Loading...
HomeMy WebLinkAboutReso - PC - 2022.09.12 - 8DDoc!Sign Enveiope lD: C48E43A4-7FC9-498A-E47 O 7D7618C4EF 31 RECQRDING REQUESTED BY: Planning Department City of Eurlingame WHEN RECORDED MAIL TO COlvlMUNlTY DEVELOPMENT DEPARTN,lENT Clry 0F BURLINGAt\,lE 501 PRINIROSE ROAD BURL NGAME CA 94010 2022-08395s 3:18 pn 12tOSt2O22R1 Feei NC FEE CcuIt of Pag06 4 Recorde,.l in Off rcialRecords Co unty of San Mat€o Mark Church Assesso r.County Clerl-Recorder llil,ill lrlflirxfl ilillllllllililtlllltlliilililii,,iill Resolution No 2022-09 12-8D 1785 SEBASTIAN DRIVE APN 025-312-160 TITLE OF DOCUMENT I hereby certity this to be a full, true and mnect copy ofthe document it purports to be. the original of which is on file in my offce. September 23, 2022 buiw *aykwt Date Kevin Gardiner. AICP, Community Development Director { RESOLVED, by the Planning Commission of the City of Burlingame that WHEREAS, a Categorical Exemption has been prepared and application has been made for Desiqn Review and Hillside Area Construction Permit for a first and s nd storv addition to an e xistinq sinole- unit dwellinq at 1785 Sebastian Drive. Zoned R-1. Qifeno Lei. orooertv owner . APN: 025-312-160 WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on September 12. 2022, at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing; NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that: It is further directed th County of San Mateo. at a certified copy of this resolution be recorded in the offi s of theJ : L0trlEl.il-d.AL hereby certify that the foregoing Planning Commission held on the d adopted at a regular meeting of the by the following vote: Chairperson , Secretary of the Planning Commission of the City of Burlingame, do resolution was introduced an 230 & 24lt VtcroRlA RD - RESO 2022{19.12{0 AYES: GAUI- HORAI, LOWENTHAL, PFAFF, SCHTID, TSE NOES: iIONE ABSET{T: COmAROTO RECUSED: NONE RESOLUTION APPROVING CATEGORICAL EXEMPTION, DESIGN REVIEW, AND HILLSIDE AREA CONSTRUCTION PERMIT 1 . On the basis of the lnitial Study and the documents submitted and reviewed, and comments received and addressed by this Commission, it is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and categorical exemption, per CEQA Section 15301 (e)(2), which states that additions to existing structures are exempt from environmental review, provided the addition will not result in an increase of more than 10,000 SF in areas where all public services and facilities are available and the area in which the pro1ect is located is not environmentally sensitive, is hereby approved. 2. Said Design Review and Hillside Area Construction Permit are approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such Design Review and Hillside Area Construction Permit are set forth in the staff report, minutes, and recording of said meeting. 12th dav of September. 2022 I, EXHIBIT "4" Conditions of Approval for Categorical Exemption, Design Review, and Hillside Area Construction Permit 1785 Sebastian Drive Effective September 22, 2022 Page 1 1 2 that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; that demolition for removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval ofthe Planning Commission, or City Council on appeal; that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit rs issued; that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a slructure, interior or exterior, shall require a demolition permit; that prior to scheduling the framing rnspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; 3 4 7 8 10 that the project shall be built as shown on the plans submitted to the Planning Division date stamped August 31 , 2022, sheets A.1 through A.8 and topographic survey; that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYl or amendment to be determined by Planning staff); 9. that the project shall meet all the requirements of the California Building and Uniform Fire Codes, in effect at time of building permit submittal, as amended by the City of Burlingame; THE FOLLOWNG CONDITIONS SHALL BE MET DURING THE BUILDING INSPEGTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: E 6. EXHIBIT'A" Conditions of Approval for Categorical Exemption, Design Review, and Hillside Area Construction permit 1785 Sebastian Drive Effective September 22, 2022 11 . that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division, and 12. that prior to final inspection, Planning Drvision staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans.