Loading...
HomeMy WebLinkAboutReso - PC - 2022.06.27 - 8COocuSign Er-velope lD 7A4A5739-555A4658-AlCF-FEF67EA44D6D Planning Department City of Burlingame COMMUNIry DEVELOPMENT DEPARTI\,4ENI CITY OF BURLINGAME 501 PRII\,IROSE ROAD BURLINGAME, CA 94010 2022-056365 3:37 pm 09/09/2022 R1 Fee NO F:E Count of Pag06, Recorded in Off ici.r I l econis Co u nty of San lll ateo lrlark Ch urch Asaeseor-Couoty Clerk-Recordsr 1 r,ll,iLi llll,iiilllilll llillL l,ill llllilli lr,llll,ll i rllr $ a 0 0132 3 7 5 6 / $ - Resolution No. 2022-06.27 -8C 2758 SUMMIT DRIVE APN 027-221-230 I hereby certify this to be a full, true and mnect mpy of the documenl it purports to be, the original ofwhich is on flle in my offic€ JU 8.2422 bu,rw Earl-iut-y TITLE OF DOCUMENT ..ir CITY tsp nH,ry q$F!E $ Date Kevin Gardiner, AICP, Community Development Director EO.,'\'N€ RECORDING REQUESTED BY: WHEN RECORDED MA]L TO: RESOLUTION APPROVING CATEGORICAL EXEMPTION, DESIGN REVIEW AND HILLSIDE AREA CONSTRUCTION PERMIT RESOLVED, by the Planning Commission of the City of Burlingame that WHEREAS, a Categorical Exemptron has been prepared and application has been made for Desiqn Review and Hillside Area Construction Permrt for first and second storv add ons to an existino sinole- unit dwellinq at )6A S m if7 Driv z R-1 ch hi nd aura Ru ranrlro n ro rt owners APN.027-221-230 WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on June 27. 2022, at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing: On the basis of the lnitial Study and the documents submitted and reviewed, and comments received and addressed by this Commission, it is hereby found that there is no substantial evidence that the pro.ject set forth above will have a significant effect on the environment, and categorical exemption, per CEQA Section 15301(e)(2), which states that additions to existing structures are exempt from environmental review, provided the addition will not result in an increase of more than 10,000 SF in areas where all publrc services and facilities are available and the area in which the pro1ect is located is not environmentally sensitive, is hereby approved. Said Design Review and Hillside Area Construction Permit are approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such Design Review and Hillside Area Construction Permit are set forth in the staff report, minutes, and recording of said meeting. 3. lt is further directed that a certified copy of this be recorded in th offi rds of the County of San Mateo ChairpersonI?ffiw , Secretary of the Planning Commission of the City of Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the Planning Commission held on the 27lh dav of June. 2022 by the following vote: 2758 SUXXIT DR - RESO 2022{!6-27{C AYES: COIIAROTO, GAUL, HORAN, PFAFF, TSE NOES: NONE ABSENT: LOYYENTHALSCHHID RECUSED: NONE 2 e L- ry NOW, THEREFORE. it is RESOLVED and DETERMINED by this Planning Commission that: 1 t, -\ 2 EXHIBIT'A" Conditions of Approval for Categorical Exemption, Design Review and Hillside Area Construction Permit 2758 Summit Drive Effective July 7,2022 Page 1 that prior to issuance of a building permit, an FYI application shall be submitted showing planters at the sides of each of the three decks and a more developed landscape plan to provide screening along the right side property line between the two single-unit dwellings; that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dorme(s), shall require an amendment to this permit; that demolition for removal of the existing structures and any gradrng or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; 4 5 6 7 8 I 10 1 that the project shall be built as shown on the plans submitted to the Planning Division and date stamped June 20, 2022, sheets A000 through 4206; that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYl or amendment to be determined by Planning staff)i that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; that the project shall meet all the requirements of the California Building and Uniform Fire Codes, in effect at time of building permit submittal, as amended by the City of Burlingame; EXHIBIT "A'' Conditions of Approval for Categorical Exemption, Design Review and Hillside Area Construction Permit 2758 Summit Drive Effective July 7,2022 Page 2 THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 11. that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; and 12. that prior to final inspection, Planning Division staff would inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans.