HomeMy WebLinkAboutReso - PC - 2022.07.11 - 8CDocuSiijn Envelope lDr 3BO2O1AB-EE8C-41A8-AF86-EF3A8OF3E66O
RECORDING REOUESIED BY
Planning Department
City of Burlingame
WHEN RECORDED lviAlL T0
COMMUNITY DEVELOPI\,,IENT DEPARTMENT
CITY OF BURLINGAME
501 PRIMROSE ROAD
BURLINGAI\,1E, CA 94010
?022-066368
3:37 FT fgi09/2022 R1 Faer NO FEF
Count of Pages4
Recorded in Off icialEecords
Co unty of San Maleo
Mark Church
Assesso r-Co u nlY Clerk_Recorder
4
Il - illl lllrJl,ill|ilillLlllil,Il[I jll,ll{ fi
Resolution No. 2022-07 . I 1 -8C
1556 CYPRESS AVENUE
APN 028-295-080
TITLE OF DOCUMENT
I hereby certify this to be a full, true and conect mpy of the
document it purports to be, the original of which is on flle in my
office.
JU 22 2022
bulw Aaykwt
CITY o
ATED T,UNE b
Kevin Gardiner, AICP, Community Development Directo
BURLINGAMECAI I T
Date
RESOLUTION APPROVING CATEGORICAL EXEMPTION AND DESIGN REVIEW AMENDMENT
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a Categorical Exemption has been proposed and application has been made for
Amendment to Desion Review fo r as-b uilt cha n o es to a oreviouslv aoo roved first and seco nd
ddition to an existin srn le-unit llin nd new detached at 1556 Cypressa
Avenue zoned R-1 Ka sev and Bill Schuh ro owne APNoDertv 028-295-080
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on
Julv 11,2022 , at which time it reviewed and considered the staff report and all other written
materials and testimony presented at said hearing;
NOW, THEREFORE. it is RESOLVED and DETERMINED by this Ptanning Commission that
It is hereby found that the project set forth above is Categorically Exempt from
environmental review pursuant to the California Environmental Quality Act (CEeA), per
Section 15301 (e)(2) of the CEQA Guidelines, which states that additions to existing
structures are exempt from environmental review, provided the addition will not result in
an increase of more than 10,000 SF in areas where all public services and facilities are
available and the area in which the project is located is not environmentally sensitive.
Said Design Review Amendment is approved subject to the conditions set forth in
Exhibit "A" attached hereto. Findings for such Design Review Amendment is set forth in
the staff report, minutes, and recording of said meeting.
3. lt is further directed that a certified copy of this re n be recorded in t tcta
2
ti
I,
records of the County of San Mateo
Chairperson
S. (-rqfrl , Secretary of the Planning Commission of the City
of Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a
regular meeting of the Planning Commission held on the 11th dav of Julv, 2022 by the following
vote:
ffi
SCHMID, TSENOES: NONE
ABSENT: HORAN
RECUSED: COHAROTO, pFAFF
Secretary
1
EXHIBIT "A"
Conditions of approval for Categorical Exemption and Design Review Amendment
1556 Cypress Avenue
Effective July 21,2022
Page 1
that the project shall be built as shown on the plans submitted to the Planning Division
date stamped June 22,2022, sheets T1.0, A1.0 through A5.0, and A9.0, and shall
include 6x6 wood corbels below the projection above the front entry;
that the 64 SF (6'-9" x 9'-5") uncovered balcony (second floor) at the rear of the house
shall not be covered, unless covering or enclosing this area does not exceed the
maximum allowed floor area ratio (FAR) or there is approval of a Variance for exceeding
the maximum allowed FAR;
that any changes to building materials, exterior finishes, windows, architectural features,
roof height or pitch, and amount or type of hardscape materials shall be subject to
Planning Division or Planning Commission review (FYl or amendment to be determined
by Planning staff);
that any changes to the size or envelope of the basement, first or second floors, or
garage, which would include adding or enlarging a dorme(s), shall require an
amendment to this permit;
that any recycling containers, debris boxes or dumpsters for the construction project
shall be placed upon the private property, if feasible, as determined by the Community
Development Director;
that prior to issuance of a building permit for construction of the project, the project
construction plans shall be modified to include a cover sheet listing all conditions of
approval adopted by the Planning Commrssion, or City Council on appeal; which shall
remain a part of all sets of approved plans throughout the construction process.
Compliance with all conditions of approval is required; the conditions of approval shall
not be modified or changed without the approval of the Planning Commission, or City
Council on appeal;
that all air ducts, plumbing vents, and flues shall be combined, where possible, to a
single termination and installed on the porlions of the roof not visible from the street; and
that these venting details shall be included and approved in the construction plans
before a Building permit is issued;
that the project shall comply with the Construction and Demolition Debris Recycling
Ordinance which requires affected demolition, new construction and alteration projects
to submit a Waste Reduction plan and meet recycling requirements; any partial or full
demolition of a structure, interior or exterior, shall require a demolition permit;
2
J
4
8
I
o
7
that demolition for removal of the existing structures and any grading or earth moving on
the site shall not occur until a building permit has been issued and such stte work shall
be required to comply with all the regulations of the Bay Area Air Quality Management
District;
EXHIBIT'A"
Conditions of approval for Categorical Exemption and Design Review Amendment
1556 Cypress Avenue
Effective July 2'l, 2022
Page 2
10 that the project shall meet all the requirements of the California Building and Uniform
Fire Codes, in effect at time of building permit submittal, as amended by the City of
Burlingame;
THE FOLLOWNG CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
11 that prior to scheduling the framing inspection the applicant shall provide a certification
by the project architect or residential designer, or another architect or residential design
professional, that demonstrates that the project falls at or below the maximum approved
floor area ratio for the property;
12 that prior to scheduling the foundation inspection, a licensed surveyor shall locate the
property corners, set the building footprint and certify the first floor elevation of the new
structure(s) based on the elevation at the top of the form boards per the approved plans;
this survey shall be accepted by the City Engineer;
13 that prior to scheduling the framing inspection the project architect or residential
designer, or another architect or residential design professional, shall provide an
architectural certification that the architectural details shown in the approved design
which should be evident at framing, such as window locations and bays, are built as
shown on the approved plans; architectural certification documenting framing
compliance with approved design shall be submitted to the Building Division before the
final framing inspection shall be scheduled;
that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the
height of the roof ridge and provide certification of that height to the Building Division;
and
15.
14.
that prior to final inspection, Planning Division staff will inspect and note compliance of
the architectural details (trim materials, window type, etc.) to verify that the project has
been built according to the approved Planning and Building plans.