK -----SF 287 SF TOTAL 1650 SF 2166 SF DEFERRED SUBMITTALS 1. FIRE SPRINKLERS SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 13D AND STATE AND LOCAL REQUIREMENTS. SHOP DRAWINGS SHALL BE APPROVED BY THE FIRE DEPARTMENT PRIOR TO INSTALLATION. PROVIDE MIN. 1" WATER METER BACKFLOW PREVENTION DEVICE/DOUBLE CHECK VALVE ASSEMBLY, AND ALL SPRINKLER DRAINAGE SHALL BE PLACED INTO LANDSCAPE AREAS. 2. CONSTRUCTION WASTE MANAGEMENT PLAN ON SHEET GB.1 3. NEW 2.96?? KW MIN. PHOTOVOLTAIC SOLAR PANEL SYSTEM UNDER SEPARATE PERMIT PER SHEET EN.1 3. ROOF TRUSS DESIGN AND SHOP DRAWINGS UNDER DEFERRED SUBMITTAL PER STRUCTURAL PLANS 4. LANDSCAPE DESIGN FOUNDATION / SOILS (GEOTECH. REPORT) 1. THE ARCHITECT IS NOT RESPONSIBLE FOR THE ADEQUACY OF THE FOUNDING SOILS. THE FOUNDATION DESIGN IS PREPARED BY THE STRUCTURAL ENGINEER, AND BASED UPON A GEOTECHNICAL REPORT BY THE ABOVE LISTED GEOTECHNICAL ENGINEER. 2. SEE STRUCTURAL DRAWINGS, GEOTECHNICAL REPORT, AND/OR CIVIL DRAWINGS FOR ADDITIONAL CRITERIA REGARDING FOUNDATIONS, EXCAVATION, EARTHWORK, SITE PLACEMENT OF ANY CONCRETE, AND/OR DRAINAGE RECOMMENDATIONS 1ST FLR 1384 SF GARAGE 320 SF STAIR 112.00 SF CEILING + 9'-0" CEILING +11'-0" 2ND FLR 1090 SF STAIR 112.00 SF ADU 797 SF WEEKDAYS: 8:00 A.M. –7:00 P.M. SATURDAYS: 9:00 A.M. –6:00 P.M. SUNDAYS AND HOLIDAYS: NO WORK ALLOWED (SEE CITY OF BURLINGAME MUNICIPAL CODE, SECTION 18.07.110 FOR DETAILS.) (SEE CITY OF BURLINGAME MUNICIPAL CODE, SECTION 13.04.100 FOR DETAILS.) CONSTRUCTION HOURS IN THE CITY PUBLIC RIGHT-OF-WAY ARE LIMITED TO WEEKDAYS AND NON-CITY HOLIDAYS BETWEEN 8:00 A.M. AND 5:00 P.M. NOTE: CONSTRUCTION HOURS FOR WORK IN THE PUBLIC RIGHT OF WAY MUST NOW BE INCLUDED ON THE PLANS. CONSTRUCTION HOURS JOB NUMBER: PROJECT DATE: SHEET NUMBER:RR TRO HIT E G. ARC CM S OF RINAYACF LE S T TA O IREN. 06.30.25 NA ICELINSED C 33359 All drawings and written materials contained herein constitute the original and unpublished work of the Architect and the same may not be duplicated, used or disclosed without the written consent of the Architect 1/10/2024 5:48:39 PM A0.1 2128Chiu ResidenceTITLE SHEET 2204 Hillside DriveBurlingame, CA 94010# POUND(S) or NUMBER & AND (E) EXISTING (N) NEW (R) REMOVE < ANGLE @ AT A/V AUDIO/VISUAL AB ANCHOR BOLT ABV ABOVE ACOUS ACCOUSTICAL ACT ACCOUSTICAL CEILING TILE AD AREA DRAIN or ACCESS DOOR ADD ADDENDUM ADJ ADJACENT or ADJUSTABLE AFF ABOVE FINISHED FLOOR AGG AGGREGATE AHU AIR HANDLING UNIT ALT ALTERNATE ALUM ALUMINUM ANOD ANODIZED APPROX APPROXIMATE ARCH ARCHITECTURAL ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS ASPH ASPHALT AUTO AUTOMATIC AVE AVENUE AVG AVERAGE AWP ACOUSTICAL WALL PANEL B BASE B.O. BOTTOM OF B.O.F. BY OWNER, FUTURE BD BOARD BIT BITUMINOUS BLDG BUILDING BLKG BLOCKING BM BEAM or BENCH MARK BOT BOTTOM BRG BEARING BSMT BASEMENT C CAULKING C.L. CENTERLINE CAB CABINET CATV CABLE TELEVISION CCD CONSTRUCTION CHANGE DIRECTIVE CCTV CLOSED CIRCUIT TELEVISION CDOT COLORADO DEPARTMENT OF TRANSPORTATION CEM CEMENTITIOUS CFL COUNTERFLASHING CG CORNER GUARD CIP CAST IN PLACE CIRC CIRCUMFERENCE DRAWING INDEX SHEET NO.SHEET NAME ARCHITECTURE A0.1 TITLE SHEET LANDSCAPE L1.0 LANDSCAPE PLAN ARCHITECTURE A0.2 TOPOGRAPHICAL SURVEY A0.3 SITE PLAN / ROOF PLAN A1.1 BASEMENT DEMO PLAN A1.2 FIRST FLOOR DEMO PLAN A2.1 FIRST FLOOR PLAN A2.2 SECOND FLOOR PLAN A2.3 ADU FLOOR PLAN A3.1 EXTERIOR ELEVATIONS A3.2 EXTERIOR ELEVATIONS A3.3 EXTERIOR ELEVATIONS A3.4 EXTERIOR ELEVATIONS A3.5 ADU ELEVATIONS A3.6 BUILDING SECTIONS A9.1 3D VIEWS - PERSPECTIVE A9.2 3D VIEWS - ARIAL PROJECT ABBREVIATIONS N CJ CONTROL JOINT CLG CEILING CLOS CLOSET CLR CLEAR CM CENTIMETERS CMU CONCRETE MASONRY UNIT CO CHANGE ORDER or CLEANOUT COL COLUMN CONC CONCRETE CONF CONFERENCE CONN CONNECTION CONSTR CONSTRUCTION CONT CONTINUOUS CONTR CONTRACTOR CORR CORRIDOR or CORRUGATED CPT CARPET CT CERAMIC TILE CTR COUNTER CU CUBIC CY CUBIC YARD DAMP DAMPROOFING DBL DOUBLE DEG DEGREE DEMO DEMOLISH or DEMOLITION DEPT DEPARTMENT DF DRINKING FOUNTAIN DIA DIAMETER DIAG DIAGONAL DIM DIMENSION DISP DISPENSER DIV DIVISION DN DOWN DR DOOR DS DOWNSPOUT DTL DETAIL DWG DRAWING DWR DRAWER E EAST EA EACH EB EXPANSION BOLT ED EXHAUST DUCT EF EXHAUST FAN or EACH FACE EJ EXPANSION JOINT EL ELEVATION ELEC ELECTRICAL ELEV ELEVATOR EMER EMERGENCY ENGR ENGINEER EOS EDGE OF SLAB EQ EQUAL EQUIP EQUIPMENT ES EACH SIDE EST ESTIMATE EW EACH WAY EWC ELECTRIC WATER COOLER EWH ELECTRIC WATER HEATER EXT EXTERIOR F FARENHEIT FA FIRE ALARM FAC FIRE ALARM CABINET FACP FIRE ALARM CONTROL PANEL FBO FURNISHED BY OTHER(S) FD FLOOR DRAIN or FIRE DAMPER FDN FOUNDATION FE FIRE EXTINGUISHER FEC FIRE EXTINGUISHER CABINET FF FINISHED FLOOR FFL FINISHED FLOOR LINE FH FIRE HYDRANT FHC FIRE HOSE CABINET FHMS FLAT HEAD MACHINE SCREW FHV FIRE HOSE VALVE FHWS FLAT HEAD WOOD SCREW FIN FINISH(ED) FIXT FIXTURE FLG FLASHING FLR FLOOR(ING) FLUOR FLUORESCENT FOC FACE OF CONCRETE FOF FACE OF FINISH FOM FACE OF MASONRY FOS FACE OF STUD FR FIRE RESISTIVE or FIRE RATED FRP FIBERGLASS REINFORCED PANEL(ING) FRT FIRE RETARDANT TREATED FT FOOT (FEET) FTG FOOTING FURN FURNISH(ED) FURR FURRED or FURRING FUT FUTURE FVC FIRE VALVE CABINET GA GAUGE GALV GALVANIZED GB GRAB BAR GC GENERAL CONTRACTOR GCMU GLAZED CONCRETE MASONRY UNIT(S) GL GLASS or GLAZING GND GROUND GR GRADE GRT GROUT GWB GYPSUM WALLBOARD GYP GYPSUM GYP. BD. GYPSUM BOARD HAS HEADED ANCHOR STUD HB HOSE BIB HC HOLLOW CORE or HANDICAPPED HDAS HEADED DEFORMED ANCHOR STUD HDR HEADER HDWR HARDWARE HM HOLLOW METAL HORIZ HORIZONTAL HR HOUR HT HEIGHT HTR HEATER HVAC HEATING, VENTILATION and AIR CONDITIONING HW HOT WATER HWH HOT WATER HEATER HWY HIGHWAY IBC INTERNATIONAL BUILDING CODE ID INSIDE DIAMETER IN INCH(ES) INCAND INCANDESCENT INCL INCLUD(ED) INFO INFORMATION INSUL INSULATION or INSULATED INT INTERIOR INTMED INTERMEDIATE INV INVERT JC JANITOR CLOSET JST JOIST JT JOINT KD KNOCKDOWN KIT KITCHEN KO KNOCKOUT KP KICK PLATE LAB LABORATORY LAM LAMINATE LAV LAVATORY LBL LABEL LDR LEADER LH LEFT HAND LKR LOCKER LP LIGHTING PANEL or LIGHT PROOF LT LIGHT LTL LINTEL LVR LOUVER MACH MACHINERY MAG MAGNETIC MAS MASONRY MATL MATERIAL MAX MAXIMUM MB MOISTURE BARRIER MECH MECHANICAL MED MEDIUM MEMB MEMBRANE MEP MECHANICAL, ELECTRICAL and PLUMBING MEZZ MEZZANINE MFR MANUFACTURER MH MANHOLE MIN MINIMUM MIRR MIRROR MISC MISCELLANEOUS MM MILLIMETERS MO MASONRY OPENING MTD MOUNT(ED) MTL METAL MUL MULLION N NORTH NIC NOT IN CONTRACT NO NUMBER NOM NOMINAL NRC NOISE REDUCTION COEFFICIENT NTS NOT TO SCALE OA OVERALL OC ON CENTER OD OUTSIDE DIAMETER OF OUTSIDE FACE OFF OFFICE OH OPPOSITE HAND OPNG OPENING OPP OPPOSITE OTO OUTSIDE-TO-OUTSIDE P PAINT(ED) P/L PROPERTY LINE PAC PREVIOUSLY AWARDED CONTRACT PAR PARALLEL PBO PROVIDED BY OTHERS PC PRECAST PERF PERFORATED PERIM PERIMETER PKG PARKING PL PLATE PLAM PLASTIC LAMINATE PLAS PLASTER PLBG PLUMBING PLY PLYWOOD PNL PANEL POL POLISHED PR PAIR or PROPOSAL REQUEST PREFAB PREFABRICATED PREFIN PREFINISHED PRESTR PRESTRESSED PRIM PRIMARY PROJ PROJECT PSF POUNDS PER SQUARE FOOT PSI POUNDS PER SQUARE INCH PT POST TENSIONED or PORCELAIN TILE PTD PAINTED PTDR PAPER TOWEL DISPENSER AND RECEPTACLE PTN