Resolution No. 2022-1 1 .1 4-7 A
1441 ALVARADO AVENUE
APN 027-103-070
TITLE OF DOCUMENT
L.
I hereby certify this to be a full, true and mnect copy ofthe
document it purports to be, the original of which is on file in my
office.
November 28, 2022
otlv€
Date
Kevin Gardiner, AICP, Community Development Director
2A23-006204
2143 Pm OV1A2O23 R1 Fee: NO FEE
Count of Pagos4
Recorded in Off icial Recods
County of San Mateo
Mark church
Assesaor-CounlY Cl6rk'Recoder
i ffi if irl[l il[lilulll[lxull|!lllulllillll{xxfllllu lill!il
.'
buiw hrkwy
RESOLUTION APPROVING CATEGORICAL EXEMPTION, DESIGN REVIEW, HILLSIDE AREA
CONSTRUCTION PERMIT, AND SPECIAL PERMITS
RESOLVED, by the Planning Commission of the City of Burlingame that
WHEREAS, a Categorical Exemption has been prepared and application has been made for Desiqn
Review, Hillside Area Construction Permit, and Special Permits for a first and second sto ry addition to
an existinq sinqle familv dwellinq and new attached qaraqe at 1441 Alvarado A nue Zo ned r(-l
Robert and Mika a meron Dertv owners. APN. 027-103-070
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on
November 14. 2022 , at which time it reviewed and considered the staff report and all other written
materials and testimony presented at said hearing,
NOW. THEREFORE, it is RESOLVED and DETERIVINED by this Planning Commission that
1. On the basis of the lnitial Study and the documents submitted and reviewed, and comments
received and addressed by this Commission, it is hereby found that there is no substantial evidence
that the project set forth above will have a significant effect on the environment, and categorical
exemption, per CEQA Section 15301 (e)(1) of the CEQA Guidelines, which states that additions
to existing structures are exempt from environmental review, provided the addition will not result
in an increase of more than 50% of the floor area of the structures before the addition are
exempt from environmental review, is hereby approved.
2. Said Design Review, Hillside Area Construction Permit, and Special Permits are approved
subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such Design
Review, Hillside Area Construction Permit, and Special Permits are set forth in the staff report,
minutes, and recording of said meeting.
3. It is further directed that a certified copy of this resolution be recorded in the official records of
hai
t,I LLLLEI-fFi,'tt--, Secretary of the Planning Commission of the City of Burlingame, do
hereby certify that the foregoing resolulion was introduced and adopted at a regular meeting of the
Planning Commission held on the 14fh day of November, 2O22 b y the following vote
't441 ALVARADO AVE. - RESO 2022-11.'t+7A
AYES: COIAROTO, GAUI- HORAll,
LOWENTHAL, PFAFF, SCHf,ID, TSE
NOES: ]{OtlE
ABSENT: NONE
RECUSED: NoNE
cretary
the County of San Mateo.
EXHIBIT "A"
Conditions of Approval for Categorical Exemption, Design Review, Hillside Area Construction Permit,
and Special Permits
1441 Alvarado Avenue
Effective November 28, 2022
Page 1
that the project shall be built as shown on the plans submitted to the Planning Division date
stamped October 7, 2022 sheets A0.0 through A4.0, L.1 through L.1 1 , and survey;
that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amount or type of hardscape materials shall be subject to Planning Division
or Planning Commission review (FYl or amendment to be determined by Planning staff);
that any changes to the size or envelope of the first or second floors, or garage, which would
include adding or enlarging a dormer(s), shall require an amendment to this permit;
that any recycling containers, debris boxes or dumpsters for the construction project shall be
placed upon the private property, if feasible, as determined by the Community Development
Director; that demolition or removal of the existing structures and any grading or earth moving
on the site shall not occur until a building permit has been issued and such site work shall be
required to comply with all the regulations of the Bay Area Air Quality Management District;
that prior to issuance of a building permit for construction of the project, the project construction
plans shall be modified to include a cover sheet listing all conditions of approval adopted by the
Planning Commission, or City Council on appeal; which shall remain a part of all sets of
approved plans throughout the construction process. Compliance with all conditions of approval
is required; the conditions of approval shall not be modified or changed without the approval of
the Planning Commission, or City Council on appeal;
that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that these
venting details shall be included and approved in the construction plans before a Building permit
is issued;
that the project shall comply with the Construction and Demolition Debris Recycling Ordinance
which requires affected demolition, new construction and alteration projects to submit a Waste
Reduction plan and meet recycling requirements; any partial or full demolition of a structure,
interior or exterior, shall require a demolition permit;
that demolition for removal of the existing structures and any grading or earth moving on the site
shall not occur until a building permit has been issued and such site work shall be required to
comply with all the regulations of the Bay Area Air Quality Management District;
that the project shall meet all the requirements of the California Building and Uniform Fire
Codes, in effect at time of building permit submittal, as amended by the City of Burlingame;
4
A
7
8
o
1
b.
EXHIBIT "A"
Conditions of Approval for Categorical Exemption, Design Review, Hillside Area Construction Permit,
and Special Permits
1.141 Alvarado Avenue
Effective November 28, 2022
Page 2
THE FOLLOWING CONDITIONS SHALL BE MET OURING THE BUILDING INSPECTION PROCESS
PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
10 that prior to scheduling the framing inspection the applicant shall provide a certification by the
project architect or residential desrgner, or another architect or residential design professional,
that demonstrates that the project falls at or below the maximum approved floor area ratio for
the property,
11 that prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural certification
that the architectural detarls shown in the approved design which should be evident at framing,
such as window locations and bays, are built as shown on the approved plans; architectural
certification documenting framing compliance with approved design shall be submitted to the
Building Division before the final framing inspection shall be scheduled;
that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of
the roof ridge and provide certification of that height to the Building Division; and
that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.
12.
13.