Loading...
HomeMy WebLinkAboutReso - PC - 2022.06.27 - 8ADocuSign Envelope lD: 7A4A3739-5554-4658-A1 CF-FEF67EA44D6D RECORDING REOUESTED BY Planning Department City of Burlingame COMMUNITY DEVELOPMENT DEPARTI\,1ENT CIry OF BURLINGAME 501 PRIMROSE ROAD BURLINGAME, CA 94010 2022-066364 3i37 pm 03/09/2022 R1 Feer NO FEE CounrofPages4 Pecord6d ih olticial Recor,s County ol San Mateo Marl Chrlch Assessor-Co unly Cierk-[iecoder 4 il il lt il illl ltll I llll llll ll. $R000128? 965$* Resolution No. 2022-06.27 -8A 620 TRENTON WAY APN 029-165-210 I hereby certify this to be a full, true and conect mpy of the document it purports to be, the original of wfiich is on file in my otfce JU 8, 2022 *"lw 6avli*r TITLE OF DOCUMENT CITY Date Kevin Gard ner AICP Community Development D ATEO.,'UHE b WHEN RECORDED fuIA L TO: BpFL!,ry-GF,uE RESOLUTION APPROVING CATEGORICAL EXEMPTION ANO DESIGN REVIEW RESOLVED, by the Planning Commission of the City of Burlingame that WHEREAS, a Categorical Exemption has been prepared and application has been made for Desiqn Review for a first and second storv ad diti on to an existino sinole-unit dwellino 620 T renton Wav, Zoned R-1 , Patricia and Griffin Tormev, oro pertv owners. APN: 029- 165-210 WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on June 27. 2O22, al which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing. NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that On the basrs of the lnitial Study and the documents submitted and reviewed, and comments received and addressed by this Commission, it is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and categorical exemption, per CEQA Section 15301(e)(2), which states that addrtions to existing structures are exempt from environmental review, provided the addition will not result in an increase of more than 10,000 SF in areas where all public services and facilities are available and the area in which the prolect is located is not environmentally sensitive, is hereby approved. 2 3 It is further directed th County of San Mateo. at a certified copy of this reso tion be recorded in the officia ords of the Chairpe n f, PFArr , Secretary of the Planning Commission of the City of Burlingame, do hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the Planning Commission held on the 27lh dav of June.2022 by the following vote: 520 TRETTON WAy - RESO 2022{t5-27{AAYES: CO AROTO, GAUL, HORAN, PFAFF, TSENOES: I{ONE ABSET{T: LOWENTHAI-SCHHID RECUSED: NONE ,n t-. l-, tary Said Design Review is approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such Design Review are set forth in the staff report, minutes, and recording of said meeting. 1 EXHIBIT "A" Conditions of Approval for Categorical Exemption and Design Review 620 Trenton Way Effective July 7, 2022 Page'l 1 that the project shall be built as shown on the plans submitted to the Planning Division and date stamped June 21, 2022, sheets A0.0 through A5.1; 2 3 that any changes to building materials, exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYl or amendment to be determined by Planning staff); that any changes to the size or envelope of the first or second floors which would include adding or enlarging a dormer(s), shall require an amendment to this permit; that any recycling containers. debris boxes or dumpsters for the construction project shall be placed upon the private property if feasible, as determined by the Community Development Director, that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal, which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street, and that these venting details shall be included and approved in the construction plans before a Building permit is issued; that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit; that the project shall meet all the requirements of the California Building and Uniform Fire Codes, in effecl at time of building permit submittal, as amended by the City of Burlingame; THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: that prior to scheduling the framing inspection the applicant shall provide a certification by the project architect or residential designer, or another architect or residential design professional, that demonstrates that the projecl falls at or below the maximum approved floor area ratio for the property; 4 6 7 8 I 10 that demolition for removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; EXHIBIT "A" Conditions of Approval for Categorical Exemption and Design Review 620 Trenton Way Effective July 7, 2022 Page 2 11 12. 13. that prior to scheduling the framing inspection the project architect or residentral designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing comp ance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled: that prior to scheduling the roof deck inspectton, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; and that prior to final inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans.