Loading...
HomeMy WebLinkAboutReso - PC - 2022.10.11 - 8BDocusign Eivetope rb 2FBDC239-4E8E-408c AASF-o4653AD82ECB RECORDING REQUESTED BY Planning Department City of Burlingame WHEN RECORDED I\,1AIL TO COMfuIUNITY DEVELOPMENT DEPARTMENT CITY OF BURLINGAI\,,IE 501 PRII\,4ROSE ROAD BURLINGAME, CA 94010 2023-004594 3i01 pm Oli31/2023 Rl Feer NO FEE Count.r, pagee4 Recorded in Oflicial R6cods County of San Mat6o Mark Church 44r rirlr u rilriiljrui ryl,ll1l1lflffirrlri ilU Resolution No. 2022-10 1 1-8B 1805 EASTON DRIVE APN 028-132-120 I hereby certify this to be a full, true and conect copy of the document it purports to be, the original of which is on file in my offrce. october 30 2022 bulw 6arku* TITLE OF DOCUMENT '-,L:AidEDate Kevin Gardiner, AICP. Community Development Director ATED.JUNE r* .:.,.i . ri ,: lr RESOLUTION APPROVING CATEGORICAL EXEMPTION AND DESIGN REVIEW RESOLVED, by the Planning Commission of the City of Burlingame that: WHEREAS, a Categorical Exemption has been proposed and application has been made for Desiqn Review for a first and second st at 1gO5 Easton Drive, zoned R-1: Michael and Ra quel Seitz. Dro perty owners, APN: 0 -171-330: WHEREAS, said October 1 1 2 matters were heard by the Planning Commission of the City of Burlingame on , at which time it reviewed and considered the staff report and all other written 1 2 materials and testimony presented at said hearing; NOW, THEREFORE, it is RESOLVED and DETERMINED by this Ptanning Commission that It is hereby found that the project set forth above rs Categorically Exempt from environmental review pursuant to the California Environmental Quality Act (CEQA), per Section 1530'l (eX1) of the CEQA Guidelines, which states that additions to existing structures are exempt from environmental review, provided the addition will not result in an increase of more than 50% of the floor area of the structures before the addition. is hereby approved. Said Design Review is approved subject to the conditions set forth in Exhibit ,,A,, attached hereto. Findings for such Design Review is set forth in the staff report, minutes, and recording of said meeting. 3. lt is further directed that a certified copy of this resolution be recorded i the official Chai rpers n LrtlrE[-]'fi-l# Burlingame, do hereby certify that t regular meeting of the Planning Co following vote: , Secretary of the Planning Commission of the City of he foregoing resolution was introduced and adopted at a mmission held on the 1 1th dav of October. 2022 by the 1805 EASTON DR. - RESO 2(2-10.!i€BAYES: CO AROTO, cAUt- HORAN, LOYYENTHAL, PFAFF, SCHUID, TSEI{OES: NONE ABSENT: I{OI{E RECUSED: NONE Secretary records of the County of San Mateo. EXHIBIT "A" 1 that the project shall be built as shown on the plans submitted to the Planning Division date stamped September 26,2022, sheets A0.0 through A3.5; that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYl or amendment to be determined by Planning staff); that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property. if feasible, as determined by the Community Development Director: that demolition for removal of the existing structures and any grading or earth movtng on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District, that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; that all air ducts, plumbing venls, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street, and that these venting details shall be included and approved in the construction plans before a Building permit is issued, that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 4 2 3 5 6 7 8 I that the project shall meet all the requirements of the California Building and Uniform Fire Codes, in effect at time of building permit submittal, as amended by the City of Burlingame, Conditions of approval for Categorical Exemption and Design Review 1805 Easton Drive Effective October 21, 2022 Page 1 EXHIBIT "A" Conditjons of approval for Categorical Exemption and Design Review '1805 Easton Drive Effective October 2'l, 2022 THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 10. that prior to scheduling the framing inspection the applicant shall provide a certification by the project architect or residential designer, or another architect or residential design professional, that demonstrates that the project falls at or below the maximum approved floor area ratio for the property, 11 that prior to scheduling the framing inspection the pro.iect architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Drvision before the final framing inspection shall be scheduled; that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division, and 13 that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials window type. etc.) to verify that the project has been built according to the approved Planning and Building plans. 12