PARTITION PTR PAPER TOWEL RECEPTACLE PVC POLYVINYL CHLORIDE PVMT PAVEMENT QT QUARRY TILE QTY QUANTITY R RISER RAD RADIUS RB RUBBER BASE RBC RUBBER BASE COVE RBS RUBBER BASE STRAIGHT RBT RUBBER TILE RD ROOF DRAIN or ROAD RE REFER TO or REFERENCE REC RECESS(ED) RECPT RECEPTACLE REF REFRIGERATOR or REFRIGERATED REINF REINFORCED REQD REQUIRED RESIL RESILIENT REV REVISE, REVISED or REVISION(S) RF RESILIENT FLOORING RFG ROOFING RFL REFLECTED RH RIGHT HAND RL RAIN LEADER RM ROOM RO ROUGH OPENING ROD ROOF OVERFLOW DRAIN ROW RIGHT OF WAY RPM REVOLUTIONS PER MINUTE RVS REVERSE (SIDE) RWC RAIN WATER CONDUCTOR S SOUTH or SEALED SC SOLID CORE SCHED SCHEDULE SD SOAP DISPENSER SEC SECTION SF SQUARE FEET SHT SHEET SHTG SHEATHING SHWR SHOWER SIM SIMILAR SOFF SOFFIT SPECS SPECIFICATION(S) SPKL SPRINKLER SPKR SPEAKER SPRT SUPPORT SQ SQUARE SR SINK RECEPTACLE SS STAINLESS STEEL SSK SERVICE SINK STA STATION STD STANDARD STL STEEL STOR STORAGE STRUCT STRUCTURE or STRUCTURAL SUSP SUSPEND(ED) SYM SYMMETRICAL SYS SYSTEM T TREAD T&B TOP AND BOTTOM T&G TONGUE AND GROOVE TBC TOP OF BACK OF CURB TELE TELEPHONE TEMP TEMPORARY or TEMPERATURE TG TEMPERED GLASS THERM THERMOSTAT THK THICK or THICKNESS THLD THRESHOLD TO TOP OF TOC TOP OF CONCRETE TOS TOP OF STEEL TOW TOP OF WALL TPD TOILET PAPER DISPENSER TPTN TOILET PARTITION TS TUBE STEEL TV TELEVISION TYP TYPICAL UL UNDERWRITER'S LABORATORY UNFIN UNFINISHED UON UNLESS OTHERWISE NOTED UR. URINAL USGS U.S. GEOLOGICAL SURVEY V VOLT VAR VARY or VARIES VB VAPOR BARRIER VCT VINYL COMPOSITION TILE VENT VENTILATION VER VERIFY VERT VERTICAL VEST VESTIBULE VIF VERIFY IN FIELD VIN VINYL or SHEET VINYL VOL VOLUME VTR VENT THROUGH ROOF VWC VINYL WALL COVERING W WEST or WIDE W.O. WHERE OCCURS W/ WITH W/C WATER CLOSET W/O WITHOUT W/R WATER RESISTANT WC WALL COVERING WD WOOD WDO WINDOW WF. WIDE FLANGE or WOOD FLOORING WGL WIRE GLASS WP WATERPROOF(ING) WPT WORKING POINT WSCT WAINSCOT WT WEIGHT WWF WELDED WIRE FABRIC YD YARD 1/8" = 1'-0"2 1ST FLR FAR PLAN 1/8" = 1'-0"3 2ND FLR FAR PLAN FAR SCHEDULE Name Area GARAGE 320 SF ADU 797 SF 1ST FLOOR 1,496 SF 2ND FLOOR 1,202 SF 3,815 SF 1/8" = 1'-0"1 ADU FAR PLAN REVISION DATE 0 DD PROGRESS 8.16.23 1 PLANNING COMMISSION 11.13.23 2 PLANNING COMMISSION 2 01.10.24 REF REF DblOvn UPOPENTOABOVEW W W W WM WMPAPAPAPAPAPAPAPAPAPAPARESIDENCEENTRYGARAGEADULOUNGE AREAHOUSETERRACE10'-0" WIDE ALLEYH-101H-102H-103S-101E-108S-201UNDERGROUNDDETENTIONBASIN(PER CIVILENGINEER)(1) CER OCC24" BOX MULTI.(1) ACE CIR24" BOX MULTI.(1) ACE CIR24" BOX MULTI.S-201D-110E-108TP-101TP-102TP-103TP-104TP-105TP-106TP-107TP-108TP-109TP-110TP-111H-105H-105H-102H-105H-1022204 HILLSIDEDRIVEBURLINGAME, CAPLANNINGPERMIT SET12345678911.06.23PLANNING COMM08.03.2023 23-09JCAWLANDSCAPE PLANL1.011.06.2023SHEET TITLESHEET NUMBERDATEPROJECT NO.DRAWN BYCHECKED BYREVISIONSNO.DATE DESCRIPTIONCEARASTUDIOLandscape ArchitectureSan Francisco, California415.317.7962SUBMITTAL TITLESIGNATURERENEWAL DATEDATE06.30.25L ICENS ED L A NDSCAPE ARCHITECTAMY W OL FF NO. 5700STATE OF CALI F O RNIAN01/8" = 1'-0"4 816SITE COVERAGECALCULATIONSDESCRIPTIONPROVIDEDTOTAL LOT SIZE6,000 SF (100%)MAIN HOUSE FOOTPRINT1,816 SF (30%)ADU FOOTPRINT797 SF (13%)REAR DECK474 SF (8%)VEHICULAR PAVING397 SF (7%)PEDESTRIAN PAVING661 SF (11%)TOTAL SITE COVERAGE4,145 SF (69%)LANDSCAPE PLAN LEGENDSYMBOLDESCRIPTIONPROPERTY LINESETBACKSEASEMENTEXISTING CONTOURSNOSE OF STAIRPAPLANTING AREAEXISTING TREES TO BE REMOVEDEXISTING TREESMATERIAL REFERENCE NUMBERXXTREESCODE BOTANICAL NAMECOMMON NAME SIZEQTY REMARKSACE CIR ACER CIRCINATUM VINE MAPLE24" BOX MULTI. 2CER OCC CERCIS OCCIDENTALIS WESTERN REDBUD 24" BOX MULTI. 1GROUND COVERS CODE BOTANICAL NAMECOMMON NAME SIZEQTYREMARKSTUR BOL TURF SOD BOLERO PLUS FESCUE BLEND SOD673 SFPLANT SCHEDULECODEDESCRIPTION STATUSLOCATION SCIENTIFIC NAMECOMMON NAMEDBH (IN)ACTIONTP-101TREE 1NON PROTECTED REAR YARD PITTOSPORUM UNDULATUM VICTORIAN BOX5REMOVETP-102TREE 2NON PROTECTED REAR YARDUNIDENTIFIABLEDEAD TREE TRUNK 20REMOVETP-103TREE 3NON PROTECTEDREAR YARDPITTOSPORUM UNDULATUM VICTORIAN BOX6REMOVETP-104TREE 4NON PROTECTED REAR YARD PITTOSPORUM UNDULATUM VICTORIAN BOX5REMOVETP-105TREE 5NON PROTECTED REAR YARD PITTOSPORUM UNDULATUM VICTORIAN BOX 7REMOVETP-106TREE 6NON PROTECTED REAR YARD PITTOSPORUM UNDULATUM VICTORIAN BOX5REMOVETP-107TREE 7NON PROTECTED REAR YARD PITTOSPORUM UNDULATUM VICTORIAN BOX5REMOVETP-108TREE 8NON PROTECTED REAR YARD PITTOSPORUM UNDULATUM VICTORIAN BOX6REMOVETP-109TREE 9NON PROTECTED REAR YARD PITTOSPORUM UNDULATUM VICTORIAN BOX5REMOVETP-110TREE 10NON PROTECTED REAR YARD PITTOSPORUM UNDULATUM VICTORIAN BOX5REMOVETP-111TREE 11NON PROTECTED FRONT YARD ACER JAPONICUM SPP.JAPANESE MAPLE5TRANSPLANTTREE PROTECTION/REMOVALSDEMOLITIONCODEDESCRIPTIOND-110REMOVE FENCEEXISTINGCODEDESCRIPTIONE-108EXISTING FENCE TO REMAINPAVINGCODEDESCRIPTIONLOCATION MATERIALSIZE (L X W X H)H-101VEHICULAR PAVINGDRIVEWAY CONCRETE PER PLANH-102PEDESTRIAN PAVINGFRONT YARD STONE PER PLANH-103WOOD DECKING AND STAIRS REAR YARD WOOD PER PLANH-105STEP PADSREAR YARDCONCRETEPER PLANFENCESCODEDESCRIPTIONLOCATION MATERIAL SIZES-101FENCEREAR YARD WOOD 6`-0" HIGHGATESCODEDESCRIPTIONLOCATION MATERIAL SIZES-201GATEREAR YARDWOOD 6`-0" HIGHREFERENCE NOTES SCHEDULENOTESPUBLIC WORKS ENGINEERING1. THE REPLACEMENT OF ALL CURB, GUTTER, DRIVEWAY ANDSIDEWALK FRONTING THE SITE SHALL BE INSTALLED PER CITYSTANDARD PROCEDURES AND SPECIFICATIONS. ALL EXISTINGUNUSED SANITARY SEWER LATERAL CONNECTIONS SHALL BEPLUGGED AND A 4" NEW LATERAL AND WYE TO MAIN AND WATERLINE CONNECTIONS TO CITY WATER MAINS FOR SERVICE OR FIRELINE SHALL BE INSTALLED.2. ALL DOWNSPOUTS FOR THE ENTIRE ROOF ARE TO BE DIRECTEDAWAY FROM THE HOUSE. SLOPE THE FINISH GRADE A MINIMUM OF2% AWAY FROM THE HOUSE AND PROPERTY LINE.3. DETENTION BASIN WILL BE SIZED FOR A 10-YEAR STORM EVENT.STORMWATER1. SITE DESIGN MEASURE: DIRECT ROOF RUNOFF ONTO VEGETATEDAREAS.PLANNINGCOMM.. A0.2 DN SITE PLAN NOTES: 1. GENERAL NOTES. SEE SHEETS A0.1, AND FLOOR PLANS FOR ADDITIONAL INFO. 2. BOUNDARY VERIFICATION. THE G.C. SHALL VERIFY THE LOCATIONS OF ALL PROPERTY BOUNDARIES, SETBACKS, AND EASEMENT LOCATIONS PRIOR TO CONSTRUCTION. ANY DISCREPANCIES SHOULD BE BROUGHT TO THE ATTENTION OF THE ARCHITECT BEFORE FURTHER COMMENCEMENT OF WORK. 3. ENCROACHMENT. THE G.C. IS RESPONSIBLE FOR OBTAINING APPROVAL / PERMIT PRIOR TO COMMENCING ANY WORK WITHIN THE PUBLIC RIGHT-OF- WAY. 4. UTILITIES. THE G.C. SHALL LOCATE ALL UTILITIES PRIOR TO ANY EXCAVATION, GRADING, OR TRENCHING. 5. UTILITIES. SEE ELECTRICAL PLAN SHEET E2.1 FOR EXACT LOCATIONS OF MAIN ELECTRIC METER AND GAS METER. COORDINATE FINAL LOCATION AND ROUTING WITH G.C. AND UTILITY SERVICE PROVIDER. 6. UTILITIES. THE G.C. SHALL COORDINATE THE LOCATION OF IRRIGATION VALVE BOXES WITH OWNER. 7. TREE PROTECTION. THE G.C. SHALL PROTECT EXISTING TREES FROM DAMAGE DURING CONSTRUCTION AND PROVIDE TREE PROTECTION PER LOCAL JURISDICTION REQUIREMENTS. LARGE ROOTS OR LARGE MASSES OF ROOTS TO BE CUT SHOULD BE INSPECTED BY A CERTIFIED ARBORIST PRIOR TO CUTTING. ANY ROOTS TO BE CUT SHALL BE MONITORED AND DOCUMENTED. ROOTS TO BE CUT SHOULD BE SEVERED CLEANLY WITH A SAW OR TOPPERS. 