Resolution No. 2022-09.26-7 A
1312 MONTERO AVENUE
APN 027-192-140
TITLE OF DOCUMENT
I hereby certify this to be a full, fue and conect mpy of the
document it purports to be, the original of which is on flle in my
office.
October 6, 2022
htiw &yl.juty
CITY
Date
Kevin Gardiner, AICP, Community Development Director
Docusign Envetope t* c02EgF:49-F589-41EO-8FEB-E81B5EA8CD8g
4{
brJUNE
RESOLUTION APPROVING CATEGORICAL EXEMPTION, DESIGN REVIEW,
AND SPECIAL PERMIT
RESOLVED, by the Planning Commission of the City of Burlingame that
WHEREAS, a Categorical Exemption has been prepared and application has been made for Desion
Review and Soecial Permit for a second floor deck for a first and second sto addition to an existino
sino le-un it dwellin q at 13'12 [,4ontero Avenue, Zoned R-1 , Joel A. and Marv Kate Rose nq uist Tr, oroDertv
owners.APN: 027-192-140
On the basis of the lnitial Study and the documents submitted and reviewed, and comments
recetved and addressed by this Commission, it is hereby found that there is no substantial
evidence that the project set forth above will have a significant effect on the environment, and
categorical exemption, per CEQA Section 15301 (e)(1) of the CEQA Guidelines, which states that
additions to existing structures are exempt from environmental review, provided the addition will
not result in an increase of more than 50% of the floor area of the structures before the addition.
is hereby approved.
Said Design Review and Special Permit are approved sublect to the conditions set forth in Exhibit
"A" attached hereto. Findings for such Design Review and Special Permit are set forth in the staff
report, minutes, and recording of said meeting.
County of San Mateo
Cha
SLC E , Secretary the Planning Commission of the City of
Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a regular
meeting of the Planning Commission held on the 26th dav of September. 2022 by the following vote:
13',r2 fotlTERO AVE. - RESO 2022{!9-26-7A
AYES: COrIAROTO,toRAtt,
LOWEiITHAL, PFAFF, SCH ID, TSE
NOES: NOiIE
ABSEIIT: GAUL
RECUSED: NONE
2
retary
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on
Seotember 26. 2022, at which time it reviewed and considered the staff report and all other written
materials and testimony presented at said hearing;
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
3. lt is further directed that a certified copy of this resolution be recorded in the official records of the
1
l
2
EXHIBIT'A"
Conditions of Approval for Categorical Exemption, Design Review, and Special Permit
l3'12 Montero Avenue
Effective October 6, 2022
Page 1
that the project shall be built as shown on the plans submitted to the Planning Division date
stamped July 15,2022, sheets A0.0 through A5.1;
that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amount or type of hardscape materials shall be subject to Planning Division
or Planning Commission review (FYl or amendment to be determined by Planning staff);
that any changes to the size or envelope of the basement, first or second floors, or garage,
which would include adding or enlarging a dormer(s), shall require an amendment to this
permit;
that any recycling containers, debris boxes or dumpsters for the construction project shall be
placed upon the private property, if feasible, as determined by the Community Development
Director;
that demolition for removal of the existing structures and any grading or earth moving on the
site shall not occur until a building permit has been issued and such site work shall be required
to comply with all the regulations of the Bay Area Air Quality Management District;
that prior to issuance of a building permit for construction of the project, the project construction
plans shall be modrfied to include a cover sheet listing all conditions of approval adopted by
the Planning Commission, or City Council on appeal; which shall remain a part of all sets of
approved plans throughout the construction process. compliance with all conditions of
approval is required; the conditions of approval shall not be modified or changed without the
approval of the Planning Commission, or City Council on appeal;
that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single
termination and installed on the portions of the roof not visible from the street; and that these
venting details shall be included and approved in the construction plans before a Building
permit is issued;
3
4
5
7
8. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance
which requires affected demolition, new construction and alteration projects to submit a Waste
Reduction plan and meet recycling requirements; any partial or full demolition of a structure,
interior or exterior, shall require a demolition permit;
L that the project shall meet all the requirements of the California Building and Uniform Fire
codes, in effect at time of building permit submittal, as amended by the city of Burlngame;
THE FOLLOWING CONOITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
1
o.
10
EXHIBIT "A"
Conditions of Approval for Categorical Exemption, Design Review, and Special Permit
1312 Montero Avenue
Effective October 6, 2022
Page 2
that prior to scheduling the framing inspection the prolect architect or residential designer, or
another architect or residential design professional, shall provide an architectural certification
that the architectural details shown in the approved design which should be evident at framing,
such as window locations and bays, are built as shown on the approved plans; architectural
certification documenting framing compliance with approved design shall be submitted to the
Building Division before the final framing inspection shall be scheduled;
11 that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of
the roof ridge and provide certification of that height to the Building Division; and
12 that prior to final inspeclion, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.