HomeMy WebLinkAboutReso - PC - 2023.04.10 - 8BDocusign Envelope lD: 4C853F52-665F 49EA,A809-D85942189CE5
Planning Department
City of Budingame
WHEN RECORDED t\,{AlL T0
C0lvltulUNlTY DEVEL0PIVENT DEPART[/ENT
CITY OF BURLINGAIUE
501 PRI[4ROSE ROAD
BURLINGAt\rE. CA 94010
2023-03912u
2:42 pm 09/1/y2023 Rl Fee. NO FEr:
Count of pages4
Racorded in Offic ia I Recor.ts
Co unty ofSan lllateo
Mark Church
Assesso r-Co u r.ty Clerk Recorder
illrri rlllii[I]ifliiflillrllliirltltil iiliilifl|liltiitii fll
Resolution No. 2023-04.10-88
1205 HOWARD AVENUE
APN 029-224-050
TITLE OF DOCUMENT
I hereby certify this to b€ a full. kue and conect mpy of the
document it purports to be, the original of which is on flle in my
oflice.
21 2023
b,jw Eoyhu,r
CITY
EysqryYgs,ryE
ATED JUNE b
Date
Kevin Gardiner, AICP, Community Development Director
RECORDING REQUESTED BY:
WHEREAS, said matters were heard by the Planning Commission of the City of Burlingame on Aoril 10.
2023, al which time it reviewed and considered the staff report and all other written materials and
testimony presented at said hearing.
NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that:
On the basis of the lnitial Study and the documents submitted and reviewed, and comments
received and addressed by this Commission, it is hereby found that there is no substantial
evidence that the project set forth above will have a significant effect on the environment, and
categorical exemption, per CEQA Section 15301(e)(2), which states that additions to exrsting
structures are exempt from environmental review, provided that the addition will not result in an
increase of more than 10,000 SF, and if all public facilities are available for maximum development
permissible rn the general plan, and the site is not in an environmentally sensitive area, is hereby
approved.
Said Commercial Design Review is approved subject to the conditions set forth in Exhibit "A"
attached hereto. Findings for such Commercial Design Review are set forth in the staff report,
minutes, and recording of said meeting.
3. lt is further directed that a certified copy of this resolutio e recorded in the official records of the
County of San Mateo
rpe 6+'^-
4 \iJt,t , Secretary of the Planning Commission of the City of Burlingame, do
hereby certify that the foregoing resolution was introduced and adopted at a regular meeting of the
Planning Commission held on the 1 oth dav of Aoril, 2023 by the following vote:
1
2
ec ta
RESOLUTION APPROVING CATEGORICAL EXEMPTION AND COMMERCIAL DESIGN REVIEW
RESOLVED, by the Planning Commission of the City of Burlingame that:
WHEREAS, a Categorical Exemption has been prepared and application has been made for_.1Qp11me1q!al
Desiqn Review for a second storv addition and facade improvements to an existino two-story, mixed-use
buildinq at 1205 Howard Avenue. Zoned HMU. Wenhui Chen. orooertv owner. APN: 029-224-050;
I,
ffi LOWENTHAI- PFAFF, SCHtrIDi{OES: NONE
ABSENT TSE
RECUSED: NONE
1
EXHIBIT "A"
Conditions of Approval for Categorical Exemption and Commercial Design Review
1205 Howard Avenue
Effective April 20, 2023
Page 1
that the project shall be built as shown on the plans submitted to the Planning Division date
stamped March 30, 2023, sheets A0.0 through A4.0;
that prior to issuance of a building permit, the applicant shall submit an FYI application for
Planning Commission review of a landscape plan;
that any changes to the size or envelope of the building, which would include changing or
adding exterior walls or parapet walls, shall require an amendment to this permit;
that any changes to building materials, exterior finishes, windows, architectural features, roof
height or pitch, and amount or type of hardscape materials shall be subject to Planning Division
or Planning Commission review (FYl or amendment to be determined by Planning staff);
that demolition or removal of the existing structures and any grading or earth moving on the
site shall not occur until a building permit has been issued and such site work shall be required
to comply with all the regulations of the Bay Area Air Quality Management District;
that prior to issuance of a building permit for construction of the project, the project construction
plans shall be modified to include a cover sheet listing all conditions of approval adopted by
the Planning Commission, or City Council on appeal; which shall remain a part of all sets of
approved plans throughout the construction process. Compliance with all conditions of
approval is required; the conditions of approval shall not be modified or changed without the
approval of the Planning Commission, or City Council on appeal;
that the project shall comply with the Constructron and Demolition Debris Recycling Ordinance
which requires affected demolition, new construction and alteration projects to submit a Waste
Reduction plan and meet recycling requirements; any partial or full demolition of a structure,
interior or exterior, shall require a demolition permit;
that the applicant shall comply with Ordinance "1503, the City of Burlingame Storm Water
Management and Discharge Control Ordinance;
that the project shall meet all the requirements of the California Building and Uniform Fire
Codes, in effect at the time of building permit submittal, as amended by the City of Burlingame;
and
10 that prior to final inspection, Planning Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.
2
4
E
o
7
I
9
EXHIBIT "A"
Conditions of Approval for Categorical Exemption and Commercial Design Review
1205 Howard Avenue
Effective April 20, 2O23
Page 2
THE FOLLOWING CONDITIONS SHALL BE MET OURING THE BUILDING INSPECTION
PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION:
11 that prior to scheduling the framing inspection the project architect or residential designer, or
another architect or residential design professional, shall provide an architectural certification
that the architectural details shown in the approved design which should be evident at framing,
such as window locations and bays, are built as shown on the approved plans; architectural
certification documenting framing compliance with approved design shall be submitted to the
Building Division before the final framing inspection shall be scheduled;
12 that prior to scheduling the roof deck inspection, a licensed surveyor shall shoot the height of
the roof ridge and provide certification of that height to the Building Divisron; and
t5 that prior to final inspection, Plannrng Division staff will inspect and note compliance of the
architectural details (trim materials, window type, etc.) to verify that the project has been built
according to the approved Planning and Building plans.