Loading...
HomeMy WebLinkAboutReso - PC - 2023.01.09 - 7ADocuSrgn Envelope tD: EF1AD694-t-5A0-42DD-AaD9-1 72E3560sAFB RECORDING REQUESTED BY Planning Departmenl C ty of Burlingame WHEN RECORDED MAIL TO COMMUNITY DEVELOPIVENT DEPARTMENI CIry OF BURLINGAME 501 PRIMROSE ROAD BURLINGAME. CA 94010 2023-0120,t5 9:31 am 03/20/2023 R1 F€e: NO FEE Count of Page6 4 Recordod in Ofi icial Records Co unty of San Mateo Mark Church Aa6eesor-County Clert-Recodor i lllilr irilI tifl l[llrillu tiiu lltiliilru illu rrlt iillt iilxt Resolution No. 2023-01.09-74 1915 CARMELITA AVENUE APN 026-185-100 I hereby certiry this to be a full, true and correct copy ofthe document it purpods to be, the original of which is on file in my office. Janua 20,2023 TITLE OF DOCUMENT =Er-i;?'-: o E tlu Date Kevln Gardiner, AICP. Community oevelopment Di C, Ettiw 6orkv*r rl RESOLUTION APPROVING CATEGORICAL EXEMPTION AND DESIGN REVIEW RESOLVED, by the Planning Commission of the City of Burlingame that: WHEREAS, a Categorical Exemption has been prepared and application has been made for Desion Review fo r a firs t and second storv addition to an existino sin le-unit dwellino at 1915 Carmelita Aven ue zoned R-1, Anthonv and Gail Mosse.orooertv owners, APN: 026-185-100 WHEREAS. said matters were heard by the Planning Commission of the City of Burlingame on January 9,2023, at which time it reviewed and considered the staff report and all other writlen materials and testimony presented at sard hearing: NOW, THEREFORE, it is RESOLVED and DETERMINED by this Planning Commission that: On the basis of the lnitial Study and the documents submitted and reviewed, and comments received and addressed by this Commission, it is hereby found that there is no substantial evidence that the project set forth above will have a significant effect on the environment, and categorical exemption, per Section 15301 (e)(1) of the CEQA Guidelines, which states that additions to existing structures are exempt from environmental review, provided the addition will not result in an increase of more than 50% of the floor area of the structures before the addition are exempt from environmental review, is hereby approved. Said Design Review is approved subject to the conditions set forth in Exhibit "A" attached hereto. Findings for such Design Review is set forth in the staff report, minutes, and recording of said meeting. 3. lt is further directed that a certified copy of this resolution be recorded in the offi al records of the County of San Mateo Chairp e , Secretary of the Planning Commiss of the City of Burlingame, do hereby certify that the foregoing resolution was introduced and adop at a regular meeting of the 1gLjt_cARfELrTA AVENUE - RESO 2023-01.os-?AAYES: COIAROTO, GAUL, HORAN, PFAFF. SCHTIDNOES: NONE ABSE T: LOWENTHAL RECUSED: TSE 1 2 lr-1l J Planning Commission held on the 9th dav of Januarv, 2023 by the following vote: EXHIBIT "A" Conditions of Approval for Categorical Exemption and Design Review 1915 Carmelita Avenue Effective January 19, 2023 Page 1 1 that the project shall be built as shown on the plans submitted to the Planning Division date stamped November 22,2022, sheets A1 through A7; that any changes to building materials, enerior finishes, windows. architectural features, roof height or pitch, and amount or type of hardscape materials shall be subject to Planning Division or Planning Commission review (FYl or amendment to be determined by Planning staff); that any changes to the size or envelope of the basement, first or second floors, or garage, which would include adding or enlarging a dorme(s), shall requjre an amendment to this permit; that any recycling containers, debris boxes or dumpsters for the construction project shall be placed upon the private property, if feasible. as determined by the Community Development Director; that demolition for removal of the existing structures and any grading or earth moving on the site shall not occur until a building permit has been issued and such site work shall be required to comply with all the regulations of the Bay Area Air Quality Management District; that prior to issuance of a building permit for construction of the project, the project construction plans shall be modified to include a cover sheet listing all conditions of approval adopted by the Planning Commission, or City Council on appeal; which shall remain a part of all sets of approved plans throughout the construction process. Compliance with all conditions of approval is required; the conditions of approval shall not be modifled or changed without the approval of the Planning Commission, or Cily Council on appeal; that all air ducts, plumbing vents, and flues shall be combined, where possible, to a single termination and installed on the portions of the roof not visible from the street; and that these venting details shall be included and approved in the construction plans before a Building permit is issued; that the project shall meet all the requirements of the California Building and Uniform Fire Codes, in effect at time of building permit submittal, as amended by the City of Burlingame; THE FOLLOWING CONDITIONS SHALL BE MET DURING THE BUILDING INSPECTION PROCESS PRIOR TO THE INSPECTIONS NOTED IN EACH CONDITION: 10. that prior to scheduling the framing inspection the applicant shall provide a certification by the project architect or residential designer, or another architect or residential design professional, that demonstrates that the project falls at or below the maximum approved floor area ratio for the property; 3 4 5 6 7 8 I 2. that the project shall comply with the Construction and Demolition Debris Recycling Ordinance which requires affected demolition, new construction and alteration projects to submit a Wasle Reduction plan and meet recycling requarements. any partial or full demolition of a structure, interior or exterior. shall require a demolition permit: EXHIBIT "A" Conditions of Approval for Categorical Exemption and Design Review 1915 Carmelita Avenue Effective January 19, 2023 Page 2 12 that prior to scheduling the framing inspection the project architect or residential designer, or another architect or residential design professional, shall provide an architectural certification that the architectural details shown in the approved design which should be evident at framing, such as window locations and bays, are built as shown on the approved plans, architectural certification documenting framing compliance with approved design shall be submitted to the Building Division before the final framing inspection shall be scheduled; and that prior to final inspection, Planning Division staff would inspect and note compliance of the architectural details (trim materaals, window type, etc.) to verify that the project has been built according to the approved Planning and Building plans. 11.