8. SLOPED GRADE. FINISH GRADE AROUND BUILDING TO HAVE A MIN. 5% SLOPE AT GRADE AWAY FROM BUILDING (2% SLOPE AT PAVING), FOR A MIN. OF 5' AROUND BUILDING. 9. FOOTING DEPTH. (N) FOUNDATION FOOTINGS SHALL BEAR ON NATIVE, UNDISTURBED SOIL, SEE GEOTECH. REPORT AND STRUCTURAL DRAWINGS FOR ADDITIONAL INFO. 10. ADDRESS. STREET ADDRESS NUMERALS TO BE AT LEAST 4" HIGH WITH A MINIMUM 1/2" STROKE, MOUNTED ON A CONTRASTING BACKGROUND CLEARLY VISIBLE FROM THE STREET. ADDRESS NUMBERS SHALL BE AT LEAST SIX FEET ABOVE THE FINISHED SURFACE OF THE DRIVEWAY. CRC R1004 11. CHIMNEYS. THE INSTALLATION OF AN APPROVED SPARK ARRESTOR IS REQURIED ON ALL CHIMNEYS, EXISTING AND NEW. SPARK ARRESTORS SHALL BE CONSTRUCTED OF WOVEN OR WELDED WIRE SCREENING OF 12 GAUGE USA STANDARD WIRE HAVING OPENINGS NOT EXCEEDING 1/2". 12. THE REPLACE ALL CURB, GUTTER, DRIVEWAY AND SIDEWALK FRONTING SITE, PLUG ALL EXISTING SANITARY SEWER LATERAL CONNECTIONS AND INSTALL A NEW 4" LATERAL AND WYE TO MAIN, ALL WATER LINE CONNECTIONS TO CITY WATER MAINS FOR SERVICES OR FIRE LINE ARE TO BE INSTALLED PER CITY STANDARD PROCEDURES AND SPECIFICATION, AND ANY OTHER UNDERGROUND UTILITY WORKS WITHIN CITY’S RIGHT-OF- WAY. ALL ABANDONED SEWER LATERAL OR WATER SERVICE SHALL BE DISCONNECTED AT THE MAIN AND PER CITY REQUIREMENTS. A3.42 A3.2 2 A3.3 2 A3.1 2 A3.1 1 A3.3 1 A3.41 A3.2 1 PROPERTY LINEPROPERTY LINE PROPERTY LINE 2208 HILLSIDE DRHILLSIDE DRIVE PROPERTY LINE2200 HILLSIDE DRA3.5 1 A3.54 A3.5 2 A3.5 3 S.33 S.32 S.45 S.47 S.32 S.32S.32 S.02 S.02[2ND FLR.] S.36 S.36 19' - 3"2" / 12"0.50' ADU SETBACK1.00' ADU SETBACK 3.00' ADU SETBACK27.27' SEPARATION DIST.SETBACK 4.00' [N] SETBACK 4.00' [N] SETBACK20.67' [N] FLR SETBACK 8.50' 2ND FLR SETBACK 8.50' 2ND 2.00'6.60'4.27'4.50'1.50' S.32 S.23S.23S.23 S.23S.23 S.25 S.29 S.31 S.29 S.07 S.29 S.33 S.12 S.13 S.13 S.09BLOCK AVG FRONT SETBACK20.67'S.32 A3.42 A3.2 2 A3.3 2 A3.1 2 A3.1 1 A3.3 1 A3.41 A3.2 1 PROPERTY LINEPROPERTY LINE PROPERTY LINE 2208 HILLSIDE DRHILLSIDE DRIVE PROPERTY LINE2200 HILLSIDE DRS.01 S.02 S.04 S.06 S.10 S.07 S.09 S.25S.26 S.29 S.28 S.28 S.29 S.33 S.12 S.40 S.42 S.29 S.31 S.31 S.12 S.33 S.34 S.28 S.34S.34S.34 S.35 S.34S.344" / 12"4" / 12"4" / 12"4" / 12" 16' - 1" 16' - 1"SETBACK15.00' [E] FRONT 47.54' [E] REAR SETBACKSETBACK 9.25' [E] SETBACK 6.51' [E] 4.00'4.00'20.67'15.00'S.52 S.21BLOCK AVG FRONT SETBACK20.67'2200 BLOCK OF HILLSIDE DRIVE [5 LOTS/HOUSES] 1. 2200 HILLSIDE [CORNER] -17’-5”-EXCLUDED 2. 2204* HILLSIDE -15’-0”-[CLOSEST] -EXCLUDED 3. 2208 HILLSIDE -21’-5”-[FARTHEST] -EXCLUDED 4. 2212 HILLSIDE -20’-8”-BLOCK AVERAGE 5. 1400 COLUMBUS [CORNER] -22’-7”-EXCLUDED NOTE: MEASUREMENTS TAKEN FROM FRONT PROPERTY LINE TO THE NEAREST WALL OR COVERED PROJECTION OF ANY EXISTING STRUCTURE. BLOCK AVG FRONT SETBACK CALCS JOB NUMBER: PROJECT DATE: SHEET NUMBER:RR TRO HIT E G. ARC CM S OF RINAYACF LE S T TA O IREN. 06.30.25 NA ICELINSED C 33359 All drawings and written materials contained herein constitute the original and unpublished work of the Architect and the same may not be duplicated, used or disclosed without the written consent of the Architect 1/10/2024 5:48:41 PM A0.3 2128Chiu ResidenceSITE PLAN / ROOF PLAN2204 Hillside DriveBurlingame, CA 94010NSite Plan Keynote Legend #DESCRIPTION S.01 [E] PROPERTY LINE S.02 [E] REQUIRED ZONING SETBACK LINE S.04 FOOTPRINT / OUTLINE OF WALL BELOW S.06 [E] ELECTRICAL METER, G.C. TO VERIFY S.07 [E] WATER SERVICE, G.C. TO VERIFY CAPACITY S.09 SEWER CLEANOUT, G.C. TO VERIFY LOCATION S.10 [E] GAS METER, G.C. TO VERIFY LOCATION & CAPACITY S.12 [E] IRRIGATION SYSTEM, G.C. TO VERIFY LOCATIONS S.13 REMOVE AND REPLACE ALL UNDERGROUND UTILITY CONNECTIONS. PLUG ALL [E] SANITARY SEWER CONNECTIONS AND INSTALL [N] 4" LATERAL & WYE TO MAIN, ALL WATER LINE CONNECTIONS TO CITY WATER MAINS FOR SERVICES OR FIRE LINE ARE TO BE INSTALLED PER CITY STANDARD PROCEDURES AND SPECS. ALL ABANDONED SEWER LATERAL OR WATER SERVICE SHALL BE DISCONNECTED AT THE MAIN AND PER CITY REQUIREMENTS. S.21 [E] CONCR. CURB S.23 [N] CURB & GUTTER. GC TO REPLACE all CURB, GUTTER, DRIVEWAY AND SIDEWALK FRONTING SITE, TYP. S.25 [E] CONCRETE DRIVEWAY S.26 [E] CONCRETE WALKWAY S.28 [E] PLANTING AREA S.29 [E] LAWN S.31 [E] PLANTER S.32 [N] PLANTING AREA S.33 [E] TREE TO REMAIN S.34 [E] TREE TO BE REMOVED S.35 [E] 6' TALL WOOD FENCE S.36 [N] 6' TALL WOOD FENCE S.40 [E] TRELLIS S.42 [E] PATIO S.45 [N] DECK S.47 [N] STEPS, S.S.D. COORDINATE LOCATION W/OWNER IN FIELD S.52 [E] CHIMNEY N 1/8" = 1'-0"1 PRPOSED SITE PLAN 1/8" = 1'-0"2 EXISTING SITE PLAN REVISION DATE 0 DD PROGRESS 8.16.23 1 PLANNING COMMISSION 11.13.23 2 PLANNING COMMISSION 2 01.10.24 WH WDBATH +8'-0" CEILING GARAGE +8'-0" CEILING STORAGE +8'-0" CEILING CRAWLSPACE +6'-0" CEILING 25'-10 1/4"23'-7 1/4"49'-5 1/2"34'-3"33'-8 1/4"15'-9 1/4"49'-5 1/2"13.04' CLR 22.69' CLR[E] WALL TO BE REMOVED WALL LEGEND: DEMOLITION NOTES: 1. GENERAL NOTES. SEE SHEETS A0.1 AND FLOOR PLANS FOR ADDITIONAL INFO. 2. SITE MEETING. PRIOR TO DEMOLITION, THE G.C. SHALL CONDUCT A PRE- DEMOLITION SITE MEETING TO SCHEDULE THE WORK WITH THE OWNER, ARCHITECT, CONSULTANTS, AND SUBCONTRACTORS. 3. PROTECTION. THE G.C. SHALL VERIFY ALL EXISTING FEATURES AND FINISHES TO REMAIN PRIOR TO DEMOLITION, AND VERIFY WITH OWNERS WHETHER REMOVED OR UNUSED PRODUCTS AND MATERIALS SHOULD BE SAVED OR DISCARDED. 4. PROTECTION. THE G.C. SHALL TAKE ALL NECESSARY MEASURES TO PREVENT DAMAGE AND SETTLEMENT, AND PROTECT EXISTING BUILDING, APPLIANCES, AND FURNISHINGS DURING DEMOLITION. ANY DAMAGES TO THESE ITEMS SHALL BE PROPTLY RESTORED, REPAIRED, OR REPLACED AT NO COST TO THE OWNER. 5. PROTECTION. THE G.C. SHALL PROVIDE ALL NECESSARY TEMPORARY ENCLOSURES, COVERINGS, AND GUARDS TO ADEQUATELY PROTECT PERSONS FROM POSSIBLE INJURY. 6. ENCROACHMENT. THE G.C. SHALL CONDUCT DEMOLITION OPERATIONS AND REMOVAL OF DEBRIS TO ENSURE MINIMUM INTERFERENCE WITH STREETS, WALKS OR OTHER OCCUPIED OR USED FACILITIES. DO NOT LOSE OR OBSTRUCT STREETS, WALKS OR OTHER OCCUPIED OR USED FACILITIES WITHOUT PERMISSION FROM AUTHORITIES HAVING JURISDICTION. 7. DISPOSAL. THE G.C. SHALL BE RESPONSIBLE FOR REMOVAL AND LEGAL DISPOSAL OF ALL CONSTRUCTION DEBRIS AND OTHER ASSOCIATEDMATERIALS FROM THE STRUCTURE AND THE SITE. 8. ELECTRICAL. ALL UNUSED AND DEMOLISHED ELECTRICAL IS TO BE REMOVED BACK TO THE NEAREST UTILIZED JUNCTION. 9. CONTAINMENT. THE G.C. SHALL PROVIDE COVERINGS AND THE LIKE FOR CONFINING DUST AND DEBRIS TO AREAS OF THE BUILDING IN WHICH DEMOLITION AND/OR ALTERATIONS ARE BEING PERFORMED. 10. REPAIRS. ALL PATCHING, REPAIRING, AND REPLACING OF MATERIALS AND SURFACES CUT OR DAMAGED DURING EXECUTION OF WORK SHALL BE EQUAL TO OR BETTER THAN THEIR ORIGINAL CONDITION. 11. SECURITY. THE G.C. SHALL MAINTAIN BUILDING SECURITY AT ALL TIMES. [E] WALL JOB NUMBER: PROJECT DATE: SHEET NUMBER:RR TRO HIT E G. ARC CM S OF RINAYACF LE S T TA O IREN. 06.30.25 NA ICELINSED C 33359 All drawings and written materials contained herein constitute the original and unpublished work of the Architect and the same may not be duplicated, used or disclosed without the written consent of the Architect 1/10/2024 5:48:41 PM A1.1 2128Chiu ResidenceBASEMENT DEMO PLAN2204 Hillside DriveBurlingame, CA 940101/4" = 1'-0"1 BASEMENT DEMOLITION PLAN Demo Keynote Legend #DESCRIPTION N REVISION DATE 0 DD PROGRESS 8.16.23 1 PLANNING COMMISSION 11.13.23 2 PLANNING COMMISSION 2 01.10.24 REFBEDROOM 1 +8'-0" CEILING BEDROOM 2 +8'-0" CEILING LIVING ROOM +8'-0" CEILING KITCHEN +8'-0" CEILING BEDROOM 3 +8'-0" CEILING DINING ROOM +8'-0" CEILING 34'-3"23'-7 1/4"25'-10 1/4"2'-2 1/4"51'-7 3/4"33'-8 1/4"16'-0 1/4"49'-8 1/2"1'-6"12'-5 3/4"10'-6 1/2"4'-0 1/2" 28'-6 3/4" [E] WALL TO BE REMOVED WALL LEGEND: DEMOLITION NOTES: 1. GENERAL NOTES. SEE SHEETS A0.1 AND FLOOR PLANS FOR ADDITIONAL INFO. 2. SITE MEETING. PRIOR TO DEMOLITION, THE G.C. SHALL CONDUCT A PRE- DEMOLITION SITE MEETING TO SCHEDULE THE WORK WITH THE OWNER, ARCHITECT, CONSULTANTS, AND SUBCONTRACTORS. 3. PROTECTION. THE G.C. SHALL VERIFY ALL EXISTING FEATURES AND FINISHES TO REMAIN PRIOR TO DEMOLITION, AND VERIFY WITH OWNERS WHETHER REMOVED OR UNUSED PRODUCTS AND MATERIALS SHOULD BE SAVED OR DISCARDED. 4. PROTECTION. THE G.C. SHALL TAKE ALL NECESSARY MEASURES TO PREVENT DAMAGE AND SETTLEMENT, AND PROTECT EXISTING BUILDING, APPLIANCES, AND FURNISHINGS DURING DEMOLITION. ANY DAMAGES TO THESE ITEMS SHALL BE PROPTLY RESTORED, REPAIRED, OR REPLACED AT NO COST TO THE OWNER. 5. PROTECTION. THE G.C. SHALL PROVIDE ALL NECESSARY TEMPORARY ENCLOSURES, COVERINGS, AND GUARDS TO ADEQUATELY PROTECT PERSONS FROM POSSIBLE INJURY. 6. ENCROACHMENT. THE G.C. SHALL CONDUCT DEMOLITION OPERATIONS AND REMOVAL OF DEBRIS TO ENSURE MINIMUM INTERFERENCE WITH STREETS, WALKS OR OTHER OCCUPIED OR USED FACILITIES. DO NOT LOSE OR OBSTRUCT STREETS, WALKS OR OTHER OCCUPIED OR USED FACILITIES WITHOUT PERMISSION FROM AUTHORITIES HAVING JURISDICTION. 7. DISPOSAL. THE G.C. SHALL BE RESPONSIBLE FOR REMOVAL AND LEGAL DISPOSAL OF ALL CONSTRUCTION DEBRIS AND OTHER ASSOCIATEDMATERIALS FROM THE STRUCTURE AND THE SITE. 8. ELECTRICAL. ALL UNUSED AND DEMOLISHED ELECTRICAL IS TO BE REMOVED BACK TO THE NEAREST UTILIZED JUNCTION. 9. CONTAINMENT. THE G.C. SHALL PROVIDE COVERINGS AND THE LIKE FOR CONFINING DUST AND DEBRIS TO AREAS OF THE BUILDING IN WHICH DEMOLITION AND/OR ALTERATIONS ARE BEING PERFORMED. 10. REPAIRS. ALL PATCHING, REPAIRING, AND REPLACING OF MATERIALS AND SURFACES CUT OR DAMAGED DURING EXECUTION OF WORK SHALL BE EQUAL TO OR BETTER THAN THEIR ORIGINAL CONDITION. 11. SECURITY. THE G.C. SHALL MAINTAIN BUILDING SECURITY AT ALL TIMES. [E] WALL JOB NUMBER: PROJECT DATE: SHEET NUMBER:RR TRO HIT E G. ARC CM S OF RINAYACF LE S T TA O IREN. 06.30.25 NA ICELINSED C 33359 All drawings and written materials contained herein constitute the original and unpublished work of the Architect and the same may not be duplicated, used or disclosed without the written consent of the Architect 1/10/2024 5:48:42 PM A1.2 2128Chiu ResidenceFIRST FLOOR DEMO PLAN2204 Hillside DriveBurlingame, CA 940101/4" = 1'-0"1 FIRST FLOOR DEMOLITION PLAN Demo Keynote Legend #DESCRIPTION N REVISION DATE 0 DD PROGRESS 8.16.23 1 PLANNING COMMISSION 11.13.23 2 PLANNING COMMISSION 2 01.10.24 REFDblOvnUP WALL LEGEND: FLOOR PLAN NOTES: 1. UNDERSTAIR SPACES. ENCLOSED ACCESSIBLE SPACE UNDER STAIRS SHALL HAVE WALLS, UNDERSTAIR SURFACE, AND ANY SOFFITS PROTECTED ON THE ENCLOSED SIDE WITH 1/2" GYP. BD. CRC 302.7 2. DRAFTSTOPS. SHALL BE INSTALLED IN FLOOR/ CEILING ASSEMBLIES WHERE THERE IS A USABLE SPACE ABOVE AND BELOW THE CONCEALED SPACE OF A FLOOR/CEILING ASSEMBLY. DRAFT STOPS SHALL BE INSTALLED SO THAT THE AREA OF THE CONCEALED SPACE DOES NOT EXCEED 1,000 SQUARE FEET AND IS DIVIDED INTO APPROXIMATELY EQUAL AREAS. CRC R302.12 3. SHOWERS. SHOWER AND TUB/SHOWER WALLS SHALL HAVE A NONABSORBENT SURFACE MIN. 72" ABOVE THE FLOOR, INSTALLED OVER FIBER-CEMENT BACKER BD. WATER-RESISTANT GYPSUM BACKING BOARD MAY NOT BE USED. CRC R307.2, R702.4 4. INTERIOR WATERPROOFING. AT ALL LOCATIONS SUBJECT TO EXPOSURE TO WATER, G.C. TO PROVIDE WATERPROOF MEMBRANE OVER HORIZONTAL AREAS AND UP WALLS 6" MIN ABOVE FINISH. 5. CONCEALED WORK. MAINTAIN RECORD DRAWINGS, SPECIFICATIONS, AND PHOTOS OF CONCEALED WORK. 6. FRAMING. ALL NEW EXTERIOR WALLS TO BE 2X4 WD. STUDS AT 16" O.C., TYP. UNLESS OTHERWISE NOTED. ALL NEW INTERIOR WALLS TO BE 2X4 WD. STUDS AT 16" O.C., TYP. UNLESS OTHERWISE NOTED. S.S.D. 7. ROUGH OPENINGS. CONTRACTOR TO VERIFY ROUGH OPENINGS SHOWN ON PLAN OR SCHEDULES WITH REQUIREMENTS OF UNITS TO BE INSTALLED PRIOR TO FRAMING OPENINGS. 8. ATTIC ACCESS. PROVIDE MIN 22" X 30" ACCESS OPENING TO ATTICS GREATER THAN 30 SF AND WITH 30" MIN HEADROOM. THRU WALL ACCESS OPENING SHALL BE MIN 22" WIDE X 30" TALL. 9. CAL GREEN. SEE SHEET GB.1 FOR CAL GREEN MANDATORY REQUIREMENTS [E] WALL TO BE REMOVED [E] WALL [E] / [N] 1 HR. RATED WALL [E] / [N] 2X6 WALL INSULATION NOTES: 1. SEE TITLE 24 ENERGY REPORT FOR REQUIRED INSULATION VALUES. 2. INSULATION SHALL CONFORM TO FLAME-SPREAD RATING AND SMOKE DENSITY REQUIREMENTS OF CRC R302.10 3. AFTER INSTALLING INSULATION, THE INSTALLER SHALL POST AN INSULATION CERTIFICATE, SIGNED BY THE INSTALLER AND THE BUILDER, IN A CONSPICUOUS LOCATION IN THE BUILDING, STATING THAT THE INSTALLATION CONFORMS WITH THE REQUIREMENTS OF TITLE 24, PART 2, CH. 2-53 OF THE CALIFORNIA ADMINISTRATIVE CODE FOUNDATION & CONCRETE NOTES: 1. UNDERFLOOR ACCESS. PROVIDE MIN. OF 18"X24" THRU FLOOR OR 16"X24" THRU WALL ACCESS TO UNDER FLOOR AREAS. CRC R408.4 2. UNDER FLOOR ACCESS. FOR AN APPLIANCE IN AN UNDER FLOOR AREA, PROVIDE MIN. 22" X 30" ACCESS OR MIN. REQUIRED BY APPLIANCE. CMC 904.10 3. CRAWL SPACE. PROVIDE 18" TALL MIN. ACCESS PATHWAY THROUGH UNDER FLOOR AREA, INCLUDING UNDER DUCTS. CMC 603.1. FLOOR JOISTS OR FLOORS WITHOUT JOISTS WITH LESS THAN 18" CLR. TO EXPOSED GROUND SHALL BE PRESSURE TREATED. GIRDERS WITH LESS THAN 12" CLR. SHALL BE P.T. CBC 2304.11.2.1. 4. PRESSURE TREATED. EXTERIOR WOOD FRAMING & SHEATHING RESTING ON FOUNDATIONS AND LESS THAN 8" FROM EARTH OR 2" FROM PAVING SHALL BE P.T. CBC 2304.11.2.2. (SIDING MAY BE 6" FROM EARTH. CBC 2304.11.2.6) 5. VERIFICATION. G.C. TO VERIFY ALL CONCRETE ROUGH OPENING SIZES, ELEVATIONS, ETC. PRIOR TO FOUNDATION POUR. G.C. TO COORDINATE ALL LOCATIONS OF HOLDOWNS, CURBS, STEPS, PLUMBING & MECHANICAL SLEEVES, ETC. 6. VERIFICATION. PRIOR TO POURING ANY CONCRETE FOR FOUNDATIONS, IT IS RECOMMENDED THAT A LICENSED SURVEYOR CONFIRM THAT THE REQUIRED SETBACKS AS SHOWN ON THE APPROVED PLANS HAVE BEEN MAINTAINED. A3.42 A3.2 2 A3.3 2 A3.62A3.62 SK 7.2 1 A3.3 1 A3.41 A3.2 1 A3.72A3.72 A3.61 11 X 12 GUESTROOM 5 X 9 GUEST BATH5 X 6 POWDER 23 X 23 KITCHEN / DINING CEILING +9'-0" GARAGE 3'6' X 8PANTRY16 x 21 LIVING 5 x 5NOOKDECK A3.7 3 A3.7 3 29.58'12.42' 42.00'45.23'4.50'49.73'10.98'38.75'49.73'4.50'26.56'15.44' 42.00'21.00' CLR13.58' CLR 12.02' CLR A3.5 1 +9'-0"CEILING +11'-0" CEILING 9'-0"11'-0" OPEN TO ABOVE 12.42'9.00'20.58' 17.48' CLR 1A 1B 1C 101 1D 105102 103 1E 1F 1G 1H 108107 109 110 1I-31I-21I-1 111 112 1J 1K 1L 1M 104 TEMPERED GLASS PANELS 1N WINEDOWNSPOUTS DOWNSPOUTS JOB NUMBER: PROJECT DATE: SHEET NUMBER:RR TRO HIT E G. ARC CM S OF RINAYACF LE S T TA O IREN. 06.30.25 NA ICELINSED C 33359 All drawings and written