Loading...
HomeMy WebLinkAboutReso - PC - 2023.08.14 - 9EDocr. !ign EnvElope lDr 05EE0519-C437-40r:'-94FC-7C07E5B2F7AB RECORDING REQUESTED BY Planning Department City of Burlingame WHEN RECORDED MA t TO COMMUNIry DEVELOPIVENT DEPARTMENT CITY OF BURLINGAI\,!E 501 PRIMROSE ROAD BURLINGAME, CA 94010 2023-A44337 3i14 pm 09/13/2023 Rl F6e: NO FEE Count o, Pagee4 Recorded in Off icial R6cords county of san Mat€o Mark Church Assesso r-Couniy CIerk-Recoder ll.llJlll,,llll ll Ill lllillt ll*$e000'Il9i-,a$i' Resolution No. 2023-08. 1 4-9E 839 CROSSWAY ROAD APN 029-016-020 TITLE OF DOCUMENT I hereby certify this to be a full, true and mnecl copy of the document it purports to be, the original of which is on file in my office. Date ust 25.2023 buiw Arkwt ..{ a. Kev n Gardiner. AICP Community Development D t on the basis of the Initial study and the documents submitted and reviewed, and comments received and addressed by this Commission, it rs hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and categorical exemption, per Section 15303 (a), which states that construction of a limited number of new, small facilities or structures including one single family residence or a second dwelling unlt in a residential zone is exempt from environmental review. ln urbanized areas, up to three single-family residences maybe constructed or converted under this exemption, is hereby approved. Said Design Review is approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such Design Review is set forth in the staff report, minutes, and recording of said meeting. 1 2 3. lt is further directed that a certifled copy of this resolutio County of San Mateo. Burlingame, do hereby certify that the fo meeting of the Planning Commissron held recorded in the official records of the regoing resolution was introduced and adopted at a regular on the 14th dav of Auqust. 2023 by the following vote. hairperson 0 ttOP$1J , Secretary of the Planning Commission of the City of 839 CROSSWAY Rp. - RES 2023.{rE.14-9EAYES: COmAROTO, HORAT{, LOWENTHAL PFAFF, SCH ID, SHORES, TSENOES: NONE ABSENT: NOIiIE RECUSED: NONE Secretary RESOLUTION APPROVING CATEGORICAL EXEMPTION AND DESIGN REVIEW RESOLVED, by the Planning Commission of the City of Burlingame that: WHEREAS, a Categorical Exemption has been prepared and application has been made for Desiqn Review for a new, two-story sinqle-unit dwellinq at 839 Crosswav Road. zoned R-l , Southwest lnvestment Funds. LLC, Dropertv owner. APN: 029-016-020; WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on Auqust 14.2023, at which time it reviewed and considered the staff report and all other written materials and testimony presented at said hearing. NOW. THEREFORE, it is RESOLVED and DETERMTNED by this ptanning Commission that: EXHIBIT "A" Conditaons of Approval for Categorical Exemption and Design Review 839 Crossway Road Effective August 24, 2023 Page 1 1 that the project shall be built as shown on the plans submitted to the Planning Division date stamped August 2, 2023, sheets A-0 through A-15; that any changes to building materials. exterior finishes, windows, architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYl or amendment to be determined by Planning staff); that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dormer(s), shall require an amendment to this permit; that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible, as determined by the Community Development Director; that demolition for removal of the existing structures and any grading or earth movrng on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; that prior to issuance of a building permit for construction of the prolect, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modified or changed without the approval of the Planning Commission, or City Council on appeal; that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; that the project shall comply wrth the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Waste Reduction plan and meet recycling requirements; any partial or full demolition of a structure, interior or exterior, shall require a demolition permit, that the project shall meet all the requirements of the California Building and Uniform Fire Codes, in effect at time of building permit submittal, as amended by the City of Burlingame: that prior to scheduling the framing inspection the applicant shall provide a certification by the project architect or residential designer, or another architect or residential design professional, that demonstrates that the project falls at or below the maximum approved floor area ratio for the property; 2 4 5 6 7 I o 10 3 THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILOING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: Conditions of Approval for Categorical Exemption and Design Review 839 C rossway Road Effective August 24, 2023 11. that prior to scheduling the foundation inspection, a licensed surveyor shall locate the property corners, set the building footprint and certify the firslfloor elevation of the new structure(s) based on the elevation at the top of the form boards per the approved plans; this survey shall be accepted by the City Engineer; 12 that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans; architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; 13 that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of the roof ridge and provide certification of that height to the Building Division; and that prior to flnal inspection, Planning Division staff will inspect and note compliance of the architectural details (trim materials, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. 14 EXHIBIT "A"