HomeMy WebLinkAboutReso - PC - 2022.11.14 - 8AOocuSign Eivelope lDi DDEDEC25-73C1-49FE-84C0-926EA78983D7
RECORDING REOUESTED BY
Planning Department
City of Burlingame
WHEN RECORDED l\,lAlL T0
COI\,4MUNITY DEVELOPI\4ENT DEPARTMENT
CITY OF BURLINGAI\,,!E
501 PRIMROSE ROAD
BURLINGAME, CA 94010
2023-006205
2:43pm 021012023Rl F6er NO FEE
Count of Page.4
Recorded in Off icial Recod6
County of San Mateo
Mark Church
Asees60 r-County Clerk-Reco.der
il| iltiliil fliil1ililllil]fititltill I il]il il llt* $ R0003331'1 46$r
Resolution No. 2022-1 1 .1 4-8A
740 PALOMA AVENUE
APN 029-043-310
TITLE OF DOCUMENT
\\
I hereby certify this to be a full, true and conect mpy of the
document it purporls to be, the original ofwhich is on file in my
otfce.
November 28. 2022
buiw Aaykuu
Kevin Gardiner, AICP, Community Development Director
Date:
RESOLUTION APPROVING CATEGORICAL EXEMPTION AND DESIGN REVIEW
RESOLVED, by the Planning Commission of the City of Burlingame that.
WHEREAS, a Categorical Exemption has been prepared and application has been made for Desion
Review fo r a new. two-sto rv sinole-unit dwellino and detached qaraoe at 740 Paloma venue. zoned
R-1. S lzt\)LLC, orooertv owner.APN 029-043-310
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on November
14. 2022, at which time it reviewed and considered the staff report and all other written materials and
testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Ptanning Commission that
on the basis of the lnitial study and the documents submitted and reviewed, and comments
received and addressed by this Commission, it is hereby found that there is no substantial
evidence that the project set forth above will have a significant effect on the environment, and
categorical exemption, per Section 15303 (a), which states that construction of a limited number
of new, small facilities or structures including one single family residence or a second dwelling
unit in a residential zone is exempt from environmental review. ln urbanized areas, up to three
single-family resrdences maybe constructed or converted under this exemption, is hereby
approved.
Said Design Review is approved subject to the conditions set forth in Exhibit "A" attached hereto.
Findings for such Design Review is set forth in the staff report, minutes, and recording of said
meeting.
It is further directed that a certified copy of this resolution be recorded in the official records of the
County of San Mateo.
2
J
t,5 L0u,E1rrt+lc-, Secretary of the Planning Commission of the City of Burlingame, do
hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the
Planning Commission held on the 14th dav of November, 2022 by the following vote:
7u, PALO AAvE. - RESO 2022-11.1/tSA
AYES: COiIAROTO, GAUL, HORAI'|,
LOWENTHAL, PFAFF, SCH ID, TSE
NOES: NONE
ABSENT: ]{Ot{E
RECUSED: NONE
Secretary
L
EXHIBIT "A"
1
that prior to issuance of a building permit an FYI application shall be submitted which shall
include specifications for the fiberglass entry door, and revised plans showing grids on all
windows as originally proposed, and specifying the garage door material to be either wood or
fiberglass;
that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amount or type of hardscape materials shall be subject to Planning Division
or Planning Commission review (FYl or amendment to be determined by Planning staff);
that any changes to the size or envelope of the basement, first or second floors, or garage,
which would include adding or enlarging a dormer(s), shall require an amendment to this
permit;
that any recycling containers, debns boxes or dumpsters for the construction project shall be
placed upon the private property, if feasible, as determined by the Community Development
Director;
that prior to issuance of a building permit for construction of the project, the project construction
plans shall be modified to include a cover sheet listing all conditions of approval adopted by
the Planning Commission, or City Council on appeal; which shall remain a part of all sets of
approved plans throughout the construction process. Compliance with all conditions of
approval is required; the conditions of approval shall not be modified or changed without the
approval of the Planning Commission, or City Council on appeal;
that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that these
venting details shall be inciuded and approved in the construction plans before a Building
permit is issued;
that the project shall comply with the Construction and Demolition Debris Recycling Ordinance
which requires affected demolitlon, new constructron and alteration projects to submit a Waste
Reduction plan and meet recycling requirements, any partial or full demolition of a structure,
interior or exterior, shall require a demolition permit;
that the project shall meet all the requirements of the California Building and Uniform Fire
Codes, in effect at time of building permit submittal, as amended by the City of Burlingame;
J
4
7
I
10
2.
Conditions of Approval for Categorical Exemption and Design Review
740 Paloma Avenue
Effective November 28, 2022
Page I
that the project shall be built as shown on the plans submitted to the Planning Division date
stamped November 4,2022, sheets A0.0 through A5.0, L1.1 through L5.1, and topographic
survey;
that demolition for removal of the existing structures and any grading or earth moving on the
site shall not occur until a building permit has been issued and such site work shall be required
to comply with all the regulations of the Bay Area Air Quality Management District;
5.
b.
9
EXHIBIT "A"
Conditions of Approval for Categorical Exemption and Design Review
740 Paloma Avenue
Effective November 28, 2022
Page 2
THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH GONDITION:
11 that prior to scheduling the framing inspection the applicant shall provide a certification by the
project architect or residential designer, or another architect or residential design professional,
that demonstrates that the project falls at or below the maximum approved floor area ratio for
the property;
that prior to scheduling the foundation inspection, a licensed surveyor shall locate the property
corners, set the building footprint and certify the first-floor elevation of the new structure(s)
based on the elevation at the top of the form boards per the approved plans; this survey shall
be accepted by the City Engineer;
that prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural certification
that the architectural details shown in the approved design which should be evident at framing,
such as window locations and bays, are built as shown on the approved plans; architectural
certification documenting framing compliance with approved design shall be submitted to the
Building Division before the final framing inspection shall be scheduled;
14 that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of
the roof ridge and provide certification of that height to the Building Division; and
that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.
15
12.
13.