materials contained herein constitute the original and unpublished work of the Architect and the same may not be duplicated, used or disclosed without the written consent of the Architect 1/10/2024 5:48:44 PM A2.1 2128Chiu ResidenceFIRST FLOOR PLAN2204 Hillside DriveBurlingame, CA 94010Plan Keynote Legend #DESCRIPTION 1/4" = 1'-0"1 SECOND FLOOR PLANN REVISION DATE 0 DD PROGRESS 8.16.23 1 PLANNING COMMISSION 11.13.23 2 PLANNING COMMISSION 2 01.10.24 W D DN WALL LEGEND: FLOOR PLAN NOTES: 1. UNDERSTAIR SPACES. ENCLOSED ACCESSIBLE SPACE UNDER STAIRS SHALL HAVE WALLS, UNDERSTAIR SURFACE, AND ANY SOFFITS PROTECTED ON THE ENCLOSED SIDE WITH 1/2" GYP. BD. CRC 302.7 2. DRAFTSTOPS. SHALL BE INSTALLED IN FLOOR/ CEILING ASSEMBLIES WHERE THERE IS A USABLE SPACE ABOVE AND BELOW THE CONCEALED SPACE OF A FLOOR/CEILING ASSEMBLY. DRAFT STOPS SHALL BE INSTALLED SO THAT THE AREA OF THE CONCEALED SPACE DOES NOT EXCEED 1,000 SQUARE FEET AND IS DIVIDED INTO APPROXIMATELY EQUAL AREAS. CRC R302.12 3. SHOWERS. SHOWER AND TUB/SHOWER WALLS SHALL HAVE A NONABSORBENT SURFACE MIN. 72" ABOVE THE FLOOR, INSTALLED OVER FIBER-CEMENT BACKER BD. WATER-RESISTANT GYPSUM BACKING BOARD MAY NOT BE USED. CRC R307.2, R702.4 4. INTERIOR WATERPROOFING. AT ALL LOCATIONS SUBJECT TO EXPOSURE TO WATER, G.C. TO PROVIDE WATERPROOF MEMBRANE OVER HORIZONTAL AREAS AND UP WALLS 6" MIN ABOVE FINISH. 5. CONCEALED WORK. MAINTAIN RECORD DRAWINGS, SPECIFICATIONS, AND PHOTOS OF CONCEALED WORK. 6. FRAMING. ALL NEW EXTERIOR WALLS TO BE 2X4 WD. STUDS AT 16" O.C., TYP. UNLESS OTHERWISE NOTED. ALL NEW INTERIOR WALLS TO BE 2X4 WD. STUDS AT 16" O.C., TYP. UNLESS OTHERWISE NOTED. S.S.D. 7. ROUGH OPENINGS. CONTRACTOR TO VERIFY ROUGH OPENINGS SHOWN ON PLAN OR SCHEDULES WITH REQUIREMENTS OF UNITS TO BE INSTALLED PRIOR TO FRAMING OPENINGS. 8. ATTIC ACCESS. PROVIDE MIN 22" X 30" ACCESS OPENING TO ATTICS GREATER THAN 30 SF AND WITH 30" MIN HEADROOM. THRU WALL ACCESS OPENING SHALL BE MIN 22" WIDE X 30" TALL. 9. CAL GREEN. SEE SHEET GB.1 FOR CAL GREEN MANDATORY REQUIREMENTS [E] WALL TO BE REMOVED [E] WALL [E] / [N] 1 HR. RATED WALL [E] / [N] 2X6 WALL INSULATION NOTES: 1. SEE TITLE 24 ENERGY REPORT FOR REQUIRED INSULATION VALUES. 2. INSULATION SHALL CONFORM TO FLAME-SPREAD RATING AND SMOKE DENSITY REQUIREMENTS OF CRC R302.10 3. AFTER INSTALLING INSULATION, THE INSTALLER SHALL POST AN INSULATION CERTIFICATE, SIGNED BY THE INSTALLER AND THE BUILDER, IN A CONSPICUOUS LOCATION IN THE BUILDING, STATING THAT THE INSTALLATION CONFORMS WITH THE REQUIREMENTS OF TITLE 24, PART 2, CH. 2-53 OF THE CALIFORNIA ADMINISTRATIVE CODE FOUNDATION & CONCRETE NOTES: 1. UNDERFLOOR ACCESS. PROVIDE MIN. OF 18"X24" THRU FLOOR OR 16"X24" THRU WALL ACCESS TO UNDER FLOOR AREAS. CRC R408.4 2. UNDER FLOOR ACCESS. FOR AN APPLIANCE IN AN UNDER FLOOR AREA, PROVIDE MIN. 22" X 30" ACCESS OR MIN. REQUIRED BY APPLIANCE. CMC 904.10 3. CRAWL SPACE. PROVIDE 18" TALL MIN. ACCESS PATHWAY THROUGH UNDER FLOOR AREA, INCLUDING UNDER DUCTS. CMC 603.1. FLOOR JOISTS OR FLOORS WITHOUT JOISTS WITH LESS THAN 18" CLR. TO EXPOSED GROUND SHALL BE PRESSURE TREATED. GIRDERS WITH LESS THAN 12" CLR. SHALL BE P.T. CBC 2304.11.2.1. 4. PRESSURE TREATED. EXTERIOR WOOD FRAMING & SHEATHING RESTING ON FOUNDATIONS AND LESS THAN 8" FROM EARTH OR 2" FROM PAVING SHALL BE P.T. CBC 2304.11.2.2. (SIDING MAY BE 6" FROM EARTH. CBC 2304.11.2.6) 5. VERIFICATION. G.C. TO VERIFY ALL CONCRETE ROUGH OPENING SIZES, ELEVATIONS, ETC. PRIOR TO FOUNDATION POUR. G.C. TO COORDINATE ALL LOCATIONS OF HOLDOWNS, CURBS, STEPS, PLUMBING & MECHANICAL SLEEVES, ETC. 6. VERIFICATION. PRIOR TO POURING ANY CONCRETE FOR FOUNDATIONS, IT IS RECOMMENDED THAT A LICENSED SURVEYOR CONFIRM THAT THE REQUIRED SETBACKS AS SHOWN ON THE APPROVED PLANS HAVE BEEN MAINTAINED. A3.42 A3.2 2 A3.3 2 A3.6 2 A3.6 2 SK 7.2 4 SK 7.2 1 A3.3 1 A3.41 A3.2 1 A3.7 2 A3.7 2 A3.6 1 A3.6 1 12 x 14 BED 1 12 x 13 BED 2 14 x 17'8" BED 3 10 x 11 BATH 3 7 x 7 CLOSET 6 x 11 BATH 2 A3.7 3 A3.7 3 A3.5 1 4.01'18.99'15.00'16.60'6.96'10.79'6.65'41.00'30.00'11.00'41.00'OPEN TO BELOW 38.00' 4.00'25.58'8.42' 38.00' 2Q-1 2R-2 2R-1 2S-2 2H 2J 2B 2O 2N 2M-3 2M-1 2L 2P-1 2F 2A 2P-2 2M-2 2C 2S-3 2S-1 2Q-3 2Q-2 2G 2I-1 2K-2 2K-1 210 209 211 202 201 204 205 206 207 208 203 DOWNSPOUTS DOWNSPOUTS JOB NUMBER: PROJECT DATE: SHEET NUMBER:RR TRO HIT E G. ARC CM S OF RINAYACF LE S T TA O IREN. 06.30.25 NA ICELINSED C 33359 All drawings and written materials contained herein constitute the original and unpublished work of the Architect and the same may not be duplicated, used or disclosed without the written consent of the Architect 1/10/2024 5:48:45 PM A2.2 2128Chiu ResidenceSECOND FLOOR PLAN2204 Hillside DriveBurlingame, CA 94010Plan Keynote Legend #DESCRIPTION 1/4" = 1'-0"1 02_LEVEL 2 REVISION DATE 0 DD PROGRESS 8.16.23 1 PLANNING COMMISSION 11.13.23 2 PLANNING COMMISSION 2 01.10.24 REFWALL LEGEND: FLOOR PLAN NOTES: 1. UNDERSTAIR SPACES. ENCLOSED ACCESSIBLE SPACE UNDER STAIRS SHALL HAVE WALLS, UNDERSTAIR SURFACE, AND ANY SOFFITS PROTECTED ON THE ENCLOSED SIDE WITH 1/2" GYP. BD. CRC 302.7 2. DRAFTSTOPS. SHALL BE INSTALLED IN FLOOR/ CEILING ASSEMBLIES WHERE THERE IS A USABLE SPACE ABOVE AND BELOW THE CONCEALED SPACE OF A FLOOR/CEILING ASSEMBLY. DRAFT STOPS SHALL BE INSTALLED SO THAT THE AREA OF THE CONCEALED SPACE DOES NOT EXCEED 1,000 SQUARE FEET AND IS DIVIDED INTO APPROXIMATELY EQUAL AREAS. CRC R302.12 3. SHOWERS. SHOWER AND TUB/SHOWER WALLS SHALL HAVE A NONABSORBENT SURFACE MIN. 72" ABOVE THE FLOOR, INSTALLED OVER FIBER-CEMENT BACKER BD. WATER-RESISTANT GYPSUM BACKING BOARD MAY NOT BE USED. CRC R307.2, R702.4 4. INTERIOR WATERPROOFING. AT ALL LOCATIONS SUBJECT TO EXPOSURE TO WATER, G.C. TO PROVIDE WATERPROOF MEMBRANE OVER HORIZONTAL AREAS AND UP WALLS 6" MIN ABOVE FINISH. 5. CONCEALED WORK. MAINTAIN RECORD DRAWINGS, SPECIFICATIONS, AND PHOTOS OF CONCEALED WORK. 6. FRAMING. ALL NEW EXTERIOR WALLS TO BE 2X4 WD. STUDS AT 16" O.C., TYP. UNLESS OTHERWISE NOTED. ALL NEW INTERIOR WALLS TO BE 2X4 WD. STUDS AT 16" O.C., TYP. UNLESS OTHERWISE NOTED. S.S.D. 7. ROUGH OPENINGS. CONTRACTOR TO VERIFY ROUGH OPENINGS SHOWN ON PLAN OR SCHEDULES WITH REQUIREMENTS OF UNITS TO BE INSTALLED PRIOR TO FRAMING OPENINGS. 8. ATTIC ACCESS. PROVIDE MIN 22" X 30" ACCESS OPENING TO ATTICS GREATER THAN 30 SF AND WITH 30" MIN HEADROOM. THRU WALL ACCESS OPENING SHALL BE MIN 22" WIDE X 30" TALL. 9. CAL GREEN. SEE SHEET GB.1 FOR CAL GREEN MANDATORY REQUIREMENTS [E] WALL TO BE REMOVED [E] WALL [E] / [N] 1 HR. RATED WALL [E] / [N] 2X6 WALL INSULATION NOTES: 1. SEE TITLE 24 ENERGY REPORT FOR REQUIRED INSULATION VALUES. 2. INSULATION SHALL CONFORM TO FLAME-SPREAD RATING AND SMOKE DENSITY REQUIREMENTS OF CRC R302.10 3. AFTER INSTALLING INSULATION, THE INSTALLER SHALL POST AN INSULATION CERTIFICATE, SIGNED BY THE INSTALLER AND THE BUILDER, IN A CONSPICUOUS LOCATION IN THE BUILDING, STATING THAT THE INSTALLATION CONFORMS WITH THE REQUIREMENTS OF TITLE 24, PART 2, CH. 2-53 OF THE CALIFORNIA ADMINISTRATIVE CODE FOUNDATION & CONCRETE NOTES: 1. UNDERFLOOR ACCESS. PROVIDE MIN. OF 18"X24" THRU FLOOR OR 16"X24" THRU WALL ACCESS TO UNDER FLOOR AREAS. CRC R408.4 2. UNDER FLOOR ACCESS. FOR AN APPLIANCE IN AN UNDER FLOOR AREA, PROVIDE MIN. 22" X 30" ACCESS OR MIN. REQUIRED BY APPLIANCE. CMC 904.10 3. CRAWL SPACE. PROVIDE 18" TALL MIN. ACCESS PATHWAY THROUGH UNDER FLOOR AREA, INCLUDING UNDER DUCTS. CMC 603.1. FLOOR JOISTS OR FLOORS WITHOUT JOISTS WITH LESS THAN 18" CLR. TO EXPOSED GROUND SHALL BE PRESSURE TREATED. GIRDERS WITH LESS THAN 12" CLR. SHALL BE P.T. CBC 2304.11.2.1. 