Loading...
HomeMy WebLinkAboutReso - PC - 2022.08.08 - 8BRECORDING REQUESTED BY Planning Department City of Budingame WIIEN RECORDED MAIL TO COI\i MUNITY DEVELOPi/ENT DEPARTMENT CITY OF BURLINGAI\.,IE 501 PRII\,IROSE ROAD BURLINGAME, CA 94010 2022-A$951 3:18pm 12tOStm22Rt Fee: NO FEE Count of Pagos4 Reccrded in Off icialR6cords County of San Mateo Mark Church As6€ssor-Co Ll nty Clerk-Recoder l1ll[l lilliillllflifliIiriU]llililllliil[llll|liilill,illlil Resolution No. 2022-08.08-88 2229 ADELINE DRIVE APN 027-161-160 { TITLE OF DOGUMENT I hereby certify this to be a full, true and conect copy ofthe document it purports to be, the original of which is on file in my office. ust 19,2022 bt*w Earharr CITY t Rr,r,!$$$,ryE I lffiXffi,,ffi: tl i ATED T.lUhE a) Date: Kevin Gardiner, AICP, Community Development Di DocuSign Envelope lD: 0688F22A-2A9F459D-BE0A-7691 6444AE43 RESOLUTION APPROVING CATEGORICAL EXEi'PTION, DESIGN REVIEW, AND SPECIAL PERMIT WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on Auoust 8. 2022, at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing: NOW, THEREFORE, it is RESOLVED and DETERMINED by this Ptanning Commission that: 'l . On the basts of the lnitial Study and the documents submitted and reviewed, and comments received and addressed by this Commission, it is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and categorical exemption, pursuant to the Califomia Environmental euality Act (CEeA), per Section 15301 (e)(1) of the CEQA Guidelines, which states that additions to existing structures are exempt from environmental review, provided the addition will not result in an increase of more than 50% of the floor area of the structures before the addition, is hereby approved. 2. Said Design Review and Special Permit are approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such Design Review and Special Permit are set forth in the staff report, minutes, and recording of said meeting. 3. lt is further directed that a certified copy of this resolution be recorded in the official records of the County of San Mateo Chairperson t,S Li.LiEliTtHt--, Secretary of the Planning Commission of the City of Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a Planning Commission held on the 8th dav of A uoust. 2022 by regular meeting of the the following vote: 2229 ADEUNE DR - RESO 2022-{18.06{BAYES: CO AROTO, GAUL,HORAN. PFAFF, SCHTID, TSENOES: NONE AASE T: NOI{E RECUSED: LOWENTHAL RESOLVED, by the Planning Commission of the City of Burlingame that: WHEREAS, a Categorical Exemption has been prepared and application has been made for Desion Review and Soecial Permit for Declininq Heiqht Envelope for a two and a half story addition to an existinq sinole-unit dwellino at 2229 Adeline Drive, Zoned R-1, Cameron D. and Shannon E. Foster Tr.. propertv owner, APN: 027-161-160; Secretary 1 Conditions of Approval for Categorical Exemption, Design Review, and Special Permit 2229 Adeline Drive Effective August 19, 2022 Page '1 that the project shall be built as shown on the plans submitted to the Planning Division date stamped July 26, 2022, sheets T1 .0, A 1 .0 through G2.0; that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYl or amendment to be determined by Planning staff); that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; that demolition for removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; J 4 b 7 8 that the project shall comply with the Construction and Demolition Debris Recycling ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; that the project shall meet all the requirements of the California Building and Uniform Fire Codes, in effecl at time of building permit submittal, as amended by the City of Burlingame; EXHIBIT "A" 2. 5. o EXHIBIT "A" THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 10. that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; 11. that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; and 12. that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. Conditions of Approval for Categorical Exemption, Design Review, and Special Permit 2229 Adeline Drive Effective August 19, 2022 Page 2