4. PRESSURE TREATED. EXTERIOR WOOD FRAMING & SHEATHING RESTING ON FOUNDATIONS AND LESS THAN 8" FROM EARTH OR 2" FROM PAVING SHALL BE P.T. CBC 2304.11.2.2. (SIDING MAY BE 6" FROM EARTH. CBC 2304.11.2.6) 5. VERIFICATION. G.C. TO VERIFY ALL CONCRETE ROUGH OPENING SIZES, ELEVATIONS, ETC. PRIOR TO FOUNDATION POUR. G.C. TO COORDINATE ALL LOCATIONS OF HOLDOWNS, CURBS, STEPS, PLUMBING & MECHANICAL SLEEVES, ETC. 6. VERIFICATION. PRIOR TO POURING ANY CONCRETE FOR FOUNDATIONS, IT IS RECOMMENDED THAT A LICENSED SURVEYOR CONFIRM THAT THE REQUIRED SETBACKS AS SHOWN ON THE APPROVED PLANS HAVE BEEN MAINTAINED. 46.00'1.00'3.00' 12 x 14 ADU BEDROOM16 x 26 ADU LIVING AREA 6 x 12 ADU BATH 27.27'17.33'0.50'A3.5 1 A3.54 A3.5 2 A3.5 3 ALL CEILINGS +9'-0" 1I-21I-1 1I-3 110 304 305 301 3G 3I 3F3E3D 3H 1J 300 3C3B3A 302 303 304304304 305305 DOWNSPOUT KITCHEN TO MEET AND/OR EXCEED ADU KITCHEN REQUIREMENTS LISTED IN BMC 25.48.030 JOB NUMBER: PROJECT DATE: SHEET NUMBER:RR TRO HIT E G. ARC CM S OF RINAYACF LE S T TA O IREN. 06.30.25 NA ICELINSED C 33359 All drawings and written materials contained herein constitute the original and unpublished work of the Architect and the same may not be duplicated, used or disclosed without the written consent of the Architect 1/10/2024 5:48:46 PM A2.3 2128Chiu ResidenceADU FLOOR PLAN2204 Hillside DriveBurlingame, CA 94010Plan Keynote Legend #DESCRIPTION N 1/4" = 1'-0"1 02_ADU REVISION DATE 0 DD PROGRESS 8.16.23 1 PLANNING COMMISSION 11.13.23 2 PLANNING COMMISSION 2 01.10.24 1ST FLR -88.16'0" 1ST FLR PLATE HT.9' -0" BACKYARD / ADU -84.16'-4' -0" PLATE HT -106.16'18' -0" T.O. ROOF -109.16'21' -0" 88.59’A.T.O.C. 84.59’REAR YARD AVG. 86.59’SIDE YARD AVG.30.00' HT MAX45.00°45.00 °12'-0"12.00'8.00' EX. PLATE HT4.00' SETBACK42.00'4.00' SETBACK REQ'D 8.00' 2ND FLR SETBACK REQ'D 8.00' 2ND FLR SETBACK 2ND FLR -98.16'10' -0" 16' - 1" 12' - 10" 4" 12" 4" 12"4" / 12"E.01 E.02 E.03 E.04 E.05 E.06E.07 E.08E.03 3.31' 9.25' E.12 E.02 EX 1ST FLR -91.16'3' -0" DHE -MEASURED FROM AVG FRONT AND REAR ELEVATION POINTS 1ST FLR -88.16'0" 1ST FLR PLATE HT.9' -0" BACKYARD / ADU -84.16'-4' -0" PLATE HT -106.16'18' -0" T.O. ROOF -109.16'21' -0" 88.16’FRONT YARD AVG. 84.85’REAR YARD AVG. 86.50’SIDE YARD AVG.FROM A.T.O.C.30.00' HT MAX45.00°45.00 °12.00'12.00'9.00' 1ST FLR PLATE HT.1.00'8.00' 2ND FLR PLATE HT4.00' SETBACK42.00'4.00' SETBACK 8.00' 2ND FLR SETBACK 8.00' 2ND FLR SETBACK 2ND FLR -98.16'10' -0" A3.61 A3.61 2.00'2.00'3.50' 1.50' 12.42'9.00'10.00'2.00'2.00' 19' - 3"TYP2.00'TYP2.00'20' - 11"20' - 0" E.21E.22 E.25 E.35 E.23 E.22 E.36 E.24 E.23 E.22 E.36 E.33 E.38 E.30 E.37E.23 E.23 5.33' TYPEX 1ST FLR -91.16'3' -0" DHE -MEASURED FROM AVG FRONT AND REAR ELEVATION POINTS 105 101 2B 1O 2C 2S-3 2S-2 2S-1 1C 1B 1A 2G 2U 2V2W E.28E.28 E.27 E.27 E.27 E.27 ATOC0.08' TOHT.MAX-118.16' 30' - 0"20.92' MAX HT FROM A.T.O.C.88.22’AVG.T.O. CURB DECLINIG HEIGHT ENVELOPE [DHE] CALCULATIONS • AVG HT. @ FRONT: 88.33 + 88.00 / 2 = 88.16’ • AVG HT @ SIDE LOT LINE: 86.56’+ 86.45’= 86.50' • AVG HT. @ REAR: 84.91 + 84.80 / 2 = 84.85’ • AVG. ELEV. CHANGE FRONT -BACK: = 3.31’ • LOT DEPTH: 90.00' @ 15' SETBACKS -AVG.SLOPE:3.31’/ 90.0’= 3.67% • ATOC [FRONT ]: 88.34 + 88.11 / 2 = 88.22’ • MAX HT ALLOWED: 30’ABV ATOC = 118.22’ NOTE: FRONT AND REAR AVG. HEIGHTS TAKEN SETBACK APPROX.15.00' FROM RESPECTIVE PROPERTY LINES JOB NUMBER: PROJECT DATE: SHEET NUMBER:RR TRO HIT E G. ARC CM S OF RINAYACF LE S T TA O IREN. 06.30.25 NA ICELINSED C 33359 All drawings and written materials contained herein constitute the original and unpublished work of the Architect and the same may not be duplicated, used or disclosed without the written consent of the Architect 1/10/2024 5:48:53 PM A3.1 2128Chiu ResidenceEXTERIOR ELEVATIONS2204 Hillside DriveBurlingame, CA 94010Elevation / Section Keynote Legend #DESCRIPTION E.01 [E] CLAY TILE ROOFING, TYP. E.02 [E] VINYL WINDOWS, TYP. E.03 [E] PTD. STUCCO, TYP. E.04 [E] WD. DOOR E.05 [E] GARAGE DOOR E.06 [E] PORCH / STAIRS E.07 [E] FIREPLACE/CHIMNEY E.08 [E] FENCE/GATE E.12 [E] HEIGHTS ARE APPROXIMATED FROM SATELLITE IMAGES & INTERIOR MEASUREMENTS. ACCURACY IS +/- 2'-0", TYP. E.21 [N] ASPHALT SHINGLE ROOFING, TYP. E.22 [N] ALUMINUM CLAD WD. WINDOWS, TYP. E.23 [N] PTD STUCCO, TYP. E.24 [N] HORIZ. WD SIDING, STAINED CEDAR, TYP E.25 [N] STONE SIDING, GREY TONE, TYP. E.27 [N] METAL DOWNSPOUTS, TYP. SEE LANDSCAPE & DRAINAGE PLAN FOR MORE INFO. E.28 [N] PROVIDE LIGHTING AT ALL EXT LANDINGS. PER CRC §303.8 OR 2022 CBC §1008.2 AND 2022 CBC §1205. E.30 [N] WD AND STONE CLAD COLUMN, TYP E.33 [N] SKYLIGHT, TYP. E.35 [N] 6'-0" WOOD FENCE, TYP. E.36 [N] STD T&G WOOD EAVE, PTD FASCIA AND METAL GUTTER. COLOR TO MATCH WINDOWS, TYP. E.37 [N] SOLID WD DOOR E.38 [N] WD GARAGE DOOR 1/4" = 1'-0"1 EXISTING EAST / FRONT ELEVATION 1/4" = 1'-0"2 EAST / FRONT ELEVATION REVISION DATE 0 DD PROGRESS 8.16.23 1 PLANNING COMMISSION 11.13.23 2 PLANNING COMMISSION 2 01.10.24 1ST FLR -88.16'0" 1ST FLR PLATE HT.9' -0" BACKYARD / ADU -84.16'-4' -0" 2ND FLR -98.16'10' -0" 20'-8" 120'-0" 88.59’FRONT YARD AVG. 84.59’REAR YARD AVG. 86.59’SIDE YARD AVG. FRONT PROPERTY LINE AVG FRONT SETBACK REAR PROPERTY LINE REAR SETBACK 15'-0" [E] SETBACK 47'-6 1/2" E.01 E.02 E.03 E.04 E.06 E.07 E.08 E.12 4" / 12"4" 12" 4" 12" 16' - 1" 6' - 3" EX 1ST FLR -91.16'3' -0" 1ST FLR -88.16'0" 1ST FLR PLATE HT.9' -0" A3.6 2 A3.62 BACKYARD / ADU -84.16'-4' -0" PLATE HT -106.16'18' -0" T.O. ROOF -109.16'21' -0" 2ND FLR -98.16'10' -0" 20'-8" 120'-0" 4'-6" 2'-0" 88.16’FRONT YARD AVG. 84.85’REAR YARD AVG. 86.50’SIDE YARD AVG. FRONT PROPERTY LINE AVG FRONT SETBACK REAR PROPERTY LINE REAR SETBACK 45'-1 1/4" 27'-3 1/4" 20' - 11"20' - 0" 2" 12" 2" 12" 2" 12" 2" 12" 2" 12"2" / 12"2" / 12"2" / 12"2.00' 2.00' E.21 E.22 E.23 E.23E.23 E.25E.35 E.36 E.22 E.26 E.23 E.30 E.24 E.29 E.36 E.31 12' - 0" 2" 12" 2" 12" E.21E.23E.36 0.50' 0.15' 0.50' E.35 6.00'6.00'E.26 EX 1ST FLR -91.16'3' -0"PLATE HT9.00' 1ST FLRPLATE HT8.00' 2ND FLR30.00' MAX HT. FROM A.T.O.C.DHE -MEASURED FROM AVG FRONT AND REAR ELEVATION POINTS 1L 2P-1 2A 1U1V1W 2R-1 2R-2 1M1N 1K 2P-2 3E3D 2T2V 2U 3C3B3A3.25'2.42' E.27 E.27E.27 E.27 E.27 HT.MAX-118.16' 30' - 0" 15.00' NOTE: GC TO VERIFY REQ'D OH CLEARANCES MAINTAIN ALL APPLICABLE CLEARANCES PER TABLE 4-2: MINIMUM ALLOWABLE CLEARANCE OF INSULATED SERVICE DROPS FROM BUILDINGS–0 VOLTS THROUGH 750 VOLTS. [SEE SECTION 4.4.2, 4.4.3 OF ELECTRIC SERVICE: OVERHEAD, PG&E ELECTRIC & GAS SERVICE REQUIREMENTS (TD-7001M) 2022–2023] DECLINIG HEIGHT ENVELOPE [DHE] CALCULATIONS • AVG HT. @ FRONT: 88.33 + 88.00 / 2 = 88.16’ • AVG HT @ SIDE LOT LINE: 86.56’+ 86.45’= 86.50' • AVG HT. @ REAR: 84.91 + 84.80 / 2 = 84.85’ • AVG. ELEV. CHANGE FRONT -BACK: = 3.31’ • LOT DEPTH: 90.00' @ 15' SETBACKS -AVG.SLOPE:3.31’/ 90.0’= 3.67% • ATOC [FRONT ]: 88.34 + 88.11 / 2 = 88.22’ • MAX HT ALLOWED: 30’ABV ATOC = 118.22’ NOTE: FRONT AND REAR AVG. HEIGHTS TAKEN SETBACK APPROX.15.00' FROM RESPECTIVE PROPERTY LINES JOB NUMBER: PROJECT DATE: SHEET NUMBER:RR TRO HIT E G. ARC CM S OF RINAYACF LE S T TA O IREN. 06.30.25 NA ICELINSED C 33359 All drawings and written materials contained herein constitute the original and unpublished work of the Architect and the same may not be duplicated, used or disclosed without the written consent of the Architect 1/10/2024 5:49:02 PM A3.2 2128Chiu ResidenceEXTERIOR ELEVATIONS2204 Hillside DriveBurlingame, CA 94010Elevation / Section Keynote Legend #DESCRIPTION E.01 [E] CLAY TILE ROOFING, TYP. E.02 [E] VINYL WINDOWS, TYP. E.03 [E] PTD. STUCCO, TYP. E.04 [E] WD. DOOR E.06 [E] PORCH / STAIRS E.07 [E] FIREPLACE/CHIMNEY E.08 [E] FENCE/GATE E.12 [E] HEIGHTS ARE APPROXIMATED FROM SATELLITE IMAGES & INTERIOR MEASUREMENTS. ACCURACY IS +/- 2'-0", TYP. E.21 [N] ASPHALT SHINGLE ROOFING, TYP. E.22 [N] ALUMINUM CLAD WD. WINDOWS, TYP. E.23 [N] PTD STUCCO, TYP. E.24 [N] HORIZ. WD SIDING, STAINED CEDAR, TYP E.25 [N] STONE SIDING, GREY TONE, TYP. E.26 [N] METAL INFILL PANEL, TO MATCH WINDOW FRAMES, TYP E.27 [N] METAL DOWNSPOUTS, TYP. SEE LANDSCAPE & DRAINAGE PLAN FOR MORE INFO. E.29 [N] EGRESS WINDOW, 5.7 SF NET CLEAR OPENING REQUIRED. 24" MINIMUM HT & 20" MINIMUM WIDTH, TYP. E.30 [N] WD AND STONE CLAD COLUMN, TYP E.31 [N] WOOD DECK, STAIN COLOR TO MATCH SIDING, TYP. E.35 [N] 6'-0" WOOD FENCE, TYP. E.36 [N] STD T&G WOOD EAVE, PTD FASCIA AND METAL GUTTER. COLOR TO MATCH WINDOWS, TYP. 1/4" = 1'-0"1 EXISTING NORTH / SIDE ELEVATION 1/4" = 1'-0"2 NORTH / SIDE ELEVATION REVISION DATE 0 DD PROGRESS 8.16.23 1 PLANNING COMMISSION 11.13.23 2 PLANNING COMMISSION 2 01.10.24 1ST FLR -88.16'0" 1ST FLR PLATE HT.9' -0" BACKYARD / ADU -84.16'-4' -0" PLATE HT -106.16'18' -0" T.O. ROOF -109.16'21' -0" 2ND FLR -98.16'10' -0" A3.61 A3.6 1 88.16’FRONT YARD AVG. 84.85’REAR YARD AVG. 86.50’SIDE YARD AVG.FROM A.T.O.C.30.00' HT MAX45.00 ° 45.00°12.00'12.00'9.00' 1ST FLR PLATE HT.1.00'8.00' 2ND FLR PLATE HT4.00' SETBACK 42.00'4.00' SETBACK 8.00' 2ND FLR SETBACK8.00' 2ND FLR SETBACK 2.00'2.00'3.50' 2.00'1 1/2" / 12"1 1/2" / 12"1 1/2" / 12"2" / 12"2" / 12"2" / 12"2" / 12"2" 12" 2" 12" 2" 12" 2" 12" 2" 12" 2" 12" 2" 12" 20' - 11"20' - 0" 2.00'3.00'3.00'2.00'E.21 E.29 E.23E.24 E.26 E.23 E.22 E.31 E.36 11.30' PLATE HT. E.36 E.35 E.23 E.29 E.25 E.26 E.33 EX 1ST FLR -91.16'3' -0" DHE -MEASURED FROM AVG FRONT AND REAR ELEVATION POINTS 1I-21I-1 1I-3 112 2O 2N 2M-3 2M-1 1T 1S 1R 1Q 1P 2M-2 2Q-3 2Q-2 2Q-1 1J 4.88'2.22' 2.38'4.88'E.28 E.28 E.27 E.27 E.27 E.27ATOC0.08' TOHT.MAX-118.16' 30' - 0" 88.22’AVG.T.O. CURB 20.92' HT MAX FROM A.T.O.C.1ST FLR -88.16'0" 1ST FLR PLATE HT.9' -0" BACKYARD / ADU -84.16'-4' -0" PLATE HT -106.16'18' -0" T.O. ROOF -109.16'21' -0" 2ND FLR -98.16'10' -0"4" / 12"16' - 1" 88.59’A.T.O.C. 84.59’REAR YARD AVG. 86.59’SIDE YARD AVG.30.00' HT MAX45.00 ° 45.00°12'-0"12.00'11.00'4.00' SETBACK 42.00'4.00' SETBACK REQ'D 8.00' 2ND FLR SETBACKREQ'D 8.00' 2ND FLR SETBACK E.01 E.02 E.03 E.07 E.12 E.08 E.13E.14 3.31'9.25' EX 1ST FLR -91.16'3' -0" DHE -MEASURED FROM AVG FRONT AND REAR ELEVATION POINTS DECLINIG HEIGHT ENVELOPE [DHE] CALCULATIONS • AVG HT. @ FRONT: 88.33 + 88.00 / 2 = 88.16’ • AVG HT @ SIDE LOT LINE: 86.56’+ 86.45’= 86.50' • AVG HT. @ REAR: 84.91 + 84.80 / 2 = 84.85’ • AVG. ELEV. CHANGE FRONT -BACK: = 3.31’ • LOT DEPTH: 90.00' @ 15' SETBACKS -AVG.SLOPE:3.31’/ 90.0’= 3.67% • ATOC [FRONT ]: 88.34 + 88.11 / 2 = 88.22’ • MAX HT ALLOWED: 30’ABV ATOC = 118.22’ NOTE: FRONT AND REAR AVG. HEIGHTS TAKEN SETBACK APPROX.15.00' FROM RESPECTIVE PROPERTY LINES Elevation / Section Keynote Legend #DESCRIPTION E.01 [E] CLAY TILE ROOFING, TYP. E.02 [E] VINYL WINDOWS, TYP. E.03 [E] PTD. STUCCO, TYP. E.07 [E] FIREPLACE/CHIMNEY E.08 [E] FENCE/GATE E.12 [E] HEIGHTS ARE APPROXIMATED FROM SATELLITE IMAGES & INTERIOR MEASUREMENTS. ACCURACY IS +/- 2'-0", TYP. E.13 [E] GLASS DOOR E.14 [E] WD TRELLIS E.21 [N] ASPHALT SHINGLE ROOFING, TYP. E.22 [N] ALUMINUM CLAD WD. WINDOWS, TYP. E.23 [N] PTD STUCCO, TYP. E.24 [N] HORIZ. WD SIDING, STAINED CEDAR, TYP E.25 [N] STONE SIDING, GREY TONE, TYP. E.26 [N] METAL INFILL PANEL, TO MATCH WINDOW FRAMES, TYP E.27 [N] METAL DOWNSPOUTS, TYP. SEE LANDSCAPE & DRAINAGE PLAN FOR MORE INFO. E.28 [N] PROVIDE LIGHTING AT ALL EXT LANDINGS. PER CRC §303.8 OR 2022 CBC §1008.2 AND 2022 CBC §1205. E.29 [N] EGRESS WINDOW, 5.7 SF NET CLEAR OPENING REQUIRED. 24" MINIMUM HT & 20" MINIMUM WIDTH, TYP. E.31 [N] WOOD DECK, STAIN COLOR TO MATCH SIDING, TYP. E.33 [N] SKYLIGHT, TYP. E.35 [N] 6'-0" WOOD FENCE, TYP. E.36 [N] STD T&G WOOD EAVE, PTD FASCIA AND METAL GUTTER. COLOR TO MATCH WINDOWS, TYP. 1/4" = 1'-0"2 WEST / REAR ELEVATION 1/4" = 1'-0"1 EXISTING WEST / REAR ELEVATION JOB NUMBER: PROJECT DATE: SHEET NUMBER:RR TRO HIT E G. ARC CM S OF RINAYACF LE S T TA O IREN. 06.30.25 NA ICELINSED C 33359 All drawings and written materials contained herein constitute the original and unpublished work of the Architect and the same may not be duplicated, used or disclosed without the written consent of the Architect 1/10/2024 5:49:08 PM A3.3 2128Chiu ResidenceEXTERIOR ELEVATIONS2204 Hillside DriveBurlingame, CA 94010REVISION DATE 0 DD PROGRESS 8.16.23 1 PLANNING COMMISSION 11.13.23 2 PLANNING COMMISSION 2 01.10.24 1ST FLR -88.16'0" 1ST FLR PLATE HT.9' -0" A3.6 2 A3.6 2 BACKYARD / ADU -84.16'-4' -0" PLATE HT -106.16'18' -0" T.O. ROOF -109.16'21' -0" 2ND FLR -98.16'10' -0" 20'-8" 120'-0" 4'-6" 2'-0" 88.16’FRONT YARD AVG. 84.85’REAR YARD AVG. 86.50’SIDE YARD AVG. FRONT PROPERTY LINE AVG FRONT SETBACK REAR PROPERTY LINE REAR SETBACK 20' - 11"20' - 0" 2" 12" 2" 12"2" 12" 2" 12" 2" 12" 2" 12"2" / 12"E.21E.22 E.23 E.24 E.25 E.26 E.36 E.22 E.30 2.00' E.23 E.22 E.35 E.25E.31 2.00' E.29 2.00'2.00'2.00'3.00'E.33 0.50' 0.35' 12' - 0" 2" 12" 2" 12"E.36 E.35 E.33 E.21 E.23 E.22E.26 27.27'PLATE HT9.00' 1ST FLRPLATE HT8.00' 2ND FLRFROM A.T.O.C.30.00' HT MAX.DHE -MEASURED FROM AVG FRONT AND REAR ELEVATION POINTS 1H 1E 1D 2H 2J2L 2F 2I-1 1F1G 2K-2 2K-1 3G3I3H 2.42'3.25'E.27 E.27 E.27 E.27 E.27 E.27 15.00' HT.MAX-118.16' 30' - 0" NOTE: GC TO VERIFY REQ'D OH CLEARANCES MAINTAIN ALL APPLICABLE CLEARANCES PER TABLE 4-2: MINIMUM ALLOWABLE CLEARANCE OF INSULATED SERVICE DROPS FROM BUILDINGS–0 VOLTS THROUGH 750 VOLTS. [SEE SECTION 4.4.2, 4.4.3 OF ELECTRIC SERVICE: OVERHEAD, PG&E ELECTRIC & GAS SERVICE REQUIREMENTS (TD-7001M) 2022–2023] 1ST FLR -88.16'0" 1ST FLR PLATE HT.9' -0" BACKYARD / ADU -84.16'-4' -0" 2ND FLR -98.16'10' -0" 20'-8" 120'-0" 4'-6" 2'-0" 88.16’FRONT YARD AVG. 84.85’REAR YARD AVG. 86.50’SIDE YARD AVG. FRONT PROPERTY LINE AVG FRONT SETBACK REAR PROPERTY LINE REAR SETBACK 47.54' 15.00' 16' - 1"4" / 12"4" / 12"E.01 E.02 E.03 E.04 E.05 E.06E.07 E.12 EX 1ST FLR -91.16'3' -0" DHE -MEASURED FROM AVG FRONT AND REAR ELEVATION POINTS DECLINIG HEIGHT ENVELOPE [DHE] CALCULATIONS • AVG HT. @ FRONT: 88.33 + 88.00 / 2 = 88.16’ • AVG HT @ SIDE LOT LINE: 86.56’+ 86.45’= 86.50' • AVG HT. @ REAR: 84.91 + 84.80 / 2 = 84.85’ • AVG. ELEV. CHANGE FRONT -BACK: = 3.31’ • LOT DEPTH: 90.00' @ 15' SETBACKS -AVG.SLOPE:3.31’/ 90.0’= 3.67% • ATOC [FRONT ]: 88.34 + 88.11 / 2 = 88.22’ • MAX HT ALLOWED: 30’ABV ATOC = 118.22’ NOTE: FRONT AND REAR AVG. HEIGHTS TAKEN SETBACK APPROX.15.00' FROM RESPECTIVE PROPERTY LINES JOB NUMBER: PROJECT DATE: SHEET NUMBER:RR TRO HIT E G. ARC CM S OF RINAYACF LE S T TA O IREN. 06.30.25 NA ICELINSED C 33359 All drawings and written materials contained herein constitute the original and unpublished work of the Architect and the same may not be duplicated, used or disclosed without the written consent of the Architect 1/10/2024 5:49:19 PM A3.4 2128Chiu ResidenceEXTERIOR ELEVATIONS2204 Hillside DriveBurlingame, CA 94010Elevation / Section Keynote Legend #DESCRIPTION E.01 [E] CLAY TILE ROOFING, TYP. E.02 [E] VINYL WINDOWS, TYP. E.03 [E] PTD. STUCCO, TYP. E.04 [E] WD. DOOR E.05 [E] GARAGE DOOR E.06 [E] PORCH / STAIRS E.07 [E] FIREPLACE/CHIMNEY E.12 [E] HEIGHTS ARE APPROXIMATED FROM SATELLITE IMAGES & INTERIOR MEASUREMENTS. ACCURACY IS +/- 2'-0", TYP. E.21 [N] ASPHALT SHINGLE ROOFING, TYP. E.22 [N] ALUMINUM CLAD WD. WINDOWS, TYP. E.23 [N] PTD STUCCO, TYP. E.24 [N] HORIZ. WD SIDING, STAINED CEDAR, TYP E.25 [N] STONE SIDING, GREY TONE, TYP. E.26 [N] METAL INFILL PANEL, TO MATCH WINDOW FRAMES, TYP E.27 [N] METAL DOWNSPOUTS, TYP. SEE LANDSCAPE & DRAINAGE PLAN FOR MORE INFO. E.29 [N] EGRESS WINDOW, 5.7 SF NET CLEAR OPENING REQUIRED. 24" MINIMUM HT & 20" MINIMUM WIDTH, TYP. E.30 [N] WD AND STONE CLAD COLUMN, TYP E.31 [N] WOOD DECK, STAIN COLOR TO MATCH SIDING, TYP. E.33 [N] SKYLIGHT, TYP. E.35 [N] 6'-0" WOOD FENCE, TYP. E.36 [N] STD T&G WOOD EAVE, PTD FASCIA AND METAL GUTTER. COLOR TO MATCH WINDOWS, TYP. 1/4" = 1'-0"2 SOUTH / SIDE ELEVATION 1/4" = 1'-0"1 EXISTING SOUTH / SIDE ELEVATION REVISION DATE 0 DD PROGRESS 8.16.23 1 PLANNING COMMISSION 11.13.23 2 PLANNING COMMISSION 2 01.10.24 1ST FLR -88.16'0" 1ST FLR PLATE HT.9' -0" BACKYARD / ADU -84.16'-4' -0" 2ND FLR -98.16'10' -0" A3.6 1 A3.6 1 6.00'9.00' PLATE HT.2" 12" 2" 12" 12' - 0"E.21E.22 E.23 E.33E.36 E.29E.35 E.39 E.22 301 3F 3E 3L 3K 3J 3D 300 3C 3B 3A 0.50'0.50' PROPERTY LINE PROPERTY LINE 0.50' 2.50' DOWNSPOUT DOWNSPOUT 1ST FLR -88.16'0" 1ST FLR PLATE HT.9' -0" BACKYARD / ADU -84.16'-4' -0" 2ND FLR -98.16'10' -0" A3.6 1 A3.6 1 12' - 0" 2" 12" 2" 12"6.00'9.00' PLATE HT.E.21 E.23 PROPERTY LINE PROPERTY LINE 2.50' 0.50' 0.50'0.50' DOWNSPOUT DOWNSPOUT 1ST FLR -88.16'0" 1ST FLR PLATE HT.9' -0" BACKYARD / ADU -84.16'-4' -0" 2ND FLR -98.16'10' -0" 12' - 0" 2" 12" 2" 12" E.21E.23E.36 0.50' E.35 6.00'9.00' PLATE HT.0.15' 0.35' PROPERTY LINE DOWNSPOUT DOWNSPOUT NOTE: GC TO VERIFY REQ'D OH CLEARANCES MAINTAIN ALL APPLICABLE CLEARANCES PER TABLE 4-2: MINIMUM ALLOWABLE CLEARANCE OF INSULATED SERVICE DROPS FROM BUILDINGS–0 VOLTS THROUGH 750 VOLTS. [SEE SECTION 4.4.2, 4.4.3 OF ELECTRIC SERVICE: OVERHEAD, PG&E ELECTRIC & GAS SERVICE REQUIREMENTS (TD-7001M) 2022–2023] 1ST FLR -88.16'0" 1ST FLR PLATE HT.9' -0" BACKYARD / ADU -84.16'-4' -0" 2ND FLR -98.16'10' -0" 0.15' 0.35' 12' - 0" 2" 12" 2" 12" E.36 E.35 E.21 E.23 E.22E.26 6.00'9.00' PLATE HT.3G3I 3F3E 3H PROPERTY LINE DOWNSPOUTDOWNSPOUT NOTE: GC TO VERIFY REQ'D OH CLEARANCES MAINTAIN ALL APPLICABLE CLEARANCES PER TABLE 4-2: MINIMUM ALLOWABLE CLEARANCE OF INSULATED SERVICE DROPS FROM BUILDINGS–0 VOLTS THROUGH 750 VOLTS. [SEE SECTION 4.4.2, 4.4.3 OF ELECTRIC SERVICE: OVERHEAD, PG&E ELECTRIC & GAS SERVICE REQUIREMENTS (TD-7001M) 2022–2023] JOB NUMBER: PROJECT DATE: SHEET NUMBER:RR TRO HIT E G. ARC CM S OF RINAYACF LE S T TA O IREN. 06.30.25 NA ICELINSED C 33359 All drawings and written materials contained herein constitute the original and unpublished work of the Architect and the same may not be duplicated, used or disclosed without the written consent of the Architect 1/10/2024 5:49:24 PM A3.5 2128Chiu ResidenceADU ELEVATIONS2204 Hillside DriveBurlingame, CA 940101/4" = 1'-0"1 ADU FRONT / EAST ELEV. 1/4" = 1'-0"2 ADU REAR / WEST ELEV. 1/4" = 1'-0"3 ADU SIDE / NORTH ELEV. 1/4" = 1'-0"4 ADU SIDE / SOUTH ELEV. Elevation / Section Keynote Legend #DESCRIPTION E.21 [N] ASPHALT SHINGLE ROOFING, TYP. E.22 [N] ALUMINUM CLAD WD. WINDOWS, TYP. E.23 [N] PTD STUCCO, TYP. E.26 [N] METAL INFILL PANEL, TO MATCH WINDOW FRAMES, TYP E.29 [N] EGRESS WINDOW, 5.7 SF NET CLEAR OPENING REQUIRED. 24" MINIMUM HT & 20" MINIMUM WIDTH, TYP. E.33 [N] SKYLIGHT, TYP. E.35 [N] 6'-0" WOOD FENCE, TYP. E.36 [N] STD T&G WOOD EAVE, PTD FASCIA AND METAL GUTTER. COLOR TO MATCH WINDOWS, TYP. E.39 [N] ALUMINUM & GLASS DOOR REVISION DATE 0 DD PROGRESS 8.16.23 1 PLANNING COMMISSION 11.13.23 2 PLANNING COMMISSION 2 01.10.24 1ST FLR -88.16'0" 1ST FLR PLATE HT.9' -0" A3.6 2 A3.62 BACKYARD / ADU -84.16'-4' -0" A3.72 A3.7 2 PLATE HT -106.16'18' -0" T.O. ROOF -109.16'21' -0" 2ND FLR -98.16'10' -0"8'-0"A3.7 3 A3.73 9.00'8.00'11'-4"9.00'1ST FLR -88.16'0" 1ST FLR PLATE HT.9' -0" BACKYARD / ADU -84.16'-4' -0" PLATE HT -106.16'18' -0" T.O. ROOF -109.16'21' -0" 2ND FLR -98.16'10' -0" A3.6 1 A3.6 1 20.67' DISTANCE TO ADJACENT BLDG. CEILING +9'-0" GARAGE 6 x 11 BATH 2 18.00' CEILING AT STAIR6.33'5.33'12.00'9.00'8.00'JOB NUMBER: PROJECT DATE: SHEET NUMBER:RR TRO HIT E G. ARC CM S OF RINAYACF LE S T TA O IREN. 06.30.25 NA ICELINSED C 33359 All drawings and written materials contained herein constitute the original and unpublished work of the Architect and the same may not be duplicated, used or disclosed without the written consent of the Architect 1/10/2024 5:49:31 PM A3.6 2128Chiu ResidenceBUILDING SECTIONS2204 Hillside DriveBurlingame, CA 94010Elevation / Section Keynote Legend #DESCRIPTION 1/4" = 1'-0"1 CROSS SECTION - SITE 1/4" = 1'-0"2 LONGITUDINAL SECTION - AT STAIR REVISION DATE 0 DD PROGRESS 8.16.23 1 PLANNING COMMISSION 11.13.23 2 PLANNING COMMISSION 2 01.10.24 JOB NUMBER: PROJECT DATE: SHEET NUMBER:RR TRO HIT E G. ARC CM S OF RINAYACF LE S T TA O IREN. 06.30.25 NA ICELINSED C 33359 All drawings and written materials contained herein constitute the original and unpublished work of the Architect and the same may not be duplicated, used or disclosed without the written consent of the Architect 1/10/2024 5:49:42 PM A9.1 2128Chiu Residence3D VIEWS - PERSPECTIVE2204 Hillside DriveBurlingame, CA 940101 FRONT VIEW 1 2 FRONT VIEW 2 3 REAR VIEW 1 4 REAR VIEW 2 REVISION DATE 0 DD PROGRESS 8.16.23 1 PLANNING COMMISSION 11.13.23 2 PLANNING COMMISSION 2 01.10.24 JOB NUMBER: PROJECT DATE: SHEET NUMBER:RR TRO HIT E G. ARC CM S OF RINAYACF LE S T TA O IREN. 06.30.25 NA ICELINSED C 33359 All drawings and written materials contained herein constitute the original and unpublished work of the Architect and the same may not be duplicated, used or disclosed without the written consent of the Architect 1/10/2024 5:49:57 PM A9.2 2128Chiu Residence3D VIEWS - ARIAL2204 Hillside DriveBurlingame, CA 940101 AXONOMETRIC FROM NORTHEAST 4 AXONOMETRIC FROM NORTHWEST 2 AXONOMETRIC FROM SOUTHEAST 3 AXONOMETRIC FROM SOUTHWEST REVISION DATE 0 DD PROGRESS 8.16.23 1 PLANNING COMMISSION 11.13.23 2 PLANNING COMMISSION 2 01.10.24 Chiu Residence 01.15.24 1/8” = 1